CN111962957A - Assembling tool for erecting power line steel pipe pole - Google Patents

Assembling tool for erecting power line steel pipe pole Download PDF

Info

Publication number
CN111962957A
CN111962957A CN202010833890.XA CN202010833890A CN111962957A CN 111962957 A CN111962957 A CN 111962957A CN 202010833890 A CN202010833890 A CN 202010833890A CN 111962957 A CN111962957 A CN 111962957A
Authority
CN
China
Prior art keywords
fixedly connected
rod
pole
tower
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010833890.XA
Other languages
Chinese (zh)
Inventor
张雨
杨喆
胡宇轩
董承熙
何勇
王一名
毛安琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhaoqing Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Zhaoqing Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Zhaoqing Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202010833890.XA priority Critical patent/CN111962957A/en
Publication of CN111962957A publication Critical patent/CN111962957A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention relates to the technical field of electric power construction, in particular to an assembling tool for erecting a steel pipe pole of an electric power circuit, which comprises an erecting tower, wherein the erecting tower comprises a base, the upper surface of the base is fixedly connected with a plurality of supporting rod bodies, a connecting body is fixedly connected among the plurality of supporting rod bodies to enclose a tower body of the erecting tower, the middle part of the tower body is fixedly connected with a supporting platform, the top of the tower body is fixedly connected with an installation platform, and the supporting platform and the installation platform are connected with the supporting rod bodies through multidirectional pipes. Utilize this assembling tool can convenient construction electric power steel pipe tower, save the equipment time, the steel pipe tower hoist and mount that the equipment obtained simultaneously are firm, and the operating personnel of being convenient for stands, improves factor of safety.

