CN211817785U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN211817785U
CN211817785U CN201921690040.8U CN201921690040U CN211817785U CN 211817785 U CN211817785 U CN 211817785U CN 201921690040 U CN201921690040 U CN 201921690040U CN 211817785 U CN211817785 U CN 211817785U
Authority
CN
China
Prior art keywords
pillar
fixedly connected
scaffold
construction
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921690040.8U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Zongpeng Construction Co ltd
Original Assignee
Peng Yuzhong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peng Yuzhong filed Critical Peng Yuzhong
Priority to CN201921690040.8U priority Critical patent/CN211817785U/en
Application granted granted Critical
Publication of CN211817785U publication Critical patent/CN211817785U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for construction, including first coupling mechanism, first coupling mechanism includes the pillar, the first down tube of the equal fixedly connected with of lower extreme of pillar both sides, the top of first down tube and the first fixed plate of outside fixedly connected with that is located the pillar, the top of first fixed plate and the outside cover that is located the pillar are equipped with the first board of placing, the outside at pillar top is provided with the external screw thread, the top of pillar is provided with second coupling mechanism. The utility model discloses set up first coupling mechanism and second coupling mechanism, played can effectually conveniently install it, not only labour saving and time saving has improved work efficiency moreover, is connected threaded rod and left pillar earlier, utilizes the threaded rod to pass through the bearing and is connected with the pillar on right side afterwards, makes its stability enhancement, at this moment with first place the board through first through-hole through-pillar to place in the top of first fixed plate.

Description

Scaffold for building construction
Technical Field
The utility model relates to a construction technical field specifically is a scaffold for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and can also be said to be the process of changing various lines on design drawings into real objects in specified places, the process comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, the construction operation place is called as a building construction site or a construction site, also called as a construction site, and a scaffold is required in the construction process;
but current scaffold is not convenient for install, and traditional fixed mode adopts external mounting and multiunit bolt to carry out the chucking and connects, and this mode is not only wasted time and energy, brings inconvenience for people's installation moreover, has reduced holistic work efficiency simultaneously, for this reason, we provide a scaffold for construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold for construction possesses the advantage of the installation of being convenient for, has solved current scaffold and has not been convenient for install, and traditional fixed mode adopts external mounting and multiunit bolt to carry out the chucking and connects, and this mode not only wastes time and energy, brings inconvenience for people's installation moreover, has reduced holistic work efficiency's problem simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme: a scaffold for building construction comprises a first connecting mechanism including a pillar, the lower ends of the two sides of the strut are fixedly connected with first inclined rods, the top of each first inclined rod and the outer side of the strut are fixedly connected with first fixing plates, a first placing plate is sleeved on the top of the first fixing plate and positioned on the outer side of the strut, external threads are arranged on the outer side of the top of the strut, the top of the strut is provided with a second connecting mechanism which comprises a connecting rod, the connecting rod is in threaded connection with the top of the strut, the bottom of the connecting rod is provided with a thread groove, the inner cavity of the thread groove is in threaded connection with the external thread, the lower ends of the two sides of the connecting rod are fixedly connected with second inclined rods, the top of second down tube and the outside fixedly connected with second fixed plate that is located the connecting rod, the top of second fixed plate and the outside cover that is located the connecting rod are equipped with the second and place the board.
Preferably, first through holes are formed in both ends of the first placing plate, and the first placing plate is sleeved outside the support column through the first through holes.
Preferably, the lower end of the inner side of the pillar is fixedly connected with a threaded sleeve, and the inner side of the threaded sleeve is in threaded connection with a threaded rod.
Preferably, the number of the threaded rods is two, the two threaded rods are movably connected through a bearing, and the bottom of the support is fixedly connected with a bottom plate.
Preferably, the second through holes are formed in the two ends of the second placing plate, and the second placing plate is sleeved on the outer side of the connecting rod through the second through holes.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model is provided with the first connecting mechanism and the second connecting mechanism, which can be effectively and conveniently installed, not only saves time and labor, but also improves the working efficiency, the threaded rod is firstly connected with the left pillar, then the threaded rod is connected with the right pillar through the bearing, which increases the stability, at the moment, the first placing plate is penetrated through the pillar through the first through hole and is placed on the top of the first fixing plate, then the connecting rod can be connected and fixed through the connection of the external thread and the thread groove, at the moment, the second placing plate is penetrated through the connecting rod through the second through hole and is placed on the top of the second fixing plate, which solves the problem that the prior scaffold is not convenient to install, the traditional fixing mode adopts an external fixing piece and a plurality of groups of bolts to carry out clamping connection, which not only wastes time and labor, but also brings inconvenience for the installation of people, and simultaneously, the overall working efficiency is reduced.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the first connecting mechanism of the present invention;
fig. 3 is a schematic structural view of a second connecting mechanism of the present invention.
In the figure: 1. a first connecting mechanism; 11. a pillar; 12. a threaded sleeve; 13. a threaded rod; 14. a first diagonal member; 15. a first fixing plate; 16. a first placing plate; 17. a first through hole; 18. an external thread; 19. a base plate; 2. a second connecting mechanism; 21. a connecting rod; 22. a thread groove; 23. a second diagonal member; 24. a second fixing plate; 25. a second placing plate; 26. a second via.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a construction frame for building construction includes a first connecting mechanism 1, the first connecting mechanism 1 includes a pillar 11, the lower end of the inner side of the pillar 11 is fixedly connected with a threaded sleeve 12, the inner side of the threaded sleeve 12 is in threaded connection with a threaded rod 13, the number of the threaded rods 13 is two, the two threaded rods 13 are movably connected through a bearing, the bottom of the pillar 11 is fixedly connected with a bottom plate 19, the lower ends of the two sides of the pillar 11 are fixedly connected with a first inclined rod 14, the top of the first inclined rod 14 is fixedly connected with a first fixing plate 15 at the outer side of the pillar 11, the top of the first fixing plate 15 at the outer side of the pillar 11 is sleeved with a first placing plate 16, the two ends of the first placing plate 16 are both provided with first through holes 17, the first placing plate 16 is sleeved at the outer side of the pillar 11 through the first through holes 17, the outer side of the, the second connecting mechanism 2 is arranged at the top of the pillar 11, so that the scaffold can be effectively and conveniently installed, time and labor are saved, the working efficiency is improved, and the problem that the existing scaffold is inconvenient to install is solved, the traditional fixing mode adopts an external fixing part and a plurality of groups of bolts for clamping connection, the mode is time-consuming and labor-consuming, inconvenience is brought to people's installation, and the whole working efficiency is reduced, the second connecting mechanism 2 comprises a connecting rod 21, the connecting rod 21 is in threaded connection with the top of the pillar 11, a thread groove 22 is formed in the bottom of the connecting rod 21, an inner cavity of the thread groove 22 is in threaded connection with an external thread 18, the lower ends of two sides of the connecting rod 21 are fixedly connected with second inclined rods 23, a second fixing plate 24 is fixedly connected to the top of the second inclined rods 23 and positioned on the outer side of the connecting rod 21, a second placing plate 25 is sleeved on the top of the, the second through holes 26 are formed at two ends of the second placing plate 25, and the second placing plate 25 is sleeved outside the connecting rod 21 through the second through holes 26.
During the use, threaded rod 13 and left pillar 11 are connected earlier, utilize threaded rod 13 to be connected through bearing and pillar 11 on right side afterwards, make it increase stability, at this moment, will first place board 16 and run through pillar 11 through first through-hole 17, and place in the top of first fixed plate 15, through external screw thread 18 and thread groove 22 threaded connection's relation afterwards, can be used to connect fixedly connecting rod 21, at this moment, it can to place board 25 through second through-hole 26 through connecting rod 21 and place in the top of second fixed plate 24 to utilize the second, the current scaffold of having solved is not convenient for install, traditional fixed mode adopts external mounting and multiunit bolt to carry out the chucking and connects, this mode is not only time-consuming and energy-consuming, and bring inconvenience for people's installation, the problem of holistic work efficiency has been reduced simultaneously.
The standard parts used in the present application document can be purchased from the market, and can be customized according to the description of the specification and the accompanying drawings, the specific connection mode of each part adopts the conventional means of mature bolt, rivet, welding and the like in the prior art, the machinery, parts and equipment adopt the conventional models in the prior art, and the structure and principle of the parts known by the skilled person can be known by the technical manual or by the conventional experimental method.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a scaffold for construction, includes first coupling mechanism (1), its characterized in that: the first connecting mechanism (1) comprises a strut (11), the lower ends of two sides of the strut (11) are fixedly connected with first inclined rods (14), the top of each first inclined rod (14) is fixedly connected with a first fixing plate (15) on the outer side of the strut (11), a first placing plate (16) is sleeved on the top of each first fixing plate (15) on the outer side of the strut (11), external threads (18) are arranged on the outer side of the top of the strut (11), a second connecting mechanism (2) is arranged on the top of the strut (11), each second connecting mechanism (2) comprises a connecting rod (21), each connecting rod (21) is in threaded connection with the top of the strut (11), a thread groove (22) is formed in the bottom of each connecting rod (21), an inner cavity of each thread groove (22) is in threaded connection with the external threads (18), and second inclined rods (23) are fixedly connected to the lower ends of two sides of the connecting rods (21), the top of second down tube (23) just is located the outside fixedly connected with second fixed plate (24) of connecting rod (21), the top of second fixed plate (24) just is located the outside cover of connecting rod (21) and is equipped with the second and places board (25).
2. A scaffold for construction as claimed in claim 1, wherein: first through holes (17) are formed in two ends of the first placing plate (16), and the first placing plate (16) is sleeved on the outer side of the support column (11) through the first through holes (17).
3. A scaffold for construction as claimed in claim 1, wherein: the lower end of the inner side of the pillar (11) is fixedly connected with a threaded sleeve (12), and the inner side of the threaded sleeve (12) is connected with a threaded rod (13) in a threaded manner.
4. A scaffold for construction as claimed in claim 3, wherein: the quantity of threaded rod (13) is two, and two threaded rod (13) pass through bearing swing joint, the bottom fixedly connected with bottom plate (19) of pillar (11).
5. A scaffold for construction as claimed in claim 1, wherein: the two ends of the second placing plate (25) are provided with second through holes (26), and the second placing plate (25) is sleeved on the outer side of the connecting rod (21) through the second through holes (26).
CN201921690040.8U 2019-10-11 2019-10-11 Scaffold for building construction Active CN211817785U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921690040.8U CN211817785U (en) 2019-10-11 2019-10-11 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921690040.8U CN211817785U (en) 2019-10-11 2019-10-11 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN211817785U true CN211817785U (en) 2020-10-30

Family

ID=73145975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921690040.8U Active CN211817785U (en) 2019-10-11 2019-10-11 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN211817785U (en)

Similar Documents

Publication Publication Date Title
CN205000554U (en) A concrete column for assembling overall structure
CN217480405U (en) Assembled steel construction building
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN205976733U (en) Can have enough to meet need encloses fender temporarily
CN103132650B (en) C-shaped steel structure component and method for combining beam column by employing C-shaped steel structure component
CN208329155U (en) A kind of assembled hollow hub node applied to grid shell
CN204356910U (en) A kind of Space Free-Form Surface wood net shell assembling type node to wearing bolt
CN211817785U (en) Scaffold for building construction
CN211341149U (en) Assembled steel construction beam column node connecting device
CN203846660U (en) Prefabricated assembled type open-web net rack for reinforced concrete
CN210194906U (en) Concrete formwork for fabricated building
CN214220423U (en) Assembly type leveling installation structure of waterproof wall surface
CN204850068U (en) Connection structure of side column and crane beam tip in steel construction
CN211973511U (en) Portable support frame for foundation pit
CN104499578A (en) Space free curved surface wooden reticulated shell assembly node of through bolt
CN216740821U (en) Reinforcing and pressing device for steel plate for opening masonry wall
CN204738401U (en) Assemble integral steel construction secondary beam and absolutely dry formula connection structure of concrete girder lateral part rigid connection
CN212105128U (en) Splicing support structure of aluminum formwork for building
CN210067028U (en) Steel structure connecting device for building
CN217205305U (en) Aluminum shear wall template device without welding
CN204826290U (en) Novel prefabricated steel pipe concrete restraint slab board shear force wall
CN212104532U (en) Steel structure node connecting component
CN211143706U (en) Protective net clip
CN221236187U (en) Building steel structure connecting piece
CN212026851U (en) Steel construction reinforcing apparatus for architectural design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230802

Address after: No.7, North Shiliuhao Group, Shihahe Town, Urad Middle Banner, Bayannur City, Inner Mongolia 015309

Patentee after: Lv Yongqiang

Address before: 251700 No.159 Wen'an Road, Huimin County, Binzhou City, Shandong Province

Patentee before: Peng Yuzhong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230926

Address after: 015100 Room 08, Floors 1-2, Building 4, International Auto Furniture Building Materials City, Wuyuan County, Bayannur City, Inner Mongolia

Patentee after: Inner Mongolia Zongpeng Industrial Co.,Ltd.

Address before: No.7, North Shiliuhao Group, Shihahe Town, Urad Middle Banner, Bayannur City, Inner Mongolia 015309

Patentee before: Lv Yongqiang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231108

Address after: 015100 Room 08, Floors 1-2, Building 4, International Auto Furniture Building Materials City, Wuyuan County, Bayannur City, Inner Mongolia

Patentee after: Inner Mongolia Zongpeng Construction Co.,Ltd.

Address before: 015100 Room 08, Floors 1-2, Building 4, International Auto Furniture Building Materials City, Wuyuan County, Bayannur City, Inner Mongolia

Patentee before: Inner Mongolia Zongpeng Industrial Co.,Ltd.