CN211342757U - Environment-friendly road drilling construction equipment assembly - Google Patents
Environment-friendly road drilling construction equipment assembly Download PDFInfo
- Publication number
- CN211342757U CN211342757U CN201921311534.0U CN201921311534U CN211342757U CN 211342757 U CN211342757 U CN 211342757U CN 201921311534 U CN201921311534 U CN 201921311534U CN 211342757 U CN211342757 U CN 211342757U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- equipment
- hydraulic
- drilling construction
- environment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a drilling construction technical field specifically is an environmental protection road drilling construction equipment assembly, including the equipment principal, the surface of equipment principal is provided with a plurality of wheels, the one end fixedly connected with handle of equipment principal, the inside of equipment principal is provided with the equipment and places the board, the top fixedly connected with water tank of board is placed to the equipment, a plurality of hydraulic oil pumps of top fixedly connected with of board are placed to the equipment, a plurality of hydraulic stem of bottom fixedly connected with of board are placed to the equipment. This environmental protection road drilling construction equipment assembly prevents the raise dust through setting up water tank and water pipe, when carrying out the road work of punching, the user can transport equipment to the region that punches that needs through handle and wheel, then starts the machine, and the hydraulic stem moves down under the effect of hydraulic oil pump, and motor and water tank work this moment, and the drill bit is rotatory under the drive of motor, and the hydraulic stem drives the whole decline of motor, punches to the road.
Description
Technical Field
The utility model relates to a drilling construction technical field specifically is an environmental protection road drilling construction equipment assembly.
Background
At present, in the field of road grouting reinforcement and the like, the repairing operation of punching and grouting is needed for damaged roads, the grouting reinforcement is a technology for injecting grouting slurry into surrounding rocks through pore-forming, the slurry is diffused to cracks of the surrounding rocks by means of grouting pressure, a reinforcing belt, namely a grouting curtain, is formed on rock mass, so that the integrity of the rock mass is improved, and the strength of the surrounding rocks is enhanced, the reinforcing grouting is suitable for various tunnels formed by damage, particularly tunnels with serious damage to some surrounding rocks, the effect is more obvious, the technology can be used for maintaining damaged tunnels, and can also be used for pre-grouting reinforcement of newly excavated tunnels, and the main technological principle of the reinforcing grouting is to adopt methods of lower blocking, upper sealing and middle permeation to carry out drilling and grouting, firstly inject a weak section, namely lower blocking, block loose cracks, force slurry to be covered and oozed, and upper sealing, namely drilling and grouting on the lower weak layer of the upper weak layer of each section, the prior art is that equipment for drilling holes is usually a hand-held air drill or a semi-automatic punching machine powered by an internal combustion engine, wherein the hand-held air drill needs to manually drill holes on a road surface, only one hole can be drilled each time, the working efficiency is low, a large amount of dust can be generated in the drilling process, the environment is not in accordance with the environmental protection policy, the peripheral environment is influenced, the body of a constructor is unfavorable, the semi-automatic punching machine powered by the internal combustion engine does not need to consume a large amount of labor force to punch the holes, the punching efficiency is improved, but only one hole can be drilled at one time, the efficiency still needs to be improved, and the problem of dust raising on the road surface still is serious and can not be solved well, so an environment-friendly road drilling construction equipment assembly is provided,
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides an environmental protection road drilling construction equipment assembly through hydraulic stem and water pipe etc. has solved the problem of proposing among the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: an environment-friendly road drilling construction equipment assembly comprises an equipment main body, wherein the outer surface of the equipment main body is provided with a plurality of wheels, one end of the equipment main body is fixedly connected with a handle, an equipment placing plate is arranged in the equipment main body, the top of the equipment placing plate is fixedly connected with a water tank, the top of the equipment placing plate is fixedly connected with a plurality of hydraulic oil pumps, the bottom of the equipment placing plate is fixedly connected with a plurality of hydraulic rods, the side surfaces of the hydraulic rods are fixedly connected with hydraulic pipes, one end of each hydraulic rod, far away from the equipment placing plate, is fixedly connected with a motor, one end of each motor, far away from the hydraulic rods, is fixedly connected with a rotating shaft, one end of each rotating shaft, far away from the motor, is fixedly connected with a drill bit, the bottom of the water tank is provided with, and a garbage collecting tank is arranged on one side of the cleaning brush.