Description

Assembling tool for erecting power line steel pipe pole
Technical Field
The invention relates to the technical field of electric power construction, in particular to an assembling tool for erecting a steel pipe pole of an electric power circuit.
Background
Steel pipe poles are often used in power line construction. Taking part of steel pipe poles of a Boquan 220kV matched line project as an example, the total height of the steel pipe poles in the line is 59-83 m, the pole body is formed by assembling pipe sections with the length of 6-9 m, the diameter of a single-section pipe is 1-2.4 m, and the single weight is 5-8T. The engineering steel pipe pole belongs to an ultra-long, ultra-heavy and ultra-large steel pipe tower.
At present, the multi-purpose crane of electric power steel pipe tower is hung highly and is installed, and the entering of the crane of being not convenient for in some areas causes the trouble to building electric power steel pipe tower, needs the construction equipment instrument, the construction of the motor steel pipe tower of being convenient for, and in the process of establishing, the stability of subassembly instrument is especially important, support personnel's safety and smooth construction, need comparatively convenient moreover, the equipment is convenient, saves the equipment time. For example, chinese patent with patent publication No. CN104453339B and publication No. 2017.10.10, which discloses a box assembled by a base, a main pipe, and a connecting rod, and a pulley is provided on the box for hoisting, but the connection structure performed in the assembling process is unstable, and only a ladder is used for an operator to climb, but the length and diameter of the steel pipe are large, so that the steel pipe is obviously unsafe and unstable to climb by using the ladder, and a stable platform is not provided for the operator to stand, so that an assembling tool with more stable and safe hoisting is needed to be designed at present.
Disclosure of Invention
The invention provides an assembling tool for erecting a power line steel pipe pole, which can be used for conveniently constructing a power steel pipe tower, save assembling time, ensure that the assembled steel pipe tower is stably hoisted, facilitate the standing of operators and improve the safety coefficient.
The technical scheme of the invention is as follows:
the utility model provides an electric power line steel pipe pole erects and uses assembly tool, includes erects the tower, it includes the base to erect the tower, the last fixed surface of base is connected with a plurality of and supports the body of rod, a plurality of fixedly connected with connector encloses between the body of rod support the body of rod of erecting the body of tower, the middle part fixedly connected with supporting platform of body of tower, the top fixedly connected with mounting platform of body of tower, supporting platform, mounting platform through multidirectional pipe with the support body of rod is connected.
Further, the base is provided with be used for with the mounting hole that the support body of rod bottom is connected.
Furthermore, a plurality of fixing holes are formed in the base and fixedly connected with the bottom surface through screws.
Further, the support body of rod is refuted by a plurality of branch pole and is formed, every the both ends of branch pole all are equipped with mounting flange, refute the mounting flange of two adjacent branch poles of locking through the butt joint and connect.
Further, fixedly connected with oblique connecting pipe and directly link the takeover on the support body of rod, the connector includes the down tube body and the straight body of rod, the both ends of the down tube body with oblique connecting pipe fixed connection, the both ends of the straight body of rod with directly link takeover fixed connection.
Furthermore, the oblique rod bodies are fixedly connected between the two adjacent supporting rod bodies and are X-shaped.
Further, the multidirectional pipe is the three-way pipe, the three-way pipe includes the standpipe and locates the standpipe both sides and be two violently pipes that the right angle set up, two connection terminal surfaces of standpipe and the connection terminal surface of violently managing are flange, two the mounting flange of branch pole carries out fixed connection and realizes refuting the connection through the flange with the standpipe both ends respectively.
Further, supporting platform includes four first component poles, the both ends of first component pole are equipped with mounting flange, four first component pole through mounting flange with the flange of violently managing of multidirectional pipe carries out fixed connection and encloses into square frame, two relatively fixedly connected with branch between the first component pole.
Further, mounting platform includes that four seconds constitute the pole, the both ends that the pole was constituteed to the second are equipped with mounting flange, four the second constitute the pole through mounting flange with the flange of violently managing of multidirectional pipe carries out fixed connection and encloses into square frame, two relatively fixedly connected with bearing bar between the pole is constituteed to the second, and two are relative in addition fixedly connected with bearing plate between the pole is constituteed to the second, the bearing plate is located the top of bearing bar, the last fixed surface of bearing plate is connected with around the wheel, the equal fixedly connected with auxiliary wheel in both sides edge of bearing plate, it is spacing to still to be equipped with the stopper on the pole is constituteed to the second and is used for installing the bearing plate.
Further, the overall shape of the erection tower is a quadrangular pyramid.
The working principle is as follows: the base is placed on the ground, the base is fixed through a fixing hole, then the bottom of a first section of branch rod forming a supporting rod body is placed in a mounting hole and fixed through a screw, then a straight rod body and an inclined rod body are fixedly connected with the first section of branch rod of the supporting rod body through an inclined connecting pipe and a straight connecting pipe, an operator climbs upwards through the straight rod body, then a multidirectional pipe is installed at the top of the first section of branch rod, then a first component rod and a support rod are installed to form a supporting platform, the operator can stand on the supporting platform through the support rod, through the method, the operator can connect the next branch rod on the supporting platform through the multidirectional pipe to continuously heighten and install the erection tower, each branch rod is installed after being connected to form a supporting platform so as to be continuously heightened, and finally when a top layer is installed, a second component rod and a bearing rod are installed through the multidirectional pipe to form an installation platform, and after the erection tower is assembled, the two ends of the stay cord are respectively connected with the winding wheel through two auxiliary wheels, one end of the stay cord is connected with the winch, and the other end of the stay cord is connected with the electric steel pipe, so that the electric steel pipe is lifted for installation.
The invention has the beneficial effects that:
1. the erection tower is provided with the support rod bodies, the connecting bodies and the multidirectional pipes, the support rod bodies are formed by connecting the multidirectional pipes through a plurality of branch rods, the connecting bodies are connected between two adjacent support rod bodies to strengthen stability, meanwhile, the straight rod bodies of the connecting bodies can be used for climbing, additional crawling ladders are not needed, and the support rod bodies are simultaneously connected through the multidirectional pipes to form the support platform and the mounting platform, so that the erection tower is stably connected, meanwhile, the support platform can be used for operators to stand to heighten, the erection is convenient and safe, the whole erection tower is in a quadrangular pyramid shape, the whole structure is stable, the safety of human bodies is protected, and the erection of the electric steel pipe tower is facilitated;
2. according to the tower, the top of each section of the support rod body is connected and assembled with the support platform through the multidirectional pipe, so that the structure of the tower is stable, a safe standing place is provided for each layer of the tower to be heightened by operators for continuous heightening operation, and safety is greatly improved; the invention has simpler erection, and enhances the stability of the structure through the alternate arrangement of the inclined rod bodies and the straight rod bodies;
3. according to the invention, the support rod body formed by the plurality of branch rods and the connecting piece formed and connected by the multidirectional pipes are used for erection, so that the climbing of personnel is facilitated, the convenience for erecting the erection tower by the personnel is improved, and meanwhile, the safety performance is ensured.
Drawings
FIG. 1 is a schematic elevation view of a tower;
FIG. 2 is a schematic side view of the erection tower;
FIG. 3 is a schematic structural view of a base;
FIG. 4 is a schematic structural view of a multidirectional tube;
FIG. 5 is a schematic structural view of the support platform;
FIG. 6 is a schematic structural view of the mounting platform;
in the figure: 1-base, 101-mounting hole, 102-fixing hole, 2-supporting rod body, 201-branch rod, 202-oblique connecting pipe, 203-direct connecting pipe, 3-supporting platform, 301-first component rod, 302-supporting rod, 4-mounting platform, 401-second component rod, 402-bearing rod, 403-bearing plate, 404-limiting block, 5-multidirectional pipe, 501-vertical pipe, 502-horizontal pipe, 503-connecting flange, 6-oblique rod body, 7-straight rod body, 8-winding wheel and 9-auxiliary wheel.
Detailed Description
The drawings are for illustrative purposes only and are not to be construed as limiting the patent; for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product; it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted. The positional relationships depicted in the drawings are for illustrative purposes only and are not to be construed as limiting the present patent.
Example 1:
as shown in fig. 1-6, an assembly tool for erecting a steel pipe pole of an electric power line, including erecting a tower, the tower includes a base 1, the base is used for fixing the position of erecting the tower, the foundation of erecting the tower, four supporting rod bodies 2 are fixedly connected with the upper surface of the base 1, the supporting rod bodies 2 are the main body for supporting and erecting the tower, a tower body for erecting the tower is enclosed by fixedly connected with connectors between the four supporting rod bodies 2, the connectors enable the stable structure of erecting the tower, a supporting platform 3 is fixedly connected with the middle of the tower body, a mounting platform 4 is fixedly connected with the top of the tower body, the supporting platform 3, the mounting platform 4 is connected with the supporting rod bodies 2 through a multidirectional pipe 5, the supporting platform 3 is used for supporting personnel to stand, the tower is convenient to be heightened, a hoisting tool is installed on the mounting platform, and the electric.
Referring to fig. 3, four corners of the base 1 are provided with mounting holes 101 for connecting with the bottom of the supporting rod body 2, four fixing holes 102 are arranged on the base 1, and the fixing holes 102 are fixedly connected with the bottom surface through screws.
Referring to fig. 1 and 2, the supporting rod body 2 is formed by connecting a plurality of branch rods 201 in a connected manner, mounting flanges are arranged at two ends of each branch rod 201, and the mounting flanges of two adjacent branch rods 201 are respectively fixedly connected with connecting flanges 503 at two ends of a vertical pipe 501 of the multi-directional pipe 5 in a connected manner. Fixedly connected with oblique connecting pipe 202 and directly link the takeover 203 on the support body of rod 2, the connector includes the oblique body of rod 6 and straight-bar body 7, the both ends and the oblique connecting pipe 202 fixed connection of the oblique body of rod 6, the both ends of straight-bar body 7 with directly link takeover 203 fixed connection, be the X form when 6 fixed connection of the oblique body of rod is between two adjacent support bodies of rod 2, the connector carries out the strengthening intensity to the support body of rod 2, prescribes a limit to its position simultaneously and has strengthened the structural stability who erects the tower.
Referring to fig. 4, multidirectional pipe 5 is the three-way pipe, the three-way pipe includes standpipe 501 and locates standpipe 501 both sides and be two violently pipes 502 of right angle setting, two connection terminal surfaces of standpipe 501 and the connection terminal surface of violently pipe 502 are flange 503, two mounting flanges that divide pole 201 carry out fixed connection and realize refuting through flange 503 with standpipe 501 both ends respectively, and the first flange 401 of constituteing pole 301 or the second of constituteing mounting platform 4 of constituteing that constitutes supporting platform 3 then installs through flange 503 of violently pipe 502.
Referring to fig. 5, the supporting platform 3 includes four first composition poles 301, mounting flanges are disposed at two ends of the first composition poles 301, the four first composition poles 301 are fixedly connected with a connecting flange 503 of one transverse pipe 502 of the multi-directional pipe 5 through the mounting flanges to form a square frame, a supporting rod 302 is fixedly connected between two opposite first composition poles 301, so that people can stand conveniently, and the supporting platform 3 can bear workers and can heighten an erection tower conveniently.
Referring to fig. 6, the mounting platform 4 includes four second composition rods 401, two ends of the second composition rods 401 are provided with mounting flanges, the four second composition rods 401 are fixedly connected with a connecting flange 302 of another transverse pipe 502 of the multi-directional pipe 5 through the mounting flanges to form a square frame, a load-bearing rod 402 is fixedly connected between two opposite second composition rods 401, a load-bearing plate 403 is fixedly connected between the other two opposite second composition rods 401, the load-bearing plate 403 is positioned above the load-bearing rod 402, the load-bearing rod 402 bears the weight to reinforce the strength of the load-bearing plate 403, a winding wheel 8 is fixedly connected to the upper surface of the load-bearing plate 403, auxiliary wheels 9 are fixedly connected to both side edges of the load-bearing plate 403 to limit the position of the steel wire rope and facilitate sliding, a limiting block 404 is provided on the second composition rods 401 to mount and limit the load-bearing plate 403, and finally two ends of the steel wire rope pass through the two auxiliary, one end of the steel wire pull rope is connected with the winch, and the other end of the steel wire pull rope is connected with the electric steel pipe, so that the electric steel pipe is lifted to be installed.
In this embodiment, the overall shape of the erection tower is a quadrangular pyramid, each surface is a trapezoid narrowing from bottom to top, and the structure is stable.
The working principle of the invention is as follows:
the base 1 is placed on the ground, the base 1 is fixed through the fixing hole 102, then the bottom of a first section branch rod 201 forming the supporting rod body 2 is placed in the mounting hole 101 and fixed through a screw, then the straight rod body 7 and the inclined rod body 6 are fixedly connected with the first section branch rod 201 of the supporting rod body 2 through the inclined connecting pipe 202 and the direct connecting pipe 203, an operator climbs upwards through the straight rod body 7, then the multidirectional pipe 5 is installed at the top of the first section branch rod 201, then the first forming rod 301 and the support rod 302 are installed to form the supporting platform 3, the operator can stand on the supporting platform 3 through the support rod 302, through the method, the operator connects the next branch rod 201 on the supporting platform 3 through the multidirectional pipe 5, the tower is continuously heightened and installed, when one branch rod 201 is installed in a connection mode, one supporting platform 3 is formed, so that the installation can be continued, and finally when the top layer is installed, the second component rod 401 and the bearing rod 402 are installed through the multidirectional pipe 5 to form the installation platform 4, the erection tower is assembled, finally, the two ends of the pull rope are respectively connected with the winding wheel 8 through the two auxiliary wheels 9, one end of the pull rope is connected with the winch, the other end of the pull rope is connected with the electric steel pipe, and the electric steel pipe is lifted to be installed.
It should be understood that the above-described embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. The utility model provides an electric power line steel pipe pole erects and uses assembling tool, includes erects the tower, its characterized in that: erect the tower and include the base, the last fixed surface of base is connected with a plurality of and supports the body of rod, a plurality of fixedly connected with connector encloses between the support body of rod erect the body of tower, the middle part fixedly connected with supporting platform of body of tower, the top fixedly connected with mounting platform of body of tower, supporting platform, mounting platform pass through the multidirectional pipe with the support body of rod is connected.
2. The tool of claim 1, wherein: the base is provided with be used for with the mounting hole that the support body of rod bottom is connected.
3. The tool of claim 1, wherein: the base is provided with a plurality of fixing holes, and the fixing holes are fixedly connected with the bottom surface through screws.
4. The tool of claim 1, wherein: the support body of rod is refuted by a plurality of branch pole and is formed, every the both ends of branch pole all are equipped with mounting flange, refute the connection through the mounting flange of two adjacent branch poles of butt joint locking.
5. The tool of claim 1, wherein: the supporting rod is fixedly connected with an inclined connecting pipe and a direct connecting pipe, the connecting body comprises an inclined rod body and a straight rod body, the two ends of the inclined rod body are fixedly connected with the inclined connecting pipe, and the two ends of the straight rod body are fixedly connected with the direct connecting pipe.
6. The tool of claim 5, wherein: the oblique rod bodies are fixedly connected between every two adjacent supporting rod bodies and are in an X shape.
7. The tool of claim 4, wherein: the utility model discloses a hydraulic support, including the standpipe, the standpipe is equipped with the connecting flange, the connecting flange is equipped with the connecting flange, the multidirectional pipe is the three-way pipe, the three-way pipe includes the standpipe and locates the standpipe both sides and be two violently pipes that the right angle set up, two the connecting end face of standpipe and the connecting end face of violently managing are flange, two the mounting flange of branch pole carries out fixed connection and realizes refuting the connecing through the connecting flange with the standpipe both.
8. The tool of claim 7, wherein: support platform includes four first component poles, the both ends of first component pole are equipped with mounting flange, four first component pole through mounting flange with the flange of violently managing of multidirectional pipe carries out fixed connection and encloses into square frame, two relatively fixedly connected with branch between the first component pole.
9. The tool of claim 7, wherein: mounting platform includes that four seconds constitute the pole, the both ends that the pole was constituteed to the second are equipped with mounting flange, four the second constitute the pole through mounting flange with the flange of violently managing of multidirectional pipe carries out fixed connection and encloses into square frame, two relatively fixedly connected with bearing bar between the second constitutes the pole, and two are relative in addition fixedly connected with bearing plate between the second constitutes the pole, the bearing plate is located the top of bearing bar, the last fixed surface of bearing plate is connected with around the wheel, the equal fixedly connected with auxiliary wheel in both sides edge of bearing plate, it is spacing that still to be equipped with the stopper on the second constitutes the pole and be used for installing the bearing plate.
10. The tool of claim 1, wherein: the overall shape of the erection tower is a quadrangular pyramid.
CN202010833890.XA 2020-08-18 2020-08-18 Assembling tool for erecting power line steel pipe pole Pending CN111962957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010833890.XA CN111962957A (en) 2020-08-18 2020-08-18 Assembling tool for erecting power line steel pipe pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010833890.XA CN111962957A (en) 2020-08-18 2020-08-18 Assembling tool for erecting power line steel pipe pole

Publications (1)

Publication Number Publication Date
CN111962957A true CN111962957A (en) 2020-11-20

Family

ID=73388271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010833890.XA Pending CN111962957A (en) 2020-08-18 2020-08-18 Assembling tool for erecting power line steel pipe pole

Country Status (1)

Country Link
CN (1) CN111962957A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554637A (en) * 2020-12-11 2021-03-26 青岛联合智造科技有限公司 Electric power iron tower installation device

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH565300A5 (en) * 1972-05-12 1975-08-15 Thomas Ltd Martin
WO2012089178A1 (en) * 2010-12-31 2012-07-05 Chladici Veze Praha, A.S. Shifting pylon for cooling towers construction
CN102817341A (en) * 2012-08-23 2012-12-12 中国十七冶集团有限公司 Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly
CN202831588U (en) * 2012-08-08 2013-03-27 广州番禺职业技术学院 Novel scaffold
CN103485522A (en) * 2013-10-12 2014-01-01 江苏耀捷建设工程有限公司 Novel easily-connected scaffold
DE102012015987A1 (en) * 2012-08-11 2014-02-13 Hymer-Leichtmetallbau Gmbh & Co. Kg Telescopic scaffold and method for operating a telescopic scaffold
CN204024004U (en) * 2014-01-23 2014-12-17 洛阳理工学院 A kind of scaffold take dismantling device fast
CN104453339A (en) * 2014-11-04 2015-03-25 国家电网公司 Assembly tool for erecting electric power line steel pipe rods and process
FR3028541A1 (en) * 2014-11-14 2016-05-20 Cdh Group DEVICE FOR DETECTING SCALES OF SCAFFOLDING
CN206785083U (en) * 2017-05-24 2017-12-22 常熟风范电力设备股份有限公司 A kind of combined pole with high firm support performance
CN207017669U (en) * 2017-03-10 2018-02-16 浙江亿达建设有限公司 A kind of edge protection support
CN209129335U (en) * 2018-11-12 2019-07-19 姜宇梁 A kind of construction carrier
CN211037771U (en) * 2019-08-27 2020-07-17 浙江省三建建设集团有限公司 Hanging basket device for outer slope construction

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH565300A5 (en) * 1972-05-12 1975-08-15 Thomas Ltd Martin
WO2012089178A1 (en) * 2010-12-31 2012-07-05 Chladici Veze Praha, A.S. Shifting pylon for cooling towers construction
CN202831588U (en) * 2012-08-08 2013-03-27 广州番禺职业技术学院 Novel scaffold
DE102012015987A1 (en) * 2012-08-11 2014-02-13 Hymer-Leichtmetallbau Gmbh & Co. Kg Telescopic scaffold and method for operating a telescopic scaffold
CN102817341A (en) * 2012-08-23 2012-12-12 中国十七冶集团有限公司 Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly
CN103485522A (en) * 2013-10-12 2014-01-01 江苏耀捷建设工程有限公司 Novel easily-connected scaffold
CN204024004U (en) * 2014-01-23 2014-12-17 洛阳理工学院 A kind of scaffold take dismantling device fast
CN104453339A (en) * 2014-11-04 2015-03-25 国家电网公司 Assembly tool for erecting electric power line steel pipe rods and process
FR3028541A1 (en) * 2014-11-14 2016-05-20 Cdh Group DEVICE FOR DETECTING SCALES OF SCAFFOLDING
CN207017669U (en) * 2017-03-10 2018-02-16 浙江亿达建设有限公司 A kind of edge protection support
CN206785083U (en) * 2017-05-24 2017-12-22 常熟风范电力设备股份有限公司 A kind of combined pole with high firm support performance
CN209129335U (en) * 2018-11-12 2019-07-19 姜宇梁 A kind of construction carrier
CN211037771U (en) * 2019-08-27 2020-07-17 浙江省三建建设集团有限公司 Hanging basket device for outer slope construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈斐明,刘富觉: "《现代管道工实用实训》", 28 February 2015 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554637A (en) * 2020-12-11 2021-03-26 青岛联合智造科技有限公司 Electric power iron tower installation device

Similar Documents

Publication Publication Date Title
CN106219419B (en) The large-scale swing arm tower crane original position of high-rise building is converted to plug-in construction method by interior climb
CN114412158B (en) Aluminum alloy-steel combined attached lifting scaffold and installation method thereof
CN216276809U (en) Building machine bailey frame connecting assembly
CN111962957A (en) Assembling tool for erecting power line steel pipe pole
CN101864841A (en) Integral mounting method of steel-structure factory building wall skin
CN2383905Y (en) Portable combined lift scaffold
CN212957576U (en) Movable elevator shaft construction platform
CN215564746U (en) Assembled steel structure ladder cage
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN213979843U (en) Prefabricated staircase safety operation platform of assembled structure
CN212832684U (en) Self-propelled combined lifting multifunctional aerial work platform truck
CN113389363A (en) Combined splicing type liftable protective tower
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN221236372U (en) Portable combined scaffold for building construction
CN221001902U (en) Construction hanger for building
CN213391149U (en) Attached lifting operation safety protection platform frame
CN218623600U (en) 5G roof television microwave signal tower lifting installation structure
CN219771544U (en) Hoisting construction equipment
CN210685313U (en) Safe convenient house steel connection structure
CN219906818U (en) Hoisting pulley device for flexible photovoltaic bracket construction and mounting structure thereof
CN114278108B (en) Construction lifter canopy and construction method
CN220564178U (en) Truss lifting device
CN220767698U (en) Supporting structure
CN219196541U (en) End hoisting plug-in type scissors stair
CN219990861U (en) Quick mounting structure for elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201120

RJ01 Rejection of invention patent application after publication