CN211143693U - Operation platform on pole and tower - Google Patents

Operation platform on pole and tower Download PDF

Info

Publication number
CN211143693U
CN211143693U CN201920934359.4U CN201920934359U CN211143693U CN 211143693 U CN211143693 U CN 211143693U CN 201920934359 U CN201920934359 U CN 201920934359U CN 211143693 U CN211143693 U CN 211143693U
Authority
CN
China
Prior art keywords
platform
insulating
pole
ropes
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920934359.4U
Other languages
Chinese (zh)
Inventor
李芸
王智鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Institute of Technology
Original Assignee
Taiyuan Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Institute of Technology filed Critical Taiyuan Institute of Technology
Priority to CN201920934359.4U priority Critical patent/CN211143693U/en
Application granted granted Critical
Publication of CN211143693U publication Critical patent/CN211143693U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

The utility model relates to an on-pole and on-tower operation platform, belonging to the field of electric power construction and maintenance; provides a pole or tower operating device which is operated by a single person and is convenient to carry and combine; the technical scheme is as follows: an on-pole work platform comprising: a pull rope, an insulating platform and a connecting accessory; the pull ropes are two insulating ropes, and one end of each pull rope is hinged with the insulating platform; the insulating platform is of a square plate-shaped structure, the connecting accessory is of an annular structure, the annular outer side of the connecting accessory is connected with one end of the insulating platform, and the connecting accessory is used for being hooped on a concrete electric pole; or the connecting accessory is a bolt with adjustable length, one end of the connecting accessory is fixedly connected with one end of the insulating platform, and the other end of the connecting accessory is connected with an angle iron through hole of the electric tower; the utility model discloses but wide application in electric power construction and maintenance field.

Description

Operation platform on pole and tower
Technical Field
The utility model relates to an operation platform on pole and tower belongs to electric power construction and maintenance field, the platform of operation on in particular to concrete pole and the shaft tower to and the portable operation platform that the operation was used on the circular iron pipe tower.
Background
At present, the pole is mostly climbed onto the pole by adopting a foot fastener or a pedal, after the pole arrives at an operation place, an operator is protected by utilizing a safety belt, the foot fastener is taken as a supporting point, the safety belt is taken as an auxiliary acting point, and meanwhile, the body is laid flat to the operation point for working or an operation frame is erected. Thus, there are the following problems.
(1) Because the supporting points are few, the labor intensity is high under long-time work, the body is consumed a lot, and the legs and the feet are easy to soften and slip.
(2) It is difficult to move on the rod due to the force of the foot.
(3) The human body inclined operation has no high efficiency of vertical operation.
(4) The erection of the operation frame not only wastes time and labor and has high operation cost, but also has some operation environments without erection conditions at all.
(5) Because the operation on the pole is difficult, two persons are often required to work together, the cooperation is difficult because the two persons are positioned on the same operation surface, even the climbers cannot be used on some circular iron towers, and the personnel cannot reach the operation surface.
(6) The common insulating arm-tucking vehicle operation method brings much inconvenience to operation on a rod due to special positions or adjacent high-voltage lines, and in addition, most lines are positioned in mountainous areas, and the arm-tucking vehicle cannot reach the operation position.
SUMMERY OF THE UTILITY MODEL
The utility model overcomes prior art exists not enough, provides one kind can single lift by crane, single installation, one-man operation, need not auxiliary assembly, installation and dismantlement simple and convenient, applicable in the pole of different thickness body of rod and iron tower on operation platform, change operating angle and operation point, expanded operating range that can be convenient, and carry and make up convenient pole on or the tower on the operation equipment.
In order to solve the technical problem, the utility model discloses a technical scheme be: an on-pole work platform comprising: a pull rope, an insulating platform and a connecting accessory; the pull ropes are two insulating ropes, and one end of each pull rope is hinged with the insulating platform; the whole insulating platform is of a square plate-shaped structure, the insulating platform comprises a square frame and grid plates fixed in the frame, the connecting accessory is of an annular structure, the annular outer side of the connecting accessory is connected with one end of the insulating platform, and the connecting accessory is used for being hooped on a concrete electric pole.
An on-tower work platform comprising: a pull rope, an insulating platform and a connecting accessory; the pull ropes are two insulating ropes, and one end of each pull rope is hinged with the insulating platform; the whole square plate-shaped structure of the insulating platform is characterized in that the insulating platform comprises a square frame and a grid plate fixed in the frame, the connecting accessories are bolts with adjustable lengths, one end of each connecting accessory is fixedly connected with one end of the insulating platform, and the other end of each connecting accessory is connected with an angle iron through hole of the electric tower.
The length-adjustable bolt is a turn buckle, and an insulating layer covers the turn buckle.
The insulation platform is fixed with the cardboard with the below of connecting fitting connected one end, the cardboard is used for compressing tightly on concrete pole and shaft tower, prevents that insulation platform from overturning from top to bottom.
The clamping plate is provided with an arc-shaped clamping groove or a through hole, and the arc-shaped clamping groove is attached to the concrete electric pole to prevent the insulating platform from turning left and right; the through hole is used for being fixed with the through hole on the angle bar of electricity tower through the bolt, prevents that insulating platform from controlling the upset.
Through holes are formed in two sides of the insulating platform, and the two insulating ropes are connected with two sides of the insulating platform in a one-to-one correspondence mode respectively.
The one end of two insulating ropes all is provided with U type pull ring, U type pull ring is articulated with insulating platform both sides, the other end of two insulating ropes all is provided with the couple, the couple is used for articulating the angle bar of fixture or electric tower of concrete pole.
And a sizing block is fixed on the end face of one end, connected with the connecting accessory, of the insulating platform, and the sizing block is of an M-shaped structure.
The two insulating ropes are inelastic ropes or safety belts.
The insulating platform is made of a square light glass fiber reinforced plastic fiber composite material.
And a safety handrail or a railing is fixed above the insulating platform.
Compared with the prior art, the utility model beneficial effect who has is: the pole operator can stand on the operation platform to operate, the labor intensity of the operator can be reduced, double-person work is changed into single-person work, the labor productivity is improved, the working range is expanded, the safety of pole operation is improved, the operation condition is improved, the power failure time can be greatly shortened, and the electric energy loss is reduced.
Drawings
The present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of embodiment 1 of the present invention.
Fig. 2 is a partial structural plan view of embodiment 1 of the present invention.
Fig. 3 is a schematic structural diagram of embodiment 2 of the present invention.
Fig. 4 is a partial structural plan view of embodiment 2 of the present invention.
In the figure: 1 is the stay cord, 2 is insulating platform, 3 is the attachment, 4 is the parallels, 5 is the safety handle, 6 is U type pull ring, 7 is the couple.
Detailed Description
Example 1
As shown in fig. 1 and 2, the utility model relates to a work platform on pole, which is characterized in that includes: the device comprises a pull rope 1, an insulating platform 2 and a connecting accessory 3; the pull rope 1 is composed of two insulating ropes, and one end of the pull rope 1 is hinged with the insulating platform 2; the whole insulating platform 2 is of a square plate-shaped structure, the insulating platform comprises a square frame and grid plates fixed in the frame, the connecting accessory 3 is of an annular structure, the annular outer side of the connecting accessory 3 is connected with one end of the insulating platform 2, the connecting accessory 3 is used for being hooped on a concrete electric pole, and the connecting accessory 3 is relatively fixed with the concrete electric pole.
The insulation platform 2 is fixed with the cardboard with the below that connecting fitting 3 is connected one end, the cardboard is used for compressing tightly on concrete pole and shaft tower, prevents that insulation platform 2 from overturning from top to bottom.
The clamping plate is provided with an arc-shaped clamping groove or a through hole, and the arc-shaped clamping groove is attached to the concrete electric pole to prevent the insulating platform 2 from turning left and right; through holes are formed in two sides of the insulating platform 2, and the two insulating ropes are connected with two sides of the insulating platform 2 in a one-to-one correspondence mode respectively.
The one end of two insulating ropes all is provided with U type pull ring 6, U type pull ring 6 is articulated with 2 both sides of insulating platform, the other end of two insulating ropes all is provided with couple 7, couple 7 is used for articulating the angle bar of fixture or the electricity tower of concrete pole.
And a sizing block 4 is fixed on the end face of one end, connected with the connecting accessory 3, of the insulating platform 2, and the sizing block 4 is of an M-shaped structure.
The two insulating ropes are inelastic ropes or safety belts.
The insulating platform 2 is made of a square light glass fiber reinforced plastic composite material.
And a safety handrail 5 is fixed above the insulating platform 2.
The present embodiment is used specifically as follows.
Attachment 3 is the chain or takes the rope, attachment 3's loop configuration cramps on the concrete pole, stay cord 1 is fixed on the cross arm or the fixture (such as staple bolt etc.) of concrete pole through couple 7, sizing block 4 chucking prevents insulating platform 2 from rotating on the concrete pole, simultaneously the cardboard chucking forms stable structure on the concrete pole, ensures that personnel can stand the operation on insulating platform 2.
Example 2
As shown in fig. 3 and 4, an upper tower work platform includes: the device comprises a pull rope 1, an insulating platform 2 and a connecting accessory 3; the pull rope 1 is composed of two insulating ropes, and one end of the pull rope 1 is hinged with the insulating platform 2; the insulating platform 2 is of a square plate-shaped structure as a whole, the insulating platform comprises a square frame and a grid plate fixed in the frame, the connecting accessories 3 are bolts with adjustable lengths, one end of each connecting accessory 3 is fixedly connected with one end of the insulating platform 2, and the other end of each connecting accessory 3 is connected with an angle iron through hole of the electric tower.
The length-adjustable bolt is a turn buckle, and an insulating layer covers the turn buckle.
The insulation platform 2 is fixed with the cardboard with the below that connecting fitting 3 is connected one end, the cardboard is used for compressing tightly on concrete pole and shaft tower, prevents that insulation platform 2 from overturning from top to bottom.
The through holes are used for being fixed with the through holes on the angle iron of the electric tower through bolts, so that the insulating platform 2 is prevented from overturning left and right; through holes are formed in two sides of the insulating platform 2, and the two insulating ropes are connected with two sides of the insulating platform 2 in a one-to-one correspondence mode respectively.
The one end of two insulating ropes all is provided with U type pull ring 6, U type pull ring 6 is articulated with 2 both sides of insulating platform, the other end of two insulating ropes all is provided with couple 7, couple 7 is used for articulating the angle bar of fixture or the electricity tower of concrete pole.
And a sizing block 4 is fixed on the end face of one end, connected with the connecting accessory 3, of the insulating platform 2, and the sizing block 4 is of an M-shaped structure.
The two insulating ropes are inelastic ropes or safety belts.
The insulating platform 2 is made of a square light glass fiber reinforced plastic composite material.
And a safety handrail 5 is fixed above the insulating platform 2.
The present embodiment is used specifically as follows.
Connecting parts 3 are the chain or take the rope, connecting parts 3 hang on the angle bar of electricity tower through basket of flowers bolt, stay cord 1 is fixed on other angle bars of electricity tower through couple 7, makes insulating platform 2 and stay cord 1 form the triangle-shaped structure, parallels 4 chucking prevents insulating platform 2 rotation on the electricity tower, simultaneously cardboard and angle bar fixed connection ensure that personnel can stand the operation on insulating platform 2.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (8)

1. An on-pole work platform, comprising: the pull rope (1), the insulating platform (2) and the connecting accessories (3); the pull rope (1) is composed of two insulating ropes, and one end of the pull rope (1) is hinged with the insulating platform (2); the concrete pole is characterized in that the insulating platform (2) is of a square plate-shaped structure, the connecting accessories (3) are of an annular structure, the annular outer side of each connecting accessory (3) is connected with one end of the insulating platform (2), and the connecting accessories (3) are used for being hooped on the concrete pole.
2. A work platform on a pole as claimed in claim 1, wherein: through holes are formed in two sides of the insulating platform (2), and the two insulating ropes are connected with two sides of the insulating platform (2) in a one-to-one correspondence mode respectively.
3. A work platform on a pole as claimed in claim 2, wherein: the one end of two insulating ropes all is provided with U type pull ring (6), U type pull ring (6) are articulated with insulating platform (2) both sides, the other end of two insulating ropes all is provided with couple (7), couple (7) are used for articulating the angle bar of fixture or the electricity tower of concrete pole.
4. A work platform on a pole as claimed in claim 3, wherein: and a sizing block (4) is fixed on the end face of one end, connected with the connecting accessory (3), of the insulating platform (2), and the sizing block (4) is of an M-shaped structure.
5. The on-pole work platform of claim 4, wherein: the two insulating ropes are inelastic ropes or safety belts.
6. The on-pole work platform of claim 5, wherein: the insulating platform (2) is made of a square light glass fiber reinforced plastic composite material.
7. The on-pole work platform of claim 6, wherein: and a safety handrail (5) is fixed above the insulating platform (2).
8. An on-tower work platform, comprising: the pull rope (1), the insulating platform (2) and the connecting accessories (3); the pull rope (1) is composed of two insulating ropes, and one end of the pull rope (1) is hinged with the insulating platform (2); the insulation platform (2) is of a square plate-shaped structure, the connecting accessories (3) are bolts with adjustable lengths, one end of each connecting accessory (3) is fixedly connected with one end of the insulation platform (2), and the other end of each connecting accessory (3) is connected with an angle iron through hole of the electric tower.
CN201920934359.4U 2019-06-20 2019-06-20 Operation platform on pole and tower Expired - Fee Related CN211143693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920934359.4U CN211143693U (en) 2019-06-20 2019-06-20 Operation platform on pole and tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920934359.4U CN211143693U (en) 2019-06-20 2019-06-20 Operation platform on pole and tower

Publications (1)

Publication Number Publication Date
CN211143693U true CN211143693U (en) 2020-07-31

Family

ID=71744348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920934359.4U Expired - Fee Related CN211143693U (en) 2019-06-20 2019-06-20 Operation platform on pole and tower

Country Status (1)

Country Link
CN (1) CN211143693U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112701612A (en) * 2020-11-10 2021-04-23 广东电网有限责任公司广州供电局 Aerial work platform of transmission line shaft tower cross arm
CN113530191A (en) * 2021-07-30 2021-10-22 中国电建集团河南工程有限公司 Method for installing diagonal steel cable of long cantilever platform
CN115142655A (en) * 2022-07-20 2022-10-04 广东电网有限责任公司 Electric power tower operation platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112701612A (en) * 2020-11-10 2021-04-23 广东电网有限责任公司广州供电局 Aerial work platform of transmission line shaft tower cross arm
CN113530191A (en) * 2021-07-30 2021-10-22 中国电建集团河南工程有限公司 Method for installing diagonal steel cable of long cantilever platform
CN115142655A (en) * 2022-07-20 2022-10-04 广东电网有限责任公司 Electric power tower operation platform
CN115142655B (en) * 2022-07-20 2023-08-22 广东电网有限责任公司 Electric power pole tower operation platform

Similar Documents

Publication Publication Date Title
CN211143693U (en) Operation platform on pole and tower
US9701520B2 (en) Hoisting platform system
CN204804298U (en) Building material hoist and mount construction scaffold
CN102635226B (en) Flexible hanging self-expansion operating platform and construction method
CN109882065B (en) General type steel frame cat ladder climbing device
CN2383905Y (en) Portable combined lift scaffold
CN212054063U (en) Novel high-voltage line protection device
CN201176567Y (en) Mobile angular adjustment frame hanging at end of staying cable beam
CN214899827U (en) High-altitude outdoor cable terminal operation platform
CN206336964U (en) A kind of support top formula lifting pipeline apparatus and system
CN201705193U (en) Dedicated flexible ladder used for replacing insulators
CN213015777U (en) Movable protective fence for building construction
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN211439747U (en) Adjustable bolt tightening device for elevator installation
CN202450838U (en) Assembling type iron tower base station
CN201620535U (en) Colored steel bottom tile mounting device of steel roof
CN111962957A (en) Assembling tool for erecting power line steel pipe pole
CN211338599U (en) Tower crane attaches wall mounting platform
CN218953229U (en) Continuous ladder for climbing steel pipe pole
CN211817834U (en) Scaffold assembly is used in room construction convenient to dismouting
CN214784678U (en) Annular steel structure building
CN204850672U (en) Portable simple and easy construction canopy
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN220365506U (en) Anti-toppling anti-falling construction ladder convenient for climbing pole
CN112609951B (en) Composite climbing bracket for high-altitude operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200731