CN210798901U - Pile hole soil cleaning device for building engineering - Google Patents
Pile hole soil cleaning device for building engineering Download PDFInfo
- Publication number
- CN210798901U CN210798901U CN201921824139.2U CN201921824139U CN210798901U CN 210798901 U CN210798901 U CN 210798901U CN 201921824139 U CN201921824139 U CN 201921824139U CN 210798901 U CN210798901 U CN 210798901U
- Authority
- CN
- China
- Prior art keywords
- mud
- fixedly connected
- arc
- handle
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a clear native device in stake hole for building engineering, including getting a mud section of thick bamboo, get the upper end surface fixedly connected with pressure disk of a mud section of thick bamboo, the upper end surface middle part fixedly connected with U type handle of pressure disk, the spout has been seted up to the internal surface both sides of U type handle, the inside sliding connection of spout has the slider, one side surface fixedly connected with handle of slider, the handle is located the inside of U type handle, the position that the inside of spout is close to the upper end is provided with reset spring, the lower extreme surface central point of handle puts fixedly connected with wire rope, wire rope's one end runs through the pressure disk and extends to the inside of getting a mud section of thick bamboo, the internal surface of getting a mud section of thick bamboo has seted up the through-hole groove, the equal fixedly connected with pulley in upper and lower. The utility model discloses simple structure, the inside mud of pile hole or the mud piece that collapses is in time cleared up to the person of facilitating the use, improves the efficiency of construction of building site, and is comparatively practical.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a clear native device in stake hole for building engineering.
Background
Pile head pouring is a common basic task in building engineering such as houses, bridges and the like, and on complicated and severe construction sites, sludge is often flushed into pile holes by construction site water or rainwater, so that normal pouring in the pile holes is influenced, the sludge in the pile holes must be cleaned, and otherwise, the quality of direct pile heads cannot be guaranteed. The existing equipment and tools have great difficulty in cleaning the hole site with certain depth and smaller caliber. Thereby bringing inconvenience to users and influencing the construction efficiency;
therefore, the soil cleaning device in the pile hole for the building engineering is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device is cleared up to downthehole portion of stake for building engineering, the device simple structure, the person of facilitating the use in time clears up the mud of downthehole portion of stake or the mud piece that collapses, improves the efficiency of construction of building site, and is comparatively practical to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a pile hole soil cleaning device for construction engineering comprises a mud taking barrel, wherein a pressure plate is fixedly connected to the outer surface of the upper end of the mud taking barrel, a U-shaped handle is fixedly connected to the middle of the outer surface of the upper end of the pressure plate, sliding grooves are formed in two sides of the inner surface of the U-shaped handle, a sliding block is slidably connected to the inner portion of each sliding groove, a handle is fixedly connected to the outer surface of one side of each sliding block and is located inside the U-shaped handle, a reset spring is arranged in the position, close to the upper end, of the inner portion of each sliding groove, a steel wire rope is fixedly connected to the central position of the outer surface of the lower end of each handle, one end of each steel wire rope penetrates through the pressure plate and extends into the mud taking barrel, a through hole groove is formed in the inner surface of the mud taking barrel, pulleys are fixedly connected to the upper end and the lower end of, get the lower extreme surface of mud section of thick bamboo and be provided with arc shovel piece, the top of arc shovel piece is provided with the pivot, the lower extreme surface of getting the mud section of thick bamboo is close to the position of pivot and sets up the activity groove, the both ends of pivot alternate to the inside in activity groove and with get mud section of thick bamboo inner wall swing joint, torsion spring has been cup jointed to the surface of pivot.
Through adopting above-mentioned technical scheme, the device simple structure, the person of facilitating the use in time clears up the inside mud in stake hole or the mud piece that collapses, improves the efficiency of construction in building site, and is comparatively practical.
