CN211601969U - Multifunctional line pendant for building construction - Google Patents

Multifunctional line pendant for building construction Download PDF

Info

Publication number
CN211601969U
CN211601969U CN201921931455.XU CN201921931455U CN211601969U CN 211601969 U CN211601969 U CN 211601969U CN 201921931455 U CN201921931455 U CN 201921931455U CN 211601969 U CN211601969 U CN 211601969U
Authority
CN
China
Prior art keywords
pivot
line
box
gear
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921931455.XU
Other languages
Chinese (zh)
Inventor
葛明华
刘一博
范志伟
秦兆富
杨静霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Seventh Engineering Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Seventh Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Seventh Engineering Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Seventh Engineering Co Ltd
Priority to CN201921931455.XU priority Critical patent/CN211601969U/en
Application granted granted Critical
Publication of CN211601969U publication Critical patent/CN211601969U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a multifunctional line weight for building construction, which comprises a line weight box, a rotating shaft A, a rotating shaft B and an iron hanging hammer; the wire weighs down and transversely rotates between the box left and right sides face and runs through pivot A and pivot B, pivot A right-hand member is on a parallel with the fixed welding of box right flank has the bull stick, fixed welding has reel A on the pivot A outer wall, fixed welding has reel B on the pivot B outer wall, pivot A and pivot B are located the wire and weigh down fixed welding respectively on the outer wall on box inner chamber right side and have gear A and gear B, connect through the chain between gear A and the gear B. The utility model discloses three group's fall ropes hang iron drop hammer aloft, and for traditional plumb line, this device is at the in-process of in-service use, and three group's fall ropes can be so that iron drop hammer quick steady state that keeps more, avoid iron drop hammer's lasting swing, and then reduced staff's latency, and improved the accuracy that the staff was under construction.

Description

Multifunctional line pendant for building construction
Technical Field
The utility model relates to a line weighs down technical field, specifically is a multi-functional line of construction weighs down.
Background
The line weighs down the construction tool who commonly uses in the construction, through the line weigh down can audio-visually look over whether there is the slope condition wall body, post etc. and weigh down through the line and can also assist a great deal of construction work, and then ensure the precision of construction.
Chinese patent is CN 201720763087.7's utility model provides a multi-functional line of construction weighs down, including spiral device, mount, the line weight body and the pen of tracing, the box is placed to the battery is installed at spiral device's top, and the battery places the internally mounted of box and have the battery, the battery is placed the top of box and is installed the mounting panel, and the both sides of spiral device all install the side-mounting board, the roll-up roller is installed through the bearing frame in spiral device's inside, the central point department of the central position department of line weight body bottom has the pen of tracing mounting groove through spring mounting, and the pen of tracing is installed to the bottom of pen of tracing mounting groove. The utility model discloses a set up automatic spiral device, weigh down the back that finishes using on line, can receive the line automatically, facilitate the use, reduced staff's work load, also improved work efficiency simultaneously, be provided with side-mounting board and last mounting panel, can make the line weigh down the snap-on the wall body, set up the pen of tracing, can make things convenient for the workman to carry out the mark of dropping point, convenient to popularize and use.
However, the device has the following problems in the practical use process:
1. in the actual use process of the device, the hanging hammer is connected with only one group of drop ropes, so that when the device is used, the hanging hammer can swing for a long time;
2. in the actual use process, the device can only measure the length of the part of the falling rope extending out of the winding device, and cannot singly measure a certain length.
In order to solve the problem, the utility model provides a multi-functional line of construction weighs down.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a multi-functional line of construction weighs down, has solved the problem that proposes among the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a multifunctional line weight for building construction comprises a line weight box, a rotating shaft A, a rotating shaft B and an iron hanging hammer;
a rotating shaft A and a rotating shaft B transversely and rotatably penetrate between the left side surface and the right side surface of the line drop box, a rotating rod is fixedly welded at the right end of the rotating shaft A parallel to the right side surface of the line drop box, the outer wall of the rotating shaft A is fixedly welded with a reel A, the outer wall of the rotating shaft B is fixedly welded with a reel B, the outer wall of the rotating shaft A and the outer wall of the rotating shaft B which are positioned at the right side of the inner cavity of the line drop box are respectively and fixedly welded with a gear A and a gear B, the gear A and the gear B are connected through a chain, a line drop hole is vertically arranged at the bottom of the line drop box in a penetrating way, reel A and reel B are gone up all to be fixed the winding and have fallen the rope, and two sets of fall ropes run through respectively and fall rope hole middle part, and are two sets of the bottom of falling the rope is all fixed at iron drop hammer top, and is two sets of it has big ball and small circle ball all to fix bonding on the outer wall of falling the rope, the line weighs down box bottom middle part and fixes bonding and has circular magnet.
As a preferred embodiment of the present invention, the rotating shaft a is located at the front side of the rotating shaft B.
As an optimized embodiment of the utility model, the right flank fixed welding that pivot A one end was kept away from to the bull stick has the turning handle.
As a preferred embodiment of the present invention, the reels a are specifically two sets, and the two sets of reels a and the two sets of reels B are both located in the inner cavity of the line weight box.
As a preferred embodiment of the utility model, big ball and small circle ball are the rubber material specifically, and big ball and small circle ball are the multiunit specifically, and the small circle ball of four groups that is provided with between per two sets of big balls, and the distance between per two sets of small circles and between big ball and the small circle ball is a centimetre.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a multi-functional line of construction weighs down, three group's fall ropes hang iron drop hammer aloft, and for traditional line weighs down, this device is at the in-process of in-service use, and three group's fall ropes can be so that iron drop hammer quick steady state that keeps more, avoid iron drop hammer's continuous swing, and then reduced staff's latency, and improved the accuracy that the staff was under construction.
2. The utility model relates to a multi-functional line of construction weighs down, through observing weigh down on the rope big ball and the relative position back of bobble and the object that awaits measuring, just can carry out the measurement of length to the object that awaits measuring, weigh down for traditional line, this device can measure the length of the object that awaits measuring at the in-process of in-service use, and can measure a certain section length, has reduced the use of staff's dipperstick, has further made things convenient for staff's work, and has reduced staff's operating time.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a front sectional view of the multifunctional line weight for building construction of the utility model;
fig. 2 is a top sectional view of the line weight box of the multifunctional line weight for building construction of the present invention;
fig. 3 is a top view of the top of the iron drop hammer of the multifunctional line drop for building construction of the utility model;
fig. 4 is a front view of the utility model discloses a multifunctional line of construction weighs down rope.
In the figure: the steel hammer comprises an iron hammer 1, a drop rope 2, a large round ball 3, a small round ball 4, a line drop box 5, a reel A6, a rotating shaft A7, a gear A8, a rotating rod 9, a rotating handle 10, a reel B11, a rotating shaft B12, a chain 13, a gear B14, a drop rope hole 15 and a round magnet 16.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in the model of providing with electrical apparatus only supplies the reference, to the ordinary technical personnel in this field, can change the different models that the function is the same according to the in service use condition and use electrical apparatus, to the ordinary technical personnel in this field, can the particular case understand that above-mentioned term is in the utility model provides a concrete meaning.
Referring to fig. 1-4, the present invention provides a technical solution: a multifunctional line weight for building construction comprises a line weight box 5, a rotating shaft A7, a rotating shaft B12 and an iron hanging hammer 1;
a rotating shaft A7 and a rotating shaft B12 transversely penetrate between the left side surface and the right side surface of the line drop box 5 in a rotating way, the right end of the rotating shaft A7 is fixedly welded with a rotating rod 9 parallel to the right side surface of the line weight box 5, the outer wall of the rotating shaft A7 is fixedly welded with a reel A6, a reel B11 is fixedly welded on the outer wall of the rotating shaft B12, a gear A8 and a gear B14 are respectively and fixedly welded on the outer walls of the rotating shaft A7 and the rotating shaft B12 which are positioned on the right side of the inner cavity of the line weight box 5, the gear A8 and the gear B14 are connected through a chain 13, a line drop hole 15 is vertically arranged at the bottom of the line drop box 5 in a penetrating way, reel A6 and reel B11 are gone up all to be fixed the winding and have fallen rope 2, and two sets of fall rope 2 run through respectively and fall rope hole 15 middle parts, and are two sets of fall rope 2's the equal fixed system in 1 top of iron sash weight, two sets of all be fixed bonding has big ball 3 and small circle ball 4 on the 2 outer walls of fall rope, the line falls 5 bottom middle parts of box and is fixed bonding have circular magnet 16.
Wherein, the rotating shaft A7 is positioned at the front side of the rotating shaft B12.
Wherein, the right side surface of one end of the rotating rod 9 far away from the rotating shaft A7 is fixedly welded with a rotating handle 10.
The reels A6 are specifically two groups, and the two groups of reels A6 and the two groups of reels B11 are both positioned in the inner cavity of the line weight box 5.
Wherein, big ball 3 and small circle ball 4 specifically are the rubber material, and big ball 3 and small circle ball 4 specifically are the multiunit, and be provided with four groups of small circle balls 4 between every two sets of big balls 3, and the distance between every two sets of small circle balls 4 and between big ball 3 and the small circle ball 4 is a centimetre.
It should be noted that the utility model relates to a multi-functional plummet of construction, including iron drop hammer 1, weight rope 2, big ball 3, small circle ball 4, plummet box 5, reel A6, pivot A7, gear A8, bull stick 9, turning handle 10, reel B11, pivot B12, chain 13, gear B14, weight rope hole 15, circular magnet 16, the part is the part that general standard or technical personnel in the art know, and its structure and principle all are that this technical personnel all can learn through the technical manual or learn through conventional experimental method.
The working principle is that the iron hanging hammer 1 is taken down from the circular magnet 16, so that the iron hanging hammer 1 naturally descends under the action of self gravity, the iron hanging hammer 1 drives the drop rope 2 to unwind from the reel A6 and the reel B11, when the unwinding length of the drop rope 2 reaches the maximum value, the iron hanging hammer 1 stops descending, at the moment, the iron hanging hammer 1 is hung in the air by the three groups of drop ropes 2, compared with the traditional line weight, in the process of actual use of the device, the three groups of drop ropes 2 can enable the iron hanging hammer 1 to be rapidly kept in a stable state, continuous swinging of the iron hanging hammer 1 is avoided, further waiting time of workers is shortened, construction accuracy of the workers is improved, after relative positions of the large round ball 3 and the small round ball 4 on the drop rope 2 and an object to be measured are observed, length measurement can be carried out on the object to be measured, compared with the traditional line weight, the device can measure the length of the object to be measured in the process of actual use, the use of staff's dipperstick has been reduced, further made things convenient for staff's work, and staff's operating time has been reduced, use and accomplish the back, rotate bull stick 9 through turning handle 10, bull stick 9 drives pivot A7 and rotates, pivot A7 drives reel 6 and rotates and wind the book to weighing down rope 2, pivot A7 passes through gear A8 simultaneously, chain 13 and gear B14 drive pivot B12 and rotate, pivot B12 drives reel B11 and rotates and wind the book to weighing down rope 2, and then make iron hammerhead 1 rise the normal position, and adsorb in the box 5 bottoms are weighed down to the line through circular magnet 16.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A multifunctional line weight for building construction is characterized by comprising a line weight box (5), a rotating shaft A (7), a rotating shaft B (12) and an iron hanging hammer (1);
the line weighs down and transversely rotates between the left and right sides face of box (5) and runs through pivot A (7) and pivot B (12), pivot A (7) right-hand member is on a parallel with the fixed welding of line weighs down box (5) right side face has bull stick (9), fixed welding has reel A (6) on the pivot A (7) outer wall, fixed welding has reel B (11) on the pivot B (12) outer wall, fixed welding has gear A (8) and gear B (14) respectively on pivot A (7) and pivot B (12) are located the outer wall on line weighs down box (5) inner chamber right side, connect through chain (13) between gear A (8) and gear B (14), the line weighs down box (5) bottom and has run through perpendicularly and has seted up and weigh down rope hole (15), all be fixed with on reel A (6) and reel B (11) and weigh down rope (2), two sets of ropes (2) run through respectively and weigh down rope hole (15) middle part, two sets of the bottom of weighing down rope (2) is all fixed at iron drop hammer (1) top, and is two sets of all fixed bonding has big ball (3) and little ball (4) on weighing down rope (2) outer wall, the line weighs down box (5) bottom middle part fixed bonding has circular magnet (16).
2. The multifunctional line pendant for building construction according to claim 1, wherein: the rotating shaft A (7) is positioned on the front side of the rotating shaft B (12).
3. The multifunctional line pendant for building construction according to claim 1, wherein: the right side face of one end, far away from the rotating shaft A (7), of the rotating rod (9) is fixedly welded with a rotating handle (10).
4. The multifunctional line pendant for building construction according to claim 1, wherein: reel A (6) specifically are two sets of, and two sets of reels A (6) and two sets of reels B (11) all are located the internal chamber of line weight box (5).
5. The multifunctional line pendant for building construction according to claim 1, wherein: big ball (3) and little ball (4) are specifically the rubber material, and big ball (3) and little ball (4) specifically are the multiunit, and be provided with four groups of little balls (4) between per two sets of big ball (3), and the distance between per two sets of little ball (4) and between big ball (3) and little ball (4) is a centimetre.
CN201921931455.XU 2019-11-11 2019-11-11 Multifunctional line pendant for building construction Expired - Fee Related CN211601969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921931455.XU CN211601969U (en) 2019-11-11 2019-11-11 Multifunctional line pendant for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921931455.XU CN211601969U (en) 2019-11-11 2019-11-11 Multifunctional line pendant for building construction

