CN211173120U - A consolidate bearing structure for building engineering - Google Patents

A consolidate bearing structure for building engineering Download PDF

Info

Publication number
CN211173120U
CN211173120U CN201921373789.XU CN201921373789U CN211173120U CN 211173120 U CN211173120 U CN 211173120U CN 201921373789 U CN201921373789 U CN 201921373789U CN 211173120 U CN211173120 U CN 211173120U
Authority
CN
China
Prior art keywords
screw rod
baffle
splint
hole
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921373789.XU
Other languages
Chinese (zh)
Inventor
李建新
韩立冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment No9 Construction Co ltd
Original Assignee
Yunnan Construction Investment No9 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment No9 Construction Co ltd filed Critical Yunnan Construction Investment No9 Construction Co ltd
Priority to CN201921373789.XU priority Critical patent/CN211173120U/en
Application granted granted Critical
Publication of CN211173120U publication Critical patent/CN211173120U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a building engineering technical field just discloses a consolidate bearing structure for building engineering, which comprises a baffle, the spout that runs through about the middle part of baffle medial surface is seted up, the equal fixed mounting in both ends has the end cover about the baffle, the middle part fixed mounting of spout has the axle sleeve, first screw rod and second screw rod have been cup jointed in the inside difference activity of axle sleeve. This a consolidate bearing structure for building engineering, set up opposite direction's screw thread through first screw rod and second screw rod, because first screw rod passes through the screw thread and is connected with first splint, it is rotatory with the second screw rod to rotate the ring messenger first screw rod, first splint can be close to in step with the second splint, thereby press from both sides tight wall form, left end and nut threaded connection through the bolt, when screwing up the nut, the stopper of bolt right-hand member is fixed in spacing hole, further fix the position of first splint and second splint, thereby fixed wall form that can be quick, prevent to become flexible.

Description

A consolidate bearing structure for building engineering
Technical Field
The utility model relates to a building engineering technical field specifically is a reinforced support structure for building engineering.
Background
The building is a general name of buildings and structures, is an artificial environment created by people by using grasped substance technical means and applying certain scientific laws, wind and water concepts and aesthetic rules in order to meet the needs of social life, and the reinforced support structure refers to various supports erected for workers to operate and solve vertical and horizontal transportation on a construction site, and if in the pouring process, a fixed support structure is needed to fix a template.
During construction, when pouring concrete to the wall post template, prevent to appear running the phenomenon of thick liquid, need fixed wall form's position, long template support and steel pipe bearing diagonal are set up to present the general wall post template both sides of adopting, use cast iron fastener fixed, use the continuous fishplate bar of multi-disc and a large amount of bolts in the junction, lead to supporting that joint length is longer, the structure is complicated, whole installation is consuming time hard, the cost is increased.
At the in-process of installation wall body template reinforcing bearing structure, after selecting the wall body template according to the size of a dimension of wall body, select fixing device such as suitable long template support or continuation fishplate bar according to the size of wall body template size again, wasted a large amount of time in the installation, can not adjust reinforcing support device's size according to the wall body template size, influence the engineering progress.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a consolidate bearing structure for building engineering possesses quick fixed, is suitable for not unidimensional wall form's advantage, has solved the problem of proposing among the above-mentioned background art.
The utility model provides a following technical scheme: a reinforced supporting structure for constructional engineering comprises a baffle plate, wherein a sliding groove which penetrates through the left and the right is formed in the middle of the inner side surface of the baffle plate, end covers are fixedly arranged at the left and the right ends of the baffle plate, an axle sleeve is fixedly arranged in the middle of the sliding groove, a first screw rod and a second screw rod are movably sleeved in the axle sleeve respectively, the left end of the first screw rod is connected with a first clamping plate through threads and penetrates through the end covers and extends to the outer sides of the end covers, the right end of the second screw rod is connected with a second clamping plate through threads, through holes which penetrate through the front and the back are formed in the ends, far away from the baffle plate, of the first clamping plate and the second clamping plate, a bolt is movably sleeved on the inner side surface of each through hole, a nut is connected with the left end of the bolt through threads, a first lug is, first recess has been seted up at the middle part of baffle bottom, the second recess has all been seted up to the both sides of baffle bottom.
Preferably, the left end of the first screw rod is fixedly provided with a circular ring, and the right end of the first screw rod is fixedly connected with one end of the second screw rod, which is positioned inside the shaft sleeve.
Preferably, the outer surface of the second screw is provided with threads, and the outer surface of the first screw at one end of the sliding groove is provided with threads in a direction opposite to that of the second screw.
Preferably, the lateral surface of baffle has seted up the ring channel, and runs through the baffle around the ring channel, the left end of bolt runs through-hole and ring channel in proper order and extends to the outside of baffle.
Preferably, the bottom that baffle one end was kept away from to first splint and second splint all sets up the spacing hole with the through-hole concentric, the right-hand member of bolt is equipped with the stopper, and the diameter of stopper is greater than the diameter of through-hole and is less than the diameter of spacing hole.
Preferably, the first protrusion and the first groove have the same shape and size, and the second protrusion and the second groove have the same shape and size.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this a consolidate bearing structure for building engineering, set up opposite direction's screw thread through first screw rod and second screw rod, because first screw rod passes through the screw thread and is connected with first splint, the second screw rod passes through the screw thread and is connected with second splint, the swivel ring makes first screw rod rotatory with the second screw rod, first splint can be close to with second splint in step, thereby press from both sides tight wall form, left end and nut threaded connection through the bolt, when screwing up the nut, the stopper of bolt right-hand member is fixed in spacing hole, further fix the position of first splint and second splint, thereby fixed wall form that can be quick, prevent to become flexible.
2. This a consolidate bearing structure for building engineering, make first screw rod and second screw rod rotate through rotating the ring, make first splint and second splint be close to or separate in step under the drive of screw thread, can change the distance size between first splint and the second splint according to wall template thickness, first recess and second recess mutually support of seting up with another baffle bottom respectively through first lug and the second lug that sets up on baffle top, can be according to the height of wall form, upwards stack the device gradually, thereby can be applicable to the wall form of different thickness and height.
Drawings
FIG. 1 is a schematic view of the inner side structure of the baffle of the present invention;
FIG. 2 is a schematic view of the structure of the outer side of the baffle plate of the present invention;
FIG. 3 is a connection diagram of the bolt and the first clamping plate according to the present invention;
FIG. 4 is a schematic view of the connection between the baffles of the present invention;
fig. 5 is the schematic view of the clamping wall form of the present invention.
In the figure: 1. a baffle plate; 2. an end cap; 3. a shaft sleeve; 4. a first screw; 5. a second screw; 6. a first splint; 7. a second splint; 8. a circular ring; 9. an annular groove; 10. a bolt; 11. a nut; 12. a first bump; 13. a second bump; 14. a first groove; 15. a second groove; 16. a chute; 17. a through hole; 18. and a limiting hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, a reinforced supporting structure for construction engineering comprises a baffle 1, a sliding groove 16 penetrating through the baffle 1 in the left and right direction is formed in the middle of the inner side surface of the baffle 1, end covers 2 are fixedly mounted at the left and right ends of the baffle 1, the end covers 2 play a role in limiting, when a circular ring 8 is rotated, a first clamping plate 6 and a second clamping plate 7 are prevented from falling off from the sliding groove 16, a shaft sleeve 3 is fixedly mounted in the middle of the sliding groove 16, a first screw rod 4 and a second screw rod 5 are movably sleeved in the shaft sleeve 3 respectively, the left end of the first screw rod 4 is connected with the first clamping plate 6 through threads, penetrates through the end cover 2 and extends to the outer side of the end cover 2, the right end of the second screw rod 5 is connected with the second clamping plate 7 through threads, anti-skid rubber pads are arranged on the inner side surfaces of the first clamping plate 6 and the second clamping plate 7, so as to clamp a, through-hole 17 that runs through around the one end that baffle 1 was kept away from to first splint 6 and second splint 7 is all seted up, bolt 10 has been cup jointed in the medial surface activity of through-hole 17, and there is nut 11 at the left end of bolt 10 through threaded connection, and the middle part fixed mounting on 1 top of baffle has first lug 12, and the equal fixed mounting in both sides on 1 top of baffle has second lug 13, and first recess 14 has been seted up at the middle part of 1 bottom of baffle, and second recess 15 has all been seted up to the both sides of 1 bottom of baffle.
Furthermore, a circular ring 8 is fixedly mounted at the left end of the first screw rod 4, and the right end of the first screw rod 4 is fixedly connected with one end of the second screw rod 5, which is positioned inside the shaft sleeve 3.
Further, the outer surface of the second screw rod 5 is provided with threads, the outer surface of one end, located on the sliding groove 16, of the first screw rod 4 is provided with threads opposite to the upper direction of the second screw rod 5, the first screw rod 4 and the second screw rod 5 are rotated by rotating the circular ring 8, so that the first clamping plate 6 and the second clamping plate 7 are close to each other synchronously, the wall formwork can be clamped, and the first clamping plate 6 and the second clamping plate 7 are prevented from loosening through friction force between the threads.
Further, annular groove 9 has been seted up to the lateral surface of baffle 1, and runs through baffle 1 around annular groove 9, and the left end of bolt 10 runs through-hole 17 and annular groove 9 in proper order and extends to the outside of baffle 1, and first splint 6 and second splint 7 are at the in-process that is close to each other, and the left end of bolt 10 can move in the inside of annular groove 9, makes first splint 6 and second splint 7 move when the suitable position, all can lock through nut 11.
Further, first splint 6 and second splint 7 keep away from the bottom of 1 one end of baffle and all offer the spacing hole 18 with through-hole 17 concentric, the right-hand member of bolt 10 is equipped with the stopper, and the diameter of stopper is greater than the diameter of through-hole 17 and is less than the diameter of spacing hole 18, after locking through the nut 11 of the left end of bolt 10, the stopper of bolt 10 right-hand member is fixed in spacing hole 18, keep away from baffle 1 at first splint 6 and second splint 7 and serve and all exert pressure, further fix the position between first splint 6 and second splint 7 and the baffle 1.
Further, the first projection 12 and the first groove 14 have the same shape and size, and the second projection 13 and the second groove 15 have the same shape and size.
The working principle is as follows:
during the use, with baffle 1 laminating in the side of wall form, according to the height of wall form, through first lug 12 and second lug 13 respectively with another first recess 14 and second recess 15 cooperation, upwards superpose a plurality of baffles 1 in proper order, according to the wall form thickness, the ring 8 rotates, make first screw rod 4 rotatory with second screw rod 5, the screw thread direction of seting up on first screw rod 4 is opposite with the screw thread direction of seting up on second screw rod 5, make first splint 6 and second splint 7 be close to in step on spout 16, contact and press from both sides tight wall form, insert the left end of bolt 10 in the through-hole 17, wear out from the outside of baffle 1, tighten through nut 11, fix first splint 6 and second splint 7.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A reinforced supporting structure for constructional engineering, comprising a baffle (1), characterized in that: the middle part of the inner side surface of the baffle plate (1) is provided with a sliding groove (16) which penetrates through the left and the right, the left and the right ends of the baffle plate (1) are both fixedly provided with an end cover (2), the middle part of the sliding groove (16) is fixedly provided with an axle sleeve (3), the inside of the axle sleeve (3) is respectively movably sleeved with a first screw rod (4) and a second screw rod (5), the left end of the first screw rod (4) is connected with a first clamping plate (6) through threads and penetrates through the end cover (2) and extends to the outer side of the end cover (2), the right end of the second screw rod (5) is connected with a second clamping plate (7) through threads, one ends of the first clamping plate (6) and the second clamping plate (7) far away from the baffle plate (1) are both provided with a through hole (17) which penetrates through the front and back, the inner side surface of the through hole (17) is, the middle part fixed mounting on baffle (1) top has first lug (12), the equal fixed mounting in both sides on baffle (1) top has second lug (13), first recess (14) have been seted up at the middle part of baffle (1) bottom, second recess (15) have all been seted up to the both sides of baffle (1) bottom.
2. A reinforced support structure for construction work according to claim 1, wherein: the left end fixed mounting of first screw rod (4) has ring (8), the right-hand member of first screw rod (4) and second screw rod (5) are located the inside one end fixed connection of axle sleeve (3).
3. A reinforced support structure for construction work according to claim 1, wherein: the outer surface of the second screw rod (5) is provided with threads, and the outer surface of one end, located on the sliding groove (16), of the first screw rod (4) is provided with threads opposite to the upper direction of the second screw rod (5).
4. A reinforced support structure for construction work according to claim 1, wherein: annular groove (9) have been seted up to the lateral surface of baffle (1), and run through baffle (1) around annular groove (9), the left end of bolt (10) runs through-hole (17) and annular groove (9) in proper order and extends to the outside of baffle (1).
5. A reinforced support structure for construction work according to claim 1, wherein: the bottom that baffle (1) one end was kept away from in first splint (6) and second splint (7) all offers spacing hole (18) with through-hole (17) concentric, the right-hand member of bolt (10) is equipped with the stopper, and the diameter of stopper is greater than the diameter of through-hole (17) and is less than the diameter of spacing hole (18).
6. A reinforced support structure for construction work according to claim 1, wherein: the first bump (12) and the first groove (14) are the same in shape and size, and the second bump (13) and the second groove (15) are the same in shape and size.
CN201921373789.XU 2019-08-23 2019-08-23 A consolidate bearing structure for building engineering Expired - Fee Related CN211173120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921373789.XU CN211173120U (en) 2019-08-23 2019-08-23 A consolidate bearing structure for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921373789.XU CN211173120U (en) 2019-08-23 2019-08-23 A consolidate bearing structure for building engineering

Publications (1)

Publication Number Publication Date
CN211173120U true CN211173120U (en) 2020-08-04

Family

ID=71793694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921373789.XU Expired - Fee Related CN211173120U (en) 2019-08-23 2019-08-23 A consolidate bearing structure for building engineering

Country Status (1)

Country Link
CN (1) CN211173120U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111872565A (en) * 2020-08-19 2020-11-03 中国人民解放军空军工程大学 On-site laser impact water restraint layer applying device and method suitable for large parts
CN111927136A (en) * 2020-08-07 2020-11-13 江苏省水利勘测设计研究院有限公司 Building structure reinforcing apparatus
CN112647630A (en) * 2020-12-02 2021-04-13 徐蓓 External photovoltaic curtain wall for green building
CN112878680A (en) * 2020-10-28 2021-06-01 江苏省苏中建设集团股份有限公司 Assembly type building template fastening structure and method thereof
CN114704086A (en) * 2022-04-06 2022-07-05 河南省中创建筑工程有限公司 Novel template device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927136A (en) * 2020-08-07 2020-11-13 江苏省水利勘测设计研究院有限公司 Building structure reinforcing apparatus
CN111872565A (en) * 2020-08-19 2020-11-03 中国人民解放军空军工程大学 On-site laser impact water restraint layer applying device and method suitable for large parts
CN111872565B (en) * 2020-08-19 2022-05-17 中国人民解放军空军工程大学 On-site laser impact water restraint layer applying device and method suitable for large parts
CN112878680A (en) * 2020-10-28 2021-06-01 江苏省苏中建设集团股份有限公司 Assembly type building template fastening structure and method thereof
CN112647630A (en) * 2020-12-02 2021-04-13 徐蓓 External photovoltaic curtain wall for green building
CN114704086A (en) * 2022-04-06 2022-07-05 河南省中创建筑工程有限公司 Novel template device
CN114704086B (en) * 2022-04-06 2024-02-20 河南省中创建筑工程有限公司 Template device

Similar Documents

Publication Publication Date Title
CN211173120U (en) A consolidate bearing structure for building engineering
CN211775804U (en) Template clamping device for building reinforcement
CN201326524Y (en) Composite tower cylinder of wind turbine
CN202164809U (en) Adjustable support of climbing type scaffold
CN212002364U (en) Foundation bolt mounting and positioning device for steel structure stand column
CN212743424U (en) Nuclear power steel lining installation buttress post device
CN212689005U (en) Overhanging type formwork supporting structure for pouring retaining wall
CN202787307U (en) Foundation bolt positioning template
CN214466644U (en) Hydraulic pipeline supporting and connecting device for hydraulic engineering
CN202731296U (en) Deformation joint prefabricated formwork and installation structure thereof
CN213709605U (en) Pile foundation construction device
CN209723624U (en) A kind of cast-in-place mounted split pattern support construction
CN211395748U (en) Superposed beam-slab structure for construction of reversed beam and consequent slab in foundation pit engineering
CN214005723U (en) Steel pipe support concrete foundation structure
CN210598153U (en) Structure for preventing concrete leakage of wall and column
CN209244243U (en) A kind of fixed device of fashioned iron sizing tripod for builder's jack
CN219834015U (en) Pile pre-buried bolt fixing device
CN210210178U (en) Pipe wrench capable of rotating in two directions
CN208137425U (en) A kind of laminated floor slab same layer support device
CN212295648U (en) Adjustable riser special water stop joint
CN215486040U (en) Supporting device for bottom of formed duct piece
CN220909190U (en) Novel elevation control that can have enough to meet need device
CN206768856U (en) A kind of tower crane fixing device for high-rise building
CN216239759U (en) Building engineering reinforcing apparatus
CN213806729U (en) Building structure beam reinforcing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804