CN210049046U - Large-particle-size water-permeability asphalt mixture pavement structure - Google Patents

Large-particle-size water-permeability asphalt mixture pavement structure Download PDF

Info

Publication number
CN210049046U
CN210049046U CN201821475428.1U CN201821475428U CN210049046U CN 210049046 U CN210049046 U CN 210049046U CN 201821475428 U CN201821475428 U CN 201821475428U CN 210049046 U CN210049046 U CN 210049046U
Authority
CN
China
Prior art keywords
layer
pavement structure
road surface
asphalt mixture
basic unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821475428.1U
Other languages
Chinese (zh)
Inventor
刘金刚
刘国权
张磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Highway Planning And Design Institute Co Ltd
Original Assignee
Shenyang Highway Planning And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Highway Planning And Design Institute Co Ltd filed Critical Shenyang Highway Planning And Design Institute Co Ltd
Priority to CN201821475428.1U priority Critical patent/CN210049046U/en
Application granted granted Critical
Publication of CN210049046U publication Critical patent/CN210049046U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a big particle diameter water permeability bituminous mixture road surface structure, including the road surface structure body, the road surface structure body includes the basic unit, and the fixed back up coat that is equipped with in top of basic unit, the fixed bituminous mixture layer that is equipped with in top of back up coat, bituminous mixture layer include frame construction and stopping, and the stopping is filled in frame construction's inside. The utility model discloses a set up the basic unit, make the utility model discloses a road surface structure has better bearing base, has guaranteed the stability of road surface structure bottom; by arranging the reinforcing layer, the pavement structure has certain strength and is not easy to be damaged in the process of applying force to the pavement structure by natural force and vehicles; the pavement structure has good water permeability and higher strength by arranging the asphalt mixture layer.

Description

Large-particle-size water-permeability asphalt mixture pavement structure
Technical Field
The utility model relates to a road surface structure, in particular to big particle diameter water permeability bituminous mixture road surface structure.
Background
With the development of society, the requirements on road surfaces are higher and higher, various problems exist in common road surface structures, such as water accumulation on the surface and in the road surfaces and poor drainage performance, and the damage of the road surface structures is accelerated.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to solve above-mentioned problem, provide a big particle diameter water permeability bituminous mixture road surface structure, road surface structure bottom stability is good, not fragile, has good water permeability and higher intensity.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a big particle diameter water permeability bituminous mixture pavement structure, includes the pavement structure body, the pavement structure body includes the basic unit, the fixed back up coat that is equipped with in top of basic unit, the fixed bituminous mixture bed that is equipped with in top of back up coat, bituminous mixture bed includes frame construction and the stopping of being made by large granule pitch and rubble mixture, the inside in frame construction is filled to the stopping.
Wherein, the basic unit includes cement layer, yellow sand layer and small-size metalling, the cement layer is located the bottom of basic unit, the fixed yellow sand layer that is equipped with in top on cement layer, the fixed small-size metalling that is equipped with in top on yellow sand layer.
Wherein the reinforcing layer is made of reinforced concrete.
Wherein the filler is made of small-particle asphalt.
Preferably, the top surface of the asphalt mixture layer is an arc surface.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a basic unit that sets up for this big particle diameter water permeability bituminous mixture pavement structure has better bearing base, has guaranteed the stability of pavement structure bottom, through the back up coat that sets up, makes this big particle diameter water permeability bituminous mixture pavement structure have certain intensity, and is not fragile to its application of force in-process at natural force and vehicle, makes this big particle diameter water permeability bituminous mixture pavement structure have good water permeability and higher intensity through the bituminous mixture bed of material that sets up.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a cross-sectional view of the present invention;
fig. 3 is a cross-sectional view of the middle base layer of the present invention.
Description of reference numerals:
1. a base layer; 2. a reinforcement layer; 3. an asphalt mixture layer; 4. a frame structure; 5. a filler; 6. a pavement structure body; 7. a cement layer; 8. a layer of yellow sand; 9. a small crushed stone layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, the utility model provides a big particle diameter water permeability bituminous mixture pavement structure, including pavement structure body 6, pavement structure body 6 includes basic unit 1, and the fixed back up coat 2 that is equipped with in top of basic unit 1, the fixed bituminous mixture bed of material 3 that is equipped with in top of back up coat 2, and bituminous mixture bed of material 3 includes frame construction 4 and stopping 5 made by large granule pitch and rubble mixture for this big particle diameter water permeability bituminous mixture pavement structure has better water permeability, and stopping 5 fills in the inside of frame construction 4.
Basic unit 1 includes cement layer 7, yellow sand layer 8 and small-size metalling 9, and cement layer 7 is located basic unit 1's bottom, and the fixed yellow sand layer 8 that is equipped with in top of cement layer 7, the fixed small-size metalling 9 that is equipped with in top of yellow sand layer 8 for this big particle diameter water permeability bituminous mixture road surface structure has better bearing base, has guaranteed the stability of road surface structure bottom.
The reinforcing layer 2 is made of reinforced concrete, so that the large-particle-size water-permeable asphalt mixture pavement structure has certain strength and is not easy to damage under the action of natural force and force applied by vehicles.
The filling material 5 is made of small-particle asphalt, so that the pavement structure of the large-particle-size water-permeable asphalt mixture has better durability and strength.
In this embodiment, the top surface of pitch mixture layer 3 is the cambered surface, effectively prevents surface gathered water.
The utility model discloses a structural principle does: firstly, a certain amount of cement, yellow sand and small-sized broken stones are mixed and stirred and paved on a road surface to form a base layer 1 of the large-particle-diameter water-permeable asphalt mixture road surface structure, after the base layer 1 is solidified, reinforced concrete, namely a reinforcing layer 2, is arranged at the top of the base layer 1, then large-particle asphalt and broken stone mixture are paved at the top of the reinforcing layer 2, and then small-particle asphalt is doped to form an asphalt mixture layer 3, the top of the asphalt mixture layer 3 is of a cambered surface structure, and therefore water accumulation on the road surface is effectively prevented. The utility model discloses a basic unit 1 that sets up for this big particle diameter water permeability bituminous mixture pavement structure has better bearing base, has guaranteed the stability of pavement structure bottom, through the back up coat 2 that sets up, makes this big particle diameter water permeability bituminous mixture pavement structure have certain intensity, and is not fragile to its application of force in-process at natural force and vehicle, makes this big particle diameter water permeability bituminous mixture pavement structure have good water permeability and higher intensity through the bituminous mixture bed of material 3 that sets up.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second", "third", "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby the features defined as "first", "second", "third", "fourth" may explicitly or implicitly include at least one such feature.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. The large-particle-size water-permeable asphalt mixture pavement structure comprises a pavement structure body (6), and is characterized in that the pavement structure body (6) comprises a base layer (1), a reinforcing layer (2) is fixedly arranged at the top of the base layer (1), an asphalt mixture layer (3) is fixedly arranged at the top of the reinforcing layer (2), the asphalt mixture layer (3) comprises a frame structure (4) and a filler (5), and the filler (5) is filled in the frame structure (4);
basic unit (1) includes cement layer (7), yellow sand layer (8) and small-size metalling (9), cement layer (7) are located the bottom of basic unit (1), the top of cement layer (7) is fixed and is equipped with yellow sand layer (8), the fixed small-size metalling (9) that is equipped with in top of yellow sand layer (8).
2. The large-particle-size water-permeable asphalt mixture pavement structure according to claim 1, wherein the reinforcement layer (2) is made of reinforced concrete.
3. The large-particle-size water-permeable asphalt mixture pavement structure according to claim 1, wherein the top surface of the asphalt mixture layer (3) is a cambered surface.
CN201821475428.1U 2018-09-10 2018-09-10 Large-particle-size water-permeability asphalt mixture pavement structure Expired - Fee Related CN210049046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821475428.1U CN210049046U (en) 2018-09-10 2018-09-10 Large-particle-size water-permeability asphalt mixture pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821475428.1U CN210049046U (en) 2018-09-10 2018-09-10 Large-particle-size water-permeability asphalt mixture pavement structure

