CN206376515U - High-lift operation hanging cradle device - Google Patents

High-lift operation hanging cradle device Download PDF

Info

Publication number
CN206376515U
CN206376515U CN201621454176.5U CN201621454176U CN206376515U CN 206376515 U CN206376515 U CN 206376515U CN 201621454176 U CN201621454176 U CN 201621454176U CN 206376515 U CN206376515 U CN 206376515U
Authority
CN
China
Prior art keywords
steel wire
connecting tube
wire rope
poppet
stock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621454176.5U
Other languages
Chinese (zh)
Inventor
赵友明
闫新康
陈建
王云坡
赵光
赵友光
陈建立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Nine Rainbow China Construction Machinery Co Ltd
Original Assignee
Beijing Nine Rainbow China Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Nine Rainbow China Construction Machinery Co Ltd filed Critical Beijing Nine Rainbow China Construction Machinery Co Ltd
Priority to CN201621454176.5U priority Critical patent/CN206376515U/en
Application granted granted Critical
Publication of CN206376515U publication Critical patent/CN206376515U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of high-lift operation hanging cradle device, including being used as hitch, suspension platform and hoisting mechanism, hitch includes fore-stock, after-poppet, connect the beam of fore-stock and after-poppet, the reinforcement steel wire rope at tie-beam two ends, reinforcement steel wire rope is supported to the balancing weight for being strained to the upper supporting column of triangular structure and being pressed on after-poppet on beam, expansion link is equipped with fore-stock and after-poppet vertical direction, the expansion link top of fore-stock and after-poppet is horizontally disposed with respectively the first connecting tube and the second connecting tube, beam includes front-axle beam, it is plugged on the back rest in the second connecting tube, some central sills being connected between the back rest and front-axle beam and some connecting square pipes, connecting square pipes are set in the back rest and central sill, central sill and central sill junction are simultaneously bolted, first connecting pipe box are located at the junction of front-axle beam and central sill and are bolted.Its hitch can adjust height and width according to different construction sites, be easy to construction.