Optionally, the number of the wheels is four, the specifications of the four wheels are consistent, the four wheels are fixedly connected to the axle, and the four wheels are symmetrical.
Optionally, the number of the hydraulic rods is six, the specifications of the hydraulic rods are consistent, and the bottoms of the six hydraulic rods are fixedly connected with motors.
Optionally, the number of the hydraulic oil pumps is two, the specifications of the two hydraulic oil pumps are consistent, and the two hydraulic oil pumps respectively control the three hydraulic rods.
Optionally, the number of the water pipes is six, the specifications of the six water pipes are consistent, the water inlet ends of the water pipes are fixedly connected to the water tank, the water outlet ends of the water pipes are fixed near the drill bit through the supporting block, and the water outlet ends of the water pipes are aligned to the direction of the drill bit.
Optionally, a detachable garbage can is arranged inside the garbage collecting tank, and the garbage collecting tank is arranged on one side close to the hydraulic rod.
Optionally, the number of the cleaning brushes is three, the three cleaning brushes are consistent in specification, and the bottoms of the cleaning brushes are overlapped with the bottom of the equipment main body.
(III) advantageous effects
The utility model provides an environmental protection road drilling construction equipment assembly possesses following beneficial effect:
1. this environmental protection road drilling construction equipment assembly, prevent the raise dust through setting up water tank and water pipe, when carrying out the road work of punching, the user can be through handle and wheel with the equipment transportation to the region that needs punch, then start the machine, the hydraulic stem moves down under the effect of hydraulic oil pump, motor and water tank work this moment, the drill bit is rotatory under the drive of motor, and the hydraulic stem drives the whole decline of motor, punch to the road, the water pipe carries out work this moment, drill bit drilling region sprays water, the existence of water pipe has both cooled down the drill bit, prevent that the drill bit high temperature, work efficiency has been accelerated, the down time of having avoided arousing because the drill bit high temperature, restrain the dust simultaneously, accord with the environmental protection, workman's is healthy to have been guaranteed.
2. This environmental protection road drilling construction equipment assembly, through setting up a plurality of drill bits simultaneous workings, work efficiency is faster, be provided with two hydraulic oil pumps in addition, hydraulic stem work is more smooth and easy, in addition be provided with at the opposite side of equipment main part and clean the mechanism, after the work of punching is accomplished, can clean the brush cleaner to ground, clean the in-process, rubbish is swept into inside the garbage collection groove, the inside of garbage collection groove is provided with can dismantle the garbage bin, it is more convenient to clean, the complicated work of cleaning after the process of punching is accomplished has been avoided, the operating time has been saved, also make workman's amount of labour reduce greatly simultaneously.
Drawings
Fig. 1 is a schematic view of the internal structure of the present invention;
FIG. 2 is a schematic structural view of the present invention;
fig. 3 is a schematic structural view of the punching mechanism of the present invention.
In the figure: 1-equipment main body, 2-wheels, 3-handles, 4-equipment placing plate, 5-water tank, 6-hydraulic oil pump, 7-hydraulic rod, 8-hydraulic pipe, 9-motor, 10-rotating shaft, 11-drill bit, 12-water pipe, 13-cleaning brush and 14-garbage collecting tank.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: an environment-friendly road drilling construction equipment assembly comprises an equipment main body 1, a plurality of wheels 2 are arranged on the outer surface of the equipment main body 1, a handle 3 is fixedly connected with one end of the equipment main body 1, an equipment placing plate 4 is arranged in the equipment main body 1, a water tank 5 is fixedly connected with the top of the equipment placing plate 4, a plurality of hydraulic oil pumps 6 are fixedly connected with the top of the equipment placing plate 4, a plurality of hydraulic rods 7 are fixedly connected with the bottom of the equipment placing plate 4, hydraulic pipes 8 are fixedly connected with the side surfaces of the hydraulic rods 7, a motor 9 is fixedly connected with one end of each hydraulic rod 7, far away from the corresponding equipment placing plate 4, a rotating shaft 10 is fixedly connected with one end of each motor 9, far away from the corresponding motor 9, a drill bit 11 is fixedly connected with one end of each rotating shaft 10, far away from the corresponding motor 9, a plurality of water, a garbage collecting groove 14 is arranged on one side of the sweeping brush 13.
As an optimal technical solution of the utility model: the number of the wheels 2 is four, the specifications of the four wheels 2 are consistent, the four wheels 2 are fixedly connected to an axle, the four wheels 2 are symmetrical, the number of the hydraulic rods 7 is six, the specifications of the six hydraulic rods 7 are consistent, the bottoms of the six hydraulic rods 7 are fixedly connected with the motors 9, the number of the hydraulic oil pumps 6 is two, the specifications of the two hydraulic oil pumps 6 are consistent, the three hydraulic rods 7 are respectively controlled by the two hydraulic oil pumps 6, the number of the water pipes 12 is six, the specifications of the six water pipes 12 are consistent, the water inlet ends of the water pipes 12 are fixedly connected to the water tank 5, the water outlet ends of the water pipes 12 are fixed near the drill bit 11 through supporting blocks, the water outlet ends of the water pipes 12 are aligned to the direction of the drill bit 11, the garbage collecting tank 14 is internally provided with a detachable garbage can, the garbage collecting tank 14 is arranged on one side, the three cleaning brushes 13 are in the same specification, and the bottoms of the cleaning brushes 13 are superposed with the bottom of the equipment main body 1.
When the user used, the start machine, hydraulic stem 7 downstream under hydraulic oil pump 6's effect, motor 9 and the work of water tank 5 this moment, and drill bit 11 is rotatory under motor 9's drive, and hydraulic stem 7 drives the whole decline of motor 9, punches the road, and water pipe 12 carries out work this moment, sprays water to drill bit 11 drilling area, and water pipe 12 cools down drill bit 11.
In conclusion, when the environment-friendly road drilling construction equipment assembly is used, dust is prevented from flying by arranging the water tank 5 and the water pipe 12, when road drilling is carried out, a user can transport the equipment to a region needing drilling through the handle 3 and the wheels 2, then the machine is started, the hydraulic rod 7 moves downwards under the action of the hydraulic oil pump 6, the motor 9 and the water tank 5 work, the drill bit 11 rotates under the driving of the motor 9, the hydraulic rod 7 drives the motor 9 to descend integrally to drill a road, the water pipe 12 works to spray water to the drilling region of the drill bit 11, the water pipe 12 cools the drill bit 11, the drill bit 11 is prevented from being overhigh in temperature, the working efficiency is improved, the downtime caused by overhigh temperature of the drill bit 11 is avoided, meanwhile, dust is inhibited, the environment is protected, the health of workers is ensured, through setting up 11 simultaneous workings of a plurality of drill bits, work efficiency is faster, be provided with two hydraulic oil pump 6 in addition, 7 work of hydraulic stem are more smooth and easy, in addition be provided with at equipment main part 1's opposite side and clean the mechanism, after the work of punching is accomplished, can clean brush 13 to ground, clean the in-process, rubbish is swept into inside garbage collection groove 14, garbage collection groove 14's inside is provided with can dismantle the garbage bin, it is more convenient to clean, the complicated work of cleaning after the process of punching is accomplished has been avoided, the operating time has been saved, also make workman's amount of labour reduce greatly simultaneously.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides an environmental protection road drilling construction equipment assembly which characterized in that: comprises an equipment main body (1), a plurality of wheels (2) are arranged on the outer surface of the equipment main body (1), a handle (3) is fixedly connected to one end of the equipment main body (1), an equipment placing plate (4) is arranged in the equipment main body (1), a water tank (5) is fixedly connected to the top of the equipment placing plate (4), a plurality of hydraulic oil pumps (6) are fixedly connected to the top of the equipment placing plate (4), a plurality of hydraulic rods (7) are fixedly connected to the bottom of the equipment placing plate (4), a hydraulic pipe (8) is fixedly connected to the side surface of each hydraulic rod (7), a motor (9) is fixedly connected to one end, far away from the equipment placing plate (4), of each hydraulic rod (7), a rotating shaft (10) is fixedly connected to one end, far away from the hydraulic rods (7), of each motor (9) is fixedly connected to one end, and a drill bit (11) is, the garbage collection device is characterized in that a plurality of water pipes (12) are arranged at the bottom of the water tank (5), a plurality of cleaning brushes (13) are fixedly connected to the bottom of one side, away from the hydraulic rod (7), of the equipment placing plate (4), and a garbage collection groove (14) is formed in one side of each cleaning brush (13).
2. The environment-friendly road drilling construction equipment assembly as claimed in claim 1, wherein: the number of the wheels (2) is four, the specifications of the wheels (2) are consistent, the four wheels (2) are fixedly connected to an axle, and the four wheels (2) are symmetrical.
