CN210828274U - Hanging basket for building - Google Patents

Hanging basket for building Download PDF

Info

Publication number
CN210828274U
CN210828274U CN201921212768.XU CN201921212768U CN210828274U CN 210828274 U CN210828274 U CN 210828274U CN 201921212768 U CN201921212768 U CN 201921212768U CN 210828274 U CN210828274 U CN 210828274U
Authority
CN
China
Prior art keywords
frame
bottom plate
adjusting screw
screw rod
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921212768.XU
Other languages
Chinese (zh)
Inventor
姜文婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jingting Construction Development Co ltd
Original Assignee
Anhui Jingting Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jingting Construction Development Co ltd filed Critical Anhui Jingting Construction Development Co ltd
Priority to CN201921212768.XU priority Critical patent/CN210828274U/en
Application granted granted Critical
Publication of CN210828274U publication Critical patent/CN210828274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a hanging basket for construction, which comprises a frame, a bottom plate, an adjusting screw rod and a stop rod, the frame is designed in an up-and-down opening mode, the section of the frame is rectangular, the bottom of the frame is connected with the bottom plate, the supporting columns of the frame penetrate through the bottom plate, the adjusting screw penetrates through the top of the frame and is connected with the bottom plate, the bottom plate can move up and down under the action of the adjusting screw rod, a through door is reserved in the long edge direction of one side of the frame, the top of the passing door is enclosed and blocked by an iron chain, a blocking rod is in threaded connection with the frame, the blocking rod is arranged at the blank of the frame, the bottom of the four-corner upright post of the frame is provided with screw-mounted Frequus wheels, the four corners welding of bottom plate has the mounting, and the mounting cover is established on the four corners stand of frame, sets up the through-hole that supplies the frame to pass on the bottom plate, and the bearing welding is on the bottom plate, and the bearing is connected with adjusting screw. The utility model has reasonable design; the position of the bottom plate is changed by adjusting the screw rod so as to change the height of the hanging basket.

Description

Hanging basket for building
Technical Field
The utility model relates to a hanging flower basket for building.
Background
Building hanging flower basket obtains extensive recognition in high-altitude operations such as outer wall construction, curtain installation, heat preservation construction and maintenance washing outer wall of high-rise multilayer high building, utilizes the hanging flower basket can exempt from to take the scaffold frame, makes construction cost greatly reduced, and the operating cost only is 28% of traditional scaffold frame, and work efficiency improves by a wide margin moreover, hanging flower basket flexible operation, easy, convenient and practical, safe and reliable shift, and the height of current hanging flower basket is mostly fixed design, can not change the height according to actual conditions.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hanging flower basket for building to solve above-mentioned technical problem.
In order to realize the purpose, the utility model adopts the following technical scheme:
a hanging basket for buildings comprises a frame, a bottom plate, an adjusting screw rod and a blocking rod, wherein the frame is designed in an up-and-down opening mode, the cross section of the frame is rectangular, the bottom of the frame is connected with the bottom plate, supporting columns of the frame penetrate through the bottom plate, the adjusting screw rod penetrates through the top of the frame and is connected with the bottom plate, the bottom plate can move up and down under the action of the adjusting screw rod, a through door is reserved in the long edge direction of one side of the frame, the top of the through door is enclosed and blocked by an iron chain, the blocking rod is in threaded connection with the frame, the blocking rod is installed at the blank of the frame, Fuma wheels mounted by screws are arranged at the bottoms of four corner upright posts of the frame, fixing pieces are welded at four corners of the bottom plate, the fixing pieces are sleeved on the four corner upright posts of the frame, through holes for the frame to, the slide bar is welded in the bottom plate, the circular ring is sleeved on the slide bar, and the circular ring can move left and right along the long edge direction of the slide bar.
Preferably, the frame is connected with a motor at the top of the building through a steel wire rope, and the frame is lifted and put down under the action of the motor.
Preferably, a safety rope is tied on the circular ring and is connected with a worker.
Preferably, one side of the fixing part is provided with a fixed knob, and the four corner upright posts of the frame are fixed by the knob.
Compared with the prior art, the utility model has the advantages of it is following: the utility model has reasonable design; the bottom of the upright posts at the four corners of the frame is provided with a horse wheel, so that the hanging basket can move easily; when the height in the hanging basket needs to be changed, the position of the bottom plate is changed by using the adjusting screw rod so as to change the height in the hanging basket, so that the hanging basket is suitable for workers with different heights; the ring in the bottom plate is connected with the worker through the safety rope, so that the safety of the worker is improved, and meanwhile, the knotting of the safety rope caused by the movement of the worker is avoided.
Drawings
Fig. 1 is a schematic view of the hanging basket for building.
Figure 2 is the bottom plate sketch map of the hanging flower basket for building of the utility model.
Figure 3 is the mounting schematic diagram of the hanging flower basket for building of the utility model.
Detailed Description
The invention is explained in further detail below with reference to the figures and the embodiments.
As shown in fig. 1-3, a hanging basket for construction comprises a frame 1, a bottom plate 2, an adjusting screw 3 and a blocking rod 6, wherein the frame 1 is designed in an up-and-down opening manner, the cross section of the frame 1 is rectangular, the bottom of the frame 1 is connected with the bottom plate 2, supporting columns of the frame 1 penetrate through the bottom plate 2, the adjusting screw 3 penetrates through the top of the frame 1 and is connected with the bottom plate 2, the bottom plate 2 can move up and down under the action of the adjusting screw 3, a through door 5 is reserved in the long edge direction of one side of the frame 1, the top of the through door 5 is enclosed and blocked by an iron chain, the blocking rod 6 is in threaded connection with the frame 1, the blocking rod 6 is installed in a blank of the frame 1, the bottom of a column of the frame 1 is provided with a forfei wheel 4 installed by screws, four corners of the bottom plate 2 are welded with fixing pieces 10, the fixing pieces 10 are sleeved on, utilize knob 13 to fix the four corners stand of frame 1, set up the through-hole 9 that supplies frame 1 to pass on the bottom plate 2, bearing 12 welds on bottom plate 2, bearing 12 is connected with adjusting screw 3, the hole 11 that leaks has been seted up to the bottom of bottom plate 2, the interior welding of bottom plate 2 has slide bar 7, ring 8 cover is established on slide bar 7, ring 8 can remove about the long limit direction of slide bar 7 along, the system has the safety rope on the ring, the safety rope is connected with the workman, the frame passes through wire rope and is connected with the motor at building top, promote the frame under the effect of motor, put down the operation.
The foregoing is a preferred embodiment of the present invention, and for those skilled in the art to understand the teaching of the present invention, the changes, modifications, replacements and variations to the embodiments will still fall within the protection scope of the present invention without departing from the principle and spirit of the present invention.

Claims (4)

1. A hanging basket for buildings comprises a frame (1), a bottom plate (2), an adjusting screw rod (3) and a blocking rod (6), and is characterized in that the frame (1) is designed in an upper and lower opening mode, the cross section of the frame (1) is rectangular, the bottom of the frame (1) is connected with the bottom plate (2), supporting columns of the frame (1) penetrate through the bottom plate (2), the adjusting screw rod (3) penetrates through the top of the frame (1) to be connected with the bottom plate (2), the bottom plate (2) can move up and down under the action of the adjusting screw rod (3), a passing door (5) is reserved in the long edge direction of one side of the frame (1), the top of the passing door (5) is enclosed and blocked by an iron chain, the blocking rod (6) is in threaded connection with the frame (1), the blocking rod (6) is installed at the blank position of the frame (1), and the bottoms of four corner upright posts of the frame (1) are provided with horse wheels (4, the four corners welding of bottom plate (2) has mounting (10), mounting (10) cover is established on the four corners stand of frame (1), set up through-hole (9) that supply frame (1) to pass on bottom plate (2), bearing (12) welding is on bottom plate (2), bearing (12) are connected with adjusting screw (3), water leakage hole (11) have been seted up to the bottom of bottom plate (2), the interior welding of bottom plate (2) has slide bar (7), ring (8) cover is established on slide bar (7), ring (8) can be followed the long limit direction of slide bar (7) and are removed the removal.
2. A construction basket according to claim 1, characterized in that the frame (1) is connected with a motor on the top of the building through a steel cable, and the frame (1) is lifted and lowered by the motor.
3. A construction basket according to claim 1, characterized in that the ring (8) is tied with safety ropes, which are connected with workers.
4. A gondola for construction as claimed in claim 1, characterized in that the fixing element (10) is provided with a fixing knob (13) on one side, and the four corner posts of the frame (1) are fixed by means of the knob (13).
CN201921212768.XU 2019-07-30 2019-07-30 Hanging basket for building Expired - Fee Related CN210828274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921212768.XU CN210828274U (en) 2019-07-30 2019-07-30 Hanging basket for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921212768.XU CN210828274U (en) 2019-07-30 2019-07-30 Hanging basket for building

Publications (1)

Publication Number Publication Date
CN210828274U true CN210828274U (en) 2020-06-23

Family

ID=71257363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921212768.XU Expired - Fee Related CN210828274U (en) 2019-07-30 2019-07-30 Hanging basket for building

Country Status (1)

Country Link
CN (1) CN210828274U (en)

Similar Documents

Publication Publication Date Title
CN201326156Y (en) Member installing tool in bridge high altitude operation
CN105952134A (en) Travel type automatic positioning hanging basket device
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN204081436U (en) A kind of climbing frame and template integrated system
CN210828274U (en) Hanging basket for building
CN106078035A (en) Bonding machine mechanical arm station location and adjusting means
CN104612391B (en) Construction of prevention work platform for skyscraper
CN206844431U (en) A kind of curtain wall construction support
CN206888659U (en) A kind of street lamp installation tool
CN204152183U (en) Assembled lifting protecting screen
CN205713043U (en) A kind of walking is automatically positioned nacelle device
CN108035530B (en) Oil tank inner wall construction hanging basket
KR100713146B1 (en) Transformer moving along the telegraph pole
CN214575532U (en) Lifting type steel platform arranged at corridor lighting well position
CN202248823U (en) Attached-type lifting scaffold with net suspended at bottom
CN214531835U (en) External hanging type operation device for large storage tank
CN210342204U (en) Automatic carry sewage pump station of sediment
CN210086058U (en) Matching type operating platform
CN105800473A (en) Gantry crane with material stacking dolly linkage
CN204357138U (en) Simple steel structure hoisting frame
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN106760468A (en) The suspension platform that a kind of construction site uses
CN215291333U (en) Safe and economical combined hanging basket
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN206625634U (en) Multi-storied garage with safe anti-falling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200623

Termination date: 20210730

CF01 Termination of patent right due to non-payment of annual fee