CN209654057U - A kind of water-conveyance tunnel lined steel pipe mounting structure - Google Patents

A kind of water-conveyance tunnel lined steel pipe mounting structure Download PDF

Info

Publication number
CN209654057U
CN209654057U CN201822247329.4U CN201822247329U CN209654057U CN 209654057 U CN209654057 U CN 209654057U CN 201822247329 U CN201822247329 U CN 201822247329U CN 209654057 U CN209654057 U CN 209654057U
Authority
CN
China
Prior art keywords
hole
steel pipe
water
supporting element
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822247329.4U
Other languages
Chinese (zh)
Inventor
王学文
熊书轩
李浩田
王超飞
翟佳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jingshui Construction Group Co Ltd
Original Assignee
Beijing Jingshui Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jingshui Construction Group Co Ltd filed Critical Beijing Jingshui Construction Group Co Ltd
Priority to CN201822247329.4U priority Critical patent/CN209654057U/en
Application granted granted Critical
Publication of CN209654057U publication Critical patent/CN209654057U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of water-conveyance tunnel lined steel pipe mounting structures, its key points of the technical solution are that including track-type facilities in tourelle in supporting element, hole and hole, track-type facilities are arranged at intervals on supporting element in tourelle and hole in the hole, and tourelle includes the sleeve that a pair of of the earrings for being symmetricly set on supporting element two sides, the steel shaft between earrings and rotation are set in steel shaft in the hole.The water-conveyance tunnel lined steel pipe mounting structure of the utility model solves the problems, such as penstock installation low efficiency in the narrow space of straight tunnel.

Description

A kind of water-conveyance tunnel lined steel pipe mounting structure
Technical field
The utility model relates to penstock installation technical field in tunnel, in particular to a kind of water-conveyance tunnel lined steel pipe installation Structure.
Background technique
Water-conveyance tunnel is an important component in diversion water diversion project, general next at present frequently with multilayer lining cutting It says, comprising: outer lining such as gunite concrete, section of jurisdiction etc.;Liner such as steel pipe, pvc pipe etc.;The reinforcing bar being filled between outer lining and liner Concrete, self-compacting concrete etc..
For saving construction cost, tunnel section is generally smaller, tunnel regular spans 3-4m, is jacked piles with small section, due to tunnel Section is small, and general mechanical equipment is difficult to transport and lift steel pipe, causes penstock installation laying in hole relatively difficult.Conventional does Method is that the transport and lifting of steel pipe are carried out by the way of the railcar of hoist engine cooperation rolling bar traction or design specialized, these are applied Work mode there are installation accuracies low, hoist engine and guidance system arrangement trouble command that cumbersome, conevying efficiency is low, transport The disadvantages of stability is poor.
Utility model content
The purpose of this utility model is to provide a kind of water-conveyance tunnel lined steel pipe mounting structures, solve the narrow of straight tunnel Penstock installation low efficiency problem in narrow space.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of water-conveyance tunnel lined steel pipe mounting structure, including track-type facilities in tourelle and hole in supporting element, hole, Track-type facilities are arranged at intervals on supporting element in tourelle and hole in the hole, and tourelle includes being symmetrical arranged in the hole The sleeve in steel shaft is set in a pair of of earrings of supporting element two sides, the steel shaft between earrings and rotation.
By using above-mentioned technical proposal, water-conveyance tunnel lined steel pipe mounting structure is arranged in tunnel, when penstock installation Steel pipe is pressed on sleeve and steel shaft after steel pipe enters tunnel inside to pushing inside tunnel by puopulsion equipment, it will Sliding friction becomes rolling friction, makes what steel pipe can be quick and smooth in tunnel install, to solve straight tunnel Narrow space in penstock installation low efficiency the problem of, while rolling friction effectively reduces mill of the steel pipe in progradation Damage.Track-type facilities play the role of guide and limit during steel pipe transmission in hole, to guarantee the installation quality of steel pipe.
The utility model is further arranged to: the earrings is in Rectangular Plate Structure, and the upper end of earrings offers straight with steel shaft The compatible arc groove of diameter.
By using above-mentioned technical proposal, steel pipe is placed on earrings by arc groove, and the structure of rectangular plate-like can make Earrings is stable to be supported steel shaft.
The utility model is further arranged to: track-type facilities include two guided ways and are arranged at intervals on guiding in the hole Lacing wire between rail, two guided ways are erected at the two sides of supporting element by lacing wire.
By using above-mentioned technical proposal, lacing wire pulls and supports power to guided way application, improves the stability of the installation of guided way.
The utility model is further arranged to: the shape of the lacing wire is in U-shape, and tips upside down on supporting element.
By using above-mentioned technical proposal, the connection of track-type facilities and supporting element in hole is realized, to prevent guide rail in hole from filling Change in location occurs between setting, guarantees the guide effect to steel pipe.
The utility model is further arranged to: tourelle in one group of hole is arranged, every 3m every 1m on the supporting element Track-type facilities in one group of hole are set.
By using above-mentioned technical proposal, earrings is symmetrically welded at the two sides of supporting element, improves the stabilization of earrings installation Property;Tourelle ensure that the transport effect to steel pipe in hole, and track-type facilities ensure that the guide effect to steel pipe in hole, improve The installation effectiveness of steel pipe.
In conclusion the utility model has the following beneficial effects:
1, by being provided in hole track-type facilities in tourelle and hole on supporting element, the two cooperation can enable steel pipe Quick and stable promote, and can correct in time to the deviation occurred in progradation, makes steel pipe is quick and smooth to be mounted on In tunnel barrel;
2, by the way that supporting element is arranged in tunnel barrel, track-type facilities are arranged at intervals on support in tourelle and hole in hole On part, to prevent from occurring between track-type facilities in tourelle and hole in hole change in location, the Transportation Efficiency of steel pipe just ensure that Fruit.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment.
In figure, 1, supporting element;2, tourelle in hole;21, earrings;211, arc groove;22, steel shaft;23, sleeve;3, hole Interior track-type facilities;31, guided way;32, lacing wire.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment: a kind of water-conveyance tunnel lined steel pipe mounting structure, as shown in Figure 1, including rolling dress in supporting element 1, hole Track-type facilities 3 in 2 and hole are set, supporting element 1 is chosen as channel steel, and support that Open Side Down is on the ground.Tourelle 2 includes in hole Earrings 21, steel shaft 22 and sleeve 23, earrings 21 are rectangular plate-like structure, and two earrings 21 are one group, and the upper end of earrings 21 is opened Equipped with arc groove 211, sleeve 23 is set in steel shaft 22, and steel shaft 22 is placed in arc groove 211, completes tourelle 2 in hole Assembly;Wherein the diameter of steel shaft 22 is 60mm, and the diameter of sleeve 23 is 75mm, and the diameter of arc groove 211 is adapted to steel shaft 22. In order to guarantee fluency that sleeve 23 rotates in steel shaft 22, can between sleeve 23 and steel shaft 22 coating lubricating oil.
Track-type facilities 3 include two guided ways 31 in hole, and each guided way 31 is formed by two channel steel butt welding, guided way 31 Long 30cm;Multiple lacing wires 32 are evenly distributed between two guided ways along its length, the shape of lacing wire is in U-shape, and two are led The two sides of lacing wire 32 are symmetrically welded to rail 31.
Tourelle 2 arranges one group every 1m on supporting element 1 in hole, and track-type facilities 3 are on supporting element 1 every 3m in hole One group is arranged, specifically, the earrings 21 of tourelle 2 is symmetrically welded at the two sides of supporting element 12 in every group of hole, in this way, both mentioning The stability that high earrings 21 is installed, and prevent that change in location occurs between tourelle 2 in hole, it ensure that the transport to steel pipe Effect;Two guided ways 31 of track-type facilities 3 are erected on supporting element 1 by lacing wire 32 in hole, realize in hole track-type facilities 3 with The connection of supporting element 1 guarantees to draw the guide effect of steel pipe simultaneously to prevent from occurring between track-type facilities 3 in hole change in location Muscle 32 pulls and supports power to the application of guided way 31, improves the installation effect of guided way 31.
Water-conveyance tunnel lined steel pipe mounting structure is arranged in tunnel, when penstock installation by puopulsion equipment by steel pipe to tunnel It pushes inside hole, is pressed on sleeve 23 and steel shaft 22 after steel pipe enters tunnel inside, sliding friction is become rolling and is rubbed It wipes, makes what steel pipe can be quick and smooth in tunnel install, pacify to solve steel pipe in the narrow space of straight tunnel The problem of filling low efficiency, while rolling friction effectively reduces abrasion of the steel pipe in progradation.Guided way 31 is transported in steel pipe Play the role of guide and limit in defeated process, to guarantee the installation quality of steel pipe.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of water-conveyance tunnel lined steel pipe mounting structure, it is characterised in that: including tourelle (2) in supporting element (1), hole with And track-type facilities (3) in hole, track-type facilities (3) are arranged at intervals on supporting element (1) in tourelle (2) and hole in the hole, Tourelle (2) includes a pair of of the earrings (21) for being symmetricly set on supporting element (1) two sides, is set between earrings (21) in the hole Steel shaft (22) and rotation be set to steel shaft (22) on sleeve (23).
2. water-conveyance tunnel lined steel pipe mounting structure according to claim 1, it is characterised in that: the earrings (21) is in square The hardened structure of shape, the upper end of earrings (21) offer arc groove (211) compatible with steel shaft (22) diameter.
3. water-conveyance tunnel lined steel pipe mounting structure according to claim 1, it is characterised in that: supporting element (1) choosing For channel steel, setting that Open Side Down.
4. water-conveyance tunnel lined steel pipe mounting structure according to claim 1, it is characterised in that: track-type facilities in the hole (3) lacing wire (32) for including two guided ways (31) and being arranged at intervals between guided way (31), two guided ways (31) pass through Lacing wire (32) is erected at the two sides of supporting element (1).
5. water-conveyance tunnel lined steel pipe mounting structure according to claim 4, it is characterised in that: outside the lacing wire (32) Shape is in U-shape, and tips upside down on supporting element (1).
6. water-conveyance tunnel lined steel pipe mounting structure according to claim 4, it is characterised in that: the guided way (31) by Two channel steel butt welding are formed.
7. water-conveyance tunnel lined steel pipe mounting structure according to claim 1, it is characterised in that: on the supporting element (1) Tourelle (2) in one group of hole is set every 1m, track-type facilities (3) in one group of hole are set every 3m.
8. water-conveyance tunnel lined steel pipe mounting structure according to claim 1, it is characterised in that: the steel shaft (22) it is straight Diameter is 60mm, and the diameter of the sleeve (23) is 75mm.
CN201822247329.4U 2018-12-29 2018-12-29 A kind of water-conveyance tunnel lined steel pipe mounting structure Expired - Fee Related CN209654057U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822247329.4U CN209654057U (en) 2018-12-29 2018-12-29 A kind of water-conveyance tunnel lined steel pipe mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822247329.4U CN209654057U (en) 2018-12-29 2018-12-29 A kind of water-conveyance tunnel lined steel pipe mounting structure

