CN209670061U - A kind of construction assembly with connection structure - Google Patents

A kind of construction assembly with connection structure Download PDF

Info

Publication number
CN209670061U
CN209670061U CN201920090415.0U CN201920090415U CN209670061U CN 209670061 U CN209670061 U CN 209670061U CN 201920090415 U CN201920090415 U CN 201920090415U CN 209670061 U CN209670061 U CN 209670061U
Authority
CN
China
Prior art keywords
prefabricated
component
ontology
lower prop
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920090415.0U
Other languages
Chinese (zh)
Inventor
李云
徐皖南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN201920090415.0U priority Critical patent/CN209670061U/en
Application granted granted Critical
Publication of CN209670061U publication Critical patent/CN209670061U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of construction assembly with connection structure, including prefabricated lower prop component, prefabricated upper prop component, precast beam unit and connection component, connection component is embedded on the prefabricated lower prop component, the prefabricated lower prop component is fixedly connected by connection component with prefabricated upper prop component and precast beam unit, the prefabricated lower prop component includes prefabricated lower prop ontology, cruciform groove is offered at the top of the prefabricated lower prop ontology, the inside of the prefabricated lower prop ontology is embedded with connection reinforcing bar and stiffener, the quantity of the connection reinforcing bar is four, the prefabricated upper prop component includes prefabricated upper prop ontology, the bottom of the prefabricated upper prop ontology offers link slot and reinforcement tank.The utility model, which facilitates, assembles prefabricated lower prop ontology, prefabricated upper prop ontology and precast beam body, greatly shortens the construction time, improves construction efficiency, equally reduce and pour work, simplify assembly work, reduces the labor intensity of worker.

Description

A kind of construction assembly with connection structure
Technical field
The utility model relates to construction mounting technology field, specially a kind of construction dress with connection structure Ligand.
Background technique
With the fast development of building trade, traditional cast in situs is since time-consuming and laborious, construction cost is high, construction is not square Just it is gradually backed out the emergence of the arena of history instead prefabrication, in building assembly is constituted, decorated The construction of frame is the important component of entire assembly building, and assembling frame is primarily referred to as group between precast beam and prefabricated post At bearing system structure, but there is also deficiencies below when existing prefabricated pre-column and precast beam constitute frame structure:
1, it is low that degree is assembled between precast beam and prefabricated post, it is also necessary to which a large amount of concrete is poured, in casting process Need to carry out die-filling, to cause assembly efficiency low, construction efficiency is slow;
2, lack connection structure between precast beam and prefabricated post, need to weld some connectors at the construction field (site) and facilitate progress Assembly, but be easily reduced the security performance of connector and need to expend a large amount of working time.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of construction assembly with connection structure, Solving existing prefabricated post, time-consuming with precast beam assembly, the unstable problem of assembling structure.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of construction with connection structure Assembly, including prefabricated lower prop component, prefabricated upper prop component, precast beam unit and connection component, on the prefabricated lower prop component It is embedded with connection component, the prefabricated lower prop component connects by the way that connection component and prefabricated upper prop component and precast beam unit are fixed It connects.
The prefabricated lower prop component includes prefabricated lower prop ontology, is offered at the top of the prefabricated lower prop ontology cross recessed Slot, the inside of the prefabricated lower prop ontology are embedded with connection reinforcing bar and stiffener, and the quantity of the connection reinforcing bar is four.
The prefabricated upper prop component includes prefabricated upper prop ontology, the bottom of the prefabricated upper prop ontology offer link slot and Reinforcement tank, the quantity of the link slot are four, and the inside of the prefabricated upper prop ontology offers and link slot and reinforcing respectively What slot was connected first pours channel and second and pours channel.
The precast beam unit includes precast beam body, and one end of the precast beam body is fixedly installed with link block, institute The connecting hole offered on link block through link block is stated, offers fixing groove in the precast beam body.
The connection component includes main board, and one end of the main board is fixedly installed with dowel, the main board it is another One end is fixedly installed with loading plate, securing plate and limit plate, and the quantity of the securing plate and limit plate is two, described in two Fixation hole is offered on limit plate.
Advanced optimize the technical program, the main board by dowel be embedded in the inside of prefabricated lower prop ontology with it is prefabricated Lower prop ontology is fixedly connected.
Advanced optimize the technical program, the quantity of the precast beam unit and connection component be four.
The technical program is advanced optimized, four link blocks pass through connecting hole and pass through connection bar splicing prefabricated On lower prop ontology and loading plate.
The technical program is advanced optimized, the precast beam body is fixedly connected by expansion bolt with limit plate.
The technical program is advanced optimized, the prefabricated lower prop ontology extends through pre- by connection reinforcing bar and stiffener The link slot and reinforcement tank and prefabricated upper prop ontology of upper prop ontology processed overlap.
The technical program is advanced optimized, described first, which pours channel, has poured coagulation with the second inside for pouring channel Soil.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of construction assembly with connection structure, has Below the utility model has the advantages that
1, the construction assembly with connection structure facilitates prefabricated lower prop ontology, prefabricated upper prop ontology and pre- Beam ontology processed is assembled, and the construction time is greatly shortened, and improves construction efficiency, is equally reduced and is poured work, is simplified Assembly work, reduces the labor intensity of worker.
2, connection component, is embedded in prefabricated by the construction assembly with connection structure by process of production The inside of lower prop ontology avoids and carries out welding now in construction, reduces the workload of construction site, applies to reduce Pollution form construction caused by work equally improves the structural strength built after assembly.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the prefabricated lower prop component of the utility model, prefabricated upper prop component, precast beam unit and connection component connection structure Schematic diagram;
Fig. 3 is the prefabricated lower prop component of the utility model structure and connection component attachment structure schematic diagram;
Fig. 4 is the prefabricated upper prop element structure schematic diagram of the utility model;
Fig. 5 is the utility model connecting component structure schematic diagram;
Fig. 6 is the prefabricated lower prop component of the utility model, precast beam unit and connection component attachment structure schematic diagram.
In figure: 1, prefabricated lower prop component;11, prefabricated lower prop ontology;12, cruciform groove;13, reinforcing bar is connected;14, reinforce Reinforcing bar;2, prefabricated upper prop component;21, prefabricated upper prop ontology;22, link slot;23, reinforcement tank;24, first channel is poured;25, Two pour channel;3, precast beam unit;31, precast beam body;32, link block;33, connecting hole;34, fixing groove;4, connection group Part;41, main board;42, dowel;43, loading plate;44, limit plate;45, securing plate;46, fixation hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-6 is please referred to, the utility model provides a kind of technical solution: a kind of construction assembly with connection structure Body, including prefabricated lower prop component 1, prefabricated upper prop component 2, precast beam unit 3 and connection component 4, it is pre-buried on prefabricated lower prop component 1 There is connection component 4, prefabricated lower prop component 1 is fixedly connected by connection component 4 with prefabricated upper prop component 2 and precast beam unit 3.
Prefabricated lower prop component 1 includes prefabricated lower prop ontology 11, and the top of prefabricated lower prop ontology 11 offers cruciform groove 12, the inside of prefabricated lower prop ontology 11 is embedded with connection reinforcing bar 13 and stiffener 14, and the quantity of connection reinforcing bar 13 is four.
Prefabricated upper prop component 2 includes prefabricated upper prop ontology 21, and the bottom of prefabricated upper prop ontology 21 offers 22 He of link slot Reinforcement tank 23, the quantity of link slot 22 are four, and the inside of prefabricated upper prop ontology 21 offers and link slot 22 and reinforcing respectively What slot 23 was connected first pours channel 24 and second and pours channel 25.
Precast beam unit 3 includes precast beam body 31, and one end of precast beam body 31 is fixedly installed with link block 32, is connected The connecting hole 33 through link block 32 is offered on block 32, offers fixing groove 34 in precast beam body 31.
Connection component 4 includes main board 41, and one end of main board 41 is fixedly installed with dowel 42, the other end of main board 41 It is fixedly installed with loading plate 43, securing plate 45 and limit plate 44, the quantity of securing plate 45 and limit plate 44 is two, two limits The bottom of position plate 44 is fixedly connected with the top of loading plate 43, and the top of two securing plates 45 is solid with the bottom of loading plate 43 Fixed connection offers fixation hole 46 on two limit plates 44, facilitates prefabricated lower prop ontology 11, prefabricated upper prop ontology 21 and pre- Beam ontology 31 processed is assembled, and the construction time is greatly shortened, and improves construction efficiency, is equally reduced and is poured work, letter Assembly work is changed, has reduced the labor intensity of worker, by the way that connection component 4 is embedded in prefabricated lower prop sheet in process of production The inside of body 11 avoids and carries out welding now in construction, reduces the workload of construction site, lead to reduce construction The pollution form construction of cause equally improves the structural strength built after assembly.
Specifically, main board 41 is embedded in the inside of prefabricated lower prop ontology 11 by dowel 42 and prefabricated lower prop ontology 11 is consolidated Fixed connection, ensure that the fastness of connection component 4.
Specifically, it is four that the quantity of precast beam unit 3 and connection component 4, which is, a frame structure can be completed Construction.
Specifically, four link blocks 32, which pass through connection reinforcing bar 13 by connecting hole 33, is overlapped on prefabricated 11 He of lower prop ontology On loading plate 43, carry out in assembling process, it is ensured that assembly efficiency between precast beam body 31 and prefabricated lower prop ontology 11 and The stability of assembly.
Specifically, precast beam body 31 is fixedly connected by expansion bolt with limit plate 44, precast beam body 31 ensure that Fastness after installation.
Specifically, prefabricated lower prop ontology 11 extends through prefabricated upper prop ontology 21 by connection reinforcing bar 13 and stiffener 14 Link slot 22 and reinforcement tank 23 and prefabricated upper prop ontology 21 overlap, facilitate prefabricated upper prop ontology 21 and prefabricated lower prop ontology 11 Between carry out pouring work.
Specifically, first pour channel 24 and second pour channel 25 inside poured concrete, by prefabricated lower prop Ontology 11, prefabricated upper prop ontology 21 and 31 three of precast beam body are firmly assembled together.
When in use, prefabricated lower prop ontology 11 is installed using suspender and ground first, it then will be prefabricated using suspender Beam ontology 31 is moved after slinging, and is vertically put down after link block 32 in precast beam body 31 is directed at cruciform groove 12, from And link block 32 enters the inside of cruciform groove 12, while connecting reinforcing bar 13 through connecting hole 33, both precast beam sheets at this time Body 31 is overlapped on prefabricated lower prop ontology 11 and loading plate 43, and so on, complete four precast beam bodies 31 and prefabricated lower prop The assembly of ontology 11, after four precast beam bodies 31 and prefabricated lower prop ontology 11 assemble, four link blocks 32 with it is cross Groove 12 will form a centre and pour chamber, for improving prefabricated lower prop ontology 11, precast beam body 31 and prefabricated upper prop ontology Fastness between 21 directly uses expansion bolt by precast beam body 31 due to holding fixing groove 34 and fixation hole 46 successfully in advance It is fixed with limit plate 44, improves the fastness between precast beam body 31 and prefabricated lower prop ontology 11, then using hanging Tool slings prefabricated upper prop ontology 21, respectively enters link slot 22 and reinforcement tank by connection reinforcing bar 13 and stiffener 14 Docking for prefabricated upper prop ontology 21 and prefabricated lower prop ontology 11 is completed in 23 inside, then pours channel 24 and the by first Two pour channel 25 carry out casting concrete, using first pour 24 casting concrete of channel by link block 32 with connect reinforcing bar 13 Be fixed, while connection reinforcing bar 13 being fixed with prefabricated upper prop ontology 21, using second pour channel 25 improve it is pre- Fastness between upper prop ontology 21 processed and prefabricated lower prop ontology 11, while centre is poured into chamber and is filled, it ensure that structure Stability.
In conclusion this has the construction assembly of connection structure, facilitate prefabricated lower prop ontology 11, prefabricated upper prop Ontology 21 and precast beam body 31 are assembled, and the construction time is greatly shortened, and are improved construction efficiency, are equally reduced and pour Work is built, assembly work is simplified, reduces the labor intensity of worker, by being in process of production embedded in connection component 4 The inside of prefabricated lower prop ontology 11 avoids and carries out welding now in construction, reduces the workload of construction site, thus Pollution form construction caused by constructing is reduced, the structural strength built after assembly is equally improved.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of construction assembly with connection structure, including it is prefabricated lower prop component (1), prefabricated upper prop component (2), pre- Beam (3) processed and connection component (4), it is characterised in that: be embedded with connection component (4), institute on the prefabricated lower prop component (1) Prefabricated lower prop component (1) is stated to be fixedly connected by connection component (4) with prefabricated upper prop component (2) and precast beam unit (3);
The prefabricated lower prop component (1) includes prefabricated lower prop ontology (11), is offered at the top of the prefabricated lower prop ontology (11) Cruciform groove (12), the inside of the prefabricated lower prop ontology (11) are embedded with connection reinforcing bar (13) and stiffener (14), institute The quantity for stating connection reinforcing bar (13) is four;
The prefabricated upper prop component (2) includes prefabricated upper prop ontology (21), and the bottom of the prefabricated upper prop ontology (21) offers Link slot (22) and reinforcement tank (23), the quantity of the link slot (22) are four, the inside of the prefabricated upper prop ontology (21) First to be connected with link slot (22) and reinforcement tank (23) is offered respectively pour channel (24) and second pour channel (25);
The precast beam unit (3) includes precast beam body (31), and one end of the precast beam body (31) is fixedly installed with company It connects block (32), the connecting hole (33) through link block (32), the precast beam body (31) is offered on the link block (32) On offer fixing groove (34);
The connection component (4) includes main board (41), and one end of the main board (41) is fixedly installed with dowel (42), described The other end of main board (41) is fixedly installed with loading plate (43), securing plate (45) and limit plate (44), the securing plate (45) Quantity with limit plate (44) is two, offers fixation hole (46) on two limit plates (44).
2. a kind of construction assembly with connection structure according to claim 1, it is characterised in that: the main body Plate (41) is fixedly connected by the inside that dowel (42) are embedded in prefabricated lower prop ontology (11) with prefabricated lower prop ontology (11).
3. a kind of construction assembly with connection structure according to claim 1, it is characterised in that: described prefabricated The quantity of beam (3) and connection component (4) be four.
4. a kind of construction assembly with connection structure according to claim 1, it is characterised in that: described in four Link block (32) passes through connection reinforcing bar (13) by connecting hole (33) and is overlapped on prefabricated lower prop ontology (11) and loading plate (43) On.
5. a kind of construction assembly with connection structure according to claim 1, it is characterised in that: described prefabricated Beam ontology (31) is fixedly connected by expansion bolt with limit plate (44).
6. a kind of construction assembly with connection structure according to claim 1, it is characterised in that: described prefabricated Lower prop ontology (11) extends through the link slot of prefabricated upper prop ontology (21) by connection reinforcing bar (13) and stiffener (14) (22) it is overlapped with reinforcement tank (23) with prefabricated upper prop ontology (21).
7. a kind of construction assembly with connection structure according to claim 1, it is characterised in that: described first It pours channel (24) and the second inside for pouring channel (25) has poured concrete.
CN201920090415.0U 2019-01-18 2019-01-18 A kind of construction assembly with connection structure Expired - Fee Related CN209670061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920090415.0U CN209670061U (en) 2019-01-18 2019-01-18 A kind of construction assembly with connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920090415.0U CN209670061U (en) 2019-01-18 2019-01-18 A kind of construction assembly with connection structure

Publications (1)

Publication Number Publication Date
CN209670061U true CN209670061U (en) 2019-11-22

Family

ID=68566215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920090415.0U Expired - Fee Related CN209670061U (en) 2019-01-18 2019-01-18 A kind of construction assembly with connection structure

Country Status (1)

Country Link
CN (1) CN209670061U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832370A (en) * 2021-01-06 2021-05-25 重庆心乐璟科技有限公司 Assembled post roof beam frame and registrate structure thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832370A (en) * 2021-01-06 2021-05-25 重庆心乐璟科技有限公司 Assembled post roof beam frame and registrate structure thereof

Similar Documents

Publication Publication Date Title
CN103243838B (en) Connection structure of integrally assembled concrete frame and shear wall
CN204876059U (en) Prefabricated assembled shaped steel concrete frame structure system
CN203174770U (en) Connection structure of prefabricated column and construction site base and building
CN201474292U (en) Midsize template assembled large template
CN203213346U (en) Connecting structure for assembling integral concrete frame and shear wall
CN104790522A (en) Prefabricated assembling type steel-reinforced concrete column-steel beam frame structure system and construction method
CN113638489B (en) RC beam column node can be dismantled to assembled
CN103669574A (en) Building frame system and assembly method thereof
CN207499427U (en) Assembly integrated precast superimposed sheet support system
CN209670061U (en) A kind of construction assembly with connection structure
CN207988212U (en) A kind of precast shear wall horizontal connection structure with W-shaped seam
CN211228887U (en) Bracing column base node is used in timber structure building decoration
CN106759933A (en) Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures
CN110616802A (en) Prefabricated steel sleeve connecting node of assembled concrete frame
CN203701386U (en) Steel-structure floor slab group
CN103572891B (en) A kind of pregroove plate
CN207244961U (en) A kind of Prefabricated stacking floor with side flanging for being used to drop plate region
CN110805141B (en) Connecting device and method for steel pipe column and shock insulation support after jacking of building
CN111719578B (en) Archaized building and construction process
CN114482561A (en) Steel structure roof installation method
CN210369497U (en) Floor bottom die block and floor
CN208633313U (en) Assembling truss type light steel frame-steel mesh-Combined concrete wall
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN204110668U (en) A kind of modularization can assemble spherical tank associating ladder landing platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191122