Publications (1)

Publication Number Publication Date
CN210049046U true CN210049046U (en) 2020-02-11

Family

ID=69377600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821475428.1U Expired - Fee Related CN210049046U (en) 2018-09-10 2018-09-10 Large-particle-size water-permeability asphalt mixture pavement structure

Country Status (1)

Country Link
CN (1) CN210049046U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112976286A (en) * 2021-03-25 2021-06-18 王云芳 Preparation method of interlocking structure brick

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112976286A (en) * 2021-03-25 2021-06-18 王云芳 Preparation method of interlocking structure brick

Similar Documents

Publication Publication Date Title
CN207314069U (en) A kind of Bridgehead by Blastig structure backfilled using EPS and solidified fly ash combination
CN207685618U (en) A kind of Old cement concrete transform asphalt pavement structure as
CN217579587U (en) Reinforced solidified soil road additionally provided with wear-resistant thin layer and adhesive layer
CN210049046U (en) Large-particle-size water-permeability asphalt mixture pavement structure
CN210368481U (en) Waterproof anti-settling roadbed
CN108411751A (en) Asphalt road surface local repairs structure and restorative procedure
CN204589746U (en) A kind of composite road surface structure being applicable to saturated dredger soft soil area Heavy Traffic condition
CN110846966A (en) Highway pavement structure and construction method thereof
CN111364307B (en) Roadbed reinforcing structure of road and bridge connecting section and construction process thereof
CN213709015U (en) Scattered gravel pavement structure capable of enhancing pavement strength
CN102337715A (en) Granite concrete pavior brick and its manufacturing method
CN210085965U (en) High-modulus asphalt mixture road structure
CN205062611U (en) Garden way pavement layer structure
CN211848900U (en) Fixed knot constructs is restoreed in building road bridge crack
CN211772560U (en) Municipal administration antiskid road surface
CN207958949U (en) Asphalt road surface local repairs structure
CN202718040U (en) Concrete bridge floor
CN207760678U (en) A kind of solidification plate body stabilization coordination structure that processing is soft soil roadbed
CN218404900U (en) Anti-rut road pavement surface layer structure
CN206245164U (en) A kind of Pavement Structure of slag punishment
CN215829172U (en) Brick structure of mating formation permeates water
CN214992789U (en) Structure for prolonging service life of pavement
CN210596862U (en) Widened and spliced roadbed structure of roadbed
CN216141831U (en) Pavement road using old stone
CN214089262U (en) Highway design structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200211