CN210340201U - Fire-fighting pipeline installation bearing structure - Google Patents

Fire-fighting pipeline installation bearing structure Download PDF

Info

Publication number
CN210340201U
CN210340201U CN201921257448.6U CN201921257448U CN210340201U CN 210340201 U CN210340201 U CN 210340201U CN 201921257448 U CN201921257448 U CN 201921257448U CN 210340201 U CN210340201 U CN 210340201U
Authority
CN
China
Prior art keywords
slide rail
fire
fighting pipeline
rod
worm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921257448.6U
Other languages
Chinese (zh)
Inventor
杜华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian China Ming Group Co Ltd
Original Assignee
Fujian China Ming Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian China Ming Group Co Ltd filed Critical Fujian China Ming Group Co Ltd
Priority to CN201921257448.6U priority Critical patent/CN210340201U/en
Application granted granted Critical
Publication of CN210340201U publication Critical patent/CN210340201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a pipeline installation technical field a fire pipeline installation bearing structure, including the pole setting, the pole setting is the U type form, pole setting upper portion is provided with fixed hook and fixed guide pulley, be provided with the direction slide rail along pole setting length direction in the pole setting, sliding connection has the supporting shoe that is used for placing the fire pipeline about the direction slide rail, the supporting shoe bottom is provided with the removal guide pulley, the pole setting lower part is provided with the take-up reel of taking the auto-lock, the winding of take-up reel outer wall has the rope, the rope free end passes fixed guide pulley in proper order, it fixes on the fixed hook to remove the guide pulley, the take-up reel winding rope drives the supporting shoe and upwards slides along the direction. The utility model discloses a take-up pulley winding rope drives the supporting shoe rebound, and the supporting shoe rebound realizes lifting of fire control pipeline, improves and lifts efficiency and reduces intensity of labour.

Description

Fire-fighting pipeline installation bearing structure
Technical Field
The utility model relates to a piping erection technical field specifically is a fire control pipeline installation bearing structure.
Background
The fire-fighting pipeline refers to a pipeline material which is used for fire fighting, connecting fire-fighting equipment and equipment, and conveying water, gas or other media for fire fighting. Due to special requirements, the thickness and the material of the fire fighting pipeline have special requirements, and the fire fighting pipeline is sprayed with red oil paint and used for conveying fire fighting water.
The partial fire pipeline in the building needs to be installed at the floor top, when the installation in proper order need be connected fixedly with the anterior segment and fix on the building body, is lifted with the help of tools such as scaffold by the manual work usually, and the fire pipeline is heavier, and the reduction and the intensity of labour of efficiency are lifted to the manual work is great.
Based on this, the utility model designs a fire control pipeline installation bearing structure to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fire pipeline installation bearing structure to the manual work that proposes carries out the fire pipeline with the help of instruments such as scaffold and lifts in solving above-mentioned background art, and the artifical reduction and the great problem of intensity of labour of lifting efficiency.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fire control pipeline installation bearing structure, includes the pole setting, the pole setting is the U type form, pole setting upper portion is provided with fixed hook and fixed guide pulley, be provided with the direction slide rail along pole setting length direction in the pole setting, sliding connection has the supporting shoe that is used for placing the fire control pipeline about the direction slide rail, the supporting shoe bottom is provided with the removal guide pulley, the pole setting lower part is provided with the take-up reel of taking the auto-lock, the winding of take-up reel outer wall has the rope, the rope free end passes fixed guide pulley in proper order, removes the guide pulley and fixes on the fixed hook, the take-up reel winding rope drives the supporting shoe and upwards slides along the direction slide rail, the pole.
Preferably, the vertical rod is formed by hinging a lower rod and an upper rod through a hinge, so that the length of the vertical rod is reduced when the vertical rod is not used, and the vertical rod is convenient to store and transport.
Preferably, the lower rod is provided with a lower sliding groove, and the upper rod is provided with an upper sliding groove aligned with the lower sliding groove.
Preferably, the guide slide rail comprises an upper slide rail and a lower slide rail, the upper slide rail is fixed in the upper chute, the lower slide rail slides in the lower chute and can be inserted into the upper chute, and the lower slide rail is inserted into the upper chute to realize the relative fixation of the lower rod and the upper rod.
Preferably, the inside horizontally connected with of supporting shoe has the worm, the circular recess has been seted up to the one side that the fire control pipeline was placed to the supporting shoe, has the supporting disk through annular slider sliding connection in the circular recess, the supporting disk is close to worm one side outer wall and is provided with the worm wheel strip with worm meshing, it has the disk lid to articulate on the supporting disk, the supporting disk passes through screw rod and supporting disk and links into an organic whole or separation, the lateral wall that supporting disk and supporting disk are close to each other has all seted up triangular groove and is used for placing the fire control pipeline, and it is rotatory to drive the supporting disk through worm and worm wheel meshing, and the fire control pipeline is pressed from both sides tightly by supporting disk and disk lid to realize the rotation of fire control.
Preferably, the worm and the worm gear are meshed to drive the supporting disc to rotate, and the maximum included angle is 45 degrees.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a take-up pulley winding rope drives the supporting shoe rebound, and the supporting shoe rebound realizes lifting of fire control pipeline, improves and lifts efficiency and reduces intensity of labour.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the upright rod structure of the present invention;
FIG. 3 is a schematic view of the matching between the vertical rod and the guide rail of the present invention;
FIG. 4 is a schematic view of the structure of the support block of the present invention;
fig. 5 is a schematic structural view of the connecting part on the supporting block of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. erecting a rod; 2. a guide slide rail; 21. an upper slide rail; 22. a lower slide rail; 3. a support block; 31. a worm; 32. a support disc; 33. a worm-wheel strip; 34. a plate cover; 35. a screw; 4. moving the guide wheel; 5. a fixed hook; 6. fixing the guide wheel; 7. a rope; 8. a winding wheel; 9. a wheel; 11. a lower rod; 111. a lower chute; 12. a rod is arranged; 121. an upper chute; 13. and (4) a hinge.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
The utility model discloses an embodiment: this scheme needs to use two sets of pole settings 1, and two sets of supporting shoes 3 in two sets of pole settings 1 are placed respectively at the both ends of fire control pipeline, drive pole setting 1 through wheel 9 and remove to the place of treating the installation.
Rotatory take- up pulley 8, 8 winding ropes 7 of take-up pulley, because the other end of rope 7 passes fixed guide pulley 6 and removes guide pulley 4 and fix on fixed hook 5, it removes to remove guide pulley 4 and fixes and follow supporting shoe 3 removal on supporting shoe 3, fixed guide pulley 6 is fixed on 1 upper portion of pole setting, make 7 lengths of rope between fixed hook 5 and the take-up pulley 8 shorten, 7 lengths of rope shorten and drive supporting shoe 3 and upwards remove under the guide of direction slide rail 2, thereby realize the lift of fire control pipeline, be favorable to reducing the pulling force that lifting fire control pipe consumed through rotatory take-up pulley 8.
When the fire fighting pipeline is lifted to the mid-air, the fire fighting pipeline needs to be aligned with the installation hole sites of other fire fighting pipelines, at the moment, the fire fighting pipeline needs to be rotated, when on the ground, the fire fighting pipeline is placed in the triangular groove of the supporting disk 32 at the top of the supporting block 3, the disk cover 34 is closed, the cover 34 and the support plate 32 are connected into a whole by the screw 35 and fixed relatively, the fire fighting pipeline is positioned in the triangular groove of the adjacent side walls of the cover 34 and the support plate 32, at this time, the fire fighting pipe is clamped by the cover plate 34 and the support plate 32, and then the worm 31 is rotated, the worm 31 is engaged with the worm wheel 33, the worm wheel 33 is fixed on the circular outer wall of the disk 32, the worm wheel 33 occupies the circular 1/8 of the disk 32, the worm 31 drives the disc 32 to rotate 45 degrees at most through the worm wheel strip 33, and the disc 32 rotates to drive the fixed fire fighting pipeline to rotate, so that the fixed fire fighting pipeline can be accurately and labor-saving aligned to installation hole sites of other fire fighting pipelines.
Two threaded holes are formed in the lower rod 11, a set of threaded rod is connected to the lower sliding rail 22 in a threaded mode, the threaded rod is matched with the threaded holes, the lower sliding rail 22 is fixed with the lower rod 11 relatively through the matching of the threaded rod and the threaded holes, when the lower sliding rail 22 is not used, the lower sliding rail 22 slides out of the upper chute 121 of the upper rod 12, at the moment, the lower rod 11 and the upper rod 12 rotate around the hinge 13 to be folded, and the length of the vertical rod 1 is favorably shortened.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a fire control pipeline installation bearing structure, includes pole setting (1), its characterized in that: the upright stanchion (1) is U-shaped, the upper part of the upright stanchion (1) is provided with a fixed hook (5) and a fixed guide wheel (6), a guide slide rail (2) is arranged on the vertical rod (1) along the length direction of the vertical rod (1), the guide slide rail (2) is connected with a supporting block (3) used for placing a fire fighting pipeline in a vertical sliding way, a movable guide wheel (4) is arranged at the bottom of the supporting block (3), a winding wheel (8) with self-locking is arranged at the lower part of the upright stanchion (1), a rope (7) is wound on the outer wall of the winding wheel (8), the free end of the rope (7) sequentially passes through the fixed guide wheel (6) and the movable guide wheel (4) to be fixed on the fixed hook (5), the winding wheel (8) is wound by the rope (7) to drive the supporting block (3) to slide upwards along the guide slide rail (2), the bottom of the vertical rod (1) is connected with a wheel (9) used for moving the vertical rod (1).
2. A fire fighting pipeline installation support structure as recited in claim 1, wherein: the upright rod (1) is formed by hinging a lower rod (11) and an upper rod (12) through a hinge (13).
3. A fire fighting pipeline installation support structure as recited in claim 2, wherein: the lower rod (11) is provided with a lower sliding groove (111), and the upper rod (12) is provided with an upper sliding groove (121) aligned with the lower sliding groove (111).
4. A fire fighting pipeline installation support structure as recited in claim 3, wherein: the direction slide rail (2) comprises last slide rail (21) and lower slide rail (22), go up slide rail (21) and fix in last spout (121), slide rail (22) slide down in spout (111) and can insert in last spout (121).
5. A fire fighting pipeline installation support structure as recited in claim 1, wherein: the fire-fighting pipeline supporting structure is characterized in that a worm (31) is horizontally connected inside the supporting block (3), a circular groove is formed in one side, where the fire-fighting pipeline is placed, of the supporting block (3), a supporting disc (32) is connected to the circular groove in a sliding mode through an annular slider, worm wheel strips (33) meshed with the worm (31) are arranged on the outer wall, close to one side of the worm (31), of the supporting disc (32), a disc cover (34) is hinged to the supporting disc (32), the supporting disc (32) is connected into a whole or separated from the supporting disc (32) through a screw (35), and triangular grooves are formed in the side walls, close to each other, of the supporting disc (32) and.
6. A fire fighting pipeline installation support structure as recited in claim 5, wherein: the worm (31) and the worm wheel bar (33) are meshed to drive the supporting disc (32) to rotate, and the maximum included angle is 45 degrees.
CN201921257448.6U 2019-08-06 2019-08-06 Fire-fighting pipeline installation bearing structure Active CN210340201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921257448.6U CN210340201U (en) 2019-08-06 2019-08-06 Fire-fighting pipeline installation bearing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921257448.6U CN210340201U (en) 2019-08-06 2019-08-06 Fire-fighting pipeline installation bearing structure

Publications (1)

Publication Number Publication Date
CN210340201U true CN210340201U (en) 2020-04-17

Family

ID=70217196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921257448.6U Active CN210340201U (en) 2019-08-06 2019-08-06 Fire-fighting pipeline installation bearing structure

Country Status (1)

Country Link
CN (1) CN210340201U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022253285A1 (en) * 2021-06-02 2022-12-08 深圳领卓智能有限公司 Building and fire-extinguishing device thereof, fire-extinguishing method, and related apparatus and technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022253285A1 (en) * 2021-06-02 2022-12-08 深圳领卓智能有限公司 Building and fire-extinguishing device thereof, fire-extinguishing method, and related apparatus and technology

Similar Documents

Publication Publication Date Title
CN210340201U (en) Fire-fighting pipeline installation bearing structure
CN111837752B (en) Greenhouse heat preservation system with snow removing function and capable of expanding upwards and rolling downwards
RU2546378C2 (en) Lifting method and lifting device for lowering and/or lifting of underwater pipeline from floating facility for pipeline installation and floating facility for pipeline installation equipped with such lifting device
CN113089894B (en) Method for mounting prefabricated wall panel of prefabricated building
CN211499953U (en) Assembled stage
CN209568444U (en) A kind of foundation pit protective device
CN208772850U (en) A kind of rapid and handy device for aligning pipeline
CN208485519U (en) A kind of subway work handling device
CN111994804B (en) Hoisting method for installing air conditioner external unit outside high-rise building wall
CN211735519U (en) Inverted siphon inspection well
CN109721013A (en) The program-controlled cleaning of spherical tank and inside and outside inspection detection device
CN207331078U (en) Steel-structure tube tower pickler
CN112010196B (en) Hoisting device for air conditioner external unit for high-rise building installation or disassembly
CN111810759A (en) Drainage pipeline plugging device
CN113955644A (en) Gantry hammock for large-scale special equipment
CN207122116U (en) A kind of Architecture Outer Curtain Wall scaffold
CN220663407U (en) Pipe fitting place stacking device
JP2012148048A (en) Device and system for hanging and stretching net or sheet body
EP2486361B1 (en) Apparatus for cleaning tubes of a heat exchanger
CN215711418U (en) Building construction building material lifting equipment
CN219792225U (en) Portal crane anchoring device
CN109573821A (en) A kind of hanging basket being readily transported building material
CN104818927B (en) Folding door on electronic Jackstay type
CN112761386A (en) Assembled stage
CN218088547U (en) Prevent that room that falls is built construction and is used article hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant