CN202731296U - Deformation joint prefabricated formwork and installation structure thereof - Google Patents

Deformation joint prefabricated formwork and installation structure thereof Download PDF

Info

Publication number
CN202731296U
CN202731296U CN 201220448290 CN201220448290U CN202731296U CN 202731296 U CN202731296 U CN 202731296U CN 201220448290 CN201220448290 CN 201220448290 CN 201220448290 U CN201220448290 U CN 201220448290U CN 202731296 U CN202731296 U CN 202731296U
Authority
CN
China
Prior art keywords
deformation joint
prefab form
screw rod
flitch
prefab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220448290
Other languages
Chinese (zh)
Inventor
宣桂鹏
游兴荣
张凯
单为
徐建新
张乐言
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN 201220448290 priority Critical patent/CN202731296U/en
Application granted granted Critical
Publication of CN202731296U publication Critical patent/CN202731296U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a deformation joint prefabricated formwork and an installation structure thereof, wherein the deformation joint prefabricated formwork comprises a concrete facing panel, wood beams and steel pipes, wherein the wood beams are distributed along the vertical direction of the deformation joint prefabricated formwork, and are fixed on the back surface of the concrete facing panel along the horizontal direction of the deformation joint prefabricated formwork and are connected with the concrete facing panel, the steel pipes are distributed along the horizontal direction of the deformation joint prefabricated formwork, and are pressed on the outer surfaces of the wood beams along the vertical direction of the deformation joint prefabricated formwork, and the concrete facing panel, the steel pipes and the wood beams are connected through hook plate screws and hill-shaped cards. Clamping screw through holes are obligated on the concrete facing panel, and steel plates and nuts which are used to connect clamping screws are welded on the back portions of the steel pipes. The middle portions of the clamping screws pass through casings, one end of the clamping screws is connected with the deformation joint prefabricated formwork which is arranged on the outer side and is fixed through the hill-shaped cards, and steel plates and the nuts which are used to connect the clamping screws are welded on the other ends of the clamping screws and the back surfaces of the steel pipes of the deformation joint prefabricated formwork which is arranged in the inner side. Supporting screws are connected with wall bodies which are arranged on the two sides of a deformation joint, supporting wood beams are arranged on the lower end of the deformation joint prefabricated formwork arranged in the inner side and are erected above the supporting screws. The supporting wood beams are closely supported by wedge wood strips.

Description

A kind of deformation joint prefab form and mounting structure thereof
Technical field
The utility model relates to a kind of deformation joint prefab form and mounting structure thereof.
Background technology
In the middle of the continuous construction in city, people are in order to pursue novelty, fashion, attractive in appearance, spatial modelling and sea level changes, especially in order to follow the fashion, the building that moulding uniqueness of all kinds occurred, different moulding and the super-long structurals such as various height have appearred in a building, in order to prevent because of temperature Change, the factor such as differential settlement and earthquake causes the use of building and security implication, at the deformation sensitive position building is disconnected in advance during design, is divided into several relatively independent unit, and the slit of reserving can guarantee that building has enough deformation spaces, has added deformation joint for this reason between structure and structure.
The structure construction of deformation joint always is a large difficult point of construction because spatial limitation, safety with badly directly having influence on structure of construction level good and attractive in appearance, so the construction technical schemes of shear force wall deformation slit is the most important thing of this engineering.
Summary of the invention
The technical problems to be solved in the utility model provides a kind of deformation joint prefab form.
Another one technical problem to be solved in the utility model provides a kind of mounting structure of deformation joint prefab form.
For the deformation joint prefab form, the technical solution adopted in the utility model is: a kind of deformation joint prefab form comprises and meets concrete panel, flitch, steel pipe; Flitch is along vertical distribution of prefab form, along the back side that laterally being fixed on of prefab form met the concrete panel and with meet the concrete panel and be connected; Steel pipe is along the cross direction profiles of prefab form, along the outside that vertically is pressed in flitch of prefab form; To meet concrete panel, steel pipe, flitch with hook plate screw rod and chevron card is connected; Meet the reservation of concrete panel tight screw rod is penetrated the hole; The back of steel pipe is welded with for the steel plate and the nut that connect tight screw rod.
As preferably, meeting the concrete panel is veneer.
As preferably, hook plate screw rod one end is welded with band iron.
For the mounting structure of deformation joint prefab form, the technical solution adopted in the utility model is: the mounting structure of deformation joint prefab form comprises prefab form, to tight screw rod, sleeve pipe, studdle, support flitch and wedge shape batten;
Sleeve pipe is passed at tight screw rod middle part, and an end is connected with outside prefab form and fastens with chevron, and the other end is welded be used to the steel plate that is connected tight screw rod with the steel pipe back of inboard prefab form and is connected with nut;
Studdle is connected with deformation joint two side lower parts cast wall; The brace orientation in the lower end of inboard prefab form and frame on studdle; The wedge shape batten pushes against and supports the lower end that flitch leans against inboard prefab form.
As preferably, also comprise jig; Jig with prefab form be connected the top of shear wall of concreting and press setpoint distance and connect.
The beneficial effects of the utility model are:
Be joined together to form and have enough rigidity meeting concrete panel and steel pipe, can effectively guarantee the monolithic prefab form that is used for deformation joint of designing requirement.Utilize the concrete structure of having poured into a mould in limited space, to fixedly mount deformation slit formwork.Its cost is low, and is economic and practical, simple to operate, and stock utilization is high, and the quality of a side shear wall and the spacing between two wall are watered in turnover and easy to maintenance after better having guaranteed.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is the structural representation of the utility model deformation joint prefab form embodiment.
Fig. 2 is the mounting structure schematic diagram of the utility model deformation joint prefab form embodiment.
Among the figure, 1-steel pipe, 2-flitch, 3-steel plate, 4-penetrates the hole to tight screw rod, 5-veneer, 6-chevron card, 7-hook plate screw rod, the 8-band iron, the 9-screw, 10-is to tight screw rod, the 11-sleeve pipe, 12-steel plate, the spacing concrete of 13-, 14-supports flitch, 15-wedge shape batten, 16-studdle, 17-Concrete In Structures, 18-had before been poured into a mould shear wall, the 19-nut.
The specific embodiment
Fig. 1 is a kind of deformation joint prefab form, by consisting of as veneer 5, flitch 2, the steel pipe 1 of meeting the concrete panel.
Flitch 2 is along vertical distribution of prefab form, and along the back side that laterally is fixed on veneer 5 of prefab form, flitch is fixed on the back side of veneer with tapping screw 9.
Steel pipe 1 is along the cross direction profiles of prefab form, along the outside that vertically is pressed in flitch 2 of prefab form.
One end of hook plate screw rod 7 is welded with band iron 8, and band iron is met the concrete surface edge and is polished into the slope and guarantees that edge fundamental sum veneer is concordant.Pass successively veneer 5, steel pipe 1, flitch 2 with hook plate screw rod 7, the other end is fixing with chevron card 5, becomes an integral prefabricated template.Reserve on the veneer tight screw rod is penetrated hole 4, be welded with in the relevant position, back of steel pipe 1 for the steel plate 3 that connects tight screw rod, be welded with nut on the steel plate 3.Be screwed into nut in order to tight screw rod penetrated.
Fig. 2 is the mounting structure of deformation slit formwork, is made of inner side template, outboard template, studdle 16, support flitch 14 and wedge shape batten 15.
Use first the following wall connecting of the previous cast shear wall 18 in studdle 16 and substructure concrete 17 and the deformation joint outside.To support again 14 of flitches and on studdle 16, place the lower end of deformation joint inner side template, in order to support inner side template.Then make its lower end that abuts against inner side template loosening with pushing against the support flitch in the wedge shape batten 15 insertion deformation joints.
The outside template be placed directly in the substructure concrete above.
Above-mentioned inner side template is the prefab form of the present embodiment, and outboard template can prefab form, also can directly use steel form.
When template is installed, with tight screw rod 10 is welded into integral body with nut 19, the nut that calculates and reserve welding on the steel plate 3 that need to pass steel pipe 1 exposes outside the screw rod 10 of 30-50mm length and stretches out mountain type card 6 and the length of nut welding, and is suitable with the thickness that guarantees interior outboard template spacing and fluid concrete.With what screw rod 10 passed reservation tight screw rod is penetrated hole 4, pierce into again sleeve pipe 11, the other end be screwed into the relevant position, back that is welded in steel pipe 1 be used for connecting in tight screw rod and nut Plate Welding, hold out against with mountain type card fully by constantly tightening screw rod 10 until with nut 19 and to twist motionlessly, screw rod just links together the prefab form of inside and outside both sides tightly at this moment.Sleeve pipe 11 usefulness soft pvcs are made, and install at a certain distance concrete prefabricated that controls shear wall thickness.Stretch out from the back side of veneer 5 at the two ends of sleeve pipe, can enter in the sleeve pipe by mortar leakage prevention.
Construction point:
1) processing of prefab form transverse joint: lay when meeting the concrete panel and abdicate tongue and groove on one side way is middle rib keel between deformation joint, another side is done outlet.Its objective is can have the reliable spreading of horizontal direction prefab form, and efficiency control concrete spillage, guarantees concrete construction quality.
2) preparation method of prefab form: use first the 150mm long bolt, one section is welded with 40 * 3 steel disc and makes the hook plate screw rod, with the hook plate screw rod panel and flitch keel and Φ 4.8 * 3.0 steel pipe connectings are connected into an integral forming template, steel tube framework horizontal spacing@400 ~ 600mm, flitch keel spacing 150mm, and make formwork edge joint compacting under the steel tube framework coverage, guarantee that piece is smooth, tight; With the 3.5x25 self-tapping screw panel and flitch are fixed by 300 spacings.Said method makes and forms an integral body between template and the steel tube framework, and its purpose satisfies integral rigidity and the turnover utilization rate of template.
3) prevent that cement paste from entering screw rod sleeve pipe and control wall thickness problem: way is the wall bushing termination directly to be stretched out meet the concrete panel, makes to water a small amount of spillage that produces in the concrete process and can not enter in the sleeve pipe.
Because sleeve pipe has passed the plate face and has not possessed the wall thickness position-limiting action, thus add the limited support made from fine-stone concrete, to reach the thickness of control shear wall.Its objective is that to guarantee this shear wall through walls to tight screw rod, must reach 100% can extract from wall bushing.
Bottom support when 4) template is installed: way is to utilize lower floor to finish the prepared screw-bolt hole of metope, stretch out screw rod, tighten with nut at the screw rod two ends, adopts and place the way temporary supporting deformation slit formwork of flitch levelling thereon, proofreaies and correct and reinforce so that the workman conveniently carries out template.Do not move down when controlling the typing large form and install with this and when building concrete.
5) template is suitable for reading fixes (not marking among the figure) with jig: way is the jig that utilizes channel-section steel waste material and thick screw rod to form, the channel-section steel section is worn at a welding of the thick screw rod of jig No. 10 channel-section steels, middle parts No. 10, channel-section steel section two sides is symmetrically welded with the big nut supporting with thick screw rod, and the thick screw rod other end leaves the through hole with the diameter 30mm that runs through of spiro rod length perpendicular direction.After the prefab form installation in position is proofreaied and correct, jig snapped in construct between the shear wall finished and the new prefab form of installing, the front end channel-section steel withstands on the two steel pipes of level of prefab form, the middle part channel-section steel is stuck in the shear wall outside of having built, thick bolt tightened to the prefab form direction can guarantee that prefab form is not shifted 1 meter of jig spacing when the concreting.
6) enter in the sleeve pipe for mortar leakage prevention: the screw rod wall bushing is selected the flexible PVC material, makes template certain level be arranged to amount of movement when loosening, does not produce excessive resistance in the lifting process when form removable.Reserve the hole of a high 150mm of wide 100mm in the large mould of every segmentation bottom, be used for stretching into the steel sled when when promoting, running into resistance and assist.Guarantee that tower crane can not run into not clear overload phenomenon in promoting large mold process.
7) form removable: behind concrete initial set (according to taking the time flexibly season, generally be that the non-caked template of concrete gets final product), screw rod 10 is oppositely back-outed from the nut of welding, loosening timber wedge, utilize crowbar that template is loosening, the top jig of dismantling, tower crane hangs out prefab form in deformation joint.
Above-described the utility model embodiment does not consist of the restriction to the utility model protection domain.Any modification of within spirit of the present utility model and principle, doing, be equal to and replace and improvement etc., all should be included within the claim protection domain of the present utility model.

