CN110388042A - A kind of construction of lift well operating platform - Google Patents
A kind of construction of lift well operating platform Download PDFInfo
- Publication number
- CN110388042A CN110388042A CN201810356392.3A CN201810356392A CN110388042A CN 110388042 A CN110388042 A CN 110388042A CN 201810356392 A CN201810356392 A CN 201810356392A CN 110388042 A CN110388042 A CN 110388042A
- Authority
- CN
- China
- Prior art keywords
- operating platform
- construction
- panel
- braced frame
- lift well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
- E04G3/246—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Types And Forms Of Lifts (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention provides a kind of construction of lift well operating platform, including braced frame and the panel that side on the support frame is arranged, the braced frame includes lateral steel pipe and longitudinal steel pipe, the opposite two sides of braced frame are equipped with support overarm, lateral steel pipe is equipped with internal screw thread, support overarm is connect with lateral steel tube screw thread, and support overarm is arranged in the preformed hole of elevator wall far from one end of braced frame, and hanging ring is equipped on the upside of panel.The operating platform is set up conveniently, reusable.
Description
Technical field
The invention belongs to the realm of building construction, in particular to a kind of construction of lift well operating platform.
Background technique
In skyscraper, the structure construction of elevator is an essential part, when constructing to elevator, is needed
Erection construction protective device is wanted to carry out a series of working procedure.Traditional construction protection device is generallyd use in shear wall and electricity
Steel tube well cabinet frame is set up between terraced beam as operating platform, specifically, first setting up two load-bearing between shear wall and elevator beam
Beam, and vertical spacer bar is welded on spandrel girder, it is inserted into steel pipe on spacer bar and sets up operating platform, and on platform
It is laid with top panel to be operated, there are operating platforms to set up inconvenience, it has not been convenient to the technical problems such as reuse.
In addition to this, construction method of the steel tube well cabinet frame as operating platform is set up using traditional, it is upward with construction layer
It sets up layer by layer, but fatigue rupture easily occurs for steel pipe, scaffolding height is higher, and security risk is bigger.In addition it adopts this method, often applies
Complete one layer of work, the materials such as template need to be hung out work surface, process is tedious.Steel pipe needed for setting up well cabinet frame, fastener, scaffold board material
Expect it is more, and have enough to meet the need utilization rate it is lower, higher cost.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of construction of lift well operating platforms, and putting up platform is convenient, can
It reuses.
In order to solve the above technical problems, the technical scheme adopted by the invention is that: a kind of construction of lift well operating platform, packet
It includes braced frame and the panel of side on the support frame is set, the braced frame includes lateral steel pipe and longitudinal steel pipe, is supported
The opposite two sides of frame are equipped with support overarm, and lateral steel pipe is equipped with internal screw thread, and support overarm connect with lateral steel tube screw thread, supports
The one end for separate braced frame of hanging oneself from a beam is arranged in the preformed hole of elevator wall, and hanging ring is equipped on the upside of panel.
In preferred scheme, the panel sidewalls are equipped with the idler wheel slid vertically, and idler wheel is slided along elevator wall.
In further embodiment, the panel sidewalls are equipped with sliding groove, and roller mounting plate is slidably mounted in sliding groove, face
Plate is equipped with multiple first bolts hole being connected to sliding groove, and roller mounting plate is equipped with the second bolt hole, and bolt passes through first
Bolt hole and the second bolt hole fixed idler whell mounting plate, idler wheel are arranged on the outside of roller mounting plate.
In preferred scheme, the support overarm is equipped with positioning plate.
In preferred scheme, the braced frame bottom is equipped with vertical supporting and skewed horizontal load, vertical supporting and oblique branch
The upper end of support is connect with the bottom at the both ends of braced frame respectively, and skewed horizontal load lower end is connect with vertical supporting, on vertical supporting
Equipped with Horizontal limiting plate, Horizontal limiting plate is arranged on the wall of elevator door bottom.
In preferred scheme, scaffold is equipped on the upside of the panel.
In preferred scheme, the panel is surrounded by fence.
A kind of construction of lift well operating platform provided by the invention, operating platform is hoisted to and builds position, passes through support
Overarm rides upon in the preformed hole of elevator wall, realizes setting up for whole operation platform, convenient to disassembly.In use, can
The materials such as the template by dismounting with supreme one layer of platform integral hoisting, operate conveniently, eliminate material and hang out the process hung in.Together
When, it changes for lift shaft dimensions, the extension elongation that need to only adjust support overarm can meet use, have enough to meet the need utilization rate
It is high.The idler wheel of setting, can prevent operating platform during handling double swerve and cause the damage of elevator wall, hang
Fortune process smooth steady.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is the top view of the use of the new type.
Fig. 3 is the scheme of installation of roller mounting plate of the invention.
In figure: braced frame 1, panel 2, support overarm 3, hanging ring 4, idler wheel 5, roller mounting plate 6, bolt 7, positioning plate 8,
Vertical supporting 9, skewed horizontal load 10, Horizontal limiting plate 11, scaffold 12, fence 13, lateral steel pipe 101, longitudinal steel pipe 102 are sliding
Dynamic slot 201, the first bolt hole 202, the second bolt hole 601.
Specific embodiment
As shown in Figure 1, a kind of construction of lift well operating platform, including braced frame 1 and is arranged in 1 upside of braced frame
Panel 2, the braced frame 1 include lateral steel pipe 101 and longitudinal steel pipe 102, and lateral steel pipe 101 and longitudinal steel pipe 102 weld
Connection, panel 2 are steel plate, are welded in braced frame 1, and the opposite two sides of braced frame 1 are equipped with support overarm 3, lateral steel pipe
101 are equipped with internal screw thread, and support overarm 3 is threadedly coupled with lateral steel pipe 101, one end setting of the support overarm 3 far from braced frame 1
In the preformed hole of elevator wall, hanging ring 4 is equipped on the upside of panel 2.
When specifically used, operating platform is lifted to installation site first, rotational support overarm 3 adjusts support overarm 3 and inserts
Enter the length in the preformed hole of elevator wall, is detached from operating platform and handling appliance after the completion of adjustment, 3 couples of behaviour of support overarm
It plays a supporting role as platform.
2 side wall of panel is equipped with the idler wheel 5 slid vertically, and idler wheel 5 is slided along elevator wall.Idler wheel 5 guarantees operation
Platform runs smoothly during lifting, while preventing operating platform double swerve from damaging elevator wall.
As shown in figure 3,2 side wall of panel is equipped with sliding groove 201, roller mounting plate 6 is slidably mounted on sliding groove 201
Interior, panel 2 is equipped with multiple first bolts hole 202 being connected to sliding groove 201, and roller mounting plate 6 is equipped with the second bolt hole
601, bolt 7 passes through 601 fixed idler whell mounting plate 6 of the first bolt hole 202 and the second bolt hole, and the setting of idler wheel 5 is installed in idler wheel
6 outside of plate.
By adjusting the position of roller mounting plate 6, realizes the adjusting of idler wheel 5 and elevator wall distance, can be applicable in not
With the elevator of size, guarantee that idler wheel 5 is close to the sliding of elevator wall.
The support overarm 3 is equipped with positioning plate 8.When specifically used, rotational support overarm 3 adjusts 3 insertion of support overarm
Length in the preformed hole of elevator wall stops adjusting after positioning plate 8 is close to elevator wall.On the one hand positioning plate 8 is protected
Length in the preformed hole of 3 insertion elevator wall of card support overarm meets support needs, on the other hand, positioning plate 8 and elevator
Well wall is close to, and has frictional force between the walls, prevents operating platform from shaking, and enhances stability.
1 bottom of braced frame is equipped with vertical supporting 9 and skewed horizontal load 10, vertical supporting 9 and skewed horizontal load 10 it is upper
End is connect with the bottom at the both ends of braced frame 1 respectively, and 10 lower end of skewed horizontal load is connect with vertical supporting 9, is set on vertical supporting 9
There is Horizontal limiting plate 11, Horizontal limiting plate 11 is arranged on the wall of elevator door bottom.
Vertical supporting 9, skewed horizontal load 10 and Horizontal limiting plate 11 further support operating platform, improve peace
Quan Xing.
Scaffold 12 is equipped on the upside of the panel 2.Scaffold 12 is convenient to worker's construction, when integral hoisting, removes foot hand
Scaffold board on frame 12, for placing template main joist.
The panel 2 is surrounded by fence 13.Prevent article or construction personnel from falling.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as limitation of the invention, this hair
Bright protection scope should be with the technical solution of claim record, technical characteristic in the technical solution recorded including claim
Equivalents are protection scope.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.
Claims (7)
1. a kind of construction of lift well operating platform, it is characterised in that: including braced frame (1) and be arranged on braced frame (1)
The panel (2) of side, the braced frame (1) include lateral steel pipe (101) and longitudinal steel pipe (102), and braced frame (1) is opposite
Two sides are equipped with support overarm (3), and lateral steel pipe (101) is equipped with internal screw thread, and support overarm (3) and lateral steel pipe (101) screw thread connect
It connects, support overarm (3) is arranged in the preformed hole of elevator wall far from the one end of braced frame (1), is equipped on the upside of panel (2)
Hanging ring (4).
2. a kind of construction of lift well operating platform according to claim 1, it is characterised in that: panel (2) side wall is set
There is the idler wheel (5) slid vertically, idler wheel (5) is slided along elevator wall.
3. a kind of construction of lift well operating platform according to claim 2, it is characterised in that: panel (2) side wall is set
Have sliding groove (201), roller mounting plate (6) is slidably mounted in sliding groove (201), and panel (2) is equipped with and sliding groove (201)
Multiple first bolts hole (202) of connection, roller mounting plate (6) are equipped with the second bolt hole (601), and bolt (7) passes through first
Bolt hole (202) and the second bolt hole (601) fixed idler whell mounting plate (6), idler wheel (5) setting is on the outside of roller mounting plate (6).
4. a kind of construction of lift well operating platform according to claim 1, it is characterised in that: on the support overarm (3)
Equipped with positioning plate (8).
5. a kind of construction of lift well operating platform according to claim 1, it is characterised in that: braced frame (1) bottom
Portion is equipped with vertical supporting (9) and skewed horizontal load (10), the upper end of vertical supporting (9) and skewed horizontal load (10) respectively with braced frame
(1) bottom at both ends connects, and skewed horizontal load (10) lower end is connect with vertical supporting (9), and vertical supporting (9) is equipped with horizontal limit
Position plate (11), Horizontal limiting plate (11) are arranged on the wall of elevator door bottom.
6. a kind of construction of lift well operating platform according to claim 1, it is characterised in that: set on the upside of the panel (2)
There are scaffold (12).
7. a kind of construction of lift well operating platform according to claim 1, it is characterised in that: panel (2) surrounding is set
There are fence (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810356392.3A CN110388042A (en) | 2018-04-19 | 2018-04-19 | A kind of construction of lift well operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810356392.3A CN110388042A (en) | 2018-04-19 | 2018-04-19 | A kind of construction of lift well operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110388042A true CN110388042A (en) | 2019-10-29 |
Family
ID=68283151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810356392.3A Pending CN110388042A (en) | 2018-04-19 | 2018-04-19 | A kind of construction of lift well operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110388042A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111573573A (en) * | 2020-04-07 | 2020-08-25 | 中石化胜利建设工程有限公司 | Elevator shaft construction device and construction method |
CN114016722A (en) * | 2021-11-26 | 2022-02-08 | 中建八局第二建设有限公司 | Bottom is from stereotyped elevator shaft operation platform of taking level protection |
-
2018
- 2018-04-19 CN CN201810356392.3A patent/CN110388042A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111573573A (en) * | 2020-04-07 | 2020-08-25 | 中石化胜利建设工程有限公司 | Elevator shaft construction device and construction method |
CN114016722A (en) * | 2021-11-26 | 2022-02-08 | 中建八局第二建设有限公司 | Bottom is from stereotyped elevator shaft operation platform of taking level protection |
CN114016722B (en) * | 2021-11-26 | 2022-12-06 | 中建八局第二建设有限公司 | Bottom is from stereotyped elevator shaft operation platform of taking level protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205077845U (en) | Hydraulic intelligent climbing operation scaffold for core barrel well of building | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN106121255A (en) | Apparatus installed by a kind of Super High glass curtain wall | |
CN110388042A (en) | A kind of construction of lift well operating platform | |
CN205773024U (en) | Convenient pipeline promotes auxiliary device | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN214834619U (en) | Aluminum alloy integrated attached lifting scaffold | |
CN210084736U (en) | A portable lifting hook for installation of people's air defense door | |
CN214195484U (en) | All-steel attached lifting scaffold | |
CN213418443U (en) | Self-climbing type elevator shaft operation platform | |
JP3074765U (en) | Pillar building construction system equipment | |
CN208280560U (en) | A kind of construction of lift well operating platform | |
US4022330A (en) | Apparatus for mounting building panels | |
CN215443025U (en) | Safety construction platform for machine-room-less elevator shaft | |
CN215055564U (en) | Elevator shaft opening protection device | |
CN211257761U (en) | Lifting type elevator shaft operating platform | |
CN204357138U (en) | Simple steel structure hoisting frame | |
CN108755419B (en) | Construction platform for hoisting bridge shock-proof steel stop block and installation method | |
CN209837631U (en) | Multistage assembled lattice frame building structure | |
CN113137047A (en) | Safety construction platform for machine-room-less elevator shaft | |
CN207194415U (en) | A kind of scaffold of building engineering construction | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube | |
CN215592465U (en) | Super high-rise assembled circular rail hangs | |
CN219175237U (en) | Guide platform for assisting in positioning steel casing on water and fixing reinforcement cage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191029 |