CN209722771U - A kind of bridge construction Hanging Basket - Google Patents
A kind of bridge construction Hanging Basket Download PDFInfo
- Publication number
- CN209722771U CN209722771U CN201822048211.9U CN201822048211U CN209722771U CN 209722771 U CN209722771 U CN 209722771U CN 201822048211 U CN201822048211 U CN 201822048211U CN 209722771 U CN209722771 U CN 209722771U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- fixed beam
- support bracket
- bridge construction
- lower fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of bridge construction Hanging Basket, including support bracket, hanger and Hanging Basket, it is provided with several spandrel girders for being used to support hanger on the support bracket, lifting brace is provided between the support bracket and spandrel girder;The hanger includes upper fixed beam, lower fixed beam, vertical bar is provided between fixed beam and lower fixed beam to be attached, the lower fixed beam is provided with two or two or more and arranged in parallel, it is connected and fixed between the lower fixed beam by horizontal quarter butt, the Hanging Basket includes bottom plate and both side plate, the Hanging Basket is installed between fixed beam and lower fixed beam, and bottom plate is located above quarter butt.The bridge construction hanging basket's components of this programme are simple, and convenient for assembling, sound construction, high reliablity is suitable for bridge construction scene.
Description
Technical field
The utility model relates to the realm of building construction, and in particular to a kind of Hanging Basket of bridge construction.
Background technique
Hanging Basket is the capital equipment in cantilever construction, can be divided into truss-like, cable-stayed type, fashioned iron formula and mixing by structure type
4 kinds of formula, it is special that various forms Hanging Basket is comprehensively compared in the requirement according to concrete cantilever construction process requirement and design drawing to Hanging Basket
Point, weight, using steel type, construction technology etc.;Hanging Basket design principle: from heavy and light, structure is simple, more stable and stronger, Forward and
It is convenient to mount and dismount, there is stronger reusable property, the features such as small is deformed after stress, and Hanging Basket down space is sufficient, it is possible to provide
Larger operation side, is conducive to steel bar template constructing operation, and so-called cradle construction refers to the cantilever glider bridge poured compared with Long span
When, using basket method, be segmented cantilever operation on the spot, it does not need erect bracket and without using large-scale crane, cradle construction compared with
Other methods, have many advantages, such as structure is light, it is simple and convenient to spell system, without ballast.
But steel cable landing is relied on when existing Hanging Basket uses, steel cable limited load bearing capacities are easy to appear and collapse when Hanging Basket is overweight
Phenomena such as disconnected, and have abrasion when rotation more, there are security risks.
Utility model content
Existing bridge construction Hanging Basket there are aiming at the problem that, that the purpose of the utility model is to provide a kind of structures is simple,
The high bridge construction Hanging Basket of security performance.
A kind of optimal technical scheme provided by the utility model is:
A kind of bridge construction Hanging Basket, including support bracket, hanger and Hanging Basket,
Several spandrel girders for being used to support hanger are provided on the support bracket, between the support bracket and spandrel girder
It is provided with lifting brace;
The hanger includes upper fixed beam, lower fixed beam, be provided between fixed beam and lower fixed beam vertical bar into
Row connection, the lower fixed beam are provided with two or two or more and arranged in parallel, pass through cross between the lower fixed beam
Quarter butt is connected and fixed,
The Hanging Basket includes bottom plate and both side plate, and the Hanging Basket is installed between fixed beam and lower fixed beam, bottom plate position
Above quarter butt.
As a further improvement of the above technical scheme, Hanging Basket both side plate upper end is provided with upper overturning, described to turn over
Side frame for fixing is provided with below side.
As a further improvement of the above technical scheme, the support bracket can be moved along bridge length direction.
As a further improvement of the above technical scheme, the support bracket bottom is provided with sliding rail.
As a further improvement of the above technical scheme, the support bracket bottom is provided with idler wheel.
As a further improvement of the above technical scheme, that driving lifting brace rises is provided on the support bracket
Hang driving device.