Claims (5)

1. a deformation joint prefab form is characterized in that: comprise and meet concrete panel, flitch, steel pipe; Described flitch is along vertical distribution of prefab form, along the back side that laterally being fixed on of prefab form met the concrete panel and with meet the concrete panel and be connected; Described steel pipe is along the cross direction profiles of prefab form, along the outside that vertically is pressed in flitch of prefab form; To meet concrete panel, steel pipe, flitch with hook plate screw rod and chevron card is connected; The described concrete panel of meeting is reserved tight screw rod is penetrated the hole; The back of described steel pipe is welded with for the steel plate and the nut that connect tight screw rod.
2. deformation joint prefab form according to claim 1, it is characterized in that: the described concrete panel of meeting is veneer.
3. deformation joint prefab form according to claim 1, it is characterized in that: described hook plate screw rod one end is welded with band iron.
4. the mounting structure of a deformation joint prefab form is characterized in that: comprise prefab form, to tight screw rod, sleeve pipe, studdle, support flitch and wedge shape batten;
Described one end is connected with outside prefab form and fastens with chevron to passing sleeve pipe in the middle part of the tight screw rod, and the other end is welded be used to the steel plate that is connected tight screw rod with the steel pipe back of inboard prefab form and is connected with nut;
Described studdle is connected with deformation joint two side lower parts cast wall; Described brace orientation in the lower end of inboard prefab form and frame on studdle; Described wedge shape batten pushes against and supports the lower end that flitch leans against inboard prefab form.
5. the mounting structure of deformation joint prefab form according to claim 4 is characterized in that: also comprise jig; Described jig with prefab form be connected the top of shear wall of concreting and press setpoint distance and connect.
CN 201220448290 2012-09-05 2012-09-05 Deformation joint prefabricated formwork and installation structure thereof Expired - Fee Related CN202731296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220448290 CN202731296U (en) 2012-09-05 2012-09-05 Deformation joint prefabricated formwork and installation structure thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220448290 CN202731296U (en) 2012-09-05 2012-09-05 Deformation joint prefabricated formwork and installation structure thereof

Publications (1)

Publication Number Publication Date
CN202731296U true CN202731296U (en) 2013-02-13

Family

ID=47657008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220448290 Expired - Fee Related CN202731296U (en) 2012-09-05 2012-09-05 Deformation joint prefabricated formwork and installation structure thereof

Country Status (1)

Country Link
CN (1) CN202731296U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074352A (en) * 2014-06-29 2014-10-01 北京首钢建设集团有限公司 Wall body template supporting method in position with narrow space
CN104088458A (en) * 2014-06-16 2014-10-08 宝鸡市第一建筑工程有限责任公司 Large groove and tongue steel mold plate of shearing wall
CN106284978A (en) * 2016-08-10 2017-01-04 中建新疆建工集团第建筑工程有限公司 A kind of movement joint both sides shear wall synchronous construction technique and canalization template

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088458A (en) * 2014-06-16 2014-10-08 宝鸡市第一建筑工程有限责任公司 Large groove and tongue steel mold plate of shearing wall
CN104074352A (en) * 2014-06-29 2014-10-01 北京首钢建设集团有限公司 Wall body template supporting method in position with narrow space
CN106284978A (en) * 2016-08-10 2017-01-04 中建新疆建工集团第建筑工程有限公司 A kind of movement joint both sides shear wall synchronous construction technique and canalization template

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
WO2015043310A1 (en) Floorslab system
CN108589767B (en) Turnbuckle single-sided vertical die inclined throwing and supporting device and construction method thereof
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN209855047U (en) Full-bolt-connection high-strength steel plate assembled beam-concrete slab combined beam
CN202731296U (en) Deformation joint prefabricated formwork and installation structure thereof
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN201334773Y (en) Self-supporting device for steel reinforced concrete composite girder
CN213682129U (en) Deep foundation pit unilateral die carrier
CN104179352A (en) Dismountable template system
CN203334661U (en) Scaffold-hole-free formwork construction device for brick-concrete structure construction column
CN204804129U (en) Prefabricated concrete floor entirely for building
CN204059973U (en) Tool-type body of wall one side formwork support type steel truss
CN208440996U (en) A kind of novel inlet pipe
CN103883121A (en) Extensible steel-truss-type formwork support
CN109518861A (en) A kind of steel bar truss floor support plate being applied in combination with cast-in-situ wall
CN206599988U (en) Isometrical barrel-type clear-water concrete structures template system
CN205677237U (en) Square stiffened column assembled variable area template system
CN109537738A (en) Steel building cast-in-place concrete hollow floor system self-supporting hanger formwork support process
CN102418415B (en) Short-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN213773941U (en) Assembled cold-formed thin-walled steel composite wall
CN211173065U (en) Basement outer wall construction joint anti-seepage template structure
CN209397938U (en) One kind reinforcing tooling for Double-side laminated co-clip heart heat-preservation shear wall wall root
CN202338108U (en) Steel-wood support rigid supporting structure fixed on lower wing plates of steel beams of floor
CN203238971U (en) Combination and adjustment device of truss end portions

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20140905

EXPY Termination of patent right or utility model