CN210341948U - Ecological bank protection in gardens - Google Patents
Ecological bank protection in gardens Download PDFInfo
- Publication number
- CN210341948U CN210341948U CN201921177145.3U CN201921177145U CN210341948U CN 210341948 U CN210341948 U CN 210341948U CN 201921177145 U CN201921177145 U CN 201921177145U CN 210341948 U CN210341948 U CN 210341948U
- Authority
- CN
- China
- Prior art keywords
- bank protection
- gardens
- tensioning
- protection main
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Retaining Walls (AREA)
Abstract
The utility model discloses an ecological bank protection in gardens belongs to side slope protection technical field, and ecological bank protection in gardens includes high-rise ground and the bank protection main part that is located high-rise ground one side, still includes the taut stock of a plurality of roots, and a plurality of taut stocks run through the bank protection main part respectively and insert the anchor hole of high-rise ground, and the taut stock of a plurality of roots is located the outside one end of bank protection main part and is connected with the concrete top layer. The utility model discloses an ecological bank protection in gardens can realize consolidating the bank protection, strengthens its fastness, prevents that rainwater from strikeing and people's walking and leading to the slope body to warp the condition emergence such as collapse even collapse.
Description
Technical Field
The utility model relates to a side slope protection technical field especially relates to an ecological bank protection in gardens.
Background
The ecological slope protection for garden is a slope protection technology for supporting slope or side slope by using basic knowledge of the disciplines of comprehensive engineering mechanics, soil science, ecology, botany and the like to form a comprehensive slope protection system consisting of plants or engineering and plants. After the excavation side slope is formed, the surface layer of the side slope is protected and reinforced by planting plants and utilizing the anchoring effect of the plants, rocks and soil bodies, so that the requirement for the stability of the surface layer of the side slope can be met, the damaged slope protection mode of the natural ecological environment can be recovered, and the method is an effective slope protection and slope fixation means.
The ecological bank protection in current gardens often can carry out artifical the heap, and the manual work goes out the slope body at the other heap of high-rise foundation, but its structure is loose, and the compactness is not enough, when receiving the rainwater impact and being equipped with the people on the bank protection and going the ladder and supply the people to walk, easily leads to the bank protection to warp and collapse even the appearance, not only influences gardens pleasing to the eye, and has the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
In order to overcome the not enough of prior art, the utility model aims to solve the technical problem that an ecological bank protection in gardens is put forward to realize consolidating the bank protection, strengthen its fastness, prevent that rainwater from strikeing and people's walking and leading to the slope body to warp the condition emergence such as collapse even.
The utility model adopts the technical proposal that:
the utility model provides a pair of ecological bank protection in gardens, include high-rise ground and be located the bank protection main part of high-rise ground one side still includes the taut stock of a plurality of roots, a plurality of taut stock runs through respectively bank protection main part and insert in the anchor hole of high-rise ground, a plurality of taut stock is located the outside one end of bank protection main part is connected with the concrete top layer.
As a further improvement of the scheme, a plurality of vegetation planting grooves communicated with the slope protection main body are formed in the concrete surface layer, and plants are planted in the vegetation planting grooves.
As a further improvement of the scheme, a plurality of tensioning anchor rods are arranged at one ends of the outer portions of the slope protection main bodies and are provided with clamping and fixing hooks, and tensioning reinforcing steel bars are clamped on the clamping and fixing hooks.
As a further improvement of the scheme, the same tensioning steel bar is clamped in the clamping hook of the tensioning anchor rod on the same horizontal line.
As a further improvement of the present solution, the tensioning reinforcing steel bar and the fastening hook are both located inside the concrete surface layer.
As a further improvement of the scheme, vertically arranged tensioning reinforcing steel bars are bound between the transversely arranged tensioning reinforcing steel bars.
As a further improvement of the scheme, the vegetation planting grooves are arranged along the slope protection main body in the inclined direction and at intervals with the tensioning reinforcing steel bars.
As a further improvement of the scheme, the slope protection device further comprises a plurality of foundation anchor rods which vertically penetrate through the slope protection main body and are inserted into the foundation at the bottom of the slope protection main body.
As a further improvement of the present solution, a concrete reinforcing layer is disposed on a side wall of the high-rise foundation between the high-rise foundation and the slope protection main body, and a plurality of the tightening anchor rods respectively penetrate through the slope protection main body and the concrete reinforcing layer and are inserted into the anchoring holes of the high-rise foundation.
As a further improvement of the scheme, the upper part of the concrete reinforcing layer extends to cover the top of the high-rise foundation.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a pair of ecological bank protection in gardens, through setting up the taut stock of a plurality of roots, make the taut stock of a plurality of roots run through the bank protection main part respectively and insert in the anchor hole of high-rise ground, and make and be located the outside one end of bank protection main part and connect the concrete top layer, the combination of concrete top layer and taut stock and high-rise ground, because of high-rise ground structure is firm, it is through the taut concrete top layer of taut stock, take-up the bank protection main part between high-rise ground and concrete top layer, can prevent effectively that the bank protection main part from appearing warping the skew and collapsing phenomenons such as collapsing, the whole fastness of reinforcing bank protection. Simultaneously, the setting on bank protection surface concrete top layer, the rainwater flows along the surface on concrete top layer and looses, can prevent effectively that the rainwater direct impact bank protection main part and make earth loss by a large scale.
Drawings
Fig. 1 is a schematic structural view of a garden ecological slope protection provided in the embodiment of the present invention;
fig. 2 is an enlarged schematic view of a portion a of fig. 1 according to an embodiment of the present invention;
fig. 3 is a schematic view of a slope structure of a garden ecological slope protection provided in the embodiment of the present invention;
fig. 4 is a schematic view of a slope structure of a slope protection main body (with a concrete surface layer removed) according to an embodiment of the present invention.
In the figure:
1. high-rise foundation; 2. a slope protection main body; 3. tensioning the anchor rod; 11. an anchoring hole; 4. a concrete surface layer; 41. a vegetation planting groove; 31. clamping and fixing a hook; 5. tensioning the reinforcing steel bars; 6. a foundation anchor rod; 7. and (5) a concrete reinforcing layer.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings and technical solutions needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
The present invention will be further explained with reference to the accompanying drawings.
As shown in fig. 1 to 4, the ecological bank protection in gardens that this embodiment provided, including high-rise foundation 1 and the bank protection main part 2 that is located 1 one side of high-rise foundation, the ecological bank protection in gardens still includes a plurality of taut stocks 3, and a plurality of taut stocks 3 run through bank protection main part 2 respectively and insert in the anchor hole 11 of high-rise foundation 1, and a plurality of taut stocks 3 are located the outside one end of bank protection main part 2 and are connected with concrete top layer 4. Through the combination of concrete top layer 4 and taut stock 3 and high-rise foundation 1, it is firm because of 1 structure of high-rise foundation, it is through the taut concrete top layer 4 of taut stock 3, take-up bank protection main part 2 between high-rise foundation 1 and concrete top layer 4, can prevent effectively that bank protection main part 2 from appearing warping the skew and collapse phenomenons such as collapsing, can strengthen the whole fastness of bank protection, and simultaneously, the concrete top layer 4 of 2 domatic settings of bank protection main part, rainwater flows along the surface of concrete top layer 4 during the rainy day, can prevent effectively that rainwater direct impact bank protection main part 2 from making the large tracts of land earth run off, prevent that bank protection main part 2 from collapsing and warping.
Further, be provided with concrete back up coat 7 on the lateral wall of the high-rise foundation 1 that is located between high-rise foundation 1 and bank protection main part 2, the top of concrete back up coat 7 extends to cover to the top of high-rise foundation 1, can protect high-rise foundation 1, increases the cohesion between high-rise foundation 1 and the taut stock 3 simultaneously.
For the taut effect of taut stock 3 to bank protection main part 2 of increase, furtherly, the one end that a plurality of taut stocks 3 are located bank protection main part 2 outsidely all welds and has the solid hook 31 of card, the card is equipped with taut reinforcing bar 5 on the solid hook 31 of card, the equal level setting of taut stock 3, the inherent same taut reinforcing bar 5 of card in the solid hook 31 of the taut stock 3 that is located same water flat line, taut reinforcing bar 5 and the solid hook 31 of card all are located the inside of concrete top layer 4, taut reinforcing bar 5 and the solid hook 31 of card combine as an organic wholely with concrete top layer 4, can increase the intensity of concrete top layer 4 and the cohesion between taut stock 3 and the concrete top layer 4, thereby guarantee the taut effect of taut stock 3 to bank protection main part 2.
Further, there is the taut reinforcing bar 5 of vertical setting between the taut reinforcing bar 5 of horizontal setting through the iron wire ligature, effectively increases the intensity on concrete top layer 4.
For improving pleasing to the eye degree and consolidating slope protection main part 2 through the combination of plant and soil, furtherly is provided with the vegetation planting groove 41 that a plurality of and slope protection main part 2 are linked together on the concrete top layer 4, plants the plant in the vegetation planting groove 41, can make slope protection main part 2 more pleasing to the eye, reinforcing gardens sight, the combination of plant and slope protection main part 2 simultaneously can fasten slope protection main part 2 soil.
Further, the vegetation planting groove 41 is arranged along the inclination direction of the slope protection main body 2 and at an interval with the transversely arranged tensioning reinforcing steel bars 5, so that the vegetation planting groove 41 does not interfere with the arrangement of the tensioning reinforcing steel bars 5.
Further, ecological bank protection in gardens still includes a plurality of ground stock 6, and a plurality of ground stock 6 are vertical respectively to run through bank protection main part 2 and insert in the ground of 2 bottoms in bank protection main part, can strengthen the cohesion between bank protection main part 2 and the ground, further strengthen the firm nature of bank protection main part 2.
During construction, firstly, spraying concrete on the side wall and the top wall of a high-rise foundation 1 by using a spraying machine to form a concrete reinforcing layer 7, then piling a slope protection main body 2 on one side of the high-rise foundation 1 by using sand, gravel, soil and the like, compacting the slope protection main body 2, then using a drilling machine to drill holes on the slope surface of the slope protection main body 2 to penetrate through the slope protection main body 2 and the high-rise foundation 1 so as to form anchoring holes 11 in the high-rise foundation 1, then pouring cement mortar into the drilled holes, respectively inserting a plurality of tensioning anchor rods 3 into the drilled holes so as to insert one end of each tensioning anchor rod 3 into each anchoring hole 11, positioning the other end of each tensioning anchor rod 3 outside the slope surface of the slope protection main body 2, penetrating foundation anchor rods 6 through the slope protection main body 2 from top to bottom and driving the foundation into the foundation, then clamping transverse tensioning steel bars 5 in clamping hooks 31 of the tensioning anchor rods 3, and then binding vertical tensioning, finally, the slope of the slope protection main body 2 is sprayed with concrete, the end parts of the tensioning steel bars 5, the tensioning anchor rods 3 and the clamping hooks 31 are covered to form a concrete surface layer 4, and the vegetation planting grooves 41 can be reserved before the concrete surface layer 4 is sprayed or can be formed after the concrete surface layer 4 is sprayed.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the creative work should be covered within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.
Claims (10)
1. The utility model provides an ecological bank protection in gardens, includes high-rise ground (1) and is located bank protection main part (2) of high-rise ground (1) one side, its characterized in that:
also comprises a plurality of tensioning anchor rods (3);
the plurality of tensioning anchor rods (3) respectively penetrate through the slope protection main body (2) and are inserted into the anchoring holes (11) of the high-rise foundation (1);
a plurality of taut stock (3) are located the outside one end of bank protection main part (2) is connected with concrete top layer (4).
2. The ecological bank protection in gardens of claim 1, characterized in that:
a plurality of vegetation planting grooves (41) communicated with the slope protection main body (2) are formed in the concrete surface layer (4);
plants are planted in the vegetation planting grooves (41).
3. The ecological bank protection in gardens of claim 2, its characterized in that:
the clamping hooks (31) are arranged at one ends of the tensioning anchor rods (3) which are positioned outside the slope protection main body (2);
the clamping and fixing hook (31) is provided with a tensioning steel bar (5) in a clamping way.
4. The ecological bank protection in gardens of claim 3, characterized in that:
the same tensioning reinforcing steel bar (5) is clamped in the clamping hook (31) of the tensioning anchor rod (3) on the same horizontal line.
5. The ecological bank protection in gardens of claim 3, characterized in that:
the tensioning reinforcing steel bars (5) and the clamping hooks (31) are located inside the concrete surface layer (4).
6. The ecological bank protection in gardens of claim 4, characterized in that:
and vertically arranged tensioning reinforcing steel bars (5) are bound between the transversely arranged tensioning reinforcing steel bars (5).
7. The ecological bank protection in gardens of claim 4, characterized in that:
the vegetation planting groove (41) is arranged along the slope protection main body (2) in the inclined direction and at intervals with the tensioning reinforcing steel bars (5).
8. The ecological bank protection in gardens of claim 1, characterized in that:
also comprises a plurality of foundation anchor rods (6);
a plurality of foundation anchor rods (6) vertically penetrate through the slope protection main body (2) and are inserted into the foundation at the bottom of the slope protection main body (2).
9. The ecological bank protection in gardens of claim 1, characterized in that:
a concrete reinforcing layer (7) is arranged on the side wall of the high-rise foundation (1) between the high-rise foundation (1) and the slope protection main body (2);
the plurality of tensioning anchor rods (3) respectively penetrate through the slope protection main body (2) and the concrete reinforcing layer (7) and are inserted into the anchoring holes (11) of the high-rise foundation (1).
10. The ecological bank protection in gardens of claim 9, characterized in that:
the top of the concrete reinforcing layer (7) extends to cover the top of the high-rise foundation (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921177145.3U CN210341948U (en) | 2019-07-24 | 2019-07-24 | Ecological bank protection in gardens |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921177145.3U CN210341948U (en) | 2019-07-24 | 2019-07-24 | Ecological bank protection in gardens |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210341948U true CN210341948U (en) | 2020-04-17 |
Family
ID=70215563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921177145.3U Active CN210341948U (en) | 2019-07-24 | 2019-07-24 | Ecological bank protection in gardens |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210341948U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113279416A (en) * | 2021-04-23 | 2021-08-20 | 游永华 | Highway side slope reinforcing apparatus |
-
2019
- 2019-07-24 CN CN201921177145.3U patent/CN210341948U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113279416A (en) * | 2021-04-23 | 2021-08-20 | 游永华 | Highway side slope reinforcing apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638634A (en) | Road rock slope vine ecological protection structure and construction method | |
CN105421470B (en) | Assembled anchor pole arched framework combined type ecological revetment construction method | |
CN208717925U (en) | A kind of high precipitous rock slope ecological safeguard structure | |
CN103430731B (en) | Method and architectural structure for virescence on rock mountain body | |
CN106703044B (en) | One kind stream modeling shape rinse fill soft stratum slope combination supporting method | |
CN105625443A (en) | High-steep soil nail grass planting slope protection structure system and construction method thereof | |
CN206736931U (en) | Highway Lithological Slope liana ecological safeguard structure | |
CN207295737U (en) | Suitable for the ecological revetment system in plateau mountainous region | |
CN209873821U (en) | Greening protection for high and steep rocky slope | |
CN103452120B (en) | A kind of stake apical cap girder construction of the high-strength Prestressed Pipe Pile for pattern foundation pit supporting structure and construction method thereof | |
CN110593281A (en) | High-steep rock slope ecological protection system and construction method thereof | |
CN109208617A (en) | Redbed rock slope flexible comprehensive supporting structure and construction method thereof | |
CN210341948U (en) | Ecological bank protection in gardens | |
CN203498845U (en) | Reorganization and expansion expressway slope protection system | |
CN207295704U (en) | A kind of ecology spray anchor protective slope structure | |
CN103953053B (en) | Plant-growing type eco-concrete anti-overflow device and construction method are built in inclined-plane | |
CN103628489B (en) | Highway side slope reinforced structure | |
CN211849496U (en) | High steep rock slope ecological protection system | |
CN203334301U (en) | Cave slope strengthening protection structure | |
CN101793032A (en) | Construction method of deep foundation ditch on small place | |
KR100935176B1 (en) | A road slope keeping for ecological planting and method | |
CN212896398U (en) | Ecological slope protection | |
JP6726981B2 (en) | Greening method and greening structure | |
CN212405193U (en) | Ecological protection structure suitable for high and steep side slope in cold area | |
CN113718802A (en) | Ecological concrete rock-soil slope protection structure and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A kind of garden ecological slope protection Effective date of registration: 20221219 Granted publication date: 20200417 Pledgee: Jizhou sub branch of Jiujiang Bank Co.,Ltd. Pledgor: JIANGXI LYUJUREN ECOLOGICAL ENVIRONMENT CO.,LTD. Registration number: Y2022980028172 |