CN210944766U - Cutting side ditch cover plate installation construction device - Google Patents

Cutting side ditch cover plate installation construction device Download PDF

Info

Publication number
CN210944766U
CN210944766U CN201921938929.3U CN201921938929U CN210944766U CN 210944766 U CN210944766 U CN 210944766U CN 201921938929 U CN201921938929 U CN 201921938929U CN 210944766 U CN210944766 U CN 210944766U
Authority
CN
China
Prior art keywords
support frame
crane
lifting
cover plate
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921938929.3U
Other languages
Chinese (zh)
Inventor
赵强
栾晓强
徐太昌
李亚平
陈霄
郭文静
张晓艳
黄帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201921938929.3U priority Critical patent/CN210944766U/en
Application granted granted Critical
Publication of CN210944766U publication Critical patent/CN210944766U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a construction field, in particular to cutting side ditch apron installation construction equipment. The device includes crane and hoist and mount subassembly, the crane includes running gear, installs crane skeleton and crane auxiliary frame on the running gear respectively, crane skeleton includes first support frame and second support frame, installs the handrail on the first support frame, installs the lifting hook on the second support frame, hangs the hoist and mount subassembly on the lifting hook, hoist and mount subassembly is including the hoist and mount rope, hoist and mount rope both ends swing joint hoist respectively, and the hoist is rotatory for the hoist and mount rope, the hoist includes rings and fixes the type of falling T on rings, the vertical section fixed connection rings of the type of falling T, and the horizontal section of the type of falling T is located preformed hole below for pocket support apron. The utility model discloses a two hoist pocket support apron, the handling is stable, and artifical promotion crane will lap to remove and put in place and install, convenient operation, and personnel's input is few, reduces personnel intensity of labour, improves the efficiency of construction, guarantees construction quality.