As a further improvement of the above technical scheme, pass through perpendicular quarter butt connection between the side frame and horizontal quarter butt.
The beneficial effect of scheme provided by the utility model is:
The prior art is compared, the bridge construction Hanging Basket of this programme includes support bracket, hanger and Hanging Basket, is set on support bracket
Be equipped with several spandrel girders for being used to support hanger, be provided with lifting brace between the support bracket and spandrel girder, hanger be by
The secured frame of the compositions such as upper fixed beam, lower fixed beam, vertical bar, hanger are arranged on support bracket, and Hanging Basket is arranged in hanger
Portion, sound construction are reliable;Hanger is pulled using the lifting brace that will not be snapped, safety is higher;The bridge construction of this programme is hung
Basket component is simple, and convenient for assembling, sound construction, high reliablity is suitable for bridge construction scene.
Detailed description of the invention
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.
Fig. 1 is the structural schematic diagram of the embodiments of the present invention.
Specific embodiment
The utility model is described in detail in specific embodiment in reference to the accompanying drawing.
Referring to Fig.1, preferred embodiment provided by the utility model, a kind of bridge construction Hanging Basket, including support bracket 100,
Hanger and Hanging Basket 300.The support bracket 100 is set as to move along bridge length direction, it is preferred that the support bracket
100 bottoms are provided with sliding rail or idler wheel.It is provided with several spandrel girders 110 for being used to support hanger on the support bracket 100, holds
It is provided with lifting brace 120 between weight bracket 100 and spandrel girder 110, driving lifting brace is additionally provided on support bracket 100
The 120 lifting driving devices risen.The hanger includes upper fixed beam 210, lower fixed beam 220, and fixed beam 210 is under
Vertical bar 230 is provided between fixed beam 220 to be attached, the lower fixed beam 220 be provided with two or two or more and mutually
It is arranged in parallel, is connected and fixed between the lower fixed beam 220 by horizontal quarter butt 240, the Hanging Basket 300 includes bottom plate and two sides
Plate, the Hanging Basket 300 are installed between fixed beam 210 and lower fixed beam 220, and bottom plate is located at 240 top of quarter butt.Hanging Basket 300
Both side plate upper end is provided with upper overturning 310, and side frame 250 for fixing, the side frame are provided with below the upper overturning 310
It is connected between frame 250 and horizontal quarter butt 240 by perpendicular quarter butt 260.The bridge construction Hanging Basket of this programme includes support bracket 100, hangs
Frame and Hanging Basket 300 are provided with several spandrel girders 110 for being used to support hanger, 110 He of support bracket on support bracket 100
Lifting brace 120 is provided between spandrel girder 110, hanger is made of upper fixed beam 210, lower fixed beam 220, vertical bar 230 etc.
Secured frame, hanger be arranged on support bracket 100, Hanging Basket 300 be arranged inside hanger, sound construction is reliable;Using not
The lifting brace 120 that can be snapped pulls hanger, and safety is higher;The bridge construction hanging basket's components of this programme are simple, convenient for assembling,
Sound construction, high reliablity are suitable for bridge construction scene.
The above is only the preferred embodiments of the utility model, as long as realizing the utility model aim with essentially identical means
Technical solution belong within the protection scope of the utility model.
Claims (7)
1. a kind of bridge construction Hanging Basket, it is characterised in that: including support bracket (100), hanger and Hanging Basket (300),
Several spandrel girders (110) for being used to support hanger, the support bracket (100) are provided on the support bracket (100)
Lifting brace (120) is provided between spandrel girder (110);
The hanger includes upper fixed beam (210), lower fixed beam (220), fixed beam (210) and lower fixed beam (220)
Between be provided with vertical bar (230) and be attached, the lower fixed beam (220), which is provided with two or two or more and is parallel to each other, to be set
It sets, is connected and fixed between the lower fixed beam (220) by horizontal quarter butt (240),
The Hanging Basket (300) includes bottom plate and both side plate, and the Hanging Basket (300) is installed in fixed beam (210) and lower fixed beam
(220) between, bottom plate is located above quarter butt (240).
2. a kind of bridge construction Hanging Basket according to claim 1, it is characterised in that: Hanging Basket (300) the both side plate upper end
It is provided with upper overturning (310), is provided with side frame for fixing (250) below the upper overturning (310).
3. a kind of bridge construction Hanging Basket according to claim 1, it is characterised in that: support bracket (100) Ke Yanqiao
Beam length direction is mobile.
4. a kind of bridge construction Hanging Basket according to claim 3, it is characterised in that: support bracket (100) bottom is set
It is equipped with sliding rail.
5. a kind of bridge construction Hanging Basket according to claim 3, it is characterised in that: support bracket (100) bottom is set
It is equipped with idler wheel.
6. a kind of bridge construction Hanging Basket according to claim 1, it is characterised in that: be arranged on the support bracket (100)
The lifting driving device for thering is driving lifting brace (120) to rise.
7. a kind of bridge construction Hanging Basket according to claim 2, it is characterised in that: the side frame (250) and horizontal quarter butt
(240) pass through perpendicular quarter butt (260) connection between.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822048211.9U CN209722771U (en) | 2018-12-06 | 2018-12-06 | A kind of bridge construction Hanging Basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822048211.9U CN209722771U (en) | 2018-12-06 | 2018-12-06 | A kind of bridge construction Hanging Basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209722771U true CN209722771U (en) | 2019-12-03 |
Family
ID=68676694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822048211.9U Active CN209722771U (en) | 2018-12-06 | 2018-12-06 | A kind of bridge construction Hanging Basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209722771U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114687297A (en) * | 2021-12-29 | 2022-07-01 | 湖北华略建设工程有限公司 | Three-dimensional bridge triangle of adjusting of module equipment hangs basket |
-
2018
- 2018-12-06 CN CN201822048211.9U patent/CN209722771U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114687297A (en) * | 2021-12-29 | 2022-07-01 | 湖北华略建设工程有限公司 | Three-dimensional bridge triangle of adjusting of module equipment hangs basket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205804190U (en) | A kind of travelling bridge for the guardrail construction that builds a bridge | |
CN201943007U (en) | Constant amplitude frame beam crane capable of being used in combination with movable support frame | |
CN207714310U (en) | A kind of lowering device for reinforcing cage | |
CN209722771U (en) | A kind of bridge construction Hanging Basket | |
CN215803108U (en) | Attached beam type hanging basket | |
CN107419665B (en) | Large-span steel beam hoisting sling and steel beam hoisting method thereof | |
CN110512517A (en) | A kind of bridge construction platform | |
CN201793330U (en) | Gantry hanger frame device | |
CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
CN201284551Y (en) | Suspension type simple platform for work high above ground | |
CN211368423U (en) | Stay cable tower top lifting traction operation platform | |
CN201952153U (en) | Portable detachable hoisting equipment | |
CN204311721U (en) | Double-support hanging basket overhanging device | |
CN109279522A (en) | Movable units body glass curtain wall cantilevered hanging device | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
CN205171343U (en) | Combination beam self anchored suspension bridge | |
CN210238296U (en) | Large tower crane wall-attached space steel truss foundation | |
CN203684097U (en) | Mountain overhead tower-attached cantilever type beam-lifting purlin-hoisting system | |
CN202899720U (en) | Steel pole provided with foot treadles and used for high-tension transmission line iron tower | |
CN207143742U (en) | A kind of large-span steel girder hoisting appliance | |
CN201952736U (en) | Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder | |
CN201485204U (en) | Gas tank hanging device | |
CN212375713U (en) | Bridge overhauls device | |
CN218562117U (en) | Bridge cornice rapid construction platform | |
CN217458425U (en) | Lifting appliance for lifting bridge deck concrete baffle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |