CN201326156Y - Member installing tool in bridge high altitude operation - Google Patents
Member installing tool in bridge high altitude operation Download PDFInfo
- Publication number
- CN201326156Y CN201326156Y CNU2008201835944U CN200820183594U CN201326156Y CN 201326156 Y CN201326156 Y CN 201326156Y CN U2008201835944 U CNU2008201835944 U CN U2008201835944U CN 200820183594 U CN200820183594 U CN 200820183594U CN 201326156 Y CN201326156 Y CN 201326156Y
- Authority
- CN
- China
- Prior art keywords
- door frame
- shape
- bridge
- high altitude
- instrument
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a member installing tool in bridge high altitude operation, comprising a running cross beam, two gantry upper cross beams, four gantry upright posts, two gantry lower cross beams, two guide rails, four idler wheels, a running trolley, a pulley block with lifting hooks and a power device. The member installing tool in bridge high altitude operation is designed on the principle of track crane, and has the advantages of small windward area, light weight, high lifting ability and the like, reduces the labor intensity of workers and improves the labor efficiency during the installation of members, and also ensures the safety of workers when the workers install the members outside the bridge in high altitude, and effective prevents the splashing objects from falling down so as to ensure the safety of people and vehicles below the bridge.
Description
Technical field
The utility model relates to the instrument of installation component in a kind of bridge work high above the ground, particularly relate to a kind of in the bridge construction process of high-altitude the special tool to bridge both sides installation component.
Background technology
The bridge both sides has the installation of members such as anticollision barrier, protecting screen usually, belongs to work high above the ground usually, operation dangerous higher, and engineering quantity is generally bigger, the volume of member such as anticollision barrier, protecting screen, weight are all big, cause the site operation difficulty big, and speed of application is slow.
Summary of the invention
In order to address the above problem, the purpose of this utility model is to provide the instrument of installation component in a kind of bridge work high above the ground, and it is simple and practical, and security performance is good, and speed of application is fast.
In order to achieve the above object, the instrument of installation component in a kind of bridge work high above the ground that the utility model provides comprises assembly pulley 9, the power set of crossbeam out of shape 1, two door frame top rails 2, four door frame columns 3, two door frame lower transverse beams 4, two guide rails 5, four rolling 6, traveling dolly 8, band suspension hook; Described crossbeam out of shape 1 is made up of an i iron, traveling dolly 8 can roll on described crossbeam 1 out of shape, described door frame top rail 2, door frame column 3 vertically weld, described crossbeam out of shape (1) is welded on the soffit at described door frame top rail (2) middle part, described door frame column 3 is connected with door frame lower transverse beam 4 bolts, and described roller 6 is installed in door frame lower transverse beam 4 bottoms and matches with guide rail 5; The assembly pulley 9 of described band suspension hook is connected with dolly 8 bolts out of shape, controls dolly 8 out of shape and roller 6 by the power set that three operation motors are formed.
Also can add diagonal brace 15, described diagonal brace 15 and door frame column 3 and 2 welding of door frame top rail like this can enhanced stability.
Also can weld Hanging Basket 7, described Hanging Basket 7 is welded on described door frame column 3 and the crossbeam out of shape 1, is convenient to constructor's operation like this, and hanging blue 7 bottoms also can have wall to wall 10, is beneficial to constructor's safety.
The instrument of installation component utilizes the gantry crane principle to design in a kind of bridge work high above the ground that the utility model provides; The utility model have front face area little, from advantage such as heavy and light, lifting ability be strong, and in the member installation process, alleviated working strength of workers, improved efficiency, guaranteed that also the workman is in high-altitude bridge outside installation component process safe, prevent the whereabouts of splash effectively, guaranteed the personnel and the traffic safety of bridge below.
Description of drawings
Fig. 1 is a structure chart of the present utility model.
Fig. 2 is the part sectioned view of traveling dolly of the present utility model.
Number description
The assembly pulley 9 of crossbeam 1 out of shape, door frame top rail 2, door frame column 3, door frame lower transverse beam 4, guide rail 5, roller 6, Hanging Basket 7, traveling dolly 8, band suspension hook, wall to wall 10, wire rope 11, member to be installed 12, diagonal brace 15,
The specific embodiment
The instrument of installation component is elaborated in a kind of bridge work high above the ground that provides below in conjunction with 1,2 pairs of the utility model of accompanying drawing.
