CN213653513U - Retaining wall rapid construction template for water conservancy construction - Google Patents

Retaining wall rapid construction template for water conservancy construction Download PDF

Info

Publication number
CN213653513U
CN213653513U CN202021618855.8U CN202021618855U CN213653513U CN 213653513 U CN213653513 U CN 213653513U CN 202021618855 U CN202021618855 U CN 202021618855U CN 213653513 U CN213653513 U CN 213653513U
Authority
CN
China
Prior art keywords
dead lever
template
vertical
wall
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021618855.8U
Other languages
Chinese (zh)
Inventor
李卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Group Third Engineering Bureau Co Ltd
Original Assignee
China Energy Group Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Group Third Engineering Bureau Co Ltd filed Critical China Energy Group Third Engineering Bureau Co Ltd
Priority to CN202021618855.8U priority Critical patent/CN213653513U/en
Application granted granted Critical
Publication of CN213653513U publication Critical patent/CN213653513U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Retaining Walls (AREA)

Abstract

The utility model discloses a water conservancy construction is with quick construction template of retaining wall, including dead lever installation cover, two through-holes have been seted up to the outer wall of dead lever installation cover, and the dead lever installation sheathes in the angle between two and be 90 to insert respectively in two through-holes of dead lever installation cover outer wall and be equipped with connecting rod and horizontal dead lever, the outside cover of horizontal dead lever is equipped with the dead lever connecting block, and dead lever connecting block outer wall has seted up vertical dead lever mounting hole to vertical dead lever mounting hole inside is equipped with vertical dead lever, the through-hole has been seted up to vertical dead lever outer wall, and is equipped with template clamping screw in the vertical dead lever outer wall through-hole to template clamping screw's. This retaining wall rapid construction template for water conservancy construction is provided with the angular adjustment structure, and the person of facilitating the use adjusts the angle of template, improves the effect of pouring of retaining wall.