Publications (1)

Publication Number Publication Date
CN209654057U true CN209654057U (en) 2019-11-19

Family

ID=68519664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822247329.4U Expired - Fee Related CN209654057U (en) 2018-12-29 2018-12-29 A kind of water-conveyance tunnel lined steel pipe mounting structure

Country Status (1)

Country Link
CN (1) CN209654057U (en)

Similar Documents

Publication Publication Date Title
RU2516667C2 (en) Device and system of pipeline installation
CN105479045A (en) External butt joint worktable of large-caliber pipes
CN102454827A (en) Pipeline transportation and installation method in tunnel or culvert
CN103032081A (en) Cross-river large-diameter slurry shield excavation and double-lining parallel construction method
CN106594388A (en) Pipe working platform and method for laying pipes by applying pipe working platform
CN105598630A (en) Hydraulic docking device used outside large-caliber gathering and transportation pipeline
CN212531167U (en) Simple material conveying device under mountain abrupt slope condition
CN113236853A (en) Equipment and method for installing hole-penetrating pipe in long-distance embankment-penetrating sleeve
CN108951642B (en) Reinforced structure capable of preventing foundation pit from rising and crossing existing tunnel and construction method
CN209369832U (en) Steel pipe behind fill concrete structure in a kind of tunnel
CN209654057U (en) A kind of water-conveyance tunnel lined steel pipe mounting structure
CN209724371U (en) A kind of water-conveyance tunnel narrow space lined steel pipe mounting structure
EP3324501B1 (en) Active cooling of cables with gaseous or liquid cooling media
CN117028730B (en) Device and method for repairing inner steel plate lining of large-caliber pipeline with middle guide pipe
JP7306619B2 (en) Main pipe conveying device into sheath pipe
JP2013126807A (en) Low floor rail facilities, truck, and non-open-cut construction method
JP2012188901A (en) Tunnel construction method and tunnel construction system
CN109505629A (en) Steel pipe behind fill concrete structure and construction method in a kind of tunnel
CN109469498B (en) Mounting structure of lining steel pipe in narrow space of water delivery tunnel and construction method of mounting structure
CN205355694U (en) Non - excavation cable push pipe
KR200381209Y1 (en) A welding steel guid structure of steel processing machinery for a circle rod structure
CN201982112U (en) Arch crown steel frame mounting device for construction
CN213177034U (en) Roller support for pipeline crossing top pipe and pipeline assembly
CN217440991U (en) Pipeline crossing device
CN220979545U (en) Auxiliary centering and grouting device for anchor rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191119

Termination date: 20211229