Description

High-lift operation hanging cradle device
Technical field
The utility model is related to the realm of building construction, in particular, and it is related to a kind of high-lift operation hanging cradle device.
Background technology
In construction project, it is often necessary to which some building materials are transported into eminence, manpower goes handling workload to be very huge , so most of building sites are all carried using goliath, so it is greatly improved operating efficiency.Due to using large-scale Job costs are higher carry for crane, therefore when building relatively low building, often carried using hanging basket Work.
At present, the nacelle device commonly used in work progress includes hitch and hanging basket, in work progress, current institute The nacelle device used includes hitch, hoisting mechanism and hanging basket, and the hitch of hanging basket is the steel pipe frame of steel-pipe welding, is hung Basket is usually a square floor, in bottom plate surrounding vertical welding railing, and hitch needs to be transported to eminence before lifting It is fixed, goods is put into hanging basket, with the effect of hoisting mechanism by handling up and down.The mostly of existing hitch are by one Crossbeam divides into one group of front and back support, and crossbeam two ends connection one strengthens steel wire rope and plays reinforcing institute by upper supporting column support triangle shape With.Front and back support is arranged on the platform for needing to lift goods, but above-mentioned platform is often the balcony being located on building top Or in the plateau of job site, the size of these positions differs and can stack some debris, existing hitch more It is difficult to make the adjustment of the adaptability in height and width according to construction site and influence construction speed.
Utility model content
The purpose of this utility model is to provide a kind of high-lift operation hanging cradle device, and its hitch can be applied according to difference Workshop adjusts height and width, is easy to construction.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of high-lift operation hanging cradle device, including hitch, the suspension platform of bearing goods and use as support In the hoisting mechanism of lifting suspension platform, the hitch includes fore-stock, after-poppet, connection fore-stock and after-poppet Beam, the reinforcement steel wire rope at tie-beam two ends, by strengthen steel wire rope supported on beam be strained to triangular structure upper supporting column and It is pressed on the balancing weight on after-poppet, fore-stock and the after-poppet vertical direction and is equipped with expansion link, the fore-stock is with after The expansion link top of support is horizontally disposed with respectively the first connecting tube and the second connecting tube, and the beam includes front-axle beam, is plugged on the The back rest, some central sills being connected between the back rest and front-axle beam and some connecting square pipes in two connecting tubes, the connecting square pipes Be set in the back rest and central sill, central sill and central sill junction and be bolted, first connecting pipe box be located at front-axle beam and in The junction of beam is simultaneously bolted.
By using above-mentioned technical proposal, front and back support is arranged on by surfacing according to the area and landform of construction site Position, the quantity of central sill is selected so that it is determined that the length of beam according to the distance between front and back support, so that hitch energy Enough adapt to different construction sites, then in the presence of expansion link up and down beam come adjust height, make beam can be with cross-domain goods The barriers such as thing, parapet, balcony edge of table, further make hitch can adapt to different construction sites, are easy to construction.
The utility model is further arranged to:The reinforcement steel wire rope two ends are by tensing nose is fixed on the beam two End, described one end for tensing nose is bolted with beam, and the other end is fixed with the screw rod for strengthening steel wire rope for winding.
By using above-mentioned technical proposal, it is tightened up with steel wire rope is strengthened, the reinforcement steel wire rope being wrapped on screw rod will It is more relatively reliable tightly around the fixation of steel wire rope on screw rod, is made, and tense the contact surface that steel wire rope and beam are strengthened in nose increase Product, makes beam more be unlikely to deform or bend under the pulling force of steel wire rope, makes overall structure relatively reliable.
The utility model is further arranged to:The reinforcement steel wire rope bypasses the screw rod and passes through some wire line shoe cards Tightly.
By using above-mentioned technical proposal, multiple wire line shoes carry out stuck to strengthening steel wire rope, make steel wire rope and beam Connection is relatively reliable.
The utility model is further arranged to:The wraparound part of reinforcement steel wire rope between the adjacent wire line shoe is in convex The arc-shaped risen is set.
By using above-mentioned technical proposal, one side projection can reduce reinforcement steel wire rope in steel between being stuck in wire line shoe Slip between cord card and cause to strengthen looseness of steel wire ropes;On the other hand raised whether diminish can be used for observation reinforcement steel wire Whether rope slides to judge the stability of hitch.
The utility model is further arranged to:The upper supporting column bottom is fixed with the card with the first connecting tube clamping Groove, top are provided with the rope sheave coordinated with the reinforcement steel wire rope, and the neck is inverted U shape setting.
By using above-mentioned technical proposal, upper supporting column is arranged on same vertical curve with fore-stock, and fore-stock can be to upper Pillar is played a supporting role, and is reduced the pressure to beam, is not allowed beam yielding.
The utility model is further arranged to:The expansion link includes being fixed on the downside of the first connecting tube and the second connecting tube Inserted link and be set in intubation bottom vertical pole, the vertical pole and inserted link open up along its length it is some be used for wear spiral shell The perforation of bolt.
By using above-mentioned technical proposal, inserted link slides into suitable position to adjust depth of beam in vertical pole, multiple Respective perforations are corresponding and are bolted, simple in construction to be easy to regulation, and the fixation of multiple bolts makes overall structure more steady Gu.
The utility model is further arranged to:The junction of the upper supporting column and the neck, the expansion link with it is described The junction of first connecting tube and the second connecting tube is provided with triangular steel plate.
By using above-mentioned technical proposal, triangular steel plate is arranged on above-mentioned junction as reinforcement makes overall structure more Plus it is firm.
In summary, the utility model has the advantages that:Hitch can adapt to different construction sites and enter Row height and width adjustment, are easy to construction;It is easy to observation to strengthen whether steel wire rope slides to judge the stability of hitch.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one;
Fig. 2 is the local exploded-view of suspension platform in embodiment one;
