CN211256615U - Road cementation of fissures device for municipal works - Google Patents

Road cementation of fissures device for municipal works Download PDF

Info

Publication number
CN211256615U
CN211256615U CN201922056226.4U CN201922056226U CN211256615U CN 211256615 U CN211256615 U CN 211256615U CN 201922056226 U CN201922056226 U CN 201922056226U CN 211256615 U CN211256615 U CN 211256615U
Authority
CN
China
Prior art keywords
pipe
fixed box
mouth
refractor
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922056226.4U
Other languages
Chinese (zh)
Inventor
傅俊橙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Jiayucheng Construction Base Engineering Co ltd
Original Assignee
Dongguan Jiayucheng Construction Base Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Jiayucheng Construction Base Engineering Co ltd filed Critical Dongguan Jiayucheng Construction Base Engineering Co ltd
Priority to CN201922056226.4U priority Critical patent/CN211256615U/en
Application granted granted Critical
Publication of CN211256615U publication Critical patent/CN211256615U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model relates to a municipal works technical field, more specifically say, it relates to a road cementation of fissures device for municipal works, and its technical scheme main points are: including the fixed box, the fixed box is connected with the discharging pipe, discharging pipe one end is provided with ejection of compact mouth, and fixed box one side is provided with pipe shaft, first mouth of pipe, the second mouth of pipe, first refractor and the second refractor, and the pipe shaft passes through the connecting rod to be connected with the fixed box, and first mouth of pipe sets up the lower extreme at the pipe shaft, and first mouth of pipe sets up with ejection of compact mouth relatively, and the second mouth of pipe sets up in the upper end of pipe shaft, and the second mouth of pipe deviates from the fixed box setting, is provided with first refractor in the junction of first mouth of pipe and pipe shaft, be provided with the second refractor in the junction of second mouth of pipe and pipe shaft, the outer wall connection of pipe shaft has the vaulting pole, and the top and the second mouth of pipe of vaulting pole are relative, and the top of vaulting pole is provided with the sight glass, the road pouring device for municipal works is convenient to.

Description

Road cementation of fissures device for municipal works
Technical Field
The utility model belongs to the technical field of the municipal works technique and specifically relates to a road cementation of fissures device for municipal works.
Background
In China, municipal equipment refers to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns and provide paid or unpaid public products and services for residents based on government responsibilities and obligations, and various public infrastructure construction matched with urban life belongs to the municipal engineering category. With the rapid development of economy, a wide road is more and more constructed, but with the increase of the service life of the road and more vehicles running on the road, cracks are easy to generate on the road, and in order to repair the cracks on the road, a road crack pouring device appears.
To the above-mentioned problem, chinese patent that patent publication number is CN209260520U, a road cementation of fissures device for municipal works is proposed, including road cementation of fissures device body, road cementation of fissures device body includes base and fixed case, the welding has the solid fixed cylinder on the base, gu fixed cylinder inside welding has the spring, the welding of spring top has the dead lever, gu the fixed case welding is at the dead lever top, the welding has the control box on the outer wall of fixed case top, inside motor and the battery of installing through the bolt of control box, motor output shaft one end is passed the solid fixed box and is provided with carousel one, a carousel bottom is provided with axis of rotation one, axis of rotation one bottom is provided with the cylinder, the cylinder bottom is provided with axis of rotation two, the utility model discloses stirring effect is good, and.
But above-mentioned utility model in the use, have the stopping of fixed case between staff and the ejection of compact mouth, fixed case can block staff's sight for the staff is difficult to observe the condition between ejection of compact mouth and the road crack, and then is difficult to observe the fissured cementation of fissures condition.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a road cementation of fissures device for municipal works, the staff of being convenient for observes the fissured cementation of fissures condition of road when using cementation of fissures equipment.
The above technical purpose of the present invention can be achieved by the following technical solutions: a road crack pouring device for municipal engineering comprises a fixed box, wherein a discharging pipe is connected to one side of the fixed box, a discharging nozzle is arranged at one end, away from the fixed box, of the discharging pipe, a refraction pipe structure is arranged on one side wall of the fixed box, the refraction pipe structure and the discharging pipe are located on the same side of the fixed box, the refraction pipe structure comprises a pipe body, a first pipe orifice, a second pipe orifice, a first refraction mirror and a second refraction mirror, the pipe body, the first pipe orifice and the second pipe orifice are all rectangular, the pipe body is connected with the fixed box through a horizontal connecting rod, the pipe body is vertically arranged, the distance between the pipe body and the fixed box is larger than the distance between the discharging nozzle and the fixed box, the first pipe orifice is horizontally arranged at the lower end of the pipe body, the opening end of the first pipe orifice is arranged opposite to the discharging nozzle, the second pipe orifice is horizontally arranged at the upper end of the pipe body, and the opening end, be provided with first refractor in the junction of first mouth of pipe and pipe shaft, the interior wall connection of fixed case, lower extreme and the interior wall connection of first mouth of pipe lower extreme are kept away from to the upper end of first refractor and pipe shaft, first refractor is 45 degrees settings, be provided with the second refractor in the junction of second mouth of pipe and pipe shaft, the inner wall connection of the upper end of second refractor and second mouth of pipe upper end, lower extreme and pipe shaft be close to fixed case, the second refractor is 45 degrees settings, the outer wall connection that fixed case was kept away from to the pipe shaft has the vaulting pole, and the top of vaulting pole is relative with the orificial open end of second, and the top of vaulting pole is provided with the sight glass.
Through adopting above-mentioned technical scheme, the cementation of fissures condition between ejection of compact mouth and the road crack is refracted to the sight glass through first refractor and second refractor on, the staff of being convenient for observes the fissured cementation of fissures condition of road when using this cementation of fissures device.
The utility model discloses further set up to: the connection mode of the sight glass and the top of the support rod is hinged.
Through adopting above-mentioned technical scheme, the angle of sight glass is adjustable to adapt to different staff's height, reinforcing commonality.
The utility model discloses further set up to: the pipe body and the connecting rod are both provided with telescopic structures.
Through adopting above-mentioned technical scheme, when not using this cementation of fissures device, can be through the pipe shaft with the flexible lateral wall that is close to the fixed case of refraction tubular construction of two sections of connecting rod, reduce the shared space of this cementation of fissures device, reduce the refraction tubular construction simultaneously and receive the collision and impaired condition.
The utility model discloses further set up to: the pipe body comprises a sleeve and a sliding pipe, the sleeve is sleeved on the sliding pipe, a first convex block is arranged on the outer wall of the sleeve, and a first screw rod penetrating through the first convex block and the side wall of the sleeve is in threaded connection with the first convex block.
Through adopting above-mentioned technical scheme, the extending structure of pipe shaft is simple, and the slide pipe is fixed through first bolt in the loop bar, and fixed mode is swift convenient, and the flexible length of pipe shaft can be adjusted at will at flexible within range.
The utility model discloses further set up to: the connecting rod includes loop bar and slide bar, the loop bar cover is on the slide bar, the outer wall of loop bar is connected with the second lug, threaded connection has the second screw rod that runs through second lug and loop bar lateral wall on the second lug.
Through adopting above-mentioned technical scheme, the extending structure of connecting rod is simple, and the slide bar is fixed through the second bolt in the loop bar, and fixed mode is swift convenient, and the flexible length of connecting rod can be adjusted at will at flexible within range.
The utility model discloses further set up to: the fixed box is characterized in that a base is arranged below the fixed box, the lower end of the fixed box is fixed to the top of the base, two universal wheels and two directional wheels are arranged at the bottom of the base respectively, the universal wheels and the two directional wheels are arranged at four corners of the bottom of the base respectively, and the universal wheels are arranged close to the discharging pipe.
Through adopting above-mentioned technical scheme, the base can realize turning to through the universal wheel when removing, improves the flexibility ratio of base, and the base can keep the stability of removal through directional wheel when removing simultaneously.
The utility model discloses further set up to: the stirring structure is arranged in the fixed box, and an observation port is formed in the side wall of one side of the fixed box.
Through adopting above-mentioned technical scheme, when the stirring structure of fixed incasement at the during operation, the staff can be through observing the stirring condition of observation window, confirms the stirring degree.
The utility model discloses further set up to: an observation window is fixed on the observation port, and glass is arranged on the observation window corresponding to the observation port.
Through adopting above-mentioned technical scheme, the security of staff when observing the stirring condition can be ensured to the observation window, and the setting of observation window can avoid stirring material to be thrown away from the viewing aperture simultaneously, reduces extravagantly.
To sum up, the utility model discloses following beneficial effect has:
firstly, a refraction pipe structure arranged on the irrigation device can present the crack pouring condition between the discharge nozzle and the road crack on a sight glass through refraction, and the sight glass can adjust the angle, so that a worker can observe the crack pouring condition of the road crack when using the crack pouring device;
and secondly, the pipe body and the connecting rod can stretch out and draw back, when the crack pouring device is not used, the refraction pipe structure can be close to the fixed box through the stretching of the pipe body and the connecting rod, the space occupied by the crack pouring device is reduced, and the condition that the refraction pipe structure is collided and damaged is reduced.
Drawings
FIG. 1 is a schematic view of the entire crack sealing device in the present embodiment;
FIG. 2 is a top view of the caulking apparatus of the present embodiment;
FIG. 3 is a sectional view of a portion of the structure taken along line A-A of FIG. 2;
fig. 4 is a partial structural schematic diagram of fig. 1.
In the figure: 1. a fixed box; 2. a base; 3. a fixed block; 4. a universal wheel; 5. a directional wheel; 6. a handle; 7. a rubber sleeve; 8. a stirring shaft; 9. a stirring blade; 10. a motor case; 11. a motor; 12. a discharge pipe; 13. a valve; 14. a discharging nozzle; 15. a viewing port; 16. an observation window; 17. a loop bar; 18. a slide bar; 19. a first bump; 20. a first screw; 21. a sleeve; 22. a slide pipe; 23. a second bump; 24. a second screw; 25. a first nozzle; 26. a second orifice; 27. a first refractive mirror; 28. a second refractor; 29. a stay bar; 30. a mounting seat; 31. a bolt; 32. a sight glass; 33. and (4) feeding a material inlet.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
The utility model provides a road cementation of fissures device for municipal works, as shown in figure 1, includes fixed case 1 and base 2, fixed case 1 and base 2 all are the rectangle, and fixed case 1 sets up in the top of base 2, and fixed case 1 welds at the top of base 2 through fixed block 3 at four angles in bottom. The bottom of base 2 is provided with two universal wheels 4 and two directive wheels 5, and two universal wheels 4 and two directive wheels 5 set up four angles in base 2 bottom respectively, and two universal wheels 4 and two directive wheels 5 lie in same one side of base 2 respectively. Two universal wheels 4 and two directional wheels 5 make base 2 portable, and the setting up of two universal wheels 4 makes base 2 can realize turning to, and it is more nimble to remove, and the setting up of two directional wheels 5 makes base 2 more stable when directional removal. A lateral wall of base 2 is provided with handle 6, and handle 6 is located base 2 and is close to on the lateral wall of two directional wheels 5, and handle 6 is used for supplying the staff to promote this cementation of fissures device, is provided with rubber sleeve 7 on the handle 6, and rubber sleeve 7 is convenient for the staff to hold handle 6 tightly.
As shown in fig. 2 and 3, a stirring shaft 8 is arranged in the fixed box 1, the stirring shaft 8 is vertically arranged in the fixed box 1, the upper end of the stirring shaft 8 penetrates through the top of the fixed box 1, stirring blades 9 are arranged on the stirring shaft 8, and the stirring shaft 8 and the stirring blades 9 are used for stirring cement, sand and water, so that the concrete can be stirred in the crack pouring device without other equipment, and time and labor are saved. The top of fixed case 1 is provided with motor case 10, and motor case 10 is located (mixing) shaft 8 directly over, has placed fixed motor 11 in the motor case 10, and motor case 10 can provide the protection for motor 11. The output shaft of motor 11 is connected with the upper end of (mixing) shaft 8, and when motor 11 started, motor 11 drive (mixing) shaft 8 rotated to make (mixing) shaft 8 stir cement, sand and water. The top of the fixed box 1 is provided with a feed inlet 33, the feed inlet 33 is positioned on one side of the motor 11 and the box 10, which is far away from the handle 6, and the feed inlet 33 is used for feeding concrete materials such as cement, sand, water and the like.
As shown in fig. 1, a horizontal discharge pipe 12 is connected to a side wall of the bottom of the fixed box 1, the discharge pipe 12 is located on the side wall of the fixed box 1 far away from the handle 6, the discharge pipe 12 is perpendicular to the side wall, the discharge pipe 12 is communicated with the inside of the fixed box 1, and the discharge pipe 12 is used for discharging the uniformly-stirred concrete in the fixed box 1. The upper end of the discharge pipe 12 is provided with a valve 13, and the valve 13 can control the opening and closing of the discharge pipe 12, so as to control the discharge in the fixed box 1. One end of the discharge pipe 12 far away from the fixed box 1 is connected with a discharge nozzle 14 with a downward opening, concrete in the fixed box 1 passes through the discharge pipe 12 and then slowly discharges through the discharge nozzle 14, and the concrete discharged from the discharge nozzle 14 can fall into cracks of roads, so that the cracks of the roads are grouted. The viewing aperture 15 of a rectangular shape is seted up to the lateral wall of fixed box 1, the staff's stirring condition in the fixed box 1 of being convenient for is observed in setting up of viewing aperture 15, be fixed with an observation window 16 on the viewing aperture 15, the position relative with viewing aperture 15 on the observation window 16 is provided with glass, the safety of staff when observing the stirring condition in fixed box 1 can be ensured in the setting of observation window 16, concrete material is thrown away from viewing aperture 15 when the setting of observation window 16 can be avoided stirring simultaneously, cause unnecessary extravagant.
As shown in fig. 1 and 4, a horizontal loop bar 17 is welded on one side wall of the fixed box 1, the loop bar 17 is rectangular, the loop bar 17 is positioned on the side wall of the fixed box 1 far away from the handle 6, and the loop bar 17 is perpendicular to the side wall. A sliding rod 18 is arranged in the loop bar 17 in a sliding manner, the sliding rod 18 is rectangular, a first convex block 19 is arranged at the upper end of the loop bar 17, a first screw rod 20 is connected to the first convex block 19 in a threaded manner, the first screw rod 20 is perpendicular to the upper end face of the first convex block 19, and the first screw rod 20 can penetrate through the first convex block 19 and the side wall of the loop bar 17. The sliding rod 18 can slide and extend in the loop bar 17, and the first screw 20 is used for tightly abutting against the sliding rod 18 to fix the sliding rod 18. The one end welding that slide bar 18 kept away from fixed case 1 has sleeve pipe 21, sleeve pipe 21 is the rectangle, the length direction of sleeve pipe 21 is parallel with vertical direction, the slip is provided with slide pipe 22 in the sleeve pipe 21, slide pipe 22 is the rectangle, slide pipe 22 is located sleeve pipe 21's below, the lateral wall of keeping away from fixed case 1 on the sleeve pipe 21 is provided with second lug 23, threaded connection has second screw rod 24 on the second lug 23, it is perpendicular with the side of keeping away from fixed case 1 on second screw rod 24 and the second lug 23, second screw rod 24 can run through second lug 23 and sleeve pipe 21's lateral wall. The slide tube 22 can slide and stretch in the sleeve 21, and the second screw 24 is used for tightly abutting against the slide tube 22 to fix the slide tube 22.
As shown in fig. 3 and 4, the lower end of the slide tube 22 is connected with a first nozzle 25, the first nozzle 25 is rectangular, and the open end of the first nozzle 25 is arranged opposite to the discharging nozzle 14. The upper end of the sleeve 21 is connected with a second pipe orifice 26, the second pipe orifice 26 is rectangular, and the open end of the second pipe orifice 26 is arranged away from the fixed box 1. The junction of first mouth of pipe 25 and slide pipe 22 is provided with first refractor 27, and the inner wall of keeping away from fixed case 1 in slide pipe 22, the inner wall of lower extreme connection at first mouth of pipe 25 lower extreme are connected to the upper end of first refractor 27, and first refractor 27 is 45 degrees settings. The junction of second mouth of pipe 26 and sleeve pipe 21 is provided with second refractor 28, and the inner wall, the lower extreme of the upper end of first mouth of pipe 25 are connected at the sleeve pipe 21 at the upper end of second refractor 28 and are close to the inner wall of fixed case 1, and second refractor 28 is 45 degrees settings. The outer wall welding of keeping away from fixed case 1 on the sleeve pipe 21 has vaulting pole 29, and vaulting pole 29 includes a horizontal bar and a vertical strip, and the horizontal bar is connected perpendicularly on the outer wall of sleeve pipe 21, indulges the one end of connecting to keep away from sleeve pipe 21 at the horizontal bar, and the length direction of indulging the strip is perpendicular with vertical direction. The top of vaulting pole 29 articulates there is mount pad 30, and mount pad 30 is the rectangle, and mount pad 30 articulates at the top of vaulting pole 29 through bolt 31, and the articulated shaft of mount pad 30 is the horizontal direction, and the articulated shaft of mount pad 30 is parallel with nearest fixed case 1 side. Sight glass 32 is installed to the upper end of mount pad 30 for sight glass 32 can be dismantled, also makes sight glass 32 can follow mount pad 30 angle of adjustment, with the staff that adapts to different heights, strengthens the commonality. The ejection of compact mouth 14 can refract to the second refractor 28 through first refractor 27 on to the fissured cementation of fissures picture of road, and rethread second refractor 28 refracts to sight glass 32 on, and the staff can observe the fissured cementation of fissures condition of road through sight glass 32 when using this cementation of fissures device to carry out the cementation of fissures.
The implementation principle of the embodiment is as follows: when using this cementation of fissures device, with slide bar 18 cunning to suitable distance in loop bar 17, slide pipe 22 cunning to suitable distance in sleeve pipe 21 again for first mouth of pipe 25 is just to ejection of compact mouth 14 and road crack, when ejection of compact mouth 14 ejection of compact carries out cementation of fissures to the road crack, the picture of cementation of fissures can be refracted to second refractor 28 through first refractor 27, rethread second refractor 28 refracts to sight glass 32 on, the staff just can observe the cementation of fissures condition of road through sight glass 32.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a road cementation of fissures device for municipal works, includes fixed case (1), one side of fixed case (1) is connected with discharging pipe (12), the one end that fixed case (1) was kept away from in discharging pipe (12) is provided with ejection of compact mouth (14), its characterized in that: a refraction tube structure is arranged on one side wall of the fixed box (1), the refraction tube structure and the discharge tube (12) are positioned on the same side of the fixed box (1), the refraction tube structure comprises a tube body, a first tube opening (25), a second tube opening (26), a first refraction mirror (27) and a second refraction mirror (28), the tube body, the first tube opening (25) and the second tube opening (26) are rectangular, the tube body is connected with the fixed box (1) through a horizontal connecting rod, the tube body is vertically arranged, the distance between the tube body and the fixed box (1) is greater than the distance between the discharge nozzle (14) and the fixed box (1), the first tube opening (25) is horizontally arranged at the lower end of the tube body, the open end of the first tube opening (25) is opposite to the discharge nozzle (14), the second tube opening (26) is horizontally arranged at the upper end of the tube body, and the open end of the second tube opening (26) is deviated from the fixed box (1), be provided with first refractor (27) in the junction of first mouth of pipe (25) and pipe shaft, the interior wall connection of fixed case (1), lower extreme and first mouth of pipe (25) lower extreme are kept away from with the pipe shaft to the upper end of first refractor (27), first refractor (27) are 45 degrees settings, be provided with second refractor (28) in the junction of second mouth of pipe (26) and pipe shaft, the interior wall connection that the upper end of second refractor (28) and the interior wall connection of second mouth of pipe (26) upper end, lower extreme and pipe shaft are close to fixed case (1), second refractor (28) are 45 degrees settings, the outer wall connection that fixed case (1) was kept away from to the pipe shaft has vaulting pole (29), and the top of vaulting pole (29) is relative with the open end of second mouth of pipe (26), and the top of vaulting pole (29) is provided with sight glass (32).
2. The road cementation of fissures device of claim 1, characterized in that: the connection mode of the sight glass (32) and the top of the stay bar (29) is hinged.
3. The road cementation of fissures device of claim 1, characterized in that: the pipe body and the connecting rod are both provided with telescopic structures.
4. The road cementation of fissures device of claim 3, characterized in that: the pipe body comprises a sleeve (21) and a sliding pipe (22), the sleeve (21) is sleeved on the sliding pipe (22), a first lug (19) is arranged on the outer wall of the sleeve (21), and a first screw rod (20) penetrating through the first lug (19) and the side wall of the sleeve (21) is connected to the first lug (19) in a threaded mode.
5. The road cementation of fissures device of claim 3, characterized in that: the connecting rod includes loop bar (17) and slide bar (18), loop bar (17) cover is on slide bar (18), the outer wall connection of loop bar (17) has second lug (23), threaded connection has second screw rod (24) that run through second lug (23) and loop bar (17) lateral wall on second lug (23).
6. The road cementation of fissures device of claim 1, characterized in that: the fixed box comprises a base (2) and is characterized in that a base (2) is arranged below the fixed box (1), the lower end of the fixed box (1) is fixed to the top of the base (2), two universal wheels (4) and two directional wheels (5) are arranged at the bottom of the base (2) respectively, the two universal wheels (4) and the two directional wheels (5) are arranged at four corners of the bottom of the base (2) respectively, and the two universal wheels (4) are close to a discharge pipe (12) in a set mode.
7. The road cementation of fissures device of claim 1, characterized in that: the stirring structure is arranged in the fixed box (1), and an observation port (15) is formed in the side wall of one side of the fixed box (1).
8. The road cementation of fissures device of claim 7, characterized in that: an observation window (16) is fixed on the observation port (15), and glass is arranged on the observation window (16) corresponding to the observation port (15).
CN201922056226.4U 2019-11-25 2019-11-25 Road cementation of fissures device for municipal works Expired - Fee Related CN211256615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922056226.4U CN211256615U (en) 2019-11-25 2019-11-25 Road cementation of fissures device for municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922056226.4U CN211256615U (en) 2019-11-25 2019-11-25 Road cementation of fissures device for municipal works