Preferably, the number of the through hole grooves and the number of the arc-shaped shovel pieces are three, and the through hole grooves and the arc-shaped shovel pieces are distributed in an annular shape at equal intervals by taking the center of the mud taking barrel as a midpoint.
Through adopting above-mentioned technical scheme, utilize arc shovel piece shovel to get the inside mud in stake hole or the mud piece that collapses, take out it in getting a mud section of thick bamboo.
Preferably, the three through hole grooves correspond to the three arc-shaped shovel pieces in position one to one, and the through hole grooves are located in the center of the top ends of the arc-shaped shovel pieces.
Through adopting above-mentioned technical scheme, the through-hole groove is used for drawing the wire rope of dragging and moves about its inside cooperation pulley.
Preferably, the steel wire ropes extending to the interior of the mud taking barrel are equally divided into three steel wire ropes, and the three steel wire ropes are respectively inserted into the corresponding through hole grooves and are pulled to penetrate through the bottom ends of the through hole grooves.
Through adopting above-mentioned technical scheme, with wire rope as for the inside contact of avoiding wire rope and the inside mud of getting the mud section of thick bamboo of through-hole inslot.
Preferably, the bottom ends of the three steel wire ropes are respectively and fixedly connected with the arc-shaped shovel pieces at the corresponding positions.
Through adopting above-mentioned technical scheme, pull wire rope and pull upset arc shovel piece and shovel and get the inside mud in stake hole.
Preferably, the two sides of the outer surface of the upper end of the arc shovel piece are fixedly connected with connecting pieces, the arc shovel piece is fixedly connected with the rotating shaft through the connecting pieces, and the torsion spring is located inside the connecting pieces on the two sides.
Through adopting above-mentioned technical scheme, torsion spring mainly plays the effect that resets to arc shovel piece, makes its three arc shovel piece go out the state of opening and shutting when not using.
Preferably, one end of the torsion spring is fixedly connected with the U-shaped handle, and the other end of the torsion spring is fixedly connected with the sliding block.
Through adopting above-mentioned technical scheme, reset spring mainly plays the effect of reseing to the handle.
Compared with the prior art, the beneficial effects of the utility model are that:
when the device is used, firstly the arc shovel blade in a silent state is in an opening and closing state, the bottom end of the mud taking barrel is also in an open state, a user carries the U-shaped handle by hand when using the device, then the mud taking barrel is inserted into a pile hole until the arc shovel blade at the bottom end of the mud taking barrel contacts the bottom end of the pile hole, then the handle is buckled upwards by fingers of the user, the handle is matched with the sliding groove to slide upwards under the action of the sliding blocks at two sides to be connected and displaced, the reset spring is extruded in the moving process, the steel wire rope is simultaneously stretched in the up-and-down moving process of the handle, the steel wire rope is upwards pulled in the through hole groove and is matched with the pulleys at the upper end and the lower end of the through hole groove to roll and pull the arc shovel blade, the arc shovel blade rotates and overturns under the action of the rotating shaft to extrude the torsion spring, snatch some mud of stake hole bottom and the mud piece that collapses to getting a mud section of thick bamboo inside, then take out its stake downthehole mud, take out the back, the user loosens the handle, the arc shovel piece resets under torsion spring's effect, the mud piece drops ground, carry out the mud work of getting next time again, the user only need repeat several times repeatedly get the mud action and can be with the mud piece sanitization of stake downthehole portion, when getting a mud section of thick bamboo and inserting stake downthehole portion simultaneously, the pressure disk of getting a mud section of thick bamboo upper end surface can be under the action of gravity and the user's decurrent push down with the mud piece compaction around the stake hole top, avoid the mud piece to collapse once more to stake downthehole influence and get mud efficiency, the device simple structure, the person of facilitating the use in time clears up the mud of stake downthehole portion or the mud piece that collapses, the efficiency of construction on.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a view of the U-shaped handle and the handle of the present invention;
FIG. 3 is a combined view of the mud taking barrel and the steel wire rope of the present invention;
FIG. 4 is a combination view of the mud taking cylinder and the through hole groove of the present invention;
fig. 5 is a combined view of the mud taking cylinder and the arc shovel blade of the present invention.
In the figure:
1. taking a mud barrel; 2. a U-shaped handle; 3. a platen; 4. an arc shovel blade; 5. a handle; 6. a wire rope; 7. a slider; 8. a chute; 9. a return spring; 10. a pulley; 11. a through hole slot; 12. a movable groove; 13. a rotating shaft; 14. a torsion spring.
Detailed Description
In the following, reference will be made to the accompanying drawings in the embodiments of the present invention for clearly and completely describing the technical solutions in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 5, the present invention provides a technical solution:
as shown in fig. 1 and 2, the soil cleaning device in the pile hole for the building engineering comprises a mud taking barrel 1, wherein a pressure plate 3 is fixedly connected to the outer surface of the upper end of the mud taking barrel 1, a U-shaped handle 2 is fixedly connected to the middle part of the outer surface of the upper end of the pressure plate 3, sliding grooves 8 are formed in two sides of the inner surface of the U-shaped handle 2, a sliding block 7 is slidably connected to the inside of each sliding groove 8, a handle 5 is fixedly connected to the outer surface of one side of each sliding block 7, the handle 5 is located inside the U-shaped handle 2, and a return spring 9 is arranged in the sliding groove 8 and close to the upper end;
as shown in fig. 3, 4 and 5, a steel wire rope 6 is fixedly connected to the central position of the outer surface of the lower end of the handle 5, one end of the steel wire rope 6 penetrates through the pressure plate 3 and extends to the inside of the mud taking barrel 1, a through hole groove 11 is formed in the inner surface of the mud taking barrel 1, pulleys 10 are fixedly connected to the upper end and the lower end of the through hole groove 11, the steel wire rope 6 extending to the inside of the mud taking barrel 1 penetrates through the pulleys 10 to the inside of the through hole groove 11 and extends to the bottom end of the mud taking barrel 1, an arc-shaped shovel sheet 4 is arranged on the outer surface of the lower end of the mud taking barrel 1, a rotating shaft 13 is arranged at the top end of the arc-shaped shovel sheet 4, a movable groove 12 is formed in the position of the outer surface of the lower end of the mud taking barrel 1, two ends of the rotating shaft 13 penetrate through the inside of the movable groove 12 and are movably connected with the inner wall of the mud taking barrel 1, and the center of the mud taking cylinder 1 is used as the midpoint to be distributed in an annular shape at equal intervals, the arc-shaped shovel pieces 4 are used for shoveling the mud or the collapsed mud blocks in the pile hole, and the mud or the collapsed mud blocks are stored in the mud taking cylinder 1 and taken out.
Through adopting above-mentioned technical scheme, the device simple structure, the person of facilitating the use in time clears up the inside mud in stake hole or the mud piece that collapses, improves the efficiency of construction in building site, and is comparatively practical.
Specifically, as shown in fig. 4, the number of the through-hole slots 11 and the number of the arc-shaped shovel pieces 4 are three, and the through-hole slots are annularly and equidistantly distributed with the center of the mud taking cylinder 1 as a midpoint.
Through adopting above-mentioned technical scheme, utilize arc shovel piece 4 to shovel and get the inside mud in stake hole or the mud piece that collapses, take out it in getting mud section of thick bamboo 1.
Specifically, as shown in fig. 4, the three through hole grooves 11 correspond to the three arc-shaped shovel pieces 4 in position one to one, and the through hole grooves 11 are located at the center of the top ends of the arc-shaped shovel pieces 4.
By adopting the technical scheme, the through hole groove 11 is used for drawing the pulled steel wire rope 6 to move up and down in the through hole groove in cooperation with the pulley 10.
Specifically, as shown in fig. 3, the steel wire ropes 6 extending into the mud taking barrel 1 are equally divided into three, and the three steel wire ropes 6 are respectively inserted into the corresponding through hole grooves 11 and are pulled to penetrate through the bottom ends of the through hole grooves 11.
Through adopting above-mentioned technical scheme, with wire rope 6 as to inside avoiding wire rope 6 and getting the inside mud contact of mud section of thick bamboo 1 of through-hole groove 11.
Specifically, as shown in fig. 3, the bottom ends of the three steel wire ropes 6 are respectively and fixedly connected with the arc-shaped shovel pieces 4 at the corresponding positions.
Through adopting above-mentioned technical scheme, through dragging wire rope 6 and pulling upset arc shovel piece 4 and shovel and get the inside mud in stake hole.
Specifically, as shown in fig. 5, two sides of the outer surface of the upper end of the arc-shaped shovel blade 4 are fixedly connected with connecting pieces, the arc-shaped shovel blade 4 is fixedly connected with the rotating shaft 13 through the connecting pieces, and the torsion spring 14 is located inside the connecting pieces at the two sides.
Through adopting above-mentioned technical scheme, torsion spring 14 mainly plays the effect that resets to arc shovel piece 4, makes its three arc shovel piece 4 go out the open and shut state when not using.
Specifically, as shown in fig. 5, one end of the torsion spring 14 is fixedly connected to the U-shaped handle 2, and the other end thereof is fixedly connected to the slider 7.
Through adopting above-mentioned technical scheme, reset spring 9 mainly plays the effect of reseing to handle 5.
The working principle is as follows: by adding a series of structural components such as a U-shaped handle 2, a handle 5, a pressure plate 3, an arc shovel blade 4, a steel wire rope 6, a return spring 9, a torsion spring 14, a rotating shaft 13 and the like into the device, the elastic coefficient of the return spring 9 and the torsion spring 14 is 4N/MM, when the device is used, the arc shovel blade 4 in a silent state is in an opening and closing state, the bottom end of a mud taking barrel 1 is also in an open state, a user holds the U-shaped handle 2 by hand when using the device, then inserts the mud taking barrel 1 into a pile hole until the arc shovel blade 4 at the bottom end of the mud taking barrel 1 contacts the bottom end of the pile hole, then the handle 5 is buckled upwards by fingers of the user, the handle 5 is matched with a sliding chute 8 to be connected and displaced upwards in a sliding manner under the action of sliding blocks 7 at two sides, the return spring 9 is squeezed in the moving process, the steel wire rope 6, the steel wire rope 6 is upwards pulled in the through hole groove 11 and matched with pulleys 10 at the upper end and the lower end of the through hole groove 11 to roll and pull the arc-shaped shovel piece 4, the arc-shaped shovel piece 4 rotates and overturns under the action of the rotating shaft 13 and extrudes the torsion spring 14 to grab some sludge at the bottom of the pile hole and collapsed sludge blocks into the mud taking barrel 1, then the sludge in the pile hole is taken out, after the sludge is taken out, a user loosens the handle 5, the arc-shaped shovel piece 4 resets under the action of the torsion spring 14, the sludge blocks fall to the ground, next sludge taking work is carried out, the user can clean the sludge blocks in the pile hole only by repeatedly repeating sludge taking actions for several times, meanwhile, when the mud taking barrel 1 is inserted into the pile hole, the pressure plate 3 on the outer surface at the upper end of the mud taking barrel 1 can compact the sludge blocks around the top of the pile hole under the action of gravity and the downward pressing force of the user, and the sludge blocks are prevented from collapsing into the, the device simple structure, the person of facilitating the use in time clears up the inside mud in stake hole or the mud piece that collapses, improves the efficiency of construction in building site, and is comparatively practical.
The using method comprises the following steps: firstly, the arc shovel blade 4 in a silent state is in an opening and closing state, the bottom end of the mud taking barrel 1 is also in an open state, a user holds the U-shaped handle 2 by hand when using, then inserts the mud taking barrel 1 into a pile hole until the arc shovel blade 4 at the bottom end of the mud taking barrel 1 contacts the bottom end of the pile hole, then the user fingers to buckle the handle 5 upwards, the handle 5 is matched with the sliding chute 8 to slide upwards under the action of the sliding blocks 7 at two sides to move in a connecting mode, the reset spring 9 is extruded in the moving process, the steel wire rope 6 is simultaneously stretched in the up-and-down moving process of the handle 5, the steel wire rope 6 is upwards pulled in the through hole groove 11 and matched with the pulleys 10 at the upper end and the lower end of the through hole groove 11 to roll and pull the arc shovel blade 4, the arc shovel blade 4 rotates and overturns under the action of the rotating shaft 13 and extrudes the torsion spring 14, and some sludge at, then take out its stake downthehole portion mud, take out the back, the user loosens handle 5, arc shovel piece 4 resets under torsion spring 14's effect, the clod piece ground that drops, carry out the mud work of getting next again, the user only need repeat several times repeatedly get the clod piece clean up that the mud action can be with stake downthehole portion, when getting a mud section of thick bamboo 1 and inserting stake downthehole portion simultaneously, get the pressure disk 3 of 1 upper end surface of a mud section of thick bamboo and can be under the action of gravity and the user decurrent pressing force with the clod compaction around the stake hole top, avoid the clod piece to collapse once more to stake downthehole portion influence and get mud efficiency.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a clear native device in stake hole for building engineering, is including getting a mud section of thick bamboo (1), its characterized in that: the mud taking barrel is characterized in that a pressure plate (3) is fixedly connected to the outer surface of the upper end of the mud taking barrel (1), a U-shaped handle (2) is fixedly connected to the middle of the outer surface of the upper end of the pressure plate (3), sliding grooves (8) are formed in two sides of the inner surface of the U-shaped handle (2), a sliding block (7) is slidably connected to the inner portion of each sliding groove (8), a handle (5) is fixedly connected to the outer surface of one side of each sliding block (7), the handle (5) is located inside the U-shaped handle (2), a reset spring (9) is arranged in the position, close to the upper end, of the inner portion of each sliding groove (8), a steel wire rope (6) is fixedly connected to the central position of the outer surface of the lower end of each handle (5), one end of each steel wire rope (6) penetrates through the pressure plate (3) and extends to the inner portion of the mud taking barrel (1), extend to get inside wire rope (6) of mud drum (1) and alternate to the inside of through-hole groove (11) through pulley (10) and extend to getting mud drum (1) bottom, the lower extreme surface of getting mud drum (1) is provided with arc shovel piece (4), the top of arc shovel piece (4) is provided with pivot (13), the lower extreme surface of getting mud drum (1) is close to the position of pivot (13) and sets up movable groove (12), the both ends of pivot (13) alternate to the inside of movable groove (12) and with get mud drum (1) inner wall swing joint, torsion spring (14) have been cup jointed to the surface of pivot (13).
2. The pile hole soil cleaning device for the building engineering according to claim 1, characterized in that: the number of the through hole grooves (11) and the number of the arc-shaped shovel pieces (4) are three, and the through hole grooves and the arc-shaped shovel pieces are distributed in an annular shape at equal intervals by taking the center of the mud taking barrel (1) as a midpoint.
3. The pile hole soil cleaning device for the building engineering according to claim 2, characterized in that: the three through hole grooves (11) correspond to the three arc-shaped shovel pieces (4) in position one to one, and the through hole grooves (11) are located in the center of the top ends of the arc-shaped shovel pieces (4).
4. The pile hole soil cleaning device for the building engineering according to claim 1, characterized in that: the steel wire ropes (6) extending into the mud taking barrel (1) are equally divided into three, and the three steel wire ropes (6) are respectively inserted into the corresponding through hole grooves (11) and are pulled to penetrate through the bottom ends of the through hole grooves (11).
5. The pile hole soil cleaning device for the building engineering according to claim 4, characterized in that: the bottom ends of the three steel wire ropes (6) are respectively and fixedly connected with the arc shovel pieces (4) at the corresponding positions.
6. The pile hole soil cleaning device for the building engineering according to claim 1, characterized in that: the arc shovel is characterized in that connecting pieces are fixedly connected to two sides of the outer surface of the upper end of the arc shovel piece (4), the arc shovel piece (4) is fixedly connected with the rotating shaft (13) through the connecting pieces, and the torsion spring (14) is located inside the connecting pieces on two sides.
7. The pile hole soil cleaning device for the building engineering according to claim 1, characterized in that: one end of the torsion spring (14) is fixedly connected with the U-shaped handle (2), and the other end of the torsion spring is fixedly connected with the sliding block (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921824139.2U CN210798901U (en) | 2019-10-28 | 2019-10-28 | Pile hole soil cleaning device for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921824139.2U CN210798901U (en) | 2019-10-28 | 2019-10-28 | Pile hole soil cleaning device for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210798901U true CN210798901U (en) | 2020-06-19 |
Family
ID=71240835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921824139.2U Expired - Fee Related CN210798901U (en) | 2019-10-28 | 2019-10-28 | Pile hole soil cleaning device for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210798901U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114555888A (en) * | 2021-01-04 | 2022-05-27 | 成都欣皓地基基础工程有限责任公司 | Square pile construction method and equipment for rotary drilling rig |
-
2019
- 2019-10-28 CN CN201921824139.2U patent/CN210798901U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114555888A (en) * | 2021-01-04 | 2022-05-27 | 成都欣皓地基基础工程有限责任公司 | Square pile construction method and equipment for rotary drilling rig |
CN114555888B (en) * | 2021-01-04 | 2023-01-31 | 成都欣皓地基基础工程有限责任公司 | Square pile construction method and equipment for rotary drilling rig |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210798901U (en) | Pile hole soil cleaning device for building engineering | |
CN213068282U (en) | Multifunctional soil sampling and soil sampling drill | |
CN110117986B (en) | Rainwater well structure convenient for garbage cleaning and operation method | |
CN110578328A (en) | Equipment for removing pile core sand for building | |
CN210112568U (en) | Oranges and tangerines planting device | |
CN207744447U (en) | A kind of flowerpot | |
CN111545320A (en) | Automatic rubbish equipment is smashed to building of control water yield | |
CN112568838B (en) | Method for cleaning garbage by using sleeving sweeping | |
CN115233639B (en) | Water surface garbage cleaning device for hydraulic engineering | |
CN216381367U (en) | Injection well mediation sampling device | |
CN109610578B (en) | Sewer dredger | |
CN111789553A (en) | Self-cleaning dustpan with comb teeth | |
CN114135223A (en) | Bridge drilling construction equipment and use method thereof | |
CN209826604U (en) | Anti-falling garbage shovel | |
CN109610579B (en) | Sewer dredge convenient to storage | |
CN208892448U (en) | A kind of liftable hand-pushing type ground washing machine of brush | |
CN212896731U (en) | Road rainwater inspection shaft based on road design | |
CN211723040U (en) | Self-cleaning dustpan with comb teeth | |
CN111869897A (en) | Integrated device for cleaning, peeling and slicing tuber food | |
CN216791709U (en) | Soil sampling equipment | |
CN213944318U (en) | A heavily contaminated soil prosthetic devices for seedling planting | |
CN112136775B (en) | Automatic razor clam collecting device | |
CN215827637U (en) | Variable speed assembly line | |
CN217870349U (en) | River trash blocking device | |
JP7266155B1 (en) | Mineral extractor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200619 Termination date: 20201028 |
|
CF01 | Termination of patent right due to non-payment of annual fee |