CN210483088U - High-altitude unloading platform for building construction - Google Patents

High-altitude unloading platform for building construction Download PDF

Info

Publication number
CN210483088U
CN210483088U CN201920592711.0U CN201920592711U CN210483088U CN 210483088 U CN210483088 U CN 210483088U CN 201920592711 U CN201920592711 U CN 201920592711U CN 210483088 U CN210483088 U CN 210483088U
Authority
CN
China
Prior art keywords
supporting
platform
plates
unloading
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920592711.0U
Other languages
Chinese (zh)
Inventor
李建光
张信
傅博
莫雅丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Municipal Group Co Ltd
Original Assignee
Linyi Municipal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Municipal Group Co Ltd filed Critical Linyi Municipal Group Co Ltd
Priority to CN201920592711.0U priority Critical patent/CN210483088U/en
Application granted granted Critical
Publication of CN210483088U publication Critical patent/CN210483088U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

The utility model discloses a high altitude platform of unloading for construction, including two support frid and roof supports, two the spout has all been seted up to adjacent one side of support frid, and the inner wall of two spouts all installs sliding guide, two sliding guide's adjacent one side all slides and is provided with the sliding block, and just adjacent one side of two sliding blocks all installs first backup pad, two the first fixing bolt that the equidistance set up is all installed at the notch top of support frid. The utility model provides a pair of platform of unloading in high altitude for construction through being provided with filter screen board and third backup pad, can carry out filtration treatment by filtering the dust residue of screen board on to the material, avoids the dust residue to pile up at the platform of unloading, needs continuous clearance, causes the trouble of clearance, is provided with the roller that the equidistance set up simultaneously on supporting the screen board, can make the material roll on the roller, has improved the convenience of unloading.

Description

High-altitude unloading platform for building construction
Technical Field
The utility model relates to a construction technical field especially relates to a platform of unloading in high altitude for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein in the process of building construction, in order to effectively move materials to a high-altitude building, a material unloading platform needs to be arranged on the high-altitude building.
Through search, the Chinese patent application numbers are: CN201821018905.1 discloses a construction is with platform of unloading, include two installation poles and be located two supporting platform between the installation pole, one side of supporting platform articulates there is first protection body, and the opposite side is provided with first connector, first connector is kept away from supporting platform's tip articulates there is the second protection body, supporting platform's one end is provided with the second connector, and above-mentioned patent exists following not enoughly: the third protection body of the discharging platform belongs to an outward opening type, and in the high-altitude operation, when the third protection body is opened and closed, the third protection body needs to be pushed and pulled at the outer port of the discharging platform, so that the danger degree is high, and therefore, the novel high-altitude discharging platform for building construction needs to be designed to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects in the prior art and providing a high-altitude unloading platform for building construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a platform of unloading with high altitude for construction, includes two support frid and roof supports, two the spout has all been seted up to adjacent one side of support frid, and the inner wall of two spouts all installs sliding guide, two sliding guide's adjacent one side all slides and is provided with the sliding block, and the adjacent one side of two sliding blocks all installs first backup pad, two the first fixing bolt that the equidistance set up is all installed at the notch top of support frid, two the guardrail is all installed at the top of first backup pad, one of them the first door body, another are installed at the opposite side top of guardrail the second door body is installed at the opposite side top of guardrail, the second recess has been seted up to the top central authorities of the second door body, and the inner wall and the first door body sliding connection of second recess.
Preferably, the centers of the bottoms of the two first supporting plates are provided with first grooves.
Preferably, the second fixing bolt is installed on one side of the top of each of the two first supporting plates.
Preferably, the top centers of the two guardrails are provided with support chains, and the tops of the two support chains are connected with the bottoms of the support top plates.
Preferably, two the second backup pad is all installed to the adjacent one side of first backup pad, and same support otter board, two are installed to the adjacent one side outer wall of two second backup pads same third backup pad is installed to the adjacent one side bottom of second backup pad.
Preferably, rollers are arranged at equal distances between the two first supporting plates.
The utility model has the advantages that:
1. the utility model provides a high altitude platform of unloading for construction, through being provided with two support frills and support roof, can install the support roof at the building wall crown through the bolt, install two support frills on building ground through first fixing bolt, then install first backup pad on the sliding block through the bolt, and finish installing each installation component on the first backup pad, then directly promote two first backup pads, release the building wall with two first backup pads and each part on the first backup pad, form an unloading platform, then fix first backup pad through second fixing bolt, realized the effect of very convenient installation device;
2. the utility model provides a high altitude platform of unloading for construction, through being provided with the supporting chain between supporting roof and guardrail, can provide a pulling force to the guardrail by the supporting chain, improve the stability of platform of unloading, be provided with first door body and second door body respectively in one side of two guardrails simultaneously, and make first door body and second door body pass through the bearing and be connected with two guardrails respectively, make first door body and second door body can only rotate in vertical direction, this kind of design is compared with the door body of traditional hinged joint's external open or interior open design, not only practiced thrift the occupation of land space, can also avoid the door body not to fix, the unexpected promotion door body produces the danger that material or personnel dropped, the security that the device used has been improved;
3. the utility model provides a pair of platform of unloading in high altitude for construction through be provided with between two second backup pads and filter screen board and third backup pad, can carry out filtration treatment by filtering the dust residue of screen board on to the material, avoids the dust residue to pile up at the platform of unloading, needs continuous clearance, causes the trouble of clearance, is provided with the roller that the equidistance set up simultaneously on supporting web board, can make the material roll on the roller, has improved the convenience of unloading.
Drawings
Fig. 1 is a schematic view of a partial main view structure of a high-altitude unloading platform for building construction provided by the utility model;
fig. 2 is a schematic side structure view of an aerial discharge platform for building construction provided by the utility model;
fig. 3 is a schematic view of a partial overlooking structure of the high-altitude unloading platform for building construction provided by the utility model;
fig. 4 is a schematic view of a partial front structure of a high-altitude unloading platform for building construction provided by the utility model;
fig. 5 is the utility model provides a positive structure schematic diagram of first door body and second door body of platform of unloading in high altitude for construction.
In the figure: the support device comprises a support trough plate 1, a first support plate 2, a first door body 3, a guardrail 4, a support chain 5, a support top plate 6, a sliding guide rail 7, a first fixing bolt 8, a first groove 9, a second fixing bolt 10, a second support plate 11, a third support plate 12, a support screen plate 13, a second door body 14 and a roller 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-5, a high-altitude unloading platform for building construction comprises two supporting groove plates 1 and a supporting top plate 6, wherein the outer wall of one adjacent side of each of the two supporting groove plates is provided with a first groove, the inner walls of the two first grooves are connected with sliding guide rails 7 through bolts, the outer wall of one adjacent side of each of the two sliding guide rails 7 is connected with a sliding block in a sliding manner, the outer wall of one adjacent side of each of the two sliding blocks is connected with a first supporting plate 2 through bolts, the outer wall of the top of each of the notches of the two supporting groove plates 1 is provided with first threaded holes which are equidistantly arranged, the inner wall of each first threaded hole is connected with a first fixing bolt 8 through a thread, the outer wall of the top of each of the two first supporting plates 2 is connected with a guardrail 4 through a bolt, the outer wall of the top of the other side of one guardrail 4 is connected, a second groove is formed in the outer wall of the center of the top of the second door body 14, and the inner wall of the second groove is connected with the outer wall of the first door body 3 in a sliding mode.
In the utility model, the outer walls of the centers of the bottoms of the two first supporting plates 2 are both provided with first grooves 9;
the outer walls of one sides of the tops of the two first supporting plates 2 are both provided with second threaded holes, and the same second fixing bolt 10 is mounted on the inner walls of the second threaded holes and one of the first threaded holes;
the outer walls of the centers of the tops of the two guardrails 4 are connected with supporting chains 5 through bolts, and the outer walls of the tops of the two supporting chains 5 are connected with the outer wall of the bottom of the supporting top plate 6 through bolts.
Example 2
Referring to fig. 1-5, the high-altitude unloading platform for building construction further comprises a second supporting plate 11 arranged between the two first supporting plates 2, the two second supporting plates 11 are respectively connected with the outer walls of the adjacent sides of the two first supporting plates 2 through bolts, the outer walls of the tops of the adjacent sides of the two second supporting plates 11 are connected with a same horizontally arranged supporting screen plate 13 through bolts, and the outer walls of the bottoms of the adjacent sides of the two second supporting plates 11 are connected with a same horizontally arranged third supporting plate 12 through bolts;
the outer walls of the tops of the two second supporting plates 11 and the supporting screen plate 13 are provided with third grooves which are arranged equidistantly, the two first supporting plates 2 are connected with rollers 15 which are arranged equidistantly through bearings, and the rollers 15 are respectively positioned inside the third grooves.
The working principle is as follows: when in use, the supporting top plate 6 is arranged on the top of a building wall through bolts, the two supporting groove plates 1 are arranged on the building ground through the first fixing bolts 8, then the first supporting plate 2 is arranged on a sliding block through bolts, all the installation parts on the first supporting plate 2 are installed completely, then the two first supporting plates 2 are directly pushed, the two first supporting plates 2 and all the parts on the first supporting plates 2 are pushed out of the building wall to form an unloading platform, then the first supporting plate 2 is fixed through the second fixing bolts 10, the effect of the convenient installation device is realized, then the supporting chain 5 is arranged between the supporting top plate 6 and the guardrail 4, then the material can be hoisted through a crane and unloaded on the device, and in the unloading process, the first door body 3 and the second door body 14 can be rotated through a bearing, the convenience of unloading is improved, and after unloading, the first door body 3 and the second door body 14 are rotated back to reset, so that the protection effect is provided.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The high-altitude unloading platform for building construction comprises two supporting groove plates (1) and a supporting top plate (6), and is characterized in that sliding grooves are formed in adjacent sides of the two supporting groove plates, sliding guide rails (7) are installed on the inner walls of the two sliding grooves, sliding blocks are arranged on adjacent sides of the two sliding guide rails (7) in a sliding mode, first supporting plates (2) are installed on adjacent sides of the two sliding blocks, first fixing bolts (8) which are arranged equidistantly are installed on the tops of notches of the two supporting groove plates (1), guardrails (4) are installed on the tops of the two first supporting plates (2), a first door body (3) is installed on the top of the other side of one guardrail (4), a second door body (14) is installed on the top of the other side of the guardrail (4), and a second groove is formed in the center of the top of the second door body (14), and the inner wall of the second groove is connected with the first door body (3) in a sliding way.
2. The high-altitude discharging platform for building construction as claimed in claim 1, wherein the centers of the bottoms of the two first supporting plates (2) are provided with first grooves (9).
3. The high-altitude discharging platform for building construction as claimed in claim 1, wherein a second fixing bolt (10) is installed on one side of the top of each of the two first supporting plates (2).
4. The high-altitude discharging platform for building construction as claimed in claim 3, wherein the supporting chains (5) are installed at the centers of the tops of the two guardrails (4), and the tops of the two supporting chains (5) are connected with the bottoms of the supporting top plates (6).
5. The high-altitude discharging platform for building construction as claimed in claim 1, wherein a second supporting plate (11) is mounted on each adjacent side of the two first supporting plates (2), the same supporting screen (13) is mounted on the outer wall of each adjacent side of the two second supporting plates (11), and the same third supporting plate (12) is mounted at the bottom of each adjacent side of the two second supporting plates (11).
6. An aerial discharge platform for building construction as claimed in claim 5, wherein rollers (15) are mounted equidistantly between the two first support plates (2).
CN201920592711.0U 2019-04-28 2019-04-28 High-altitude unloading platform for building construction Expired - Fee Related CN210483088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920592711.0U CN210483088U (en) 2019-04-28 2019-04-28 High-altitude unloading platform for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920592711.0U CN210483088U (en) 2019-04-28 2019-04-28 High-altitude unloading platform for building construction

Publications (1)

Publication Number Publication Date
CN210483088U true CN210483088U (en) 2020-05-08

Family

ID=70508143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920592711.0U Expired - Fee Related CN210483088U (en) 2019-04-28 2019-04-28 High-altitude unloading platform for building construction

Country Status (1)

Country Link
CN (1) CN210483088U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706090A (en) * 2020-07-02 2020-09-25 中国十七冶集团有限公司 Construction platform for housing construction engineering
CN113445759A (en) * 2021-06-02 2021-09-28 杨晓凡 A assembled platform of unloading safely for construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706090A (en) * 2020-07-02 2020-09-25 中国十七冶集团有限公司 Construction platform for housing construction engineering
CN113445759A (en) * 2021-06-02 2021-09-28 杨晓凡 A assembled platform of unloading safely for construction

Similar Documents

Publication Publication Date Title
CN210483088U (en) High-altitude unloading platform for building construction
CN108190757B (en) Barrel frame supporting type steel platform and tower crane integral jacking device and jacking method thereof
CN108951651A (en) A kind of pattern foundation pit supporting structure that stablizing effect is good
CN106284811A (en) A kind of convertible awning steel construction
CN220565647U (en) Bearing frame for building construction
CN212742912U (en) Man-made movable board house for house building construction
CN208502103U (en) A kind of sizing awning
CN205348720U (en) Take hoisting device's removal scaffold
CN110388042A (en) A kind of construction of lift well operating platform
CN211173018U (en) A operation platform for inserted lift scaffold
CN209339578U (en) It is a kind of be built in hoistway packaged type protection and operating platform
CN114229736A (en) Rail mounted lift platform is used in curtain engineering construction
CN209509451U (en) A kind of structural steelwork construction dismountable feet hand cradle
CN211622545U (en) Self-clamping type protective platform for operation in elevator shaft
CN208007756U (en) A kind of container body of movable type chemical waste liquid processing equipment
CN201907906U (en) Bucket with side door for vertical shaft
CN206903281U (en) Moveable pumping equipment room
CN218438174U (en) Be used for attached lift scaffold tower crane to attach arm wearing frame structure
CN108824792A (en) A kind of elevator combination lifting device
CN111997388A (en) Special console mode platform of unloading of factory building
CN218346754U (en) Safe operation platform for tile hanging of inclined roof
CN112049398A (en) Construction hanging basket convenient to split
CN213448351U (en) Double-layer multifunctional on-off equipment maintenance platform
CN219654339U (en) Lighting well opening anti-falling device
CN215631467U (en) Support frame for culvert gate maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200508