Publications (1)

Publication Number Publication Date
CN211601969U true CN211601969U (en) 2020-09-29

Family

ID=72587558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921931455.XU Expired - Fee Related CN211601969U (en) 2019-11-11 2019-11-11 Multifunctional line pendant for building construction

Country Status (1)

Country Link
CN (1) CN211601969U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118009999A (en) * 2024-04-10 2024-05-10 贵州省地质矿产勘查开发局一O五地质大队 Identification means for remote sensing survey and drawing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118009999A (en) * 2024-04-10 2024-05-10 贵州省地质矿产勘查开发局一O五地质大队 Identification means for remote sensing survey and drawing
CN118009999B (en) * 2024-04-10 2024-06-07 贵州省地质矿产勘查开发局一O五地质大队 Identification means for remote sensing survey and drawing

Similar Documents

Publication Publication Date Title
CN212176629U (en) Verticality measuring device for building construction
CN211601969U (en) Multifunctional line pendant for building construction
CN215448031U (en) Anti-deformation safety intelligent monitoring device for building
CN218628355U (en) Verticality detection equipment
CN109470227B (en) Line weight for construction based on base plate accurate measurement technique
CN209372075U (en) A kind of building construction verticality measurement device
CN215296260U (en) Tool for detecting verticality of template
CN215524629U (en) Measuring device for building engineering management
CN212645690U (en) Special measuring device of building engineering cost
CN210135879U (en) Verticality tester for civil construction
CN210375317U (en) Tank body liquid level measuring device and tank body assembly
CN211144474U (en) Water level measuring instrument for rock and soil exploration drilling
CN110132251B (en) Wall column template perpendicularity detection device and method
CN216049916U (en) Civil engineering design is with portable measuring tool
CN111980018A (en) Drilling secant pile sleeve for deep foundation pit construction
CN212658252U (en) Measurement auxiliary device for building construction
CN213985040U (en) Civil engineering survey and drawing sopwith staff convenient to it is balanced
CN211012977U (en) Measuring device is used in public road bridge roof beam construction
CN212482469U (en) Building engineering is with straightness detection device that hangs down
CN217738106U (en) Measuring device that construction used
CN220454594U (en) Portable civil construction measuring tool
CN217442560U (en) Verticality measuring equipment
CN219607908U (en) Portable multipurpose ruler
CN221280263U (en) Upright post verticality measuring device
CN213714232U (en) Wall body straightness detector that hangs down that building real estate aassessment was used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200929

Termination date: 20211111