Fig. 3 is the structural representation of pin assemblies in embodiment one;
Fig. 4 is the B portions enlarged drawing in Fig. 1;
Fig. 5 is the C portions enlarged drawing in Fig. 2;
The structural representation of hitch in Fig. 6 embodiments one;
The exploded perspective view of hitch in Fig. 7 embodiments one;
Fig. 8 is the D portions enlarged drawing in Fig. 6;
Fig. 9 is the A portions enlarged drawing in Fig. 1;
The sectional view of weight in Figure 10 embodiments one;
Vertical direction sectional view in Figure 11 embodiments one at limiting plate;
Horizontal direction sectional view in Figure 12 embodiments one at limiting plate.
Reference:1st, suspension platform;11st, underframe;111st, square plate;12nd, lateral rail;121st, coaming plate;122nd, laterally Square tube;123rd, longitudinal square tube;1231st, clamping plate;13rd, preceding railing;131st, longitudinal steel pipe;132nd, square tube tenon;1321st, projection; 14th, rear railing;141st, wheel assembly is supported;1411st, fixed plate;1412nd, U-board;14121st, side plate;14122nd, bottom plate;1413rd, prop up Support wheel;142nd, spring;15th, base;151st, tongue-and-groove;1511st, boss;1512nd, snap ring;152nd, universal wheel;153rd, flanged plate;2nd, hang Suspension mechanism;201st, perforate;21st, fore-stock;211st, the first bearing;2111st, the first vertical pole;2112nd, the first cross bar;2113rd, it is fixed Bar;212nd, the first inserted link;213rd, the first connecting tube;22nd, after-poppet;221st, the second inserted link;222nd, the second connecting tube;223rd, second Bearing;2231st, the second vertical pole;2232nd, the second cross bar;2233rd, weight linear meter;23rd, beam;231st, front-axle beam;2311st, baffle plate;232nd, in Beam;233rd, the back rest;234th, connecting square pipes;24th, steel wire rope is strengthened;241st, nose is tensed;2411st, U-shaped steel plate;2412nd, parallel-plate; 25th, upper supporting column;251st, neck;252nd, rope sheave grip block;253rd, rope sheave;26th, balancing weight;3rd, hoisting mechanism;31st, steel wire is lifted Rope;32nd, steel wire rope is protected;321st, limiting plate;3211st, arc-like sheet;3212nd, raised line;3213rd, fixed cover;3214th, cone tank; 3215th, fixing groove;3216th, buckle;32161st, chuck;32162nd, slide block;322nd, weight;3221st, staving;3222nd, bung; 3223rd, threaded rod;3224th, connection ring;3225th, nut;3226th, pad;33rd, elevator;34th, distribution box;35th, safety lock; 351st, limiter;352nd, roll assembly;3521st, disk roller;3522nd, grip block;35221st, arcuate socket;3523rd, small disk roller;3524、 Small grip block;353rd, safety lock installing plate;4th, pin assemblies;41st, latch;42nd, steady pin;43rd, draw ring;44th, chain;5th, triangle steel Plate;6th, wire line shoe.
Embodiment
The utility model is described further referring to the drawings.
Embodiment one:
As shown in figure 1, a kind of high-lift operation hanging cradle device, include for ship the suspension platform 1 of material, two be used for Hoisting mechanism 3 of the support with the hitch 2 of load and for lifting suspension platform 1.
Reference picture 2, specifically, the underframe 11 for loading that the bottom of suspension platform 1 is provided with, the both sides of underframe 11 are welded with The preceding column as main railing is respectively arranged with before and after two lateral rails 12 for providing hard point for suspension platform 1, underframe 11 Bar 13 and the rear railing 14 by wall, wherein, the square plate 111 for load-bearing is welded with the middle of underframe 11.
Two structures of lateral rail 12 are identical, and the bottom of lateral rail 12 is welded with coaming plate 121, and lateral rail 12 is provided with some Horizontal square tube 122 and two longitudinal square tubes 123 in the both sides of lateral rail 12 for reinforcing lateral rail 12, the upper end of lateral rail 12 is set Trapezium structure is set to increase stability when suspension platform 1 is lifted, the centre and upper end of both sides longitudinal direction square tube 123 are provided with The clamping plate 1231 of preceding railing 13 and rear railing 14 is fixed for clamping, being used for provided with insertion of clamping plate 1231 fixes preceding column The screw of bar 13 and rear railing 14.
Preceding railing 13 is identical with the rear frame structure of railing 14 be square tubes soldering steel frame construction, the preceding both sides of railing 13 are perpendicular The longitudinal steel pipe 131 directly set, longitudinal steel pipe 131 be provided with the corresponding screw of clamping plate 1231, longitudinal lower end of steel pipe 131 is prolonged Railing 13 is provided with square tube tenon 132 before stretching out.
Pin assemblies 4 can be fixed preceding railing 13 and rear railing 14 by the screw of clamping plate 1231 and longitudinal steel pipe 131.Ginseng According to accompanying drawing 3, pin assemblies 4 include the latch 41 and the steady pin being plugged in the jack of the one end of latch 41 for non-floating rail 42, latch 41 is provided with draw ring 43 on one end of steady pin 42 and steady pin 42 and pulled pin with facilitating, and leads between two draw rings 43 Chain 44 is crossed to connect in order to the use of latch 41 first being inserted into screw when pin assemblies 4 are used, then steady pin 42 is inserted in into latch To prevent latch 41 from deviating from from screw on 41 jack.
Fig. 2 and Fig. 1 are reviewed, the bottom of longitudinal square tube 123 of the both sides of lateral rail 12 is welded with for supporting suspension platform 1 Base 15, referring to the drawings 4, specifically, base 15 is provided with the tongue-and-groove 151 for grafting square tube tenon 132, tongue-and-groove 151 The universal wheel 152 for supporting suspension platform 1 and the flanged plate 153 for fixing universal wheel 152 are fixed with, universal wheel 152 is consolidated It is a flange arrangement to determine face, and flanged plate 153 is provided with to be used to fix universal wheel 152 with the corresponding flange arrangement of universal wheel 152, Flanged plate 153 and tongue-and-groove 151 are the integrative-structures of steel plate welding.Be welded with the outer wall of tongue-and-groove 151 two it is horizontally arranged convex The snap ring 1512 of a strip is rotatably connected between platform 1511, two boss 1511, two relative faces of boss 1511 are set to Lozenges, makes spacing of two boss 1511 closer to the two sides relative both it of tongue-and-groove 151 bigger, blocks in the presence of lozenges Ring 1512 keeps fitting and is not easy to rotate sideways with tongue-and-groove 151, and the top of snap ring 1512 extends to the upper of tongue-and-groove 151 Side, and can engage with being welded on the side wall upper protruding block 1321 of square tube tenon 132, so as to play limitation square tube tenon 132 from tenon The effect of abjection in groove 151, the connection of railing 13 and base 15 is relatively reliable before making.