Description

Cutting side ditch cover plate installation construction device
Technical Field
The utility model relates to a construction field, in particular to cutting side ditch apron installation construction equipment.
Background
Cutting gutter apron all concentrates prefabrication at item portion mix station, through the secondary transportation of falling, the transportation is installed to the job site, the handling in-process occupies a large amount of personnel and machinery, in addition, there is prefabricated apron unfilled corner condition emergence among the transportation process, through the research decision, it uses plastic mold to prefabricate on the spot with the help of dull and stereotyped shaking table to level and smooth the place back, reduce apron transportation number of times, because the job site space is limited, it is very inconvenient to adopt large-scale hoisting equipment to hoist and mount apron, therefore, can only carry cutting gutter notch position with the on-the-spot prefabricated apron through artifical transport mode, the installation of apron again carries out, adopt this kind of mode, occupy a large amount of personnel, increase personnel's intensity of labour, reduce the efficiency of construction, and the installation accuracy is not high, damage the apron easily when using crowbar adjustment mounted position, construction quality can not guarantee.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and carrying the prefabricated apron of job site to cutting edge ditch notch position through artifical transport mode and installing again, intensity of labour is big, and the efficiency of construction is low, apron fragile during installation, and the technical problem that construction quality can not guarantee provides a cutting edge ditch apron installation construction equipment, can guarantee construction quality, reduces personnel intensity of labour, improves the efficiency of construction.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: cutting edge trench cover plate installation construction equipment comprises a crane and a hoisting assembly, wherein the crane comprises a walking device, a crane framework and a crane auxiliary frame are respectively installed on the walking device, the crane framework comprises a first support frame and a second support frame, one end of the first support frame and one end of the second support frame are respectively fixed on the midpoint of a middle shaft of the walking device, a handrail is installed at the other end of the first support frame, a lifting hook is installed at the other end of the second support frame, the hoisting assembly is hung on the lifting hook and comprises a hoisting rope, the two ends of the hoisting rope are respectively movably connected with a hoisting tool, the hoisting tool rotates relative to the hoisting rope, the hoisting tool comprises a hoisting ring and a reversed T-shaped part fixed on the hoisting ring, the vertical section of the reversed T-shaped part is fixedly connected with the hoisting ring, the vertical section of the reversed T-shaped part penetrates through a reserved hole on a cover plate, and the transverse section of the, used for supporting the cover plate.
Further, a counterweight platform is further mounted on the second support frame.
Further, the cover is equipped with hook-off prevention part on the hoist and mount rope, hook-off prevention part contacts with the lifting hook for prevent that hoist and mount subassembly from droing.
Furthermore, the hanging ring is provided with a connecting hole for movably connecting the hoisting rope.
Furthermore, the crane auxiliary frame comprises a vertical rod, the lower end of the vertical rod is welded to the middle point of the center shaft of the walking device, support frames are welded to two sides of the vertical rod, the two support frames and the center shaft of the walking device form a triangle, two auxiliary supports are further welded to the vertical rod, and two ends of each auxiliary support are respectively welded to the first support frame and the second support frame.
Further, the walking device is a single-shaft roller.
Further, the crane framework is made of hollow steel pipes.
Furthermore, the lifting hook is made of finish-rolled deformed steel bars.
Furthermore, the hoisting rope is a steel wire rope.
The utility model discloses a hoist pocket holds in palm the apron, adopt two hoisting points, it is more stable to make the handling, the rethread crane will lap and mention, promote the crane and lap the installation to cutting side ditch notch position, personnel's input is few, personnel's intensity of labour has been reduced, improve personnel's efficiency of construction, lever principle is utilized in the preparation of crane skeleton, use manpower sparingly greatly, install the counter weight platform on the crane skeleton, can indulge the cross slope and the length counter weight of fortune is by oneself to the freight distance according to the job site, the installation effect is good, the apron is not fragile, can satisfy apron installation gap standard requirement simultaneously, construction quality has been guaranteed, the device is with low costs, moreover, the steam generator is simple in structure, and.
Drawings
Fig. 1 is a front view of the structure of the present invention.
Fig. 2 is a top view of the structure of the present invention.
Fig. 3 is a right side view of the structure of the present invention.
Figure 4 is the utility model discloses a hoist and mount subassembly structure front view.
In the figure: 1. the lifting appliance comprises a lifting appliance, 2 auxiliary supports, 3 a counterweight platform, 4 a traveling device, 5 a first support frame, 6 a second support frame, 7 handrails, 8 a lifting hook, 9 an anti-falling hook part, 10 a steel wire rope, 11 an upright rod and 12 a support frame.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples, but the present invention is not limited to the specific examples.
The cutting edge trench cover plate installation construction device shown in fig. 1-3 comprises a crane and a hoisting component, wherein the crane comprises a walking device 4 for manually pushing the crane, a crane framework and a crane auxiliary frame are respectively arranged on the walking device 4, the crane framework comprises a first support frame 5 and a second support frame 6, one end of the first support frame 5 and one end of the second support frame 6 are respectively fixed on the midpoint of the central shaft of the walking device 4, a handrail 7 is arranged at the other end of the first support frame 5, a lifting hook 8 is arranged at the other end of the second support frame 6, the direction of the lifting hook 8 is upward, the hoisting component is suspended on the lifting hook 8, a counterweight platform 3 is also arranged on the second support frame 6, the counterweight can be automatically balanced according to the longitudinal and transverse slopes of a construction site and the length of a transport distance, the construction efficiency of personnel is improved, the crane auxiliary frame comprises a vertical rod 11, two sides of the upright stanchion 11 are welded with support frames 12, the two support frames 12 and the middle shaft of the walking device 4 form a triangle, the framework can be effectively prevented from deforming, the upper part of the upright stanchion 11 is welded with two auxiliary brackets 2, the two ends of the two auxiliary brackets 2 are respectively welded on the first support frame 5 and the second support frame 6, the hoisting component comprises a hoisting rope, the two ends of the hoisting rope are respectively movably connected with a hoisting tool 1, the hoisting tool 1 rotates relative to the hoisting rope, the hoisting tool 1 comprises a hoisting ring and a reversed T-shaped part fixed on the hoisting ring, the hoisting ring is provided with a connecting hole, is used for movably connecting a hoisting rope, the vertical section of the inverted T-shaped part is fixedly connected with a hoisting ring, the vertical section of the inverted T-shaped part passes through the preformed hole on the cover plate, the horizontal section of the inverted T-shaped part is positioned below the preformed hole, be used for the pocket to hold in the palm the apron, the cover is equipped with hook 9 of anticreep on the hoist and mount rope, and hook 9 of anticreep contacts with lifting hook 8 for prevent that hoist and mount subassembly from droing.
Preferably, the walking device 4 is a single-axle roller, a hand cart wheel of a construction site can be used, the width of an outer tire of the roller is 6.8cm, and the distance between two tires is 80 cm.
Preferably, the crane framework is made of hollow steel pipes.
Preferably, the length of the first support frame 5 is 4 m.
Preferably, the length of the second support frame 6 is 2 m.
Preferably, the hook 8 is made of finish-rolled deformed steel, so that friction between the hook 8 and the wire rope 10 can be increased.
Preferably, the hoisting rope is a steel wire rope 10.
By adopting the cutting side ditch cover plate installation construction device, self-balancing is carried out on the balancing platform 3 in advance according to the field longitudinal and transverse slopes, the cutting side ditch cover plate has three 20-3-13 cm reserved holes, the lifting appliance 1 is made of round steel according to the design structure form of the cover plate, rubber pads are arranged around the lifting appliance 1, finished product protection is emphasized, the lifting appliance 1 penetrates through the reserved holes of the cover plate, the lifting appliance 1 is rotated to enable the transverse section of the inverted T-shaped piece to wrap the cover plate, the head part of the lifting appliance is provided with a lifting hook 8, a steel wire rope 10 is hung on the lifting hook 8, a worker operates the lifting appliance to lift the cover plate, then the lifting appliance 4 is pushed by the walking appliance 4, the walking appliance 4 is a single-shaft roller, a hand-pushing building-site wheel can be used, the self weight of the lifting appliance is reduced and the service life is prolonged comprehensively, the width of a roller cover tire is 6.8cm, the distance between two tires is 80cm, two constructors can easily, through commander's adjustment apron position and supplementary unhook, guarantee that the left and right sides interval satisfies drawing and standard requirement, continue the installation of circulation apron, accomplish until cutting side ditch apron installation, follow-up use is done grey and is clogged the gap, and the installation back driving direction apron is seamless.
Crane framework material is hollow national standard steel pipe, lever principle is utilized in its preparation, carry out the split by two hollow tube welding, use manpower sparingly greatly, there is an auxiliary steel pipe as the support respectively in both sides, effectively prevent the skeleton and warp, install the counter weight platform on the crane skeleton, can be according to job site longitudinal and transverse slopes and transport distance length counter weight by oneself, improve personnel's efficiency of construction, personnel's input is few, in the past, carry the apron through manual mode and carry out the apron installation, only can install 200 ~ 250 in a day, use cutting side ditch apron installation construction equipment, can install 350 ~ 400 prefabricated apron in a day, greatly improve the efficiency of construction, personnel's intensity of labour has been reduced, through the on-the-site inspection, apron installation piece width and apron interval satisfy the design specification demand, construction quality has been guaranteed, the device is with low costs, moreover, the steam generator is simple in structure.
The above description is further detailed in connection with the preferred embodiments of the present invention, and it is not intended that the specific embodiments of the present invention be limited to these descriptions. To the utility model belongs to the technical field of the ordinary technical personnel, do not deviate from the utility model discloses a under the prerequisite of the design, can also make simple deduction and replacement, all should regard as the utility model discloses a protection scope.