Description

Retaining wall rapid construction template for water conservancy construction
Technical Field
The utility model relates to a water conservancy construction equipment technical field specifically is a retaining wall fast construction template for water conservancy construction.
Background
Hydraulic engineering works have many similarities to the construction of general civil engineering works such as roads, railways, bridges, building construction, etc. And retaining wall can set up the both sides in the river course, restricts the position of rivers through retaining wall.
The existing retaining wall is in the construction process, because the template of the retaining wall is fixed by the supporting frame in the installation process, the template is very complicated to set, and the angle adjustment is very inaccurate, so that the angle of the surface of the retaining wall can be influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a retaining wall fast construction template for water conservancy construction to the template of the retaining wall that proposes in the solution background art is fixed the template through the support frame in the in-process of installation, and the setting of template is very loaded down with trivial details, and angle of adjustment is very inaccurate, can influence the problem of retaining wall surface angle like this.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water conservancy construction is with retaining wall fast construction template, includes dead lever installation cover, two through-holes have been seted up to the outer wall of dead lever installation cover, and the dead lever installation sheathes in and the angle between two is 90 to insert respectively in two through-holes of dead lever installation cover outer wall and be equipped with connecting rod and horizontal dead lever, the outside cover of horizontal dead lever is equipped with the dead lever connecting block, and dead lever connecting block outer wall has seted up vertical dead lever mounting hole to vertical dead lever mounting hole inside is equipped with vertical dead lever, the through-hole has been seted up to vertical dead lever outer wall, and is equipped with template clamping screw in the vertical dead lever outer wall through-hole to template.
Preferably, the connecting rods and the transverse fixing rods are at least 4, and the outer parts of the connecting rods and the outer parts of the transverse fixing rods are round steel pipes.
Preferably, threaded holes are formed in the upper portion and the lower portion of the fixing rod mounting sleeve, a second fixing screw and a first fixing screw are arranged in the threads in the upper portion and the lower portion of the fixing rod mounting sleeve respectively, and one end of the second fixing screw and one end of the first fixing screw are respectively pushed against the connecting rod and the transverse fixing rod.
Preferably, one side of the template main body, which is close to the vertical fixing rod, is provided with a supporting block, the other end of the supporting block is provided with an arc-shaped groove, and the outer wall of the vertical fixing rod is clamped in the groove on the supporting block.
Preferably, the outer portion of the template fixing screw rod is sleeved with a nut, and one surface of the nut abuts against the vertical fixing rod.
Preferably, the vertical fixing rods are parallel to the formwork main body.
Compared with the prior art, the beneficial effects of the utility model are that: this retaining wall rapid construction template for water conservancy construction is provided with the angular adjustment structure, and the person of facilitating the use adjusts the angle of template, improves the effect of pouring of retaining wall. The connecting rod and the transverse fixing rod of the device can form a frame in a 'return' shape, the periphery of the template main body is fixed, the fixing rod mounting sleeve can drive the upper end of the vertical fixing rod to move when moving, the vertical fixing rod is enabled to be inclined, the vertical fixing rod can drive the template main body to incline, the template fixing screw rod can be fixed on the vertical fixing rod through the nut, and the vertical fixing rod and the template main body can be connected together.
Drawings
FIG. 1 is a schematic structural view of a rapid construction template of a retaining wall for water conservancy construction of the present invention;
FIG. 2 is a side view of the transverse fixing rod of the retaining wall rapid construction template for water conservancy construction;
fig. 3 is the utility model relates to a retaining wall fast construction template supporting shoe side view for water conservancy construction.
In the figure: 1. connecting rod, 2, dead lever installation cover, 3, horizontal dead lever, 4, supporting shoe, 5, template main part, 6, first fixed screw, 7, second fixed screw, 8, template fixed screw, 9, nut, 10, vertical dead lever, 11, dead lever connecting block, 12, vertical dead lever mounting hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a water conservancy construction is with retaining wall fast construction template, including dead lever installation cover 2, two through-holes have been seted up to the outer wall of dead lever installation cover 2, and dead lever installation cover 2 goes up the angle between two and is 90, and it is equipped with connecting rod 1 and horizontal dead lever 3 to insert respectively in two through-holes of 2 outer walls of dead lever installation cover, connecting rod 1 and horizontal dead lever 3 all are equipped with 4 at least, and connecting rod 1 and 3 outsides of horizontal dead lever are circular steel pipe, connecting rod 1 and horizontal dead lever 3 of this structure can form the frame shape, can be with template main part 5's restriction all around through connecting rod 1 and horizontal dead lever 3, fix the position in the template main part 5 outside, dead lever installation cover 2 is all seted up threaded hole from top to bottom, and be equipped with second fixed screw 7 and first fixed screw 6 in the dead lever installation cover 2 top screw thread respectively, and the one end of second fixed screw 7 and first fixed screw 6 pushes up respectively on The upper and lower threaded holes of the fixing rod mounting sleeve 2 of the structure play a role of accommodating a second fixing screw 7 and a first fixing screw 6, the positions of a connecting rod 1 and a transverse fixing rod 3 can be fixed through the second fixing screw 7 and the first fixing screw 6, a fixing rod connecting block 11 is sleeved outside the transverse fixing rod 3, a vertical fixing rod mounting hole 12 is formed in the outer wall of the fixing rod connecting block 11, a vertical fixing rod 10 is arranged inside the vertical fixing rod mounting hole 12, a through hole is formed in the outer wall of the vertical fixing rod 10, a template fixing screw 8 is arranged in the through hole in the outer wall of the vertical fixing rod 10, a template main body 5 is fixed at one end of the template fixing screw 8, a supporting block 4 is arranged at one surface, close to the vertical fixing rod 10, of the template main body 5, an arc-shaped groove is formed at the other end, the supporting block 4 on the outer wall of the template main body 5 of the structure can be clamped on the vertical fixing rod 10, so that a certain distance is formed between the vertical fixing rod 10 and the template main body 5, the position of the vertical fixing rod 10 is convenient to pull, the nut 9 is sleeved outside the template fixing screw rod 8, one surface of the nut 9 is propped against the vertical fixing rod 10, the template fixing screw 8 of the structure can penetrate through the outer wall of the vertical fixing rod 10, and the nut 9 on the outer wall of the template fixing screw 8 is fixed on the vertical fixing rod 10 to connect the template fixing screw 8 and the vertical fixing rod 10 together, the vertical fixing rod 10 is parallel to the template main body 5, the vertical fixing rod 10 of the structure can drive the template main body 5 to rotate together when rotating, therefore, the template main body 5 can be driven to incline, and the inclination angle of the template main body 5 is controlled through the vertical fixing rod 10.
The working principle is as follows: when the retaining wall rapid construction template for water conservancy construction is used, the device is firstly arranged at a proper place, then the template main body 5 forms a frame, then concrete can be poured into the inner side of the template main body 5, the concrete is molded through the template main body 5, if the angle of the template main body 5 is required to be adjusted, the first fixing screw 6 and the second fixing screw 7 on one side of the device are unscrewed, then the fixing rod mounting sleeve 2 is dragged, the fixing rod mounting sleeve 2 can drive the fixing rod connecting block 11 to move, then the fixing rod connecting block 11 drives the vertical fixing rod 10 to be inclined, thus the template main body 5 on the template fixing screw 8 in the through hole of the vertical fixing rod 10 is also inclined, finally the first fixing screw 6 and the second fixing screw 7 are screwed, and the vertical fixing rod 10 can be clamped in the groove on the supporting block 4, thus, the vertical fixing rod 10 does not skew on the supporting block 4, and the connecting rod 1 can connect different fixing rod mounting sleeves 2 together, thereby completing a series of works.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a retaining wall rapid construction template for water conservancy construction, includes dead lever installation cover (2), its characterized in that: two through-holes have been seted up to the outer wall of dead lever installation cover (2), and dead lever installation cover (2) goes up the angle between two and is 90 to insert respectively in two through-holes of dead lever installation cover (2) outer wall and be equipped with connecting rod (1) and transverse fixing pole (3), the outside cover of transverse fixing pole (3) is equipped with dead lever connecting block (11), and dead lever connecting block (11) outer wall has seted up vertical dead lever mounting hole (12) to vertical dead lever mounting hole (12) inside is equipped with vertical dead lever (10), the through-hole has been seted up to vertical dead lever (10) outer wall, and is equipped with template fixing screw (8) in vertical dead lever (10) outer wall through-hole, and the one end of template fixing screw (8) is fixed with template main.
2. The retaining wall rapid construction template for water conservancy construction according to claim 1, characterized in that: the connecting rod (1) and the transverse fixing rod (3) are at least provided with 4, and the connecting rod (1) and the transverse fixing rod (3) are externally provided with round steel pipes.
3. The retaining wall rapid construction template for water conservancy construction according to claim 1, characterized in that: threaded holes are formed in the upper portion and the lower portion of the fixing rod mounting sleeve (2), second fixing screws (7) and first fixing screws (6) are arranged in threads in the upper portion and the lower portion of the fixing rod mounting sleeve (2) respectively, and one ends of the second fixing screws (7) and the first fixing screws (6) are respectively pushed onto the connecting rod (1) and the transverse fixing rods (3).
4. The retaining wall rapid construction template for water conservancy construction according to claim 1, characterized in that: one side of the template main body (5) close to the vertical fixing rod (10) is provided with a supporting block (4), the other end of the supporting block (4) is provided with an arc-shaped groove, and the outer wall of the vertical fixing rod (10) is clamped in the groove on the supporting block (4).
5. The retaining wall rapid construction template for water conservancy construction according to claim 1, characterized in that: the external sleeve of the template fixing screw rod (8) is provided with a nut (9), and one surface of the nut (9) is propped against the vertical fixing rod (10).
6. The retaining wall rapid construction template for water conservancy construction according to claim 1, characterized in that: the vertical fixing rods (10) are parallel to the template main body (5).
CN202021618855.8U 2020-08-06 2020-08-06 Retaining wall rapid construction template for water conservancy construction Active CN213653513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021618855.8U CN213653513U (en) 2020-08-06 2020-08-06 Retaining wall rapid construction template for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021618855.8U CN213653513U (en) 2020-08-06 2020-08-06 Retaining wall rapid construction template for water conservancy construction

Publications (1)

Publication Number Publication Date
CN213653513U true CN213653513U (en) 2021-07-09

Family

ID=76692019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021618855.8U Active CN213653513U (en) 2020-08-06 2020-08-06 Retaining wall rapid construction template for water conservancy construction

Country Status (1)

Country Link
CN (1) CN213653513U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482042A (en) * 2021-08-19 2021-10-08 重庆永固建筑科技发展有限公司 Combined template for reinforced retaining wall cast-in-place wall surface, wall surface system and construction method of wall surface system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482042A (en) * 2021-08-19 2021-10-08 重庆永固建筑科技发展有限公司 Combined template for reinforced retaining wall cast-in-place wall surface, wall surface system and construction method of wall surface system

Similar Documents

Publication Publication Date Title
CN213653513U (en) Retaining wall rapid construction template for water conservancy construction
CN210461936U (en) Municipal water supply pipeline strutting arrangement
CN210849262U (en) Auxiliary tool for pipeline cutting
CN209874484U (en) Aluminum alloy template bracing device
CN219196719U (en) Cantilever support template for water inlet tower construction
CN212477746U (en) Be used for civil engineering with fender pile underground structure supporting device
CN212110038U (en) Simple and easy measuring tool of template straightness that hangs down
CN104481163B (en) A kind of L beam construction equipment for building structure reinforcing and method
CN208455656U (en) A kind of anchor ear support device
CN208152556U (en) A kind of branch fastener for beam slab early stripping formwork system system
CN208310105U (en) A kind of adjustable bathroom of mounting height
CN220791251U (en) Positioning fixture for embedded water stop steel plate
CN111441366A (en) Be used for civil engineering with fender pile underground structure supporting device
CN111206611B (en) Civil construction foundation construction is with dysmorphism template reinforcing apparatus
CN214089360U (en) Template is used in highway side ditch construction
CN211341905U (en) Support connecting structure
CN211306719U (en) Bay window reinforcement
CN211081010U (en) Template external member for municipal building engineering
CN212613830U (en) Accurate installation device for embedded steel plates of reinforced concrete wall and column
CN216340861U (en) Diagonal bracing structure for aluminum alloy template
CN212534141U (en) Slope gradient control tool capable of being adjusted in inclined slope protection assembly mode
CN215252867U (en) Auxiliary vertical equipment for inserting and driving steel pipe piles in flowing water
CN214771656U (en) Device convenient to box girder installation location
CN218932917U (en) Road and bridge crack repair fixing structure
CN220934805U (en) Cable hook for secondary structure construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant