CN210395374U - Insertion type steel for construction method pile - Google Patents

Insertion type steel for construction method pile Download PDF

Info

Publication number
CN210395374U
CN210395374U CN201921189843.5U CN201921189843U CN210395374U CN 210395374 U CN210395374 U CN 210395374U CN 201921189843 U CN201921189843 U CN 201921189843U CN 210395374 U CN210395374 U CN 210395374U
Authority
CN
China
Prior art keywords
plate
locking
dovetail
hole
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921189843.5U
Other languages
Chinese (zh)
Inventor
刘腾
扈延清
郭旭东
王蕾
李欣祚
洪传龙
韩陈旗
杨瑾
陈浩
白川江
冯超
苏芹照
王晓卫
李旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201921189843.5U priority Critical patent/CN210395374U/en
Application granted granted Critical
Publication of CN210395374U publication Critical patent/CN210395374U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an insert shaped steel for worker's method stake belongs to foundation ditch excavation construction field, include: first shaped steel, second shaped steel, first connection assembly, second connection assembly and side connection assembly, the one end of first shaped steel with the one end of second shaped steel contacts, the one end of first shaped steel with the one end of second shaped steel passes through first connection assembly, second connection assembly and side connection assembly are connected and are formed, first connection assembly and second connection assembly set up first shaped steel with the web both sides of second shaped steel junction, the side connection assembly sets up respectively first shaped steel with the flange board department of second shaped steel. The utility model provides a pair of insert shaped steel for worker's method stake is connected together first shaped steel and second shaped steel through adopting first connection assembly, second connection assembly and side connection assembly, reaches reduction of erection time, practices thrift cost, the stronger characteristics of fastness.

