CN209647646U - A kind of drilling equipment of bridge construction - Google Patents

A kind of drilling equipment of bridge construction Download PDF

Info

Publication number
CN209647646U
CN209647646U CN201920367883.8U CN201920367883U CN209647646U CN 209647646 U CN209647646 U CN 209647646U CN 201920367883 U CN201920367883 U CN 201920367883U CN 209647646 U CN209647646 U CN 209647646U
Authority
CN
China
Prior art keywords
bridge
drill bit
clamp plate
scaffold
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920367883.8U
Other languages
Chinese (zh)
Inventor
杜新宁
马强
赵永立
杨超华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920367883.8U priority Critical patent/CN209647646U/en
Application granted granted Critical
Publication of CN209647646U publication Critical patent/CN209647646U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model embodiment discloses a kind of drilling equipment of bridge construction, including vertically disposed scaffold, bridge plate fixing piece and boring assemblies are horizontally installed on scaffold, bridge plate fixing piece is connected to the middle part of scaffold, boring assemblies are provided with two groups and are symmetricly set on the upper and lower of bridge plate fixing piece, boring assemblies include the fixed station connecting with scaffold, fixed station is connected with telescopic block by telescopic putter, driving motor is provided in telescopic block, the output shaft of driving motor is connected with drill bit, drilling depth limited post there are two being also connected in telescopic block, drilling depth limited post is located at the two sides of drill bit;The utility model is by carrying out bore operation to two pieces of bridge plates by upper and lower two drill bit two-way simultaneous, save drilling time, drilling efficiency is high, and bridge plate bidirectional stress is fixed without hand pressing, while it is not in that bridge plate assembles unmatched happen that the size position that drills, which is consistent,.

Description

A kind of drilling equipment of bridge construction
Technical field
The utility model embodiment is related to equipment for bridge construction technical field, and in particular to a kind of drilling of bridge construction Device.
Background technique
Bridge be it is a kind of facilitate traffic etc. pass through can not directly cross-domain region building, possess length in the world Remote development history, with the fast development of Modern Traffic industry, people begin through the vehicles and explore more and more regions, lead to The construction mankind for crossing bridge can overcome various limitations spatially, to reach the destination of exploration, so modern is often It is referred to as " bridge " successful opportunity is led to, in the architectural process of modern bridge, multiple bridge plates is needed to be fitting to connection to lead to Farther area, bridge plate it is chimeric during, generally require the drilling operating for being attached purpose.
The existing drilling equipment for bridge construction engineering have the defects that in design it is certain, firstly, general bridge Beam drilling equipment is often hand-held, needs manpower alignment target point to be pressed, then drill by screw rod, time-consuming to take Power, and it is unavoidable will appear operation error, influence project progress, if hole size position is inconsistent, will lead to bridge Part-structure assembles built on the sand, to influence the safety of bridge.
Utility model content
For this purpose, the utility model embodiment provides a kind of drilling equipment of bridge construction, it can by upper and lower two drill bits Bore operation is carried out to two pieces of bridge plates simultaneously, guarantees the matching of two pieces of bridge plates drilling, while bridge plate bearing up-down force is not necessarily to hand Pressing, it is time saving and energy saving, to solve the problems, such as that background technique is proposed.
To achieve the goals above, the embodiments of the present invention provides the following technical solutions:
A kind of drilling equipment of bridge construction, including vertically disposed scaffold are horizontally installed on the scaffold For fixing the bridge plate fixing piece of bridge plate and carrying out the boring assemblies of bore operation to bridge plate, the bridge plate fixing piece, which is connected to, to be applied The middle part of the movements and postures of actors, the boring assemblies are provided with two groups and are symmetricly set on the upper and lower of the bridge plate fixing piece;
The boring assemblies include the fixed station connecting with scaffold, and the fixed station is connected with flexible by telescopic putter Block is provided with driving motor in the telescopic block, and the output shaft of the driving motor is connected with drill bit, also connects in the telescopic block It connects there are two drilling depth limited post, the drilling depth limited post is located at the two sides of drill bit.
As a kind of preferred embodiment of the utility model, the bridge plate fixing piece by consistency of thickness upper clamp plate and lower clamp plate Composition, one end of the lower clamp plate is fixedly connected with scaffold, and the upper clamp plate is arranged in the upper surface of upper clamp plate, and it is described on Drill bit positioning through hole is offered on clamping plate and lower clamp plate.
As a kind of preferred embodiment of the utility model, the axis at the center of the drill bit positioning through hole and upper and lower two drill bits Line is overlapped, and the diameter of the through-hole is greater than the diameter of the drill bit.
As a kind of preferred embodiment of the utility model, the drilling depth limited post includes telescopic mast and is set in flexible Spacing collar outside column, and connected between the bottom of the spacing collar and the bottom of the telescopic mast by spring.
As a kind of preferred embodiment of the utility model, the difference etc. of the height of the height of the drill bit and the spacing collar In the sum of bridge plate and the thickness of upper clamp plate or lower clamp plate.
The embodiments of the present invention has the advantages that
Two pieces of bridge plates are fixed on centre by bridge plate fixing piece by the utility model, and are all provided in the upper and lower of bridge plate fixing piece It is equipped with drill bit, bore operation is carried out to two pieces of bridge plates by upper and lower two drill bit two-way simultaneous, saves drilling time, drilling efficiency Height, bridge plate bidirectional stress are fixed without hand pressing, at the same the size position that drills be consistent be not in bridge plate assembly not With the case where occur.
Detailed description of the invention
It, below will be to reality in order to illustrate more clearly of the embodiments of the present invention or technical solution in the prior art It applies mode or attached drawing needed to be used in the description of the prior art is briefly described.It should be evident that attached in being described below Figure is only exemplary, for those of ordinary skill in the art, without creative efforts, can be with It is extended according to the attached drawing of offer and obtains other implementation attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for Those skilled in the art understands and reads, and is not intended to limit the utility model enforceable qualifications, therefore does not have technology On essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the utility model institute energy Under the effect of generation and the purpose that can reach, it should all still fall in the revealed technology contents of the utility model and obtain the model that can cover In enclosing.
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the enlarged structure schematic diagram of the drilling depth limit column of the utility model;
Fig. 3 is the schematic perspective view of the bridge plate fixing piece of the utility model.
In figure:
1- scaffold;2- bridge plate fixing piece;3- fixed station;4- telescopic putter;5- telescopic block;6- driving motor;7- drill bit; 8- drilling depth limited post;
21- upper clamp plate;22- lower clamp plate;23- drill bit positioning through hole;