The instrument of installation component in a kind of bridge work high above the ground that the utility model provides comprises assembly pulley 9, the power set of crossbeam out of shape 1, two door frame top rails 2, four door frame columns 3, two door frame lower transverse beams 4, two guide rails 5, four rolling 6, traveling dolly 8, band suspension hook; Described crossbeam out of shape 1 is made up of an i iron, traveling dolly 8 can roll on described crossbeam 1 out of shape, described door frame top rail 2, door frame column 3 vertically weld, described crossbeam out of shape (1) is welded on the soffit at described door frame top rail (2) middle part, described door frame column 3 is connected with door frame lower transverse beam 4 bolts, and described roller 6 is installed in door frame lower transverse beam 4 bottoms and matches with guide rail 5; The assembly pulley 9 of described band suspension hook is connected with dolly 8 bolts out of shape, controls dolly 8 out of shape and roller 6 by the power set that three operation motors are formed.
Also can add diagonal brace 15, described diagonal brace 15 and door frame column 3 and 2 welding of door frame top rail like this can enhanced stability.
Also can weld Hanging Basket 7, described Hanging Basket 7 is welded on described door frame column 3 and the crossbeam out of shape 1, is convenient to constructor's operation like this.
Hanging blue 7 bottoms also can have wall to wall 10, is beneficial to constructor's safety.
Rotation control roller 6 by big operation motor both forward and reverse directions moves forward and backward on guide rail 5, thereby the instrument of the utility model whole erection member is moved forward and backward; Rotation control traveling dolly 8 by lifting motor, trolley travelling motor both forward and reverse directions, thereby about being undertaken by the assembly pulley 9 that traveling dolly 8 drives the band suspension hook that is attached thereto, move left and right.
Control the traffic direction and the speed of roller 6, traveling dolly 8 with motor.The rating of electric machine sees the following form:
Title | Lifting motor | The trolley travelling motor | Big operation motor |
The motor model | ZD41-4 | ZDY121-4 | YZR160m |
Power (Kw) | 7.5 | 0.8 | 5.5 |
When needs weld member 12 to be installed, at first the instrument by big operation Electric Machine Control the utility model whole erection member moves forward and backward on guide rail 5, when the instrument of whole erection member moves to bridge floor position, member to be installed 12 place, fix with wire rope 11 and member to be installed 12 both sides, then wire rope 11 is suspended on the assembly pulley 9 of band suspension hook, pass through lifting motor, the trolley travelling motor is treated installation component 12 and is lifted and contraposition, after contraposition is finished, fix by carrying out spot welding among the constructor 7 in hanging basket, weld at last comprehensively.
The utility model can change the model or the specification of miscellaneous part according to the weight of the member to be installed 12 that is lifted, the variation of volume.
Claims (3)
1, the instrument of installation component in a kind of bridge work high above the ground comprises assembly pulley (9), the power set of crossbeam out of shape (1), two door frame top rails (2), four door frame columns (3), two door frame lower transverse beams (4), two guide rails (5), four rolling (6), traveling dolly (8), band suspension hook; Described crossbeam out of shape (1) is made up of an i iron, traveling dolly (8) can be gone up at described crossbeam out of shape (1) and roll, the vertically welding of described door frame top rail (2), door frame column (3), described crossbeam out of shape (1) is welded on the soffit at described door frame top rail (2) middle part, described door frame column (3) is connected with door frame lower transverse beam (4) bolt, and described roller (6) is installed in door frame lower transverse beam (4) bottom and matches with guide rail (5); The assembly pulley of described band suspension hook (9) is connected with dolly out of shape (8) bolt, controls dolly out of shape (8) and roller (6) by the power set that three operation motors are formed.
2, the instrument of installation component in a kind of bridge work high above the ground as claimed in claim 1 is characterized in that also can wrapping diagonal brace (15), described diagonal brace (15) and door frame column (3) and door frame top rail (2) welding.
