CN106759933A - Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures - Google Patents

Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures Download PDF

Info

Publication number
CN106759933A
CN106759933A CN201710035263.XA CN201710035263A CN106759933A CN 106759933 A CN106759933 A CN 106759933A CN 201710035263 A CN201710035263 A CN 201710035263A CN 106759933 A CN106759933 A CN 106759933A
Authority
CN
China
Prior art keywords
prefabricated post
composite beam
grout sleeve
assembled
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710035263.XA
Other languages
Chinese (zh)
Inventor
成张佳宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710035263.XA priority Critical patent/CN106759933A/en
Publication of CN106759933A publication Critical patent/CN106759933A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses prefabricated post composite beam intermediate layer interior joint connection method in a kind of assembled RC frame-shear structures, during formal assembling, first assemble lower floor's wall of prefabricated post both sides, lower floor's Column border node of assembling prefabricated post both sides, after the completion of supported on both sides, stirrup on full grout sleeve and beam is loaded onto on beam steel at two side gussets, afterwards, the lower floor's composite beam for being coated with upper longitudinal bar is lifted again, composite beam is carried out into leveling, support, screw the pre- full grout sleeve put, connected upper longitudinal bar is set to be evenly distributed on inside full grout sleeve, then the stirrup at colligation post-cast strip;Prefabricated post both sides are closed by the connected position that full grout sleeve is formed with cement mortar, joint face is formed closed cavity;Sitting slurry carries out cementing operations after 1 day, mix grouting material is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting.Integral construction of the present invention is easy, and anti-seismic performance is good, construction cost saving, short construction period.