3. The environment-friendly road drilling construction equipment assembly as claimed in claim 1, wherein: the quantity of a plurality of hydraulic stems (7) is six, six the specification of hydraulic stem (7) is unanimous, six the equal fixedly connected with motor (9) in bottom of hydraulic stem (7).
4. The environment-friendly road drilling construction equipment assembly as claimed in claim 1, wherein: the number of the hydraulic oil pumps (6) is two, the specifications of the hydraulic oil pumps (6) are consistent, and the two hydraulic oil pumps (6) respectively control the three hydraulic rods (7).
5. The environment-friendly road drilling construction equipment assembly as claimed in claim 1, wherein: a plurality of the quantity of water pipe (12) is six, six the specification of water pipe (12) is unanimous, the end fixed connection that intakes of water pipe (12) is in water tank (5), the play water end of water pipe (12) passes through the supporting shoe to be fixed near drill bit (11), the direction of drill bit (11) is aimed at to the play water end of water pipe (12).
6. The environment-friendly road drilling construction equipment assembly as claimed in claim 1, wherein: the garbage collection tank (14) is internally provided with a detachable garbage can, and the garbage collection tank (14) is arranged on one side close to the hydraulic rod (7).
7. The environment-friendly road drilling construction equipment assembly as claimed in claim 1, wherein: the number of the cleaning brushes (13) is three, the specifications of the cleaning brushes (13) are consistent, and the bottoms of the cleaning brushes (13) are superposed with the bottom of the equipment main body (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921311534.0U CN211342757U (en) | 2019-08-13 | 2019-08-13 | Environment-friendly road drilling construction equipment assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921311534.0U CN211342757U (en) | 2019-08-13 | 2019-08-13 | Environment-friendly road drilling construction equipment assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211342757U true CN211342757U (en) | 2020-08-25 |
Family
ID=72133110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921311534.0U Expired - Fee Related CN211342757U (en) | 2019-08-13 | 2019-08-13 | Environment-friendly road drilling construction equipment assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211342757U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112665343A (en) * | 2020-12-25 | 2021-04-16 | 苗根成 | Be used for chinese-medicinal material matrimony vine drying device |
-
2019
- 2019-08-13 CN CN201921311534.0U patent/CN211342757U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112665343A (en) * | 2020-12-25 | 2021-04-16 | 苗根成 | Be used for chinese-medicinal material matrimony vine drying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206554077U (en) | A kind of stake holes cleaning equipment | |
CN203742465U (en) | Soil removing device for auger stem | |
CN109209226A (en) | Construction of hydro project drilling machine suitable for the drilling on harder soil | |
CN211342757U (en) | Environment-friendly road drilling construction equipment assembly | |
CN105887642B (en) | Slope of highway repairs rotary cutting apparatus | |
CN206800494U (en) | A kind of negative pressure transportation formula dredging robot | |
CN205804134U (en) | Slope of highway finishing rotary cutting apparatus | |
CN107803942B (en) | Square pile linear cutting equipment and mechanical excavation method for square piles in hard rock stratum | |
CN102839915A (en) | Hydraulic high frequency rotary vibration construction device applicable to dry pneumatic rock drilling pile machine | |
CN203403888U (en) | Impact-type tunneling machine | |
CN209384305U (en) | A kind of ground pipeline pipe laying equipment | |
CN116497814A (en) | Green and efficient piling and wall forming construction method for soft soil and hard rock combined stratum | |
CN207812252U (en) | A kind of smashing device in cement flooring for building | |
CN202946012U (en) | Sleeving spiral drilling machine for pile head processing | |
CN102493808A (en) | Method for digging deep well manually | |
CN206632077U (en) | A kind of bionical cleaning device of Alternative manifold type pipe inwall | |
CN211314218U (en) | Movable shield scraper | |
CN106968678A (en) | A kind of overall cavitation machine of stone matter surrounding rock tunnel and construction technology | |
CN207419572U (en) | A kind of rotate excavates device for casting | |
GB2489782A (en) | Cutting tool for repairing pot holes by creating an area of repair in damaged road | |
CN215169713U (en) | Integrated down-the-hole hammer with filling function | |
CN206256493U (en) | A kind of new silt cleaning device | |
CN113338791A (en) | Integrated down-the-hole hammer with filling function | |
CN214783546U (en) | Pre-cleaning device of road roller | |
CN216879560U (en) | Rubble device that civil engineering used |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200825 Termination date: 20210813 |