3, the instrument of installation component in a kind of bridge work high above the ground as claimed in claim 1 or 2 is characterized in that also can comprising Hanging Basket (7), and described Hanging Basket (7) is welded on described door frame column (3) and the crossbeam out of shape (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201835944U CN201326156Y (en) | 2008-12-22 | 2008-12-22 | Member installing tool in bridge high altitude operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201835944U CN201326156Y (en) | 2008-12-22 | 2008-12-22 | Member installing tool in bridge high altitude operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201326156Y true CN201326156Y (en) | 2009-10-14 |
Family
ID=41178130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201835944U Expired - Lifetime CN201326156Y (en) | 2008-12-22 | 2008-12-22 | Member installing tool in bridge high altitude operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201326156Y (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101979803B (en) * | 2009-12-04 | 2011-11-30 | 深圳市建设(集团)有限公司 | Method for mounting prefabricated members of roof or floor in place and mounting equipment |
CN102817320A (en) * | 2012-04-27 | 2012-12-12 | 中铁大桥局集团第五工程有限公司 | Concrete wall guard template construction trolley |
US20130200622A1 (en) * | 2012-02-06 | 2013-08-08 | Tessema Dosho Shifferaw | Marine geothermal power generation system with turbine engines |
CN104195960A (en) * | 2014-08-29 | 2014-12-10 | 项伟轩 | Suspension type bridge maintenance air operation platform system |
CN104738361A (en) * | 2015-04-03 | 2015-07-01 | 长安大学 | Continuous cooking device and method for nut food |
CN105568873A (en) * | 2016-01-13 | 2016-05-11 | 邓泽仲 | Detachable bridge replacement device and construction method thereof |
CN107201719A (en) * | 2017-04-19 | 2017-09-26 | 上海市政建设有限公司 | Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method |
CN107724235A (en) * | 2017-11-07 | 2018-02-23 | 内蒙古路桥集团有限责任公司 | A kind of bridge-collision-avoidance wall Safety operation platform |
CN108147294A (en) * | 2018-02-11 | 2018-06-12 | 李浩涵 | A kind of anti-theft safety door experiment fixing device |
CN110512517A (en) * | 2019-08-23 | 2019-11-29 | 邹旭君 | A kind of bridge construction platform |
-
2008
- 2008-12-22 CN CNU2008201835944U patent/CN201326156Y/en not_active Expired - Lifetime
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101979803B (en) * | 2009-12-04 | 2011-11-30 | 深圳市建设(集团)有限公司 | Method for mounting prefabricated members of roof or floor in place and mounting equipment |
US20130200622A1 (en) * | 2012-02-06 | 2013-08-08 | Tessema Dosho Shifferaw | Marine geothermal power generation system with turbine engines |
CN102817320A (en) * | 2012-04-27 | 2012-12-12 | 中铁大桥局集团第五工程有限公司 | Concrete wall guard template construction trolley |
CN104195960A (en) * | 2014-08-29 | 2014-12-10 | 项伟轩 | Suspension type bridge maintenance air operation platform system |
CN104195960B (en) * | 2014-08-29 | 2017-01-25 | 项伟轩 | Suspension type bridge maintenance air operation platform system |
CN104738361A (en) * | 2015-04-03 | 2015-07-01 | 长安大学 | Continuous cooking device and method for nut food |
CN105568873A (en) * | 2016-01-13 | 2016-05-11 | 邓泽仲 | Detachable bridge replacement device and construction method thereof |
CN107201719A (en) * | 2017-04-19 | 2017-09-26 | 上海市政建设有限公司 | Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method |
CN107724235A (en) * | 2017-11-07 | 2018-02-23 | 内蒙古路桥集团有限责任公司 | A kind of bridge-collision-avoidance wall Safety operation platform |
CN108147294A (en) * | 2018-02-11 | 2018-06-12 | 李浩涵 | A kind of anti-theft safety door experiment fixing device |
CN110512517A (en) * | 2019-08-23 | 2019-11-29 | 邹旭君 | A kind of bridge construction platform |
CN110512517B (en) * | 2019-08-23 | 2021-03-30 | 邹旭君 | Bridge engineering construction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201326156Y (en) | Member installing tool in bridge high altitude operation | |
CN205501818U (en) | Steel truss arch bridge maintenance car | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN104711927B (en) | A kind of bridge inspection car | |
CN107043060A (en) | A kind of installation method of inverse formula installation lift | |
CN205152788U (en) | But telescopic bridge testing platform of antihunting | |
CN105888230A (en) | Lifting device for building curtain wall construction and construction method thereof | |
CN103193137B (en) | High-altitude full automatic lifting and using method thereof | |
CN206828042U (en) | A kind of inspection platform of power station main building rack illuminator | |
CN102837705A (en) | Traveling bogie in steel box | |
CN216076228U (en) | Rail mounted hanging flower basket support device | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN103132463A (en) | Movable hanger operating platform and manufacturing, installing, using and removing methods thereof | |
CN205764526U (en) | For welding the dolly of clamping-rail trolley conductor bracket | |
CN205933141U (en) | Frame Assembly turning device | |
CN201817208U (en) | Simple lifting machine | |
CN111847242A (en) | Special trolley for mounting movable adjustable sliding contact line | |
CN106744340A (en) | A kind of multi-functional special purpose crane in the laboratory for being applied to small space | |
CN203998580U (en) | Indoor GIS equipment transport carriage | |
CN207451439U (en) | A kind of Overhead Crane Bridge | |
CN203640250U (en) | Trailer for construction of external surface of large-sized storage tank | |
CN203440761U (en) | Special lifting device for curing and construction of viaduct | |
CN211687992U (en) | Movable shield tunnel construction operation platform with lifting equipment | |
CN209957241U (en) | Steel hanger | |
CN204185146U (en) | Construction of Steel Structure overhang crane between skyscraper two tall buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20091014 |