Description

Insertion type steel for construction method pile
Technical Field
The utility model belongs to foundation ditch excavation construction field, concretely relates to insert shaped steel for worker's method stake.
Background
In the construction of a large-scale deep foundation pit, the enclosing mode of combining the concrete enclosing purlin and the pile in the SMW construction method is widely applied. In the construction process of the construction method pile, the joint quantity of the section steel is large. The traditional method for jointing is to add a back plate with proper length at the joint and then weld the base metal and the back plate by electric welding, thus not only wasting a large amount of manpower and material resources, welding rods and steel materials, but also having larger deformation after welding and needing secondary adjustment.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shaped steel joint and having wasted a large amount of manpower and materials, welding rod, steel, it is great to warp after welding moreover, needs the defect of secondary adjustment, provides an insert shaped steel for worker's method stake, has the reduction of erection time, practices thrift cost, the stronger characteristics of fastness.
An insert-type steel for a pile of a construction method, comprising:
the first section steel, the second section steel, the first connecting assembly, the second connecting assembly and the side connecting assembly are connected, one end of the first section steel is contacted with one end of the second section steel, one end of the first section steel and one end of the second section steel are formed by connecting the first connecting assembly, the second connecting assembly and the side connecting assembly, the first connecting assembly and the second connecting assembly are arranged on two sides of a web plate at the joint of the first section steel and the second section steel, the side connecting assembly is respectively arranged at flange plates of the first section steel and the second section steel, the first connecting assembly comprises a first bottom plate, a first locking side plate, a second locking side plate and a first top plate, the first bottom plate is arranged on one side of the web plate at the joint of the first section steel and the second section steel, one end of the first locking side plate is provided with a first locking rod, first shaped steel one end both wings listrium one side all is equipped with first through-hole and second through-hole, second shaped steel one end both wings listrium one side all is equipped with third through-hole and fourth through-hole, first locking lever includes two first check lock lever, two first check lock lever sets up respectively in first through-hole and the third through-hole, second check lock curb plate sets up relatively the opposite side of first check lock curb plate, second check lock curb plate one end is equipped with the second check lock lever, the second check lock lever includes two the second check lock lever, two the second check lock lever sets up respectively in second through-hole and the fourth through-hole, first roof sets up between first check lock curb plate and the second check lock curb plate, first roof is fixed on the first bottom plate, the second connect the assembly with first connection assembly structure is the same, the second connects the assembly to set up first shaped steel with the opposite side web of second shaped steel junction On, the side connection assembly includes first side connecting plate and second side connecting plate, first side connecting plate and second side connecting plate are all fixed the flange board department that one end of first shaped steel and one end of second shaped steel contacted.
Preferably, the method comprises the following steps: the second bottom plate is arranged on the other side of the web plate at the joint of the first profile steel and the second profile steel, one end of the third locking side plate is provided with a third locking rod, the other side of the two flange plates at one end of the first profile steel is provided with a fifth through hole and a sixth through hole, the other side of the two flange plates at one end of the second profile steel is provided with a seventh through hole and an eighth through hole, the third locking rod comprises two third locking rods, the two third locking rods are respectively arranged in the fifth through hole and the seventh through hole, the fourth locking side plate is arranged on the other side opposite to the third locking side plate, one end of the fourth locking side plate is provided with a fourth locking rod, the fourth locking rod comprises two fourth locking rods, and the two fourth locking rods are respectively arranged in the sixth through hole and the eighth through hole, the second top plate is arranged between the third locking side plate and the fourth locking side plate, and the second top plate is fixed on the second bottom plate.
Preferably, the first locking side plate is provided with a first dovetail cylinder, a first dovetail groove body is arranged on one side of the first base plate, the second locking side plate is provided with a second dovetail cylinder, the first locking side plate and the second locking side plate are connected with one side of the first base plate through dovetail grooves, the third locking side plate is provided with a third dovetail cylinder, a second dovetail groove body is arranged on one side of the second base plate, the fourth locking side plate is provided with a fourth dovetail cylinder, and the third locking side plate and the fourth locking side plate are connected with one side of the second base plate through dovetail grooves.
Preferably, the first dovetail cylinder includes two the first dovetail cylinder, first dovetail groove includes two first dovetail groove, the second dovetail cylinder includes two the second dovetail cylinder, two first dovetail cylinder and two the second dovetail cylinder all can be in two respectively in the first dovetail groove removes, the third dovetail cylinder includes two the third dovetail cylinder, the second dovetail groove includes two the second dovetail groove, the fourth dovetail cylinder includes two the fourth dovetail cylinder, two the third dovetail cylinder and two the fourth dovetail cylinder all can be in two respectively in the second dovetail groove removes.
Preferably, both ends of the first side connecting plate are provided with 45-degree chamfers.
Preferably, both ends of the second side connecting plate are provided with 45-degree chamfers.
The utility model provides a pair of insert shaped steel for worker's method stake is connected together first shaped steel and second shaped steel through adopting first connection assembly, second connection assembly and side connection assembly, reaches reduction of erection time, practices thrift cost, the stronger characteristics of fastness.
Drawings
Fig. 1 is an isometric view of an insert profile for a construction method pile according to the present invention.
Fig. 2 is an isometric view of a first connection assembly of inserted profile steel for a construction method pile according to the present invention.
Fig. 3 is an isometric view of a second connection assembly of the insertion profile for a construction method pile according to the present invention.
Fig. 4 is an isometric view of a portion of a first connection assembly of an insert profile for a construction method pile according to the present invention.
Fig. 5 is an isometric view of a second connection assembly portion of an insert profile for a construction method pile according to the present invention.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1, a first embodiment of the present invention provides an insert type steel for a construction-method pile, based on the prior art, comprising: first shaped steel 1, second shaped steel 2, first connection assembly 4, second connection assembly 5 and side connection assembly 3, the one end of first shaped steel 1 and the one end of second shaped steel 2 contact, the one end of first shaped steel 1 and the one end 2 of second shaped steel are formed by connecting first connection assembly 4, second connection assembly 5 and side connection assembly 3, first connection assembly 4 and second connection assembly 5 are arranged on the web both sides of the junction of first shaped steel 1 and second shaped steel 2, side connection assembly 3 is respectively arranged on the flange plate of first shaped steel 1 and second shaped steel 2, the first connection assembly is as shown in figure 2 and comprises a first bottom plate 44, a first locking side plate 42, a second locking side plate 43 and a first top plate 41, the first bottom plate 44 is arranged on the web one side of the junction of first shaped steel 1 and second shaped steel 2, the first locking side plate 42 is provided with a first locking rod 421 at one end, the first steel section 1 is provided with a first through hole and a second through hole at one side of two flange plates at one end, the second steel section 2 is provided with a third through hole and a fourth through hole at one side of two flange plates at one end, the first locking rod 421 comprises two first locking rods 421, the two first locking rods 421 are respectively arranged in the first through hole and the third through hole, the second locking side plate 43 is arranged at the other side opposite to the first locking side plate 42, one end of the second locking side plate 43 is provided with a second locking rod 431, the second locking rod 431 comprises two second locking rods 431, the two second locking rods 431 are respectively arranged in the second through hole and the fourth through hole, the first top plate 41 is arranged between the first locking side plate 42 and the second locking side plate 43, the first top plate 41 is fixed on the first bottom plate through bolts, the second connection assembly 5 with 4 structures of first connection assembly are the same, the second connection assembly is installed first shaped steel 1 with on the web opposite side of second shaped steel 2 junction, side connection assembly 3 includes first side connecting plate 31 and second side connecting plate 32, first side connecting plate 31 and second side connecting plate 32 are screwed on first check lock pole 421 and second check lock pole 431 respectively through first connecting plate bolt 33 and second connecting plate bolt 34 respectively to fix first side connecting plate 31 and second side connecting plate 32 first shaped steel 1's one end with the flange board department that the one end of second shaped steel 2 contacted.
The second connection assembly 5 is shown in fig. 3 and comprises: a second bottom plate 54, a third locking side plate 52, a fourth locking side plate 53 and a second top plate 51, wherein the second bottom plate 54 is installed on the other side of the web plate at the joint of the first section steel 1 and the second section steel 2, one end of the third locking side plate 52 is provided with a third locking lever 521, the other sides of the two flange plates at one end of the first section steel 1 are both provided with a fifth through hole and a sixth through hole, the other sides of the two flange plates at one end of the second section steel 2 are both provided with a seventh through hole and an eighth through hole, the third locking lever 521 comprises two third locking levers 521, the two third locking levers 521 are respectively installed in the fifth through hole and the seventh through hole, the fourth locking side plate 53 is installed on the other side opposite to the third locking side plate 52, one end of the fourth locking side plate 53 is provided with a fourth locking lever 531, the fourth locking lever 531 comprises two fourth locking levers 531, the two fourth locking rods 531 are respectively installed in the sixth through hole and the eighth through hole, the second top plate 51 is installed between the third locking side plate 52 and the fourth locking side plate 53, the second top plate 51 is fixed on the second bottom plate 54 through bolts, and the first side connecting plate 31 and the second side connecting plate 32 are respectively screwed on the third locking rod 521 and the fourth locking rod 531 through the first connecting plate bolt 33 and the second connecting plate bolt 34.
For the convenience of installation, as shown in fig. 3 and 4, the first locking side plate 42 is provided with a first dovetail cylinder 422, one side of the first bottom plate 44 is provided with a first dovetail groove 441, the second locking side plate 43 is provided with a second dovetail cylinder 432, the first locking side plate 42 and the second locking side plate 43 are connected with one side of the first bottom plate 44 through a dovetail groove, the third locking side plate 52 is provided with a third dovetail cylinder 521, one side of the second bottom plate 54 is provided with a second dovetail groove 541, the fourth locking side plate 53 is provided with a fourth dovetail cylinder 532, and the third locking side plate 52 and the fourth locking side plate 53 are connected with one side of the second bottom plate 54 through a dovetail groove.
In order to be more fixed, the first dovetail cylinder 422 includes two first dovetail cylinders 422, the first dovetail groove 441 includes two first dovetail grooves 441, the second dovetail cylinder 432 includes two second dovetail cylinders 432, the two first dovetail cylinders 422 and the two second dovetail cylinders 432 are respectively movable in the two first dovetail grooves 441, the third dovetail cylinder 521 includes two third dovetail cylinders 521, the second dovetail groove 541 includes two second dovetail grooves 541, the fourth dovetail cylinder 532 includes two fourth dovetail cylinders 532, the two third dovetail cylinders 521 and the two fourth dovetail cylinders 532 are respectively movable in the two second dovetail grooves 541, in order to enter into the soil more easily, the first side connecting plate 31 and both ends are provided with 45-degree chamfers, and both ends of the second side connecting plate 32 are provided with 45-degree chamfers.
The specific working mode is as follows:
one end of the first section steel 1 is contacted with one end of the second section steel 2, the first locking side plate 42 and the second locking side plate 43 are respectively inserted into the first dovetail groove body 441 from two sides of the first bottom plate 44, the first bottom plate 44 is attached to the position where one end of the first section steel 1 is contacted with one end of the second section steel 2, the first locking side plate 42 and the second locking side plate 43 move towards two sides, the two first locking rods 421 are respectively installed in the first through hole and the third through hole, the two second locking rods 431 are respectively installed in the second through hole and the fourth through hole, the third locking side plate 52 and the fourth locking side plate 53 are respectively inserted into the second dovetail groove body 541 from two sides of the second bottom plate 54, the second bottom plate 54 is attached to the other side of the position where one end of the first section steel 1 is contacted with one end of the second section steel 2, the web is opposite to the first bottom plate 44, the third locking side plate 52 and the fourth locking side plate 53 move towards two sides, two third locking rods 521 are respectively installed in the fifth through hole and the seventh through hole, two fourth locking rods 531 are respectively installed in the sixth through hole and the eighth through hole, the first top plate 41 is installed between the first locking side plate 42 and the second locking side plate 43, the second top plate 51 is installed between the third locking side plate 52 and the fourth locking side plate 53, two through holes are respectively formed in the second top plate 51 and the first top plate 41, two through holes are correspondingly formed in the positions where one end of the first section steel 1 and one end of the second section steel 2 are contacted with the web, the second top plate 51 and the first top plate 41 are fixed through the second top plate 51, the first top plate 41 and the nuts by using two bolts, the first side connecting plate 31 and the second side connecting plate 32 are fixed at the positions where one end of the first section steel 1 and one end of the second section steel 2 are contacted with each other, and the first side connecting plate 31 and the second side connecting plate 32 are respectively divided into two parts by using the first connecting plate bolts 33 and the second connecting plate 34 Respectively screwed on the first, second, third and fourth lock levers 421, 431, 521 and 531. Thereby to be connected to first shaped steel and second shaped steel together, solved extravagant a large amount of manpower and materials, welding rod, steel, it is great to weld the postweld deformation moreover, needs the defect of secondary adjustment to reach the reduction of erection time, practice thrift cost, characteristics that the fastness is stronger.

Claims (6)

1. An insert type steel for a pile of a construction method, comprising:
the first section steel, the second section steel, the first connecting assembly, the second connecting assembly and the side connecting assembly are connected, one end of the first section steel is contacted with one end of the second section steel, one end of the first section steel and one end of the second section steel are formed by connecting the first connecting assembly, the second connecting assembly and the side connecting assembly, the first connecting assembly and the second connecting assembly are arranged on two sides of a web plate at the joint of the first section steel and the second section steel, the side connecting assembly is respectively arranged at flange plates of the first section steel and the second section steel, the first connecting assembly comprises a first bottom plate, a first locking side plate, a second locking side plate and a first top plate, the first bottom plate is arranged on one side of the web plate at the joint of the first section steel and the second section steel, one end of the first locking side plate is provided with a first locking rod, first shaped steel one end both wings listrium one side all is equipped with first through-hole and second through-hole, second shaped steel one end both wings listrium one side all is equipped with third through-hole and fourth through-hole, first locking lever includes two first check lock lever, two first check lock lever sets up respectively in first through-hole and the third through-hole, second check lock curb plate sets up relatively the opposite side of first check lock curb plate, second check lock curb plate one end is equipped with the second check lock lever, the second check lock lever includes two the second check lock lever, two the second check lock lever sets up respectively in second through-hole and the fourth through-hole, first roof sets up between first check lock curb plate and the second check lock curb plate, first roof is fixed on the first bottom plate, the second connect the assembly with first connection assembly structure is the same, the second connects the assembly to set up first shaped steel with the opposite side web of second shaped steel junction On, the side connection assembly includes first side connecting plate and second side connecting plate, first side connecting plate and second side connecting plate are all fixed the flange board department that one end of first shaped steel and one end of second shaped steel contacted.
2. The insertion-type steel for a construction-method pile according to claim 1, comprising: the second connecting assembly comprises a second bottom plate, a third locking side plate, a fourth locking side plate and a second top plate, the second bottom plate is arranged on the other side of a web plate at the joint of the first section steel and the second section steel, one end of the third locking side plate is provided with a third locking rod, the other sides of two flange plates at one end of the first section steel are respectively provided with a fifth through hole and a sixth through hole, the other sides of two flange plates at one end of the second section steel are respectively provided with a seventh through hole and an eighth through hole, the third locking rod comprises two third locking rods, the two third locking rods are respectively arranged in the fifth through hole and the seventh through hole, the fourth locking side plate is arranged on the other side opposite to the third locking side plate, one end of the fourth locking side plate is provided with a fourth locking rod, the fourth locking rods comprise two fourth locking rods, and the two fourth locking rods are respectively arranged in the sixth through hole and the eighth through hole, the second top plate is arranged between the third locking side plate and the fourth locking side plate, and the second top plate is fixed on the second bottom plate.
3. The insertion type steel for the construction method pile as claimed in claim 2, wherein the first locking side plate is provided with a first dovetail cylinder, one side of the first base plate is provided with a first dovetail groove body, the second locking side plate is provided with a second dovetail cylinder, the first locking side plate and the second locking side plate are connected with one side of the first base plate through a dovetail groove, the third locking side plate is provided with a third dovetail cylinder, one side of the second base plate is provided with a second dovetail groove body, the fourth locking side plate is provided with a fourth dovetail cylinder, and the third locking side plate and the fourth locking side plate are connected with one side of the second base plate through a dovetail groove.
4. The insertion type steel for a construction method pile according to claim 3, wherein the first dovetail cylinder comprises two first dovetail cylinders, the first dovetail groove comprises two first dovetail grooves, the second dovetail cylinder comprises two second dovetail cylinders, the two first dovetail cylinders and the two second dovetail cylinders are respectively movable in the two first dovetail grooves, the three dovetail cylinders comprise two third dovetail cylinders, the two second dovetail grooves comprise two second dovetail grooves, the four dovetail cylinders comprise two fourth dovetail cylinders, and the two third dovetail cylinders and the two fourth dovetail cylinders are respectively movable in the two second dovetail grooves.
5. The insertion-type steel for construction-method piles as claimed in claim 2, wherein the first side connecting plate is provided at both ends thereof with 45-degree chamfers.
6. The insertion-type steel for construction-method piles as claimed in claim 3, wherein the second side connecting plate is provided at both ends thereof with 45-degree chamfers.
CN201921189843.5U 2019-07-26 2019-07-26 Insertion type steel for construction method pile Active CN210395374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921189843.5U CN210395374U (en) 2019-07-26 2019-07-26 Insertion type steel for construction method pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921189843.5U CN210395374U (en) 2019-07-26 2019-07-26 Insertion type steel for construction method pile

Publications (1)

Publication Number Publication Date
CN210395374U true CN210395374U (en) 2020-04-24

Family

ID=70356664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921189843.5U Active CN210395374U (en) 2019-07-26 2019-07-26 Insertion type steel for construction method pile

Country Status (1)

Country Link
CN (1) CN210395374U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115085107A (en) * 2022-07-05 2022-09-20 嘉兴市华通金属制品有限公司 Cable bridge and installation process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115085107A (en) * 2022-07-05 2022-09-20 嘉兴市华通金属制品有限公司 Cable bridge and installation process thereof

Similar Documents

Publication Publication Date Title
CN210395374U (en) Insertion type steel for construction method pile
CN209817172U (en) Horizontal seam unit is connected futilely to assembled shear force wall
CN209854880U (en) Prefabricated assembled escape canal
CN111502061A (en) Horizontal connecting structure of assembled shear wall and construction method thereof
CN109162353A (en) Steel concrete assembled connected node
CN206873641U (en) The cantilevered corner beam Column border node and assembled connector of a kind of quadrate steel pipe column and H profile steel
KR20110016846A (en) The iron frame which has the senior means which is strong being empty
CN213837010U (en) Full-assembly type concrete beam column joint device based on top and bottom angle steel connection
CN206873642U (en) Four bean column nodes and assembled connector of a kind of quadrate steel pipe column and H profile steel
CN212670921U (en) Assembly type building structure
CN212129617U (en) Assembled floor dry-type connected node
CN209837286U (en) Three-dimensional prestressing force assembled installs beam column node structure fast
CN210105027U (en) Connect reliable prefabricated assembled shear force wall
CN210395642U (en) Detachable assembly type steel structure building connecting node
CN219992414U (en) Assembled static pressure stake connection structure
CN205742150U (en) High fault tolerance recyclable piling bar socket join structure
CN110409652A (en) Fabricated shear wall group and preparation method thereof
CN219410923U (en) Side slope frame beam
CN215716057U (en) Connecting node structure for invading side wall steel pipe column and side wall
CN211690746U (en) Energy-consuming connection node between full-prefabricated wallboard and full-prefabricated floor slab
CN215801588U (en) Mortise and tenon type uplift pile
CN203668916U (en) Pile connecting structure and pile
CN215166575U (en) Assembly type structure connected node structure
CN221001395U (en) Beam-column connection structure of assembled concrete structure
CN211172689U (en) Precast concrete wall