CN206245164U - A kind of Pavement Structure of slag punishment - Google Patents

A kind of Pavement Structure of slag punishment Download PDF

Info

Publication number
CN206245164U
CN206245164U CN201621251974.8U CN201621251974U CN206245164U CN 206245164 U CN206245164 U CN 206245164U CN 201621251974 U CN201621251974 U CN 201621251974U CN 206245164 U CN206245164 U CN 206245164U
Authority
CN
China
Prior art keywords
layer
slag
drainage pipe
lower section
breach
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621251974.8U
Other languages
Chinese (zh)
Inventor
许福建
张万磊
顾忠
成相飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tianhe Scarlett To Renewable Resources Co ltd
Nanjing Pujiang Engineering Detection Co ltd
Original Assignee
Nanjing Tianhe Renewable Energy Resources Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tianhe Renewable Energy Resources Co Ltd filed Critical Nanjing Tianhe Renewable Energy Resources Co Ltd
Priority to CN201621251974.8U priority Critical patent/CN206245164U/en
Application granted granted Critical
Publication of CN206245164U publication Critical patent/CN206245164U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of Pavement Structure of slag punishment, including asphalt surface course and sub-surface, the lower section middle part of sub-surface is provided with the first crushed gravel filter layer, the lower section of the first crushed gravel filter layer is provided with horizontal aqueduct to both sides respectively, the gap lower section formed between two horizontal aqueducts is provided with central drainage pipe, central drainage pipe bottom is provided with base, two sidewall slopes of base extend upward nonwoven layer, each nonwoven layer is connected to the horizontal aqueduct lower section of respective side, central drainage pipe top is provided with first breach in UNICOM gap, central drainage pipe both sides are provided with the second breach at top.The utility model increases drainage pipeline, can effectively prevent sub-surface from loosening, and asphalt surface course includes the coarse grain formula or middle grain formula asphalt concrete layer and the particulate formula asphalt concrete layer that are from bottom to top distributed, it is cheap for manufacturing cost, simple structure, easily realizes, has a good application prospect.

Description

A kind of Pavement Structure of slag punishment
Technical field
The utility model is related to highway construction technical field, and in particular to a kind of Pavement Structure of slag punishment.
Background technology
Currently, highway in China construction is developed rapidly, and by 2015, China's traffic mileage mileage reached 4,500,000 highways, its In more than half highway be bituminous paving.Bituminous paving is formed by asphalt making, and asphalt is by having One deciding grade and level coarse aggregate, fine aggregate, the miberal powder matched somebody with somebody with appropriate asphalt material through mixing and stirring the uniform compound being made, and suitable At a temperature of be compacted after the resulting porosity with some strength road composite.At this stage, it is big in asphalt Amount also consumes substantial amounts of natural rock resource while use, be more expensive to manufacture.And current asphalt pavement structure draining Treatment is poor, and prolonged water logging easily causes ground and loosens to be caused to occur collapsing, and influences the normally travel of vehicle, or even occur Security incident.
Utility model content
The purpose of this utility model is to overcome the problem that asphalt pavement structure is present in the prior art.The utility model Slag silty filler asphalt pavement structure, increase drainage pipeline, can effectively prevent sub-surface from loosening, and drip Blue or green supercrust includes the coarse grain formula or middle grain formula asphalt concrete layer and the particulate formula asphalt concrete layer that are from bottom to top distributed, manufacture With low cost, simple structure is easily realized, is had a good application prospect.
In order to achieve the above object, the technical scheme that the utility model is used is:
A kind of Pavement Structure of slag punishment, it is characterised in that:Including asphalt surface course and sub-surface, the pitch Surface layer includes the coarse grain formula or middle grain formula asphalt concrete layer and the particulate formula asphalt concrete layer that are from bottom to top distributed, the road surface Basic unit include grey soil layer and the cement stabilized macadam being sequentially coated on above the grey soil layer go to a grassroots level with cement stabilized macadam Basic unit, the lower section middle part of the sub-surface is provided with the first crushed gravel filter layer, the first crushed gravel filter layer lower section point Both sides horizontal aqueduct is not provided with, the gap lower section formed between two horizontal aqueducts is provided with central drainage pipe, institute State central drainage pipe bottom and be provided with base, two sidewall slopes of the base extend upward nonwoven layer, each non-woven fabrics Layer is connected to the horizontal aqueduct lower section of respective side, and the central drainage pipe top is provided with first breach in UNICOM gap, institute State the second breach that central drainage pipe both sides are provided with the top, the nonwoven layer phase of second breach and respective side UNICOM.
A kind of Pavement Structure of foregoing slag punishment, it is characterised in that:The nonwoven layer and central drainage pipe Between be provided with the second crushed gravel filter layer.
A kind of Pavement Structure of foregoing slag punishment, it is characterised in that:The asphalt surface course is included from bottom to top The coarse grain formula of distribution or middle grain formula asphalt concrete layer and particulate formula asphalt concrete layer.
A kind of Pavement Structure of foregoing slag punishment, it is characterised in that:The coarse grain formula or middle grain formula pitch are mixed Solidifying soil layer is slag silty filler coarse grain formula or middle grain formula asphalt concrete pavement.
A kind of Pavement Structure of foregoing slag punishment, it is characterised in that:The particulate formula asphalt concrete layer is Slag silty filler particulate formula asphalt concrete pavement.
A kind of Pavement Structure of foregoing slag punishment, it is characterised in that:The width in the gap is 3-5cm.
A kind of Pavement Structure of foregoing slag punishment, it is characterised in that:First breach, the width of the second breach It is 1cm to spend.
The beneficial effects of the utility model are:The asphalt pavement structure of slag silty filler of the present utility model, increased Drainage pipeline, can effectively prevent sub-surface from loosening, and blacktop includes the coarse grain formula being from bottom to top distributed Or middle grain formula asphalt concrete layer and particulate formula asphalt concrete layer, cheap for manufacturing cost, simple structure, easily realize having Good application prospect.
Brief description of the drawings
Fig. 1 is the structural representation of the asphalt pavement structure of slag silty filler of the present utility model.
Fig. 2 is the structural representation of asphalt surface course of the present utility model.
Fig. 3 is the structural representation of sub-surface of the present utility model.
The implication marked in accompanying drawing is as follows:
1:Blacktop;101:Coarse grain formula or middle grain formula asphalt concrete layer;102:Particulate formula asphalt concrete layer;2: Sub-surface;201:Grey soil layer:202:Cement stabilized macadam is gone to a grassroots level;203:Basic unit on cement stabilized macadam:3:First broken ovum Stone filter layer;4:Horizontal aqueduct;5:Gap;6:Central drainage pipe;7:Base;8:Nonwoven layer;9:Second crushed gravel is filtered Layer.
Specific embodiment
Below in conjunction with Figure of description, the utility model is further described.
As shown in figure 1, the asphalt pavement structure of slag silty filler of the present utility model, including asphalt surface course 1 and road surface Basic unit 2.
As shown in Fig. 2 the blacktop 1 includes the coarse grain formula being from bottom to top distributed or middle grain formula asphalt concrete layer 101 and particulate formula asphalt concrete layer 102, the structure type of blacktop 1 includes AC-13, AC-20, AC-20, AC-25.
The coarse grain formula or middle grain formula asphalt concrete layer 101 are slag silty filler coarse grain formula or middle grain formula pitch coagulation Native surface layer, the particulate formula asphalt concrete layer 102 is slag silty filler particulate formula asphalt concrete pavement, and slag silty is filled out Material asphalt concrete pavement using 1.5~4% slag filler, 50~70% coarse aggregate, 30~50% fine aggregate, 3~ 5% asphalt material is mixed, and wherein slag filler is processed into by domestic waste incineration residue.Mix by mix-design After material, the temperature that thickness is gathered materials is heated to 170~180 DEG C, adds asphalt mixing, be eventually adding slag filler, continue to stir Asphalt is obtained after mixing.The water content of wherein slag filler is not more than 1%, and ratio of the particle size range less than 0.15mm is 90%-100%, ratio of the particle size range less than 0.075mm is 70%-100%.In slag silty filler asphalt concrete pavement Slag filler Testing index is as shown in table 1:
Slag filler Testing index in the slag silty filler asphalt concrete pavement of table 1
Blacktop 1 is matched somebody with somebody using AC-20 type design levels, and level is with being shown in Table 2.
Table 2 is matched somebody with somebody using slag filler AC-20 type design levels
Above-mentioned material indices meet the relevant regulations of JTG F40-2004, and Bitumen Mix Design level is with being AC-20, bitumen aggregate ratio is 4.5%, and its gradation design meets the relevant regulations in JTG F40-2004.
Slag silty carrier performance index is as shown in table 3.
The slag filler performance of asphalt mixture index of table 3
Above-mentioned slag filler asphalt requirements can meet technical requirements.
As shown in figure 3, the sub-surface 2 includes grey soil layer 201 and is sequentially coated on the water of the top of the grey soil layer 201 Cement-stabilizing broken stone is gone to a grassroots level basic unit 203, blacktop of the present utility model 1 and sub-surface on 202 and cement stabilized macadam 2, it is with low cost, construction costs is reduced, make rational use of resources.
The lower section middle part of the sub-surface 2 is provided with the first crushed gravel filter layer 3, the first crushed gravel filter layer 3 Lower section is provided with horizontal aqueduct 4 to both sides respectively, and the lower section in the gap 5 formed between two horizontal aqueducts 4 is provided with Central drainage pipe 6, the bottom of the central drainage pipe 6 is provided with base 7, and two sidewall slopes of the base 7 are extended upward Nonwoven layer 8, each nonwoven layer 8 is connected to the lower section of horizontal aqueduct 4 of respective side, and the top of the central drainage pipe 6 is provided with First breach 601 in UNICOM gap 5, the both sides of the central drainage pipe 6 are provided with the second breach 602 at top, institute State the second breach 602 to be connected with the nonwoven layer 8 of respective side, it is broken to be provided with second between nonwoven layer 8 and central drainage pipe 6 Cobble filter layer 9, the water of immersion can flow into central drainage pipe 6, nonwoven by the first breach 601 in so horizontal aqueduct 4 The water of the outer immersion of layer of cloth 8 can flow into central drainage pipe 6, the centrally disposed drainpipe of the second breach 602 by the second breach 602 At 6 close top, the water for being prevented from central drainage pipe 6 is excessive, occurs passing back into the phenomenon outside nonwoven layer 8.
The width in the gap 5 is 3-5cm, and first breach 601, the width of the second breach 602 are 1cm.
In sum, the asphalt pavement structure of slag silty filler of the present utility model, increases drainage pipeline, can be effective The sub-surface that prevents loosen, and blacktop includes the coarse grain formula that is from bottom to top distributed or middle grain formula bituminous concrete Layer and particulate formula asphalt concrete layer, cheap for manufacturing cost, simple structure are easily realized, had a good application prospect.
General principle of the present utility model, principal character and advantage has been shown and described above.The technical staff of the industry It should be appreciated that the utility model is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification is originally The principle of utility model, on the premise of the utility model spirit and scope are not departed from, the utility model also has various change And improvement, these changes and improvements are both fallen within the range of claimed the utility model.The utility model claims scope By appending claims and its equivalent thereof.

Claims (6)

1. the Pavement Structure that a kind of slag is punished, it is characterised in that:Including asphalt surface course(1)And sub-surface(2), it is described Asphalt surface course(1)Including the coarse grain formula being from bottom to top distributed or middle grain formula asphalt concrete layer(101)With particulate formula pitch coagulation Soil layer(102), the sub-surface(2)Including grey soil layer(201)Be sequentially coated on the grey soil layer(201)The cement of top Stabilization gravel is gone to a grassroots level(202)With basic unit on cement stabilized macadam(203), the sub-surface(2)Lower section middle part be provided with First crushed gravel filter layer(3), the first crushed gravel filter layer(3)Lower section is respectively provided with horizontal aqueduct to both sides (4), two horizontal aqueducts(4)Between formed gap(5)Lower section is provided with central drainage pipe(6), the central drainage pipe (6)Bottom is provided with base(7), the base(7)Two sidewall slopes extend upward nonwoven layer(8), each non-woven fabrics Layer(8)It is connected to the horizontal aqueduct of respective side(4)Lower section, the central drainage pipe(6)Top is provided with UNICOM gap(5)'s First breach(601), the central drainage pipe(6)Both sides are provided with the second breach at top(602), described second Breach(602)With the nonwoven layer of respective side(8)It is connected.
2. the Pavement Structure that a kind of slag according to claim 1 is punished, it is characterised in that:The nonwoven layer (8)With central drainage pipe(6)Between be provided with the second crushed gravel filter layer(9).
3. the Pavement Structure that a kind of slag according to claim 1 is punished, it is characterised in that:The coarse grain formula or in Grain formula asphalt concrete layer(101)It is slag silty filler coarse grain formula or middle grain formula asphalt concrete pavement.
4. the Pavement Structure that a kind of slag according to claim 1 is punished, it is characterised in that:The particulate formula pitch Concrete layer(102)It is slag silty filler particulate formula asphalt concrete pavement.
5. the Pavement Structure that a kind of slag according to claim 1 is punished, it is characterised in that:The gap(5)'s Width is 3-5cm.
6. the Pavement Structure that a kind of slag according to claim 1 is punished, it is characterised in that:First breach (601), the second breach(602)Width be 1cm.
CN201621251974.8U 2016-11-15 2016-11-15 A kind of Pavement Structure of slag punishment Active CN206245164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621251974.8U CN206245164U (en) 2016-11-15 2016-11-15 A kind of Pavement Structure of slag punishment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621251974.8U CN206245164U (en) 2016-11-15 2016-11-15 A kind of Pavement Structure of slag punishment

Publications (1)

Publication Number Publication Date
CN206245164U true CN206245164U (en) 2017-06-13

Family

ID=58999901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621251974.8U Active CN206245164U (en) 2016-11-15 2016-11-15 A kind of Pavement Structure of slag punishment

Country Status (1)

Country Link
CN (1) CN206245164U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824454A (en) * 2018-08-31 2018-11-16 福州美佳环保资源开发有限公司 A kind of existing road back fill of pipe trough structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824454A (en) * 2018-08-31 2018-11-16 福州美佳环保资源开发有限公司 A kind of existing road back fill of pipe trough structure and its construction method

Similar Documents

Publication Publication Date Title
CN207227890U (en) A kind of environment protection asphalt pavement structure
CN204875416U (en) Porous pavement structure
CN206052536U (en) Asphalt bridge floor with discharge structure and bridge
CN103850164B (en) The construction method of penetrating induction type drainage pavement of a kind of long-life
CN106676999A (en) Red mud and red mud stabilized macadam combined type base pavement structure
CN206956485U (en) A kind of basic unit's cold-regenerated road surface structure
RU2492290C1 (en) Method to construct motor roads and motor road design
CN102051848B (en) HMA/CC (Hot-Mix Asphalt)/(Cement Concrete) composite type pavement structure and constructing method thereof
CN106587744A (en) CPC-AC composite pavement fiber asphalt mixture and preparation method thereof
CN207259961U (en) A kind of Reflection Cracking type heavy traffic drainage pavement paving structure
CN106677003A (en) Pervious concrete structure and preparation method thereof
CN206245164U (en) A kind of Pavement Structure of slag punishment
CN206359847U (en) A kind of asphalt pavement structure of clinker silty filler
CN105887616B (en) A kind of method that sponge urban ground strengthens water suction by underlay charcoal
CN209211198U (en) A kind of urban environmental protection road surface
CN107268371A (en) A kind of dankness type Cement Treated Material and its construction method
CN207828727U (en) A kind of full impregnated pavement structure
CN206245160U (en) A kind of asphalt surface course structure of slag fine aggregate
CN211947752U (en) Asphalt concrete road base reinforced structure
CN212335688U (en) Alkaline residue stabilizes dirt road bed drainage formula road surface structure
CN107354843A (en) A kind of porous pavement and its laying method
CN210085965U (en) High-modulus asphalt mixture road structure
CN108570899A (en) A kind of pavement of road base layer structure
JPH0534299B2 (en)
CN208072118U (en) A kind of warm-mixed asphalt pavement structure applied to bus rapid transit special lane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180409

Address after: 5, building 210032, Zhongtai building, 29 Si Si Road, Pukou District, Nanjing, Jiangsu

Co-patentee after: NANJING PUJIANG ENGINEERING DETECTION CO.,LTD.

Patentee after: NANJING TIANHE JIANENG RENEWABLE RESOURCES CO.,LTD.

Address before: 5, building 210032, Zhongtai building, 29 Si Si Road, Pukou District, Nanjing, Jiangsu

Patentee before: NANJING TIANHE JIANENG RENEWABLE RESOURCES CO.,LTD.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: No. A-85, Industrial Development Zone, Xingdian Street, Pukou District, Nanjing City, Jiangsu Province, 210000

Patentee after: JIANGSU TIANHE SCARLETT TO RENEWABLE RESOURCES Co.,Ltd.

Patentee after: NANJING PUJIANG ENGINEERING DETECTION CO.,LTD.

Address before: Floor 5, Zhongtai Building, No. 29, Pusi Road, Pukou District, Nanjing City, Jiangsu Province, 210032

Patentee before: NANJING TIANHE JIANENG RENEWABLE RESOURCES CO.,LTD.

Patentee before: NANJING PUJIANG ENGINEERING DETECTION CO.,LTD.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20230320

Address after: No. A-85, Industrial Development Zone, Xingdian Street, Pukou District, Nanjing City, Jiangsu Province, 210000

Patentee after: JIANGSU TIANHE SCARLETT TO RENEWABLE RESOURCES Co.,Ltd.

Address before: No. A-85, Industrial Development Zone, Xingdian Street, Pukou District, Nanjing City, Jiangsu Province, 210000

Patentee before: JIANGSU TIANHE SCARLETT TO RENEWABLE RESOURCES Co.,Ltd.

Patentee before: NANJING PUJIANG ENGINEERING DETECTION CO.,LTD.