Fig. 1 and Fig. 2 are reviewed, to prevent that suspension platform 1 is scratched with metope during hanging object, the rear upper lateral of railing 14 Side is provided with several support wheel assemblies 141, referring to the drawings 5, specifically, support wheel assembly 141 is provided with a fixation The U-board 1412 that plate 1411 and one use cooperatively with fixed plate 1411, U-board 1412 includes two side plates 14121 and one Individual bottom plate 14122, U-board 1412 be by steel plate bending into integrative-structure, being fixed with by screw rod between biside plate 14121 can The support wheel 1413 of rotation.Two springs 142 for playing connection function, spring are welded between fixed plate 1411 and bottom plate 14122 142 are respectively positioned on the top of rear railing 14, are easy to fixed plate 1411 and bottom plate 14122 being clamped in the steel pipe on the rear top of railing 14 On, then it is bolted.Support wheel 1413 is supported in metope and rear railing 14 during the raising and lowering of suspension platform 1 Between and roll with the lifting and decline of suspension platform 1 with the friction of railing after reduction 14 and metope while it also avoid after Railing 14 is scratched to metope.And after loosering a bolt, in the presence of spring 142 between fixed plate 1411 and bottom plate 14122 It is big away from becoming, it can be supported according to the position adjustment of flat pathway on the width and metope of metope behind the position of wheel assembly 141, Support wheel assembly 141 is fixedly clamped again, so that more different construction sites can be applied to, and suspension platform 1 Raising and lowering is more steady.
Reference picture 6 and Fig. 7, hitch 2 include the fore-stock 21 played a supportive role and after-poppet 22, connection fore-stock 21 and the beam 23 of after-poppet 22, the reinforcement steel wire rope 24 of rigidity for improving beam 23 and it is supported on beam 23 and strengthens steel wire rope 24 upper supporting column 25.
Fore-stock 21 include the first bearing 211, the first bearing of grafting 211 top, for coordinate the first bearing 211 adjust The first inserted link 212 of the height of fore-stock 21 is saved, and is welded on the first company at the top of the first inserted link 212, for fixed beam 23 Adapter 213.First bearing 211 includes the first cross bar 2112, is vertically welded in first vertical pole 2111 at the middle part of the first cross bar 2112 And two root bead be connected on the fix bars 2113 of the both sides of the first vertical pole 2111, the two ends of fix bar 2113 are respectively welded at and first is horizontal The two ends of bar 2112 and the top of the first vertical pole 2111, to improve the stability of the first bearing 211.
After-poppet 22 includes the second bearing 223, the second inserted link 221 for being plugged on the top of the second bearing 223 and is welded on Second connecting tube 222 at the top of the second inserted link 221.Second bearing 223 includes the second cross bar 2232, is vertically welded in the second cross bar Second vertical pole 2231 and some weight linear meters 2233 being vertically welded on the second cross bar 2232 at 2232 middle parts, weight linear meter 2233 The both sides of the second vertical pole 2231 are symmetricly set on, and are equipped with some balancing weights 26 being pressed on the second cross bar 2232.
First inserted link 212 with the corresponding position of the first vertical pole 2111, the second inserted link 221 it is corresponding with the second vertical pole 2231 Some perforation 201 for being used to adjust height are equipped with position.First inserted link 212 and the second inserted link 221 are respectively in the first vertical pole 2111 and second slide up and down behind suitable position in vertical pole 2231, and the relative connection of corresponding perforation 201 is simultaneously solid by bolt It is fixed, you can to complete the regulation to height.
The lower end of upper supporting column 25 is welded with the neck 251 with the clamping of the first connecting tube 213, and neck 251 is what section was inverted U shape Channel-section steel, and fixed by bolt with the first connecting tube 213;The upper end of upper supporting column 25 is welded with two parallel rope sheave grip blocks 252, Rotatable rope sheave 253 has been bolted in rope sheave grip block 252.
The junction at the first connecting tube 213 and the top of the first inserted link 212, the junction of neck 251 and upper supporting column 25, second The junction of the inserted link 221 of connecting tube 222 and second is welded with the triangular steel plate 5 of reinforcing.
Beam 23 includes end to end front-axle beam 231, central sill 232, the back rest 233 and connection central sill 232 and the back rest successively 233 connecting square pipes 234.The front end of front-axle beam 231 has been bolted a U-shaped baffle plate 2311.The end of front-axle beam 231 and central sill The 232 interior, end of central sill 232 of the first connecting tube of front end insertion 213 and the back rest 233 are inserted in connecting square pipes 234, the back rest 233 End is inserted in the second connecting tube 222, is then bolted.
Strengthen the two ends that the two ends of steel wire rope 24 are fixed on beam 23 by tensing nose 241.It is by a U-shaped steel to tense nose 241 What the parallel-plate 2412 that plate 2411 and two are welded in the bottom surface of U-shaped steel plate 2411 was constituted.The U-shaped steel plate of two tension noses 241 2411 clamp outside U-shaped baffle plate 2311 and the second connecting tube 222 and are bolted respectively, are equipped between two parallel-plates 2412 For the fixed screw rod for strengthening steel wire rope 24.Strengthen the two ends of steel wire rope 24 to bypass after above-mentioned screw rod, it is solid by some wire line shoes 6 It is scheduled on tension nose 241.Reference picture 8, strengthens the raised sub-fraction of steel wire rope 24 by the part of wraparound between wire line shoe 6, uses Strengthen whether steel wire rope 24 is slided to judge the stability of hitch 2 in observation.Strengthen riding over rope sheave 253 in the middle of steel wire rope 24 On, and tensed between the two ends of beam 23.
Review Fig. 1 and Fig. 2, hoisting mechanism 3 is included for coordinating the boom hoist cable 31 of lifting, to be provided using process Protection protection steel wire rope 32, two offer power elevator 33, control elevator 33 distribution box 34 and for lock protect Protect the cradle safety lock 35 of 32 braking actions of steel wire rope.Elevator 33 is arranged on lateral rail 12, and distribution box 34 is arranged on On preceding railing 13.
The centre position of the trapezium structure upper bottom edge of lateral rail 12 is provided with cradle safety lock 35 by bolt.Hanging basket safety Lock 35 tops and a roll assembly 352 for being used to detect the angle of boom hoist cable 31, lifting are fixed with bolt close to hanging basket side Steel wire rope 31 passes through bottom after roll assembly 352 to be connected with elevator 33, wherein being the hoist engine of elevator 33, protects steel wire rope 32 It is fixedly connected with the top of boom hoist cable 31 by wire line shoe 6 with baffle plate 2311, fixed form is with strengthening steel wire rope 24 It is identical with the fixed form for tensing nose 241.During hanging object, two groups of elevators 33 are by coordinating boom hoist cable 31 to suspension platform 1 Produce upward power.
Referring to the drawings 9, specifically, roll assembly 352 includes the grip block 3522 for clamping disk roller 3521, clamping The bottom of plate 3522 is clamped and is fixed on cradle safety lock 35, and grip block 3522, which is provided with, to be used to limit the rotation model of grip block 3522 The arcuate socket 35221 enclosed, arcuate socket 35221 is on a circumference using the fixing point of grip block 3522 as the center of circle to limit roller The angular range of wheel assembly 352, on the top of two grip block 3522 provided with some screws for being used to adjust the fixed position of disk roller 3521, Grip block 3522, the small grip block 3524 for detecting the angle of boom hoist cable 31 and cradle safety lock 35 are fixed by screw rod, Small disk roller 3523 is set on small grip block 3524 to coordinate regulation disk roller 3521 to reduce rubbing for roll assembly 352 and boom hoist cable 31 Wipe power.
Protection steel wire rope 32 close to upper end position be fixed with for limit the hoisting depth of suspension platform 1 limiting plate 321, in Between be fixed with weight 322 for stretching protection steel wire rope 32 through cradle safety lock 35, bottom, weight 322 is close to ground But it is above the ground level to play a part of stretching protection steel wire rope 32, the moment of protection steel wire rope 32 is kept tensioning state.
Reference picture 10, weight 322 is set in tubbiness, including staving 3221 and the bung that is threadedly coupled with staving 3221 3222, the center of bung 3222 is equipped with a threaded rod 3223, and the top of threaded rod 3223 is welded with a connection ring 3224, The bottom of protection steel wire rope 32 is fixedly connected with connection ring 3224, and fixed form is with strengthening steel wire rope 24 with tensing consolidating for nose 241 Determine mode identical;The bottom of threaded rod 3223 is connected with a nut 3225, and one is provided between nut 3225 and bung 3222 Annular gasket 3226 makes to increase the contact area between nut 3225 and bung 3222, the lifting surface area of increase bung 3222 It does not allow yielding or even breakage.Staving 3221 can load the weights such as water, sandstone increase weight.
Reference picture 11 and Figure 12, limiting plate 321 are set in protection steel wire rope 32 and can be along protection steel wire ropes about 32 Mobile, the bottom surface of limiting plate 321 is fixed with four arc-like sheets 3211, and four arc-like sheets 3211, which are enclosed, is set in protection steel wire rope There is certain gap between up big and down small frustum outside 32, and adjacent arc-like sheet 3211, arc-like sheet 3211 it is small Periphery is held provided with a circle raised line 3212.The lower section of limiting plate 321 is additionally provided with a fixed cover being set in outside protection steel wire rope 32 3213, the top of fixed cover 3213 offers the cone tank 3214 that the taper platform shape enclosed with arc-like sheet 3211 is adapted, Gu Surely cover 3213 outer walls and offer four and be uniformly distributed and fixing groove 3215 that at right angles triangle is set, fixing groove 3215 pushes up Face and the outer wall vertical of fixed cover 3213;The bottom surface of limiting plate 321 is further fixed on the strip of four and the clamping of fixing groove 3215 Buckle 3216, the right angled triangle card that the bottom of buckle 3216 is set to engage with fixing groove 3215 towards the side of arc-like sheet 3211 Platform 32161, the slide block 32162 for being set to away from the side of arc-like sheet 3211 strip.When adjusting 321 height of limiting plate, on Lower mobile limiting plate 321 is to after specified location, and movable fixed cover 3213 makes it close with limiting plate 321, four arc-like sheets 3211 Cone tank 3214 is stretched into, raised line 3212 is made four arc-like sheets 3211 close to each other and clamped and protect by the extruding of the inwall of cone tank 3214 Steel wire rope 32;Fixed cover 3213 is to during the activity of limiting plate 321, and the corner of its top surface and side wall is to chuck 32161 Inclined-plane is extruded, and is deformed buckle 3216 and is bent to the direction away from arc-like sheet 3211, subsequent buckle 3216 is along fixed cover 3213 outer wall is slided until engage with fixing groove 3215, that is, is completed 3213 pairs of fixed cover and the fixation of limiting plate 321, made arc Piece 3211 keeps clamping the fixation protected steel wire rope 32 and realize limiting plate 321.When the movable limiting plate 321 of needs, mobile striking Motion block 32162 makes buckle 3216 deform to the direction bending away from arc-like sheet 3211, and now chuck 32161 is out of fixing groove 3215 Skid off and release the fixation to fixed cover 3213, you can movable fixed cover 3213 makes it away from arc-like sheet 3211 and releases arc-like sheet The clamping of 3211 pairs of protection steel wire ropes 32, so as to movable limiting plate 321.
In the uphill process of suspension platform 1, when hanging basket run-off the straight or work fracture of rope, relaxation, its roll assembly 352 Occurs change in angular position, driving the executive component of safety lock 35 makes lock rope mechanism action, by safety lock 35 and protection steel wire Rope 32, hanging basket is pinned, and the executive component of safety lock 35 and Suo Sheng mechanisms are the disclosed knot in existing safety lock 35 here Structure, therefore repeat no more here.
The upper outside of cradle safety lock 35 is vertically installed with on-off action limiter 351, the connection elevator 33 of limiter 351 It is interior can be as one of elevator 33 switch, during hanging object, when suspension platform 1 reaches specified altitude assignment and workman fails to stop in time When only being lifted, the limiter 351 set on the triggering lateral rail 12 of limiting plate 321 makes elevator 33 carry out forced brake.
The application method of pin-connected panel electrical suspension platform:
S1:Supporting construction is installed
Selected lifting place, place cleaning sets the spacing of two groups of hitches 2 according to the specification of suspension platform 1 used, The first bearing 211 and the second bearing 223 are laid respectively, and two group of first bearing 211 is pressed close into parapet is set, the knot in embodiment Structure assembles hitch 2, then lays boom hoist cable 31 and protection steel wire rope 32, and limiting plate is installed on protection steel wire rope 32 321, appropriate number of balancing weight 26 is laid according to the weight of institute's hanging object, balancing weight 26 is uniformly distributed along the both sides of the second vertical pole 2231 To lift the stability of the second bearing 223.
S2:Suspension platform 1 and hoisting mechanism 3 are installed
Suspension platform 1 is installed by said structure, cradle safety lock 35 is installed, fixed lifting is installed on suspension platform 1 Machine 33 and distribution box 34, are worn on elevator 33 by said structure connect boom hoist cable 31 afterwards, worn on cradle safety lock 35 Protection steel wire rope 32 is connect, weight 322, connection line are installed in protection steel wire rope 32 end.
S3:Hanging object
After confirming that connection is errorless, two groups of positions of hitch 2 are adjusted again and check whether hitch 2 is firm, three groups The projection of steel wire rope bearing has fricton-tight, and the position of limited block is adjusted again, is then electrified to check circuit.After confirmation is errorless, With the pin assemblies 4 in the securing plate of lateral rail 12 on railing 13 before extracting, railing 13 before unloading retightens preceding column after loading material Bar 13, starts elevator 33 and is lifted to suspension platform 1 at 30cm in advance, observe the perpendicularity of suspension platform 1, supporting construction and steel wire Rope junction projection has without exception, confirms the normal rear normal hanging object of progress.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (7)

1. a kind of high-lift operation hanging cradle device, including hitch (2) as support, the suspension platform (1) of bearing goods with And for lifting the hoisting mechanism (3) of suspension platform (1), the hitch (2) include fore-stock (21), after-poppet (22), Connection fore-stock (21) and the beam (23) of after-poppet (22), the reinforcement steel wire rope (24) at tie-beam (23) two ends, steel wire will be strengthened Rope (24) supports the balancing weight for being strained to the upper supporting column of triangular structure (25) and being pressed on after-poppet (22) on beam (23) (26), it is characterised in that:Expansion link, the fore-stock are equipped with the fore-stock (21) and after-poppet (22) vertical direction (21) and after-poppet (22) expansion link top respectively be horizontally disposed with have the first connecting tube (213) and the second connecting tube (222), institute State beam (23) including front-axle beam (231), the back rest (233) being plugged in the second connecting tube (222), some be connected to the back rest (233) Central sill (232) and some connecting square pipes (234) between front-axle beam (231), the connecting square pipes (234) are set in the back rest (233) (23) and central sill (232), central sill (232) and central sill (232) junction and it is bolted, first connecting tube (213) it is set in the junction of front-axle beam (231) and central sill (232) and is bolted.
2. high-lift operation hanging cradle device according to claim 1, it is characterised in that:Described reinforcement steel wire rope (24) two ends lead to The two ends that tension nose (241) is fixed on the beam (23) are crossed, one end of the tension nose (241) and beam (23) are solid by bolt Fixed, the other end is fixed with the screw rod for strengthening steel wire rope (24) for winding.
3. high-lift operation hanging cradle device according to claim 2, it is characterised in that:The reinforcement steel wire rope (24) bypasses institute State screw rod and pass through some wire line shoes (6) clamping.
4. high-lift operation hanging cradle device according to claim 3, it is characterised in that:Between the adjacent wire line shoe (6) The wraparound part of reinforcement steel wire rope (24) set in raised arc-shaped.
5. high-lift operation hanging cradle device according to claim 1, it is characterised in that:Upper supporting column (25) bottom is fixed with Neck (251), top with the first connecting tube (213) clamping are provided with the rope sheave coordinated with the reinforcement steel wire rope (24) (253), the neck (251) is inverted U shape setting.
6. high-lift operation hanging cradle device according to claim 1, it is characterised in that:The expansion link includes being fixed on first Inserted link on the downside of connecting tube (213) and the second connecting tube (222) and the vertical pole for being set in intubation bottom, the vertical pole and inserted link Some perforation (201) for being used to wear bolt are opened up along its length.
7. high-lift operation hanging cradle device according to claim 5, it is characterised in that:The upper supporting column (25) and the neck (251) junction, the expansion link and the junction of first connecting tube (213) and the second connecting tube (222) is respectively provided with There is triangular steel plate (5).
CN201621454176.5U 2016-12-27 2016-12-27 High-lift operation hanging cradle device Expired - Fee Related CN206376515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621454176.5U CN206376515U (en) 2016-12-27 2016-12-27 High-lift operation hanging cradle device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621454176.5U CN206376515U (en) 2016-12-27 2016-12-27 High-lift operation hanging cradle device

Publications (1)

Publication Number Publication Date
CN206376515U true CN206376515U (en) 2017-08-04

Family

ID=59408914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621454176.5U Expired - Fee Related CN206376515U (en) 2016-12-27 2016-12-27 High-lift operation hanging cradle device

Country Status (1)

Country Link
CN (1) CN206376515U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700820A (en) * 2017-11-07 2018-02-16 吴振明 A kind of building hanging basket of Anti-inclining
CN107882317A (en) * 2017-10-21 2018-04-06 成都中机盈科科技有限公司 A kind of nacelle device for external wall work high above the ground
CN108383052A (en) * 2018-04-18 2018-08-10 江苏博宇建筑工程设备科技有限公司 Suspension arrangement is stretched in aerial work basket
CN108385959A (en) * 2018-02-06 2018-08-10 段学治 A kind of cradle for constructional engineering structure and its installation method
CN108868102A (en) * 2018-07-26 2018-11-23 温州鹿城第三建筑工程有限公司 A kind of construction hanging basket built for municipal works and room
CN110056177A (en) * 2019-05-30 2019-07-26 贵州建工集团第二建筑工程有限责任公司 Suspension electric hanging basket and its construction method of installation
CN110067375A (en) * 2019-05-31 2019-07-30 苏州艾士德机械有限公司 A kind of driven hanging basket balance weight mechanism
CN110422285A (en) * 2019-08-09 2019-11-08 浙江海洋大学 A kind of hanging apparatus for spitkit
CN110552627A (en) * 2019-08-29 2019-12-10 长沙理工大学 Support hanging basket type high and steep slope anchor and use construction equipment
CN110821138A (en) * 2019-11-28 2020-02-21 湖南青蓝文化传媒集团有限公司 Building decoration construction equipment
CN112234536A (en) * 2019-07-15 2021-01-15 青岛平建建筑安装股份有限公司 Pipeline fixed connection fastener on construction scaffold
CN112431399A (en) * 2020-11-16 2021-03-02 中山志特铝模科技有限公司 Hanging basket for building outer wall and mounting method thereof
CN113445724A (en) * 2021-05-26 2021-09-28 杨晓凡 Hanging basket device for building curtain wall construction
CN113719108A (en) * 2021-09-02 2021-11-30 上海建工七建集团有限公司 Hanging basket fixing device and method on steel structure frame beam
CN115419250A (en) * 2022-10-24 2022-12-02 河北工程大学 Movable hanging basket for material conveying

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882317A (en) * 2017-10-21 2018-04-06 成都中机盈科科技有限公司 A kind of nacelle device for external wall work high above the ground
CN107882317B (en) * 2017-10-21 2019-05-31 江苏大隆鑫建设集团有限公司 A kind of nacelle device for external wall high altitude operation
CN107700820A (en) * 2017-11-07 2018-02-16 吴振明 A kind of building hanging basket of Anti-inclining
CN108385959A (en) * 2018-02-06 2018-08-10 段学治 A kind of cradle for constructional engineering structure and its installation method
CN108383052A (en) * 2018-04-18 2018-08-10 江苏博宇建筑工程设备科技有限公司 Suspension arrangement is stretched in aerial work basket
CN108868102A (en) * 2018-07-26 2018-11-23 温州鹿城第三建筑工程有限公司 A kind of construction hanging basket built for municipal works and room
CN110056177A (en) * 2019-05-30 2019-07-26 贵州建工集团第二建筑工程有限责任公司 Suspension electric hanging basket and its construction method of installation
CN110067375A (en) * 2019-05-31 2019-07-30 苏州艾士德机械有限公司 A kind of driven hanging basket balance weight mechanism
CN112234536A (en) * 2019-07-15 2021-01-15 青岛平建建筑安装股份有限公司 Pipeline fixed connection fastener on construction scaffold
CN110422285A (en) * 2019-08-09 2019-11-08 浙江海洋大学 A kind of hanging apparatus for spitkit
CN110552627A (en) * 2019-08-29 2019-12-10 长沙理工大学 Support hanging basket type high and steep slope anchor and use construction equipment
CN110552627B (en) * 2019-08-29 2020-11-20 长沙理工大学 Support hanging basket type high and steep slope anchor and use construction equipment
CN110821138A (en) * 2019-11-28 2020-02-21 湖南青蓝文化传媒集团有限公司 Building decoration construction equipment
CN112431399A (en) * 2020-11-16 2021-03-02 中山志特铝模科技有限公司 Hanging basket for building outer wall and mounting method thereof
CN113445724A (en) * 2021-05-26 2021-09-28 杨晓凡 Hanging basket device for building curtain wall construction
CN113719108A (en) * 2021-09-02 2021-11-30 上海建工七建集团有限公司 Hanging basket fixing device and method on steel structure frame beam
CN115419250A (en) * 2022-10-24 2022-12-02 河北工程大学 Movable hanging basket for material conveying
CN115419250B (en) * 2022-10-24 2023-10-03 中铁十九局集团有限公司 Movable hanging basket for material transportation

Similar Documents

Publication Publication Date Title
CN206376515U (en) High-lift operation hanging cradle device
CN206375642U (en) Nacelle device
CN206521197U (en) A kind of adjustable balance hoisting beam
CN206376513U (en) Pin-connected panel nacelle device
CN105421786B (en) Large steel formwork firewall concrete pumping auxiliary equipment
CN2923635Y (en) Single-column towing type elevator
CN202594610U (en) I-shaped beam hoisting device for hoisting of pressure steel pipe tiles
CN202023352U (en) Adhesion type lifting scaffold for building construction
CN206375644U (en) A kind of driven hanging basket device
CN206554524U (en) A kind of construction discharging platform
CN207090863U (en) A kind of furnace throat steel watt apparatus for examination and repair
CN205527435U (en) Installation and device of dismantling jib loading boom
CN206375643U (en) Movable hanging basket device
CN107416685A (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN216109906U (en) Device for replacing and installing curtain wall stone
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN204529090U (en) Electric precipitation anode plate hanging apparatus
CN201099575Y (en) Hanging basket rotatable material lifting equipment
CN207144446U (en) A kind of construction Skidproof hanging cradle
CN207296361U (en) A kind of regularization assembled overhanging protection canopy
CN207061690U (en) Bridge crane with suspender maintenance rig
CN109378767A (en) A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable
CN202754699U (en) Overlong steel plate balance hoisting beam
CN205653066U (en) Take gantry crane of windrow dolly linkage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20211227

CF01 Termination of patent right due to non-payment of annual fee