Publications (1)

Publication Number Publication Date
CN211256615U true CN211256615U (en) 2020-08-14

Family

ID=71988315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922056226.4U Expired - Fee Related CN211256615U (en) 2019-11-25 2019-11-25 Road cementation of fissures device for municipal works

Country Status (1)

Country Link
CN (1) CN211256615U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982125A (en) * 2021-03-16 2021-06-18 陈洪飞 Road bed subsidence prosthetic devices

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982125A (en) * 2021-03-16 2021-06-18 陈洪飞 Road bed subsidence prosthetic devices

Similar Documents

Publication Publication Date Title
CN211256615U (en) Road cementation of fissures device for municipal works
CN112791637B (en) Mixing equipment for producing asphalt concrete and asphalt concrete production method
CN112127254A (en) Road cementation of fissures device for municipal works
CN213790631U (en) Civil engineering is with on-spot dust collector
CN108547638B (en) A kind of lining concrete adjustable type watering device of constructing tunnel
CN113059673A (en) Concrete grouting device for civil engineering construction
CN215903735U (en) Cement mixing stirring device for highway construction
CN209157905U (en) A kind of wall surface grinding device of construction and decoration
CN216505938U (en) Concrete mixing device that highway engineering construction was used
CN216156321U (en) Road crack pouring device for municipal engineering
CN210916936U (en) Bridge floor patching device is used in bridge construction
CN210766250U (en) Ground mortar laying device for architectural design
CN211689801U (en) Highway pavement maintenance equipment
CN208472532U (en) A kind of road gap-grouting device
CN217176638U (en) Tunnel crack repairing device
CN217287709U (en) Dust fall machine of municipal administration highway construction
CN220847011U (en) Highway crack processing apparatus that highway engineering was used
CN218667058U (en) Highway crack filling equipment
CN221072246U (en) Cement mortar crack pouring device
CN221371745U (en) Stirring device for highway construction
CN211689821U (en) Use convenient highway road surface maintenance equipment
CN212656096U (en) Pavement repairing device for cement road
CN212129438U (en) Lightweight draws water and inhales mud equipment
CN109129910A (en) A kind of construction machine of included Multi Loading and Unloading Functions
CN215482196U (en) Asphalt repairing device for road maintenance construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814