Description

Prefabricated post-composite beam intermediate layer interior joint connection method in assembled RC frame shear structures
Technical field
The invention belongs to building structure connection area, and in particular to prefabricated post-overlapping in a kind of assembled RC frame shear structures The interior joint connection method of beam intermediate layer.
Background technology
Traditional cast-in-place building refers to carry out building for the construction such as reinforcing bar colligation, formwork supporting plate, casting concrete at the construction field (site) Build.The past for quite a long time, to receiving surplus rural labor force of China, solution personnel employment etc. rises cast-in-place building Positive effect, current cast-in-place mode still occupies absolute main flow in China's construction.But, cast-in-place building is applied for a long time Situ wet operation amount is widely present in work big, labour's input amount is big, and labor strength is high, poor working environment, template, pin The input amounts such as hand cradle are big, turnover utilization rate is low, mechanized construction low degree, construction safety hidden danger and Frequent Accidents, with respect to work efficiency The not high and job site thorny problem such as largely produce airborne dust, noise pollution, building waste many.These cast-in-place buildings it is congenital Drawback is incompatible with the trend of the current construction industry development of China.
Assembled architecture is, in plant produced, to be assembled building subassembly and component and fitting at the construction field (site) and be formed by connecting Building.It with modern science and technology is support that the construction of assembled architecture is, with industrialized production as means, with engineering Mesh management innovation is core, and building products production overall process is coupled integral by extensive utilization information technology, intelligent environment protection technology Change the structural system of industrial chain, assembled architecture can economize on resources and be polluted with the energy, reduction, effectively improves labor productivity, Improve construction quality etc..The house for meeting China " 13 " national development stage " energy and land saving " and " structure industrial system " is produced Industry guiding theory, with significant economic benefit and social benefit.The current desalination along with China human mortality bonus, it is of the right age to build The reduction of industry number of employees is built, development assembled architecture is brought into schedule in good time.
Assembled architecture presses structural system, is broadly divided into assembled frame-shear structure, fabricated shear wall structure, assembled frame Frame-shear wall structure etc..Wherein first two structural system is relatively more in the research of China, and both at home and abroad to assembling frame- The research of shear wall structure is also relatively fewer, and existing research is concentrated mainly on theoretical and numerical simulation aspect, wherein H. A. D. Samith Buddika etc. have carried out theoretical research based on Opensees softwares to assembled frame shear structure.Dionysios Bournas etc. has carried out pseudo to 1 three layers of assembled frame shear structure model, have studied structural model different parts, Damaged situation of the node of multi-form under geological process.Majid Divana etc. with nonlinear static force method to difference across number and The assembled frame shear structure of floor height has carried out theoretical research.Current developing rapidly in China, assembled with building industrialization The application of frame shear wall structure is increasing, therefore is necessary to further investigate it.
At present, the common practice to shear wall position in assembled RC frame shear structures is using traditional complete cast-in-place mode Shear wall is built, this is mainly based upon in frame shear wall structure, shear wall as main lateral resistant member, in earthquake In undertake most horizontal force, while shear wall is destroyed at first as the first line of defence in earthquake, thus shear wall from The anti-seismic performance quality of body is most important.For the requirement of shear wall aspect of performance, the present patent application scheme proposes a kind of dress With prefabricated post in formula RC frame shear structures-composite beam intermediate layer interior joint connection method.
The content of the invention
Goal of the invention:In order to solve the deficiencies in the prior art, the invention provides pre- in a kind of assembled RC frame shear structures Post processed-composite beam intermediate layer interior joint connection method.
Technical scheme:Prefabricated post-composite beam intermediate layer interior joint connection method in a kind of assembled RC frame shear structures, bag Include following steps:
1)During formal assembling, lower floor's wall of prefabricated post both sides is first assembled, assemble lower floor's Column border node of prefabricated post both sides, two is collateral After the completion of support, stirrup on full grout sleeve and beam is loaded onto on the beam steel at two side gussets, afterwards, then lift and be coated with Lower floor's composite beam of the vertical muscle in portion, leveling, support are carried out by composite beam, screw the pre- full grout sleeve put, and make connected top Vertical muscle is evenly distributed on inside full grout sleeve, then the stirrup at colligation post-cast strip;
2)Carried out sitting slurry operation with cement mortar, i.e., with cement mortar by prefabricated post both sides by being connected that full grout sleeve is formed Position is closed, and joint face is formed closed cavity;
3)Sitting slurry carries out cementing operations after 1 day, mix is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting Grouting material.
As optimization:Before formal assembling, first dabbing treatment will be carried out at rear pouring concrete faying face, water under high pressure is used after dabbing Floating dust is rinsed well.
Beneficial effect:Integral construction of the present invention is easy, and anti-seismic performance is good, construction cost saving, short construction period.
Brief description of the drawings
Fig. 1 is structural representation of the invention;In figure:Stirrup, 5 tops on 1 prefabricated post, 2 composite beams, 3 beam steels, 4 beams Pouring concrete behind vertical muscle, 6 full grout sleeves, 7.
Specific embodiment
With reference to specific embodiment, the invention will be further described.
Embodiment
As shown in figure 1, the invention provides a kind of prefabricated post-composite beam intermediate layer interior joint connection method, specially:
1)During formal assembling, lower floor's wall of the both sides of prefabricated post 1, lower floor's Column border node of assembling prefabricated post 1 both sides, both sides are first assembled After the completion of support, stirrup 4 on full grout sleeve 6 and beam is loaded onto on the beam steel 3 at two side gussets, afterwards, then lift and wear Lower floor's composite beam 2 equipped with upper longitudinal bar 5, by composite beam 2 carry out leveling, support, screw the pre- full grout sleeve 6 put, make by The upper longitudinal bar 5 of connection is evenly distributed on inside full grout sleeve 6, then the stirrup at colligation post-cast strip;
2)Carried out sitting slurry operation with cement mortar, i.e., with cement mortar by the both sides of prefabricated post 1 by being connected that full grout sleeve 6 is formed Socket part position is closed, and joint face is formed closed cavity;
3)Sitting slurry carries out cementing operations after 1 day, mix is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting Grouting material.
Before formal assembling, first dabbing treatment will be carried out at the faying face of rear pouring concrete 7, rushed floating dust with water under high pressure after dabbing Wash clean.
The present invention is not limited to above-mentioned preferred forms, and anyone can show that other are various under enlightenment of the invention The product of form, however, make any change in its shape or structure, it is every with skill identical or similar to the present application Art scheme, is within the scope of the present invention.

Claims (2)

1. prefabricated post-composite beam intermediate layer interior joint connection method in a kind of assembled RC frame shear structures, it is characterised in that:Bag Include following steps:
1)During formal assembling, lower floor's wall of prefabricated post both sides is first assembled, assemble lower floor's Column border node of prefabricated post both sides, two is collateral After the completion of support, stirrup on full grout sleeve and beam is loaded onto on the beam steel at two side gussets, afterwards, then lift and be coated with Lower floor's composite beam of the vertical muscle in portion, leveling, support are carried out by composite beam, screw the pre- full grout sleeve put, and make connected top Vertical muscle is evenly distributed on inside full grout sleeve, then the stirrup at colligation post-cast strip;
2)Carried out sitting slurry operation with cement mortar, i.e., with cement mortar by prefabricated post both sides by being connected that full grout sleeve is formed Position is closed, and joint face is formed closed cavity;
3)Sitting slurry carries out cementing operations after 1 day, mix is carried out in strict accordance with high-strength cement base grouting material product operation instruction before grouting Grouting material.
2. prefabricated post-composite beam intermediate layer interior joint connection side in assembled RC frame shear structures according to claim 1 Method, it is characterised in that:Before formal assembling, first dabbing treatment will be carried out at rear pouring concrete faying face, will with water under high pressure after dabbing Floating dust is rinsed well.
CN201710035263.XA 2017-01-18 2017-01-18 Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures Pending CN106759933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710035263.XA CN106759933A (en) 2017-01-18 2017-01-18 Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710035263.XA CN106759933A (en) 2017-01-18 2017-01-18 Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures

Publications (1)

Publication Number Publication Date
CN106759933A true CN106759933A (en) 2017-05-31

Family

ID=58946447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710035263.XA Pending CN106759933A (en) 2017-01-18 2017-01-18 Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures

Country Status (1)

Country Link
CN (1) CN106759933A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442612A (en) * 2018-03-20 2018-08-24 浙江省建筑科学设计研究院有限公司 The standardization joint structure method of the horizontal longitudinal reinforcement connection of precast beam and anchoring
CN110080455A (en) * 2019-06-06 2019-08-02 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of precast shear wall, connecting node and its construction method
CN110306656A (en) * 2019-06-27 2019-10-08 广东工业大学 A kind of assembly concrete frame structure and its construction technology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4369077B2 (en) * 2001-05-31 2009-11-18 日本スプライススリーブ株式会社 Reinforcement structure for joints between reinforced concrete columns and beam members
CN105155683A (en) * 2015-08-12 2015-12-16 四川省建筑设计研究院 Prefabricated beam-column connection in prefabricated concrete buildings and construction method thereof
CN105951984A (en) * 2016-05-24 2016-09-21 东南大学 High-ductility assembled integral type frame exterior joint connection structure and construction method thereof
CN205669259U (en) * 2016-06-02 2016-11-02 上海城建建设实业(集团)有限公司 Post-tensioned prestressing precast frame
CN106284654A (en) * 2016-08-17 2017-01-04 沈阳建筑大学 Novel fabricated beam column node connection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4369077B2 (en) * 2001-05-31 2009-11-18 日本スプライススリーブ株式会社 Reinforcement structure for joints between reinforced concrete columns and beam members
CN105155683A (en) * 2015-08-12 2015-12-16 四川省建筑设计研究院 Prefabricated beam-column connection in prefabricated concrete buildings and construction method thereof
CN105951984A (en) * 2016-05-24 2016-09-21 东南大学 High-ductility assembled integral type frame exterior joint connection structure and construction method thereof
CN205669259U (en) * 2016-06-02 2016-11-02 上海城建建设实业(集团)有限公司 Post-tensioned prestressing precast frame
CN106284654A (en) * 2016-08-17 2017-01-04 沈阳建筑大学 Novel fabricated beam column node connection device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘梦然: "《建设工程绿色施工及技术应用》", 30 September 2016 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442612A (en) * 2018-03-20 2018-08-24 浙江省建筑科学设计研究院有限公司 The standardization joint structure method of the horizontal longitudinal reinforcement connection of precast beam and anchoring
CN110080455A (en) * 2019-06-06 2019-08-02 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of precast shear wall, connecting node and its construction method
CN110080455B (en) * 2019-06-06 2023-10-03 呼和浩特市中朵兴泰远大建筑工业有限公司 Prefabricated shear wall, connecting node and construction method thereof
CN110306656A (en) * 2019-06-27 2019-10-08 广东工业大学 A kind of assembly concrete frame structure and its construction technology

Similar Documents

Publication Publication Date Title
CN203049832U (en) Assembling type shear wall structure
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN106121107B (en) Assemble type concrete slab and its plate dry type connection method
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN104727476B (en) The light body 3D steel bar girders floor plates of assembled and its manufacture method
CN204252269U (en) A kind of Prefabricated steel construction integration assembling green building Component composition assembly unit
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN205242773U (en) Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection
CN105133731B (en) A kind of assembled steel performance
CN206368422U (en) A kind of assembled beam-column connecting node
CN105143570A (en) Building structure and construction method for same
CN106759933A (en) Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures
CN108277881A (en) A kind of assembled beam-column connecting node
CN103362307B (en) Construction method for modularizing insulation wall boards and pouring integrated house building
CN106836473A (en) Prefabricated post composite beam intermediate layer mid-side node connection method in assembled RC frame-shear structures
CN106759882A (en) Prefabricated post composite beam top story exterior joints connection method in assembled RC frame-shear structures
CN106760228A (en) The method of precast shear wall wall Vertical bar connection
CN206681193U (en) A kind of prefabricated assembled shear wall
CN106869331A (en) The connection method of precast shear wall composite beam in assembled RC frame-shear structures
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN205875520U (en) Precast beam steel reinforcement cage component and reinforced concrete roof beam
CN104878837A (en) Concrete frame structure system and assembly method thereof
CN107060132A (en) A kind of prefabricated assembled shear wall
CN104032828B (en) Industrialized modular multilayer and high-rise assembling type steel structure center support system
CN204609121U (en) A kind of precast truss frame beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531