Claims (9)

1. Cutting gutter apron installation construction equipment, its characterized in that: the lifting device comprises a crane and a lifting assembly, wherein the crane comprises a walking device (4), a crane framework and a crane auxiliary frame are respectively installed on the walking device (4), the crane framework comprises a first support frame (5) and a second support frame (6), one end of the first support frame (5) and one end of the second support frame (6) are respectively fixed on the middle point of the middle shaft of the walking device (4), a handrail (7) is installed at the other end of the first support frame (5), a lifting hook (8) is installed at the other end of the second support frame (6), the lifting assembly is suspended on the lifting hook (8), the lifting assembly comprises a lifting rope, two ends of the lifting rope are respectively and movably connected with a lifting appliance (1), the lifting appliance (1) rotates relative to the lifting rope, the lifting appliance (1) comprises a lifting ring and a reversed T-shaped piece fixed on the lifting ring, and the vertical section of the reversed T-shaped, the vertical section of the inverted T-shaped part penetrates through a preformed hole in the cover plate, and the transverse section of the inverted T-shaped part is located below the preformed hole and used for supporting the cover plate.
2. The cutting gutter cover plate installation and construction device of claim 1, wherein: and a counterweight platform (3) is also arranged on the second support frame (6).
3. The cutting gutter cover plate installation and construction device of claim 1, wherein: the anti-disengaging hook (9) is sleeved on the hoisting rope, and the anti-disengaging hook (9) is in contact with the lifting hook (8) and used for preventing the hoisting assembly from falling off.
4. The cutting gutter cover plate installation and construction device of claim 1, wherein: and the hanging ring is provided with a connecting hole for movably connecting a hoisting rope.
5. The cutting gutter cover plate installation and construction device of claim 1, wherein: the crane auxiliary frame comprises a vertical rod (11), the lower end of the vertical rod (11) is welded to the middle point of the middle shaft of the traveling device (4), support frames (12) are welded to two sides of the vertical rod (11), the two support frames (12) and the middle shaft of the traveling device (4) form a triangle, two auxiliary supports (2) are further welded to the vertical rod (11), and two ends of the two auxiliary supports (2) are respectively welded to the first support frame (5) and the second support frame (6).
6. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: the walking device (4) is a single-shaft roller.
7. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: the crane framework is made of hollow steel pipes.
8. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: and the lifting hook (8) is made of finish-rolled deformed steel.
9. The cutting trench cover plate installation and construction device according to any one of claims 1 to 5, characterized in that: the hoisting rope is a steel wire rope (10).
CN201921938929.3U 2019-11-12 2019-11-12 Cutting side ditch cover plate installation construction device Active CN210944766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921938929.3U CN210944766U (en) 2019-11-12 2019-11-12 Cutting side ditch cover plate installation construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921938929.3U CN210944766U (en) 2019-11-12 2019-11-12 Cutting side ditch cover plate installation construction device

Publications (1)

Publication Number Publication Date
CN210944766U true CN210944766U (en) 2020-07-07

Family

ID=71376374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921938929.3U Active CN210944766U (en) 2019-11-12 2019-11-12 Cutting side ditch cover plate installation construction device

Country Status (1)

Country Link
CN (1) CN210944766U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112794254A (en) * 2020-12-23 2021-05-14 中国十九冶集团有限公司 Tool for mounting road side ditch cover plate
CN117686340A (en) * 2024-02-04 2024-03-12 菲普新材料科技(深圳)有限公司 Intensity detection system of ditch cover

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112794254A (en) * 2020-12-23 2021-05-14 中国十九冶集团有限公司 Tool for mounting road side ditch cover plate
CN117686340A (en) * 2024-02-04 2024-03-12 菲普新材料科技(深圳)有限公司 Intensity detection system of ditch cover
CN117686340B (en) * 2024-02-04 2024-04-16 菲普新材料科技(深圳)有限公司 Intensity detection system of ditch cover

Similar Documents

Publication Publication Date Title
CN206376515U (en) High-lift operation hanging cradle device
CN201240810Y (en) Novel manual hoister
CN210944766U (en) Cutting side ditch cover plate installation construction device
CN103086279A (en) Vertical transportation construction method for building construction
CN105780646A (en) Bridge overhauling equipment capable of automatically walking
CN203486784U (en) Trolley for installing and disassembling steel moulding plate for construction of anti-colliding wall of bridge
CN210048420U (en) Reinforced concrete pipe handling installation dolly
CN101649684B (en) Installing method of roof mast
CN212450344U (en) Hoisting and traction device for construction
CN206308626U (en) Operating platform for installing hanging basket at top of pier body of pier
CN113023590A (en) Railway box wagon
CN203049587U (en) Multifunctional concrete storehouse surface placing boom
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN203437842U (en) Pipeline welding platform
CN115613478A (en) Continuous beam cantilever casting method
CN213011646U (en) Slide way type hoisting device
CN206070370U (en) A kind of bridge maintenance equipment of automatically walk
CN208762890U (en) Bridge construction anti-drop device
CN207002095U (en) Guide bearing block means of transport during one kind maintenance
CN203593962U (en) Movable transversally-tensioning device of T-shaped beam bridge floor system
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
JP2004155538A (en) Suspension tool
CN215711202U (en) Anti-falling device for fixed pulley steel wire rope of 20t crane
CN217264421U (en) A installation component for tunnel ditch cable duct apron
CN214399682U (en) Hoisting device for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant