CN209686443U - One kind can formwork composed bogie in early demoulding gallery - Google Patents

One kind can formwork composed bogie in early demoulding gallery Download PDF

Info

Publication number
CN209686443U
CN209686443U CN201920027102.0U CN201920027102U CN209686443U CN 209686443 U CN209686443 U CN 209686443U CN 201920027102 U CN201920027102 U CN 201920027102U CN 209686443 U CN209686443 U CN 209686443U
Authority
CN
China
Prior art keywords
several
mould
tai
neizhi
trolleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920027102.0U
Other languages
Chinese (zh)
Inventor
刘正泉
刘萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920027102.0U priority Critical patent/CN209686443U/en
Application granted granted Critical
Publication of CN209686443U publication Critical patent/CN209686443U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

It can formwork composed bogie in early demoulding gallery the utility model relates to one kind, it is made of two Tai Neizhi mould trolleys of symmetrical configuration, wedged template, several fixed dimension connecting rods, several struts, several extensible links, it is characterized by: being linked into an integrated entity between two Tai Neizhi mould trolleys of symmetrical configuration by several fixed dimension connecting rods, several extensible links, and two Tai Neizhi mould trolley backform among be arranged one piece of wedged template, wedged template rests on the secondary beam both ends of two Tai Neizhi mould trolleys, the fixed several struts in wedged template lower part.The utility model among two Tai Neizhi mould trolleys due to being arranged a supporting part being made of wedged template and several struts, in demoulding, two Tai Neizhi mould trolleys are kept completely separate removal, continue to support as the stress of gallery top plate, to realize the early demoulding of trolley, trolley each service life time can significantly be shortened, improve working efficiency, due to using standardized component, modularization installation, is suitble to industrialization large-scale production.

Description

One kind can formwork composed bogie in early demoulding gallery
Technical field
The utility model belongs to building engineering field, is related in gallery branch mould trolley more particularly to one kind can early demoulding corridor Formwork composed bogie in road.
Background technique
Branch mould trolley is called interior branch mould trolley, is a kind of integral unit template branch moved integrally for being equipped with castor The equipment for supportting one is usually used in the inner template construction of underground gallery, box culvert, water channel.But the interior branch mould trolley of the prior art, In In corridor when the construction of clear span biggish gallery, due to concrete will until code requirement strength of mould stripping could demoulding, in corridor clear span compared with When big, the interior formwork trolley formwork dismounting of the prior art needs 15 days or so at normal temperature, and longer in winter, this makes the every of trolley One duty cycle is too long, affects the trolley number of turnover while the duration of a project being allowed to extend.Therefore, it is necessary to study one kind can be early Formwork composed bogie in demoulding gallery, to solve the above-mentioned problems in the prior art.
Summary of the invention
The utility model provide one kind can formwork composed bogie in early stripping formwork system gallery, can when clear span is larger in corridor, The early demoulding of trolley is realized, trolley each service life time can be significantly shortened, improves working efficiency, due to using standard Change component, modularization installation is suitble to industrialization large-scale production.
The technical solution of the utility model are as follows:
One kind can formwork composed bogie in early demoulding gallery, if by two Tai Neizhi mould trolleys of symmetrical configuration, wedged template, Dry fixed dimension connecting rod, several struts, several extensible links composition, it is characterised in that: two Tai Neizhi die station of symmetrical configuration It is linked into an integrated entity between vehicle by several fixed dimension connecting rods, several extensible links, and in the backform of two Tai Neizhi mould trolleys Between be arranged one piece of wedged template, wedged template rests on the secondary beam both ends of two Tai Neizhi mould trolleys, if wedged template lower part is fixed Dry strut.
The interior branch mould trolley includes two Pin main couples, clump weight sunpender, clump weight, the adjustable height silk in several lower parts Bar, two girders, several secondary beams, several tops be adjusted height screw rod, several waling stripes, several 45 degree of diagonal braces, rail wheel, Two tracks, backform, angle mould, side form, angle mould strut, side form strut, two Pin main couples and several waling stripes, several 45 degree it is oblique Support forms trolley main frame by bolt;There are two rail wheels and a row lower part, and height silk is adjusted for every Pin main couple lower end dress Bar, rail wheel are individually placed on two tracks, every Pin main couple upper end equipped with a row top be adjusted height screw rod, every side it is upper Portion, which is adjusted on height screw rod, supports a girder, and several secondary beams are laid on two girders, backform is laid on secondary beam, are pushed up Mould side hangs with angle mould by hinge, and angle mould lower end is connected with side form, to guarantee that height screw rod is adjusted on top in trolley formwork Template can normally be gone up and down when lifting, trolley do not have the other side of angle mould and side form hang with the comparable clump weight of side form weight, Clump weight hangs over secondary beam beam-ends by clump weight sunpender peace;Angle mould strut is mounted between two Pin main couples and angle mould, side form support Bar is mounted between two Pin main couples and side form.
Further, one end length of the secondary beam between two Tai Neizhi mould trolleys will be more than backform, can allow wedge shape The narrow two sides in template lower part can rest on secondary beam.
Further, the distance between two Tai Neizhi mould trolley secondary beams are at least twice of strut diameter.
Further, the clump weight is hung in two Tai Neizhi mould trolleys by sunpender at a distance of the secondary beam end side of most proximal end, And the distance of two clump weights between Tai Neizhi mould trolley is at least twice of strut diameter.
Further, several fixed dimension connecting rods of two Tai Neizhi mould trolley connection and several extensible links can be with Easily quickly installs or remove.
The utility model provide one kind can formwork composed bogie in early stripping formwork system gallery, can when clear span is larger in corridor, By being combined by two Tai Neizhi mould trolleys, and a support being made of wedged template and several struts is set among combination section Band forms an entirety with the template of two Tai Neizhi mould trolleys in branch die combination, and in demoulding, two Tai Neizhi mould trolleys are complete Separation removes, and an intermediate independent supporting part is then kept completely separate with trolley and not disturbed, continue as gallery top plate by Power support, to realize the early demoulding of trolley, can significantly shorten trolley each service life time, improve working efficiency, Due to using standardized component, modularization installation is suitble to industrialization large-scale production.
Detailed description of the invention
Fig. 1 is that two Tai Neizhi mould trolleys combine front view when the utility model template is installed.
Two Tai Neizhi mould trolleys separate front view when Fig. 2 is the utility model form removable.
Fig. 3 is that detail drawing is faced in two Tai Neizhi mould trolley of the utility model combination middle and upper part.
Fig. 4 is that two Tai Neizhi mould trolley of the utility model combines middle and upper part perspective view.
Fig. 5 is that detail drawing is faced in two Tai Neizhi mould trolley of the utility model combination middle and lower part.
Fig. 6 is that two Tai Neizhi mould trolley of the utility model combines middle and lower part perspective view.
Fig. 7 is the interior branch mould trolley main frame perspective view of the utility model.
Fig. 8 is the extensible link structural schematic diagram of the utility model.
Specific embodiment
The utility model is described more fully with reference to the accompanying drawings, wherein illustrating the novel exemplary reality of this example Apply example.The component that the utility model is not particularly described is existing structure.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, the utility model by symmetrical configuration two Tai Neizhi Mould trolley, wedged template 2, several fixed dimension connecting rods 5, several struts 10, several extensible links 11 form, symmetrical configuration It is linked into an integrated entity between two Tai Neizhi mould trolleys by several fixed dimension connecting rods 5, several extensible links 11, every interior formwork If trolley include two Pin main couples 1, clump weight sunpender 3, clump weight 4, several lower parts be adjusted 6, two girders 7 of height screw rod, Height screw rod 9, several waling stripes 12,14, two several 45 degree of diagonal braces 13, rail wheel rails is adjusted in dry secondary beam 8, several tops Road 15, backform 16, angle mould 17, side form 18, angle mould strut 19, side form strut 20, two Pin main couples 1 and several waling stripes 12, Several 45 degree of diagonal braces 13 form trolley main frame by bolt;There are two on rail wheel 14 and a row for every 1 lower end of Pin main couple dress Portion's adjustable length screw rod 6, rail wheel 14 are individually placed on two tracks 15, so far two moveable interior branch mould trolley stress System is formed;Height screw rod 9 is adjusted equipped with a row top in every 1 upper end of Pin main couple, and top is adjusted on height screw rod 9 and supports A girder 7, lay several secondary beams 8 on two girders 7, lay backform 16 on secondary beam 8, it is each in branch mould trolley backform 16 sides hang with angle mould 17 by hinge, and 17 lower end of angle mould is connected with side form 18, to guarantee that interior formwork trolley formwork is adjustable on top Template can normally be gone up and down when saving the lifting of height screw rod 9, and branch mould trolley does not have angle mould 17 and the other side of side form 18 to hang with inside With the comparable clump weight 4 of side form weight, clump weight 4 hangs 8 beam-ends of secondary beam by the peace of clump weight sunpender 3, so far liftable template It is formed, angle mould strut 19 is mounted between two Pin main couples 1 and angle mould 17, and side form strut 20 is mounted on two Pin main couples 1 and side Between mould 18;Not having side form 18 only to hang with connection between clump weight 4 in two Tai Neizhi mould trolleys uses several fixed dimensions to connect Bar 5 connects 11 with several extensible links, and so far two Tai Neizhi mould trolley main stress framework compositions are integral;In two interior formworks One piece of wedged template 2 is set among trolley backform 16, and there is the independent support of several struts 10 in 2 lower part of wedged template, adjusts in two Extensible link 11 between branch mould trolley makes 16 width of backform of two Tai Neizhi mould trolleys be suitble to 2 width of wedged template, wedge Shape template 2 rests on 8 both ends of secondary beam.The distance between two Tai Neizhi mould trolley secondary beams are twice of strut diameter.Two Tai Neizhi The distance of clump weight between mould trolley is twice of strut diameter.Several fixed dimensions of the two Tai Neizhi mould trolley connection Connecting rod and several extensible links easily quickly can be installed or be removed.
In this example, as shown in fig. 1: by the component of various specifications, providing one kind can prop up in early stripping formwork system gallery Die combination trolley by being combined by two Tai Neizhi mould trolleys, and can be arranged one when clear span is larger in corridor among combination section The supporting part that item is made of wedged template and several struts, in formwork, the template of itself and two Tai Neizhi mould trolleys formation one is whole Body.As shown in Figure 2: in demoulding, two Tai Neizhi mould trolleys are kept completely separate, and an intermediate independent supporting part then with interior formwork Trolley is kept completely separate and not disturbed, continues to support as the stress of gallery top plate, so that the early demoulding of trolley is realized, it can It is significant to shorten trolley each service life time, improve working efficiency.

Claims (5)

1. one kind can formwork composed bogie in early demoulding gallery, by two Tai Neizhi mould trolleys of symmetrical configuration, wedged template, several Fixed dimension connecting rod, several struts, several extensible links composition, it is characterised in that: two Tai Neizhi mould trolleys of symmetrical configuration Between linked into an integrated entity by several fixed dimension connecting rods, several extensible links, and among the backform of two Tai Neizhi mould trolleys One piece of wedged template is set, and wedged template rests on the secondary beam both ends of two Tai Neizhi mould trolleys, and the fixation of wedged template lower part is several Strut.
2. according to claim 1 can formwork composed bogie in early demoulding gallery, it is characterised in that: the interior branch die station Vehicle include two Pin main couples, clump weight sunpender, clump weight, several lower parts be adjusted height screw rod, two girders, several secondary beams, Height screw rod, several waling stripes, several 45 degree of diagonal braces, rail wheel, two tracks, backform, angle mould, sides is adjusted in several tops Mould, angle mould strut, side form strut, two Pin main couples and several waling stripes, several 45 degree of diagonal braces form trolley master by bolt Frame;There are two rail wheels and a row lower part, and height screw rod is adjusted for every Pin main couple lower end dress, and rail wheel is individually placed to two On track, height screw rod is adjusted equipped with a row top in every Pin main couple upper end, and the top of every side is adjusted on height screw rod and props up A girder is supportted, several secondary beams are laid on two girders, backform is laid on secondary beam, backform side hangs with angle by hinge Mould, angle mould lower end are connected with side form, and clump weight hangs over secondary beam beam-ends by clump weight sunpender peace;Angle mould strut is mounted on two Pin main trusses Between frame and angle mould, side form strut is mounted between two Pin main couples and side form.
3. according to claim 2 can formwork composed bogie in early demoulding gallery, it is characterised in that: the secondary beam is in Liang Tai One end length between interior branch mould trolley will be more than backform, and the two sides that wedged template lower part can be allowed narrow can rest on secondary beam.
4. according to claim 2 can formwork composed bogie in early demoulding gallery, it is characterised in that: two Tai Neizhi mould trolleys The distance between secondary beam is at least twice of strut diameter.
5. according to claim 2 can formwork composed bogie in early demoulding gallery, it is characterised in that: the clump weight passes through Sunpender hanging in two Tai Neizhi mould trolleys at a distance of the secondary beam end side of most proximal end, and the clump weight between two Tai Neizhi mould trolleys away from From twice of at least strut diameter.
CN201920027102.0U 2019-01-08 2019-01-08 One kind can formwork composed bogie in early demoulding gallery Expired - Fee Related CN209686443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920027102.0U CN209686443U (en) 2019-01-08 2019-01-08 One kind can formwork composed bogie in early demoulding gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920027102.0U CN209686443U (en) 2019-01-08 2019-01-08 One kind can formwork composed bogie in early demoulding gallery

Publications (1)

Publication Number Publication Date
CN209686443U true CN209686443U (en) 2019-11-26

Family

ID=68598451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920027102.0U Expired - Fee Related CN209686443U (en) 2019-01-08 2019-01-08 One kind can formwork composed bogie in early demoulding gallery

Country Status (1)

Country Link
CN (1) CN209686443U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111336876A (en) * 2020-03-31 2020-06-26 山东科技大学 Method for reducing damage of tunnel blasting shock waves and noise
CN111391074A (en) * 2020-04-01 2020-07-10 中交第四航务工程局有限公司 Immersed tube tunnel middle cavity template system and construction method
CN112112422A (en) * 2020-09-18 2020-12-22 中铁济南工程建设监理有限公司 Template support assembly for subway station side wall and supervision method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111336876A (en) * 2020-03-31 2020-06-26 山东科技大学 Method for reducing damage of tunnel blasting shock waves and noise
CN111336876B (en) * 2020-03-31 2023-09-01 山东科技大学 Method for reducing damage of tunnel blasting shock wave and noise
CN111391074A (en) * 2020-04-01 2020-07-10 中交第四航务工程局有限公司 Immersed tube tunnel middle cavity template system and construction method
CN112112422A (en) * 2020-09-18 2020-12-22 中铁济南工程建设监理有限公司 Template support assembly for subway station side wall and supervision method thereof

Similar Documents

Publication Publication Date Title
CN209686443U (en) One kind can formwork composed bogie in early demoulding gallery
CN208815424U (en) A kind of bridge descending hanging basket
CN203866715U (en) Multi-roof-truss rhombic truss hanging basket for long-cantilever box beam construction
CN107630709B (en) A kind of construction method of the mobile trolley of bored tunnel construction
CN109868755B (en) Hanging basket construction method for diamond truss hanging basket and cantilever beam
CN207608836U (en) A kind of Successive interference cancellation cantilever pouring construction Diamond-Shape Form Traveler
CN109826653B (en) Synchronous construction formwork trolley and construction method thereof
CN202544854U (en) Lining trolley for subway station
CN103352710A (en) Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN207315404U (en) Municipal tunnel big cross section culvert and piping lane trolley
CN114164772A (en) Rhombic hanging basket for viaduct cantilever pouring construction and mounting method
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN105332718A (en) Trolley for construction of large-span multi-section tunnel
CN211420881U (en) Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam
CN209760294U (en) Narrow corridor formwork supporting trolley with clear width smaller than 1.8M in corridor
CN109519199B (en) Shield tunnel segment supporting trolley
CN210975880U (en) Adjustable open cut tunnel is hydraulic pressure platform truck by oneself
CN112482241A (en) Walking type hanging bracket for post-pouring section of box girder flange plate and construction method thereof
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN209584868U (en) A kind of sunpender underneath type Bridge Erector box beam
CN208215605U (en) A kind of fast assembling-disassembling T beam forms
CN207044363U (en) A kind of new precast beam protection and operating platform
CN210341665U (en) Installation device for corrugated steel web of suspension casting bridge
CN217582149U (en) Frameless lining trolley
CN204551271U (en) A kind of reinforcement type Hanging Basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191126