CN206800622U - A kind of assembled integral concrete shear force wall balcony attachment structure - Google Patents

A kind of assembled integral concrete shear force wall balcony attachment structure Download PDF

Info

Publication number
CN206800622U
CN206800622U CN201720711298.6U CN201720711298U CN206800622U CN 206800622 U CN206800622 U CN 206800622U CN 201720711298 U CN201720711298 U CN 201720711298U CN 206800622 U CN206800622 U CN 206800622U
Authority
CN
China
Prior art keywords
balcony
hanging plate
lower edge
slab
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720711298.6U
Other languages
Chinese (zh)
Inventor
贾恺
王晓光
薛深
陆斌
汪汝军
郭涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Overseas Construction Ltd
Original Assignee
SHENZHEN ZHONGHAI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ZHONGHAI CONSTRUCTION CO Ltd filed Critical SHENZHEN ZHONGHAI CONSTRUCTION CO Ltd
Priority to CN201720711298.6U priority Critical patent/CN206800622U/en
Application granted granted Critical
Publication of CN206800622U publication Critical patent/CN206800622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of assembled integral concrete shear force wall balcony attachment structure, it is related to building attachment structure technical field, pre-buried structure corresponds to balcony slab groove and the position of hanging plate groove is embedded in prefabricated balcony plate or balcony hanging plate in advance, two connect steel plate and are respectively arranged in the balcony slab groove on edge on balcony slab and the hanging plate groove of hanging plate lower edge and on the balcony slab groove and hanging plate of balcony slab lower edge in the hanging plate groove on edge, and it is connected by pad and bolt with each embedded nut tail end, by edge on the balcony slab of prefabricated balcony plate and balcony slab lower edge respectively with the hanging plate lower edge and hanging plate of two balcony hanging plates along being connected;The utility model passes through junction steel plate structure, realize the Fast Installation of balcony hanging plate, substantially increase the installation effectiveness of balcony hanging plate, the installation fixed mass of balcony hanging plate is advantageously ensured that simultaneously, it is good with the adaptability of balcony prefabricated component, beneficial to installing and using for prefabricated component, work progress is safe, avoids causing personal injury to installer.

Description

A kind of assembled integral concrete shear force wall balcony attachment structure
Technical field
It the utility model is related to building attachment structure technical field, and in particular to one kind is cut for assembled integral concrete The attachment structure of power wall and prefabricated balcony.
Background technology
In recent years, housing industrialization constantly developed.Using modern science and technology, advanced management method and industrialized The mode of production, it is directed to realizing the construction of house high efficiency, high-quality, low consumption of resources and low environmental impact.The industry of house Change has epoch-making meaning, realizes housing industry from traditional labour-intensive transformation to technology-intensive type, also will be The direction of Mirae Corp.'s development.
Prefabricated balcony is the important component of prefabricated components, and at present, the connection of prefabricated balcony and balcony hanging plate is mainly adopted With pre- doweling or bar planting mode, its connected mode is complicated, and installation difficulty, work progress security is poor, and installation fixed mass is difficult Control, cause prefabricated balcony is mounted for a construction Difficulties, is not only difficult to the needs for meeting live rapid construction, also restricts The use of balcony position prefabricated components product.
Utility model content
The utility model is precisely in order to avoid the weak point present in above-mentioned prior art, there is provided a kind of assembling Integral concrete shear wall balcony attachment structure.
The present invention adopts the following technical scheme that to solve technical problem:A kind of assembled integral concrete shear force wall balcony connects Binding structure, it is edge on balcony slab at the top of prefabricated balcony plate, bottom is balcony slab lower edge, edge and balcony slab lower edge on the balcony slab Balcony slab groove is equipped with, balcony hanging plate is square platy structure, and its top is edge on hanging plate, and bottom is hanging plate lower edge, the extension On plate hanging plate groove is equipped with edge and hanging plate lower edge;Reinforcing bar is set through embedded nut front end, with being fixed on the pre-buried spiral shell The pre-embedded steel slab of female afterbody forms pre-buried structure, and the pre-buried structure corresponds to the position of the balcony slab groove and the hanging plate groove Put pre- be embedded in the prefabricated balcony plate or the balcony hanging plate;
A balcony hanging plate is respectively set along below top and balcony slab lower edge on the balcony slab, two balcony hanging plates are close to institute The one end for stating prefabricated balcony plate is respectively edge on hanging plate lower edge and hanging plate, and two junction steel plates are respectively arranged on the sun on edge on balcony slab In platen groove and the hanging plate groove of hanging plate lower edge and on the balcony slab groove and hanging plate of balcony slab lower edge in the hanging plate groove on edge, And be connected by pad and bolt with each embedded nut, edge on the balcony slab of the prefabricated balcony plate and balcony slab lower edge are distinguished With in the hanging plate lower edge and hanging plate of two balcony hanging plates along being connected.
Further, edge and the balcony slab lower edge and the hanging plate lower edge and hanging plate of two balcony hanging plates on the balcony slab Piece is formed between upper edge, the piece is sealed with waterproof material.
Further, edge and the balcony slab lower edge respectively set at least two balcony slab grooves, the extension on the balcony slab Edge and the hanging plate lower edge respectively set at least two hanging plate grooves on plate.
Further, the junction steel plate both ends respectively set a mounting hole, and the mounting hole is elongated hole, and two are installed Hole is respectively laterally and vertically arranged, for the fine setting in being installed.
The utility model provides a kind of assembled integral concrete shear force wall balcony attachment structure, has below beneficial to effect Fruit:
1st, by junction steel plate structure, the Fast Installation of balcony hanging plate is realized, substantially increases the installation effect of balcony hanging plate Rate, while advantageously ensure that the installation fixed mass of balcony hanging plate;
2nd, installation being attached by embedded nut and bolt using junction steel plate and pre-embedded steel slab, work progress is easy, Labor strength is low, and required artificial few, human cost is low;
3rd, it is good with the adaptability of balcony prefabricated component, beneficial to installing and using for prefabricated component;
4th, work progress is safe, avoids causing personal injury to installer.
Brief description of the drawings
Fig. 1 is assembling structure schematic diagram of the present utility model;
Fig. 2 is the partial structural diagram at the utility model A;
Fig. 3 is the structural representation of the utility model prefabricated balcony plate;
Fig. 4 is the structural representation of the utility model balcony hanging plate;
Fig. 5 is the structural representation of the utility model junction steel plate.
In figure:
1st, prefabricated balcony plate, 11, edge on balcony slab, 12, balcony slab lower edge, 13, balcony slab groove;2nd, balcony hanging plate, 21, Edge on hanging plate, 22, hanging plate lower edge, 23, hanging plate groove;31st, embedded nut, 32, pre-embedded steel slab, 33, reinforcing bar;4th, junction steel plate; 51st, pad, 52, bolt;6th, piece.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Type embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that described implementation Example is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, this area The every other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to the utility model The scope of protection.
As shown in Fig. 1~Fig. 5, its structural relation is:The top of prefabricated balcony plate 1 is, along 11, bottom is balcony on balcony slab Along 12 under plate, balcony slab groove 13 is equipped with along 12 along under 11 and balcony slab on balcony slab, balcony hanging plate 2 is square platy structure, Its top is along 21, bottom is along 22 under hanging plate, and hanging plate groove 23 is equipped with along 22 along under 21 and hanging plate on hanging plate on hanging plate; Reinforcing bar 33 is set through the front end of embedded nut 31, and the pre-embedded steel slab 32 with being fixed on the afterbody of embedded nut 31 forms pre-buried structure, Pre-buried structure corresponds to balcony slab groove 13 and the position of hanging plate groove 23 is embedded in prefabricated balcony plate 1 or balcony hanging plate 2 in advance;
A balcony hanging plate 2 is respectively set along 12 lower sections along under 11 tops and balcony slab on balcony slab, two balcony hanging plates 2 are close One end of prefabricated balcony plate 1 is respectively to be respectively arranged on edge on balcony slab along 21, two junction steel plates 4 along 22 and hanging plate under hanging plate Balcony slab groove 13 and hanging plate under 11 balcony slab groove 13 and hanging plate along 22 hanging plate groove 23 and under balcony slab along 12 On be connected along 21 hanging plate groove 23, and by pad 51 and bolt 52 with each embedded nut 31, by the sun of prefabricated balcony plate 1 On platen along under 11 and balcony slab along 12 respectively with being connected under the hanging plate of two balcony hanging plates 2 along 22 and hanging plate along 21.
On balcony slab along under 11 and balcony slab along 12 and two balcony hanging plates 2 hanging plate under along 22 and hanging plate along between 21 Piece 6 is formed, piece 6 is sealed with waterproof material.
Preferably, at least two balcony slab grooves 13 are respectively set along 12 along under 11 and balcony slab on balcony slab, along 21 on hanging plate With under hanging plate at least two hanging plate grooves 23 are respectively set along 22.
Preferably, the both ends of junction steel plate 4 respectively set a mounting hole, and mounting hole is elongated hole, and two mounting holes are horizontal respectively To with it is vertically arranged, for the fine setting in being installed.
When specifically used, junction steel plate 4 is made using 250*80*10mm steel plates, and both ends are opened laterally and vertically long ellipse respectively Circular hole, for wearing Local uniqueness when bolt 52 is fixed and installed.Pre-embedded steel slab 2 is 80*80*6mm iron plates, and reinforcing bar 33 passes through The M16*70 front end of embedded nut 31 is welded and fixed, and pre-embedded steel slab 2 is welded in the tail end of embedded nut 31 and integral built-in is in prefabricated Balcony slab groove 13 and the correspondence position of hanging plate groove 23 in balcony slab 1 and balcony hanging plate 2.
During installation, prefabricated balcony plate 1 is lifted to installation site, first one piece of junction steel plate 4 is located on balcony slab along 11 Balcony slab groove 13 and top hanging plate under along 22 hanging plate groove 23, and pass through bolt 5 and pad 8 and each embedded nut 31 Connection, will be connected on balcony slab along under 11 and hanging plate along 22.After the installation of top balcony hanging plate 2, in the same way Carry out the installation of lower section balcony hanging plate 2.Balcony hanging plate 2 can be fixed temporarily with diagonal brace during installation.
The later stage finishing that reserved balcony slab groove 13 and hanging plate groove 23 are used for link position is handled.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to foregoing reality Example is applied the utility model is described in detail, it will be understood by those within the art that:It still can be to preceding State the technical scheme described in each embodiment to modify, or equivalent substitution is carried out to which part technical characteristic;And these Modification is replaced, and the essence of appropriate technical solution is departed from the spirit and model of various embodiments of the utility model technical scheme Enclose.

Claims (4)

  1. A kind of 1. assembled integral concrete shear force wall balcony attachment structure, it is characterised in that:It is sun at the top of prefabricated balcony plate (1) Along (11) on platen, bottom be balcony slab lower edge (12), and edge (11) and balcony slab lower edge (12) are equipped with sun on the balcony slab Platen groove (13), balcony hanging plate (2) are square platy structure, and its top is edge (21) on hanging plate, and bottom is hanging plate lower edge (22), On the hanging plate hanging plate groove (23) is equipped with along (21) and hanging plate lower edge (22);Before reinforcing bar (33) passes through embedded nut (31) End is set, and the pre-embedded steel slab (32) with being fixed on the embedded nut (31) afterbody forms pre-buried structure, the pre-buried structure pair The position of the balcony slab groove (13) and the hanging plate groove (23) is answered to be embedded in the prefabricated balcony plate (1) or the balcony in advance In hanging plate (2);
    A balcony hanging plate (2) is respectively set with balcony slab lower edge (12) lower section along above (11) on the balcony slab, two balconies are hung Plate (2) is respectively along (21), two junction steel plates on hanging plate lower edge (22) and hanging plate close to one end of the prefabricated balcony plate (1) (4) be respectively arranged on balcony slab along (11) balcony slab groove (13) and hanging plate lower edge (22) hanging plate groove (23) in and balcony On the balcony slab groove (13) and hanging plate of plate lower edge (12) along the hanging plate groove (23) of (21), and pass through pad (51) and bolt (52) it is connected with each embedded nut (31), by edge (11) and balcony slab lower edge (12) on the balcony slab of the prefabricated balcony plate (1) Respectively with being connected in the hanging plate lower edge (22) and hanging plate of two balcony hanging plates (2) along (21).
  2. A kind of 2. assembled integral concrete shear force wall balcony attachment structure according to claim 1, it is characterised in that:Institute State on balcony slab the edge along in the hanging plate lower edge (22) and hanging plate of (11) and the balcony slab lower edge (12) and two balcony hanging plates (2) (21) piece (6) is formed between, the piece (6) is sealed with waterproof material.
  3. A kind of 3. assembled integral concrete shear force wall balcony attachment structure according to claim 1, it is characterised in that:Institute State and respectively set at least two balcony slab grooves (13) along (11) and the balcony slab lower edge (12) on balcony slab, edge on the hanging plate (21) and the hanging plate lower edge (22) respectively sets at least two hanging plate grooves (23).
  4. A kind of 4. assembled integral concrete shear force wall balcony attachment structure according to claim 1, it is characterised in that:Institute State junction steel plate (4) both ends and respectively set a mounting hole, the mounting hole is elongated hole, and two mounting holes are respectively laterally and vertical Set, for the fine setting in being installed.
CN201720711298.6U 2017-06-19 2017-06-19 A kind of assembled integral concrete shear force wall balcony attachment structure Active CN206800622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720711298.6U CN206800622U (en) 2017-06-19 2017-06-19 A kind of assembled integral concrete shear force wall balcony attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720711298.6U CN206800622U (en) 2017-06-19 2017-06-19 A kind of assembled integral concrete shear force wall balcony attachment structure

Publications (1)

Publication Number Publication Date
CN206800622U true CN206800622U (en) 2017-12-26

Family

ID=60747537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720711298.6U Active CN206800622U (en) 2017-06-19 2017-06-19 A kind of assembled integral concrete shear force wall balcony attachment structure

Country Status (1)

Country Link
CN (1) CN206800622U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149784A (en) * 2018-01-31 2018-06-12 山东海龙建筑科技有限公司 Premade closure balcony and its construction method
CN108385869A (en) * 2018-03-19 2018-08-10 河北晶达建筑科技股份有限公司 A kind of wall element of overlapped shear wall and construction method using its progress
CN109826310A (en) * 2018-09-11 2019-05-31 中国建筑第四工程局有限公司 A kind of prefabricated assembled balcony construction method of residential building
CN112049323A (en) * 2019-06-05 2020-12-08 李志强 Modularized autoclaved aerated concrete slab

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149784A (en) * 2018-01-31 2018-06-12 山东海龙建筑科技有限公司 Premade closure balcony and its construction method
CN108385869A (en) * 2018-03-19 2018-08-10 河北晶达建筑科技股份有限公司 A kind of wall element of overlapped shear wall and construction method using its progress
CN108385869B (en) * 2018-03-19 2020-06-09 河北晶达建筑科技股份有限公司 Construction method using wall unit for superposed shear wall
CN109826310A (en) * 2018-09-11 2019-05-31 中国建筑第四工程局有限公司 A kind of prefabricated assembled balcony construction method of residential building
CN112049323A (en) * 2019-06-05 2020-12-08 李志强 Modularized autoclaved aerated concrete slab

Similar Documents

Publication Publication Date Title
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN106869368A (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN204098253U (en) A kind of modified air-entrained concrete building block exterior wall insulated structure
CN106869379A (en) A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure
CN206607724U (en) A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure
CN208379857U (en) A kind of disjunctor stone curtain wall
CN206607709U (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN207672836U (en) The outer eaves of combined and spliced formula steel house
CN206707070U (en) A kind of sheet material Combined hanger installation system
CN206693555U (en) A kind of combined wall board bracket and the wall body structure using the bracket
CN204531072U (en) A kind of light thermal-insulation partition board connected without slurry
CN204738406U (en) Lightning protection device of prefabricated frame post
CN203174837U (en) Combination hanging piece and beam-free reinforced ceramic gravel curtain wall system
CN203174835U (en) Combination hanging piece and beam-free ceramic gravel curtain wall system
CN206667471U (en) Lightning protection steel house
CN205444459U (en) Biconjugate position steel construction
CN207419934U (en) A kind of installation node of hanging plate, pendant and cladding panel
CN206189603U (en) Wallboard and floor board and balcony board piece together steel connection structure futilely
CN205804999U (en) The attachment structure of prefabrication tower crane
CN205918178U (en) Energy -efficient pin -connected panel basic station room
CN205153127U (en) Stabilize steel construction
CN205153126U (en) Fixed steel construction
CN204876278U (en) Hollow brick structure
CN206752769U (en) A kind of stone curtain wall
CN203795627U (en) Corrugated metal mesh composite thermal insulation board

Legal Events

Date Code Title Description
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518057 5F, ante building, No.5 Qimin Road, Langshan No.2 Road, North Science Park, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Shipping Construction Co.,Ltd.

Address before: 518052 5F, ante building, No.5 Qimin Road, Langshan No.2 Road, North Science Park, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Zhonghai Construction Co.,Ltd.