CN210723989U - Water and electricity construction pipeline pre-embedding device - Google Patents

Water and electricity construction pipeline pre-embedding device Download PDF

Info

Publication number
CN210723989U
CN210723989U CN201920109206.6U CN201920109206U CN210723989U CN 210723989 U CN210723989 U CN 210723989U CN 201920109206 U CN201920109206 U CN 201920109206U CN 210723989 U CN210723989 U CN 210723989U
Authority
CN
China
Prior art keywords
mounting
groove
hole
sides
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920109206.6U
Other languages
Chinese (zh)
Inventor
肖梦秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huibang Kaiyuan Beijing Technology Co ltd
Original Assignee
Huibang Kaiyuan Beijing Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huibang Kaiyuan Beijing Technology Co ltd filed Critical Huibang Kaiyuan Beijing Technology Co ltd
Priority to CN201920109206.6U priority Critical patent/CN210723989U/en
Application granted granted Critical
Publication of CN210723989U publication Critical patent/CN210723989U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a pre-buried device of water and electricity construction pipeline, which comprises a cross beam, the mounting hole has been seted up to the bottom side of crossbeam, and movable mounting has the supporting seat in the mounting hole, and outside the top side and the bottom side of supporting seat all extended to the mounting hole, movable mounting had the marking off rod that is located the crossbeam below on the supporting seat, and the mounting groove has all been seted up to the both sides of crossbeam, and equal movable mounting has the mounting panel on the bottom side inner wall of two mounting grooves, and one side that two mounting panels were kept away from each other extends. The utility model discloses simple structure places two landing legs respectively in the both sides of cable pit and carries out the pre-buried location of water and electricity pipeline through the marking off pole, when needing to adjust the interval of two landing legs, rotates when rotating the knob and can drive the dwang and remove, and the two homoenergetic is the interval of two mounting panels of quick adjustment to the interval of two landing legs has been adjusted to the efficient more, with the cable pit that adapts to different widths, it is convenient to adjust, has satisfied the user demand.

Description

Water and electricity construction pipeline pre-embedding device
Technical Field
The utility model relates to a water and electricity construction technical field especially relates to a pre-buried device of water and electricity construction pipeline.
Background
In the building work process, need lay the cable conductor, but now when laying the pipeline only simple dig out the ditch then bury the water and electricity pipeline, but when the construction now, the levelness of the ditch of digging out is not good, the levelness of the pipeline of laying is also not high, this state that has just led to the fact the pipeline to locate the slope for a long time, and to the pipeline, some positions that the live time has been long probably cause the jam, it is unsatisfactory to use, the degree of depth that the cable was buried is different again, and can bury too deeply again, this phenomenon that just causes the inhomogeneous cable fusing that easily takes place of cable heat dissipation.
The patent that publication is CN206593578U discloses a pre-buried positioner of building water and electricity pipeline, which comprises a cross beam, the surface both sides of crossbeam are equipped with connecting thread hole, connecting thread hole's inside has the extension rod through extension screw thread head threaded connection, this patent passes through threaded connection's extension rod and landing leg, not only makes things convenient for the dismouting and deposits, can improve the accuracy of location greatly moreover, but the interval of two landing legs is adjusted through extension rod and extension screw thread head on this pre-buried positioner of water and electricity pipeline, it is inconvenient to adjust, and the interval is cascaded adjustment, the interval of two landing legs of adjustment that can not be continuous and stable, thereby can not adapt to the cable pit of different width, consequently, there is the improvement space.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a pre-buried device of a water and electricity construction pipeline.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a hydroelectric construction pipeline pre-embedding device comprises a cross beam, wherein the bottom side of the cross beam is provided with a mounting hole, a supporting seat is movably mounted in the mounting hole, the top side and the bottom side of the supporting seat both extend out of the mounting hole, a scribing rod positioned below the cross beam is movably mounted on the supporting seat, mounting grooves are respectively formed on both sides of the cross beam, mounting plates are movably mounted on the inner walls of the bottom sides of the two mounting grooves, one sides, far away from each other, of the two mounting plates respectively extend out of the two mounting grooves, both sides of the cross beam are respectively provided with a supporting leg fixedly mounted on the bottom sides of the two mounting plates, the inner wall of one side, close to each other, of the two mounting grooves is provided with a same connecting hole, the inner wall of one side of the connecting hole is provided with, the one end that the connecting hole was kept away from to the regulation pole extends to outside the regulation hole and fixed mounting has the knob, and one side that the movable block is close to the connecting hole is rotated and is installed and rotate the post, and the one end that rotates the post extends to in the connecting hole and fixed mounting has the dwang, rotates the post and annular and offers the draw-in groove that is located the connecting hole, and the draw-in groove sets up for the slope, and fixed mounting has L type kelly on one side inner wall of connecting hole, and the one end of L type kelly extends to in the draw-in groove, spherical groove has all been seted up at the both ends of dwang, and equal movable mounting has spherical piece in two spherical grooves, and one side that two spherical pieces kept away from each other extends to outside two spherical grooves respectively and fixed.
Preferably, a sliding groove is formed in the inner wall of the bottom side of the mounting groove, a sliding block is slidably mounted in the sliding groove, and the top side of the sliding block is fixedly mounted on the bottom side of the mounting plate.
Preferably, the limiting grooves are formed in the inner walls of the two sides of the adjusting hole, the limiting blocks are fixedly mounted on the two sides of the movable block, and one sides, far away from each other, of the two limiting blocks are slidably mounted in the two limiting grooves respectively.
Preferably, the inner wall of the movable groove is provided with an internal thread, the adjusting rod is provided with an external thread, and the internal thread on the inner wall of the movable groove is matched with the external thread on the adjusting rod.
Preferably, the both sides of adjusting the pole are equal fixed mounting have the rotatory piece that is located the regulation hole, and the rotating groove has been seted up to the annular on the inner wall in regulation hole, and one side that two rotatory pieces kept away from each other all extends to the rotating groove in.
Compared with the prior art, the beneficial effects of the utility model are that:
in the utility model, through the matching use of the beam, the mounting hole, the supporting seat, the marking rod, the mounting groove, the mounting plate, the supporting leg, the connecting hole and the push-pull rod, the two supporting legs are respectively placed at the two sides of the cable trench and the pre-embedding positioning of the water and electricity pipeline is carried out through the marking rod, the supporting leg and the mounting plate are movably mounted in the mounting groove, the distance between the two supporting legs can be conveniently adjusted only through the push-pull rod, the rotating knob drives the adjusting rod to rotate through the adjusting hole, the movable block, the movable groove, the adjusting rod, the knob, the rotating block, the rotating groove, the rotating column, the rotating rod, the clamping groove, the L-shaped clamping rod, the spherical groove and the spherical block, the rotating knob drives the adjusting rod to rotate, further drives the movable block and the rotating column to move, the rotating rod rotates when moving to the direction far away from the knob under the limit of the L-shaped clamping rod, the two mounting plates are far away from each other, so that the adjustment is more efficient;
the utility model discloses simple structure places two landing legs respectively in the both sides of cable pit and carries out the pre-buried location of water and electricity pipeline through the marking off pole, when needing to adjust the interval of two landing legs, rotates when rotating the knob and can drive the dwang and remove, and the two homoenergetic is the interval of two mounting panels of quick adjustment to the interval of two landing legs has been adjusted to the efficient more, with the cable pit that adapts to different widths, it is convenient to adjust, has satisfied the user demand.
Drawings
Fig. 1 is a schematic front view of a hydroelectric construction pipeline pre-embedding device provided by the utility model;
fig. 2 is a schematic top view of the pre-buried device for the water and electricity construction pipeline provided by the utility model;
fig. 3 is the utility model provides a water and electricity construction pipeline pre-buried device a part's in fig. 2 structure schematic diagram.
In the figure: the device comprises a beam 1, a mounting hole 2, a support seat 3, a scribing rod 4, a mounting groove 5, a mounting plate 6, a support leg 7, a connecting hole 8, a push-pull rod 9, an adjusting hole 10, a movable block 11, a movable groove 12, an adjusting rod 13, a knob 14, a rotating block 15, a rotating groove 16, a rotating column 17, a rotating rod 18, a clamping groove 19, a clamping rod 20L, a spherical groove 21 and a spherical block 22.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a water and electricity construction pipeline pre-embedding device comprises a cross beam 1, wherein a mounting hole 2 is formed in the bottom side of the cross beam 1, a supporting seat 3 is movably mounted in the mounting hole 2, the top side and the bottom side of the supporting seat 3 both extend out of the mounting hole 2, a scribing rod 4 positioned below the cross beam 1 is movably mounted on the supporting seat 3, mounting grooves 5 are formed in both sides of the cross beam 1, mounting plates 6 are movably mounted on the inner walls of the bottom sides of the two mounting grooves 5, one sides, far away from each other, of the two mounting plates 6 respectively extend out of the two mounting grooves 5, supporting legs 7 fixedly mounted on the bottom sides of the two mounting plates 6 are arranged on both sides of the cross beam 1, the same connecting hole 8 is formed in the inner wall of one side, close to each other, of the connecting hole 8 is, one side that connecting hole 8 was kept away from to movable block 11 has been seted up movable groove 12, movable mounting has regulation pole 13 in movable groove 12, the one end that connecting hole 8 was kept away from to regulation pole 13 extends to outside regulation hole 10 and fixed mounting has knob 14, one side that movable block 11 is close to connecting hole 8 is rotated and is installed and rotate post 17, the one end that rotates post 17 extends to in the connecting hole 8 and fixed mounting has dwang 18, annular draw-in groove 19 that is located connecting hole 8 has been seted up on rotating post 17, draw-in groove 19 sets up for the slope, fixed mounting has L type kelly 20 on one side inner wall of connecting hole 8, the one end of L type kelly 20 extends to in draw-in groove 19, spherical groove 21 has all been seted up at the both ends of dwang 18, equal movable mounting has spherical piece 22 in two spherical grooves 21, one side that two spherical pieces 22 kept away from each other extends to outside two spherical grooves 21 respectively and fixed mounting has push-and push-pull rod On, place two landing legs 7 respectively in the both sides of cable pit and carry out the pre-buried location of water and electricity pipeline through marking off pole 4, when needing to adjust the interval of two landing legs 7, rotate knob 14, drive and adjust pole 13 and rotate, adjust the internal thread looks adaptation on the external screw thread on the pole 14 and the movable groove 12 inner wall, and movable block 11 by spacing on the both sides inner wall of regulation hole 10, make and adjust pole 14 and rotate and drive movable block 11 and remove to the direction that is close to dwang 18, movable block 11 drives and rotates post 11 and remove.
A sliding groove is arranged on the inner wall of the bottom side of the mounting groove 5, a sliding block is arranged in the sliding groove, the top side of the sliding block is fixedly arranged on the bottom side of the mounting plate 6, the inner walls of two sides of the adjusting hole 10 are respectively provided with a limiting groove, two sides of the movable block 11 are respectively and fixedly provided with a limiting block, one side of the two limiting blocks, which is far away from each other, is respectively and slidably arranged in the two limiting grooves, the inner wall of the movable groove 12 is provided with an internal thread, the adjusting rod 13 is provided with an external thread, the internal thread on the inner wall of the movable groove 12 is matched with the external thread on the adjusting rod 13, two sides of the adjusting rod 13 are respectively and fixedly provided with a rotating block 15 positioned in the adjusting hole 10, the inner wall of the adjusting hole 10 is annularly provided with a rotating groove 16, one side of the two rotating blocks, thereby make the post 11 that rotates rotate, and then rotate when making dwang 18 remove, dwang 18 is when moving to the direction of keeping away from knob 14, dwang 18 pushes away and pushes two mounting panels 6 through push-and-pull rod 9, make two mounting panels 6 keep away from each other, setting up of spherical groove 21 and spherical piece 22 makes push-and-pull rod 9 can the multi-angle rotation, dwang 18 rotates equally can drive two mounting panels 6 through push-and-pull rod 9 and keep away from, make the interval regulation of two mounting panels 6 faster, thereby the interval of two landing legs 7 has been adjusted to more efficient, in order to adapt to the cable pit of different width, and it is convenient to adjust.
The working principle is as follows: two supporting legs 7 are respectively placed on two sides of a cable trench and are positioned in a water and electricity pipeline embedding way through a scribing rod 4, when the distance between the two supporting legs 7 needs to be adjusted, a knob 14 is rotated to drive an adjusting rod 13 to rotate, external threads on the adjusting rod 14 are matched with internal threads on the inner wall of a movable groove 12, a movable block 11 is limited on the inner walls of two sides of an adjusting hole 10, the adjusting rod 14 is rotated to drive the movable block 11 to move towards a direction close to a rotating rod 18, the movable block 11 drives a rotating column 11 to move, one end of an L-shaped clamping rod 20 is clamped into a clamping groove 19 which is arranged on the rotating column 11 in an annular inclined way, so that the rotating column 11 rotates, the rotating rod 18 rotates while moving, when the rotating rod 18 moves towards a direction far away from the knob 14, the rotating rod 18 pushes and pushes two mounting plates 6 through a push-pull rod 9, the two mounting plates 6 are far away from each other, the dwang 18 rotates and to drive two mounting panels 6 to keep away from through push-and-pull rod 9 equally for the interval of two mounting panels 6 is adjusted more fast, thereby the interval of two landing legs 7 has been adjusted to the more efficient, with the cable pit that adapts to different width, it is convenient to adjust, has satisfied the user demand.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a pre-buried device of water and electricity construction pipeline, including crossbeam (1), a serial communication port, mounting hole (2) have been seted up to the bottom side of crossbeam (1), movable mounting has supporting seat (3) in mounting hole (2), the top side and the bottom side of supporting seat (3) all extend outside mounting hole (2), movable mounting has marking off rod (4) that are located crossbeam (1) below on supporting seat (3), mounting groove (5) have all been seted up to the both sides of crossbeam (1), equal movable mounting has mounting panel (6) on the bottom side inner wall of two mounting grooves (5), one side that two mounting panels (6) kept away from each other extends outside two mounting grooves (5) respectively, the both sides of crossbeam (1) all are equipped with landing leg (7) of fixed mounting on two mounting panels (6) bottom side, set up same connecting hole (8) on the one side inner wall that two mounting, an adjusting hole (10) is formed in the inner wall of one side of the connecting hole (8), the inner walls of two sides of the adjusting hole (10) are movably provided with the same movable block (11), one side, far away from the connecting hole (8), of the movable block (11) is provided with a movable groove (12), an adjusting rod (13) is movably arranged in the movable groove (12), one end, far away from the connecting hole (8), of the adjusting rod (13) extends out of the adjusting hole (10) and is fixedly provided with a knob (14), one side, close to the connecting hole (8), of the movable block (11) is rotatably provided with a rotating column (17), one end of the rotating column (17) extends into the connecting hole (8) and is fixedly provided with a rotating rod (18), a clamping groove (19) which is positioned in the connecting hole (8) is annularly formed in the rotating column (17), the clamping groove (19) is obliquely arranged, and an, one end of the L-shaped clamping rod (20) extends into the clamping groove (19), spherical grooves (21) are formed in the two ends of the rotating rod (18), spherical blocks (22) are movably mounted in the two spherical grooves (21), one sides, far away from each other, of the two spherical blocks (22) extend to the outer portions of the two spherical grooves (21) respectively and are fixedly provided with the push-pull rods (9) respectively, and one ends, far away from each other, of the two push-pull rods (9) are rotatably mounted on one side, close to each other, of the two mounting plates (6) respectively.
2. The pre-buried device of a water and electricity construction pipeline of claim 1, characterized in that, the bottom side inner wall of mounting groove (5) has seted up the sliding tray, and slidable mounting has the sliding block in the sliding tray, and the top side fixed mounting of sliding block is on the bottom side of mounting panel (6).
3. The pre-buried device of a water and electricity construction pipeline of claim 1, characterized in that, the both sides inner wall of regulation hole (10) all has seted up the spacing groove, and the both sides of movable block (11) are equal fixed mounting has the stopper, and the one side that two stoppers kept away from each other is sliding mounting respectively at two spacing inslots.
4. The hydropower construction pipeline embedding device as claimed in claim 1, wherein the inner wall of the movable groove (12) is provided with an internal thread, the adjusting rod (13) is provided with an external thread, and the internal thread on the inner wall of the movable groove (12) is matched with the external thread on the adjusting rod (13).
5. The hydropower construction pipeline embedding device as claimed in claim 1, wherein the two sides of the adjusting rod (13) are fixedly provided with rotating blocks (15) located in the adjusting holes (10), the inner wall of each adjusting hole (10) is provided with a rotating groove (16) in an annular shape, and one side of each rotating block (15) which is far away from each other extends into the rotating groove (16).
CN201920109206.6U 2019-01-23 2019-01-23 Water and electricity construction pipeline pre-embedding device Expired - Fee Related CN210723989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920109206.6U CN210723989U (en) 2019-01-23 2019-01-23 Water and electricity construction pipeline pre-embedding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920109206.6U CN210723989U (en) 2019-01-23 2019-01-23 Water and electricity construction pipeline pre-embedding device

Publications (1)

Publication Number Publication Date
CN210723989U true CN210723989U (en) 2020-06-09

Family

ID=70935031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920109206.6U Expired - Fee Related CN210723989U (en) 2019-01-23 2019-01-23 Water and electricity construction pipeline pre-embedding device

Country Status (1)

Country Link
CN (1) CN210723989U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114069502A (en) * 2021-10-13 2022-02-18 国网浙江省电力有限公司平阳县供电公司 Cable protection casing plugging device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114069502A (en) * 2021-10-13 2022-02-18 国网浙江省电力有限公司平阳县供电公司 Cable protection casing plugging device

Similar Documents

Publication Publication Date Title
CN210723989U (en) Water and electricity construction pipeline pre-embedding device
CN209869061U (en) Ceramic tile drilling positioner for building
CN211875288U (en) Urban engineering is with drain pipe strutting arrangement convenient to adjust
CN113653066A (en) Foundation pit slope supporting structure
CN110797804B (en) Cable pipe port multidirectional pulley auxiliary tool
CN210461936U (en) Municipal water supply pipeline strutting arrangement
CN210849262U (en) Auxiliary tool for pipeline cutting
CN213461027U (en) Simple cable trench support structure
CN212027171U (en) Pre-buried positioner of regulation formula precast concrete stair bolt
CN213653513U (en) Retaining wall rapid construction template for water conservancy construction
CN211209195U (en) Support is laid to transformer engineering cable
CN203188917U (en) Base device of core drill for drilling long and thin holes
CN217762356U (en) Adjustable base is used in drain pipe installation
CN219571095U (en) Adjustable pipeline positioning structure
CN218365083U (en) MPP electric power pipe processing fixed establishment
CN210436408U (en) Slotting device for water and electricity installation
CN219472954U (en) Pipeline laying device for water conservancy construction
CN219181152U (en) Construction buried pipe line fixing device
CN211622074U (en) Civil engineering antidetonation structure
CN214293290U (en) MPP electric power pipe processing equipment
CN216923466U (en) Pipeline positioning support for water supply and drainage engineering
CN215806847U (en) Adjustable supporting structure for hydraulic pipeline installation of hydraulic engineering
CN219119976U (en) Petroleum pipeline supporting device special for petroleum engineering
CN219568893U (en) Combined pipe gallery foundation pit supporting structure
CN212751748U (en) Portable cable supporting and fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609

CF01 Termination of patent right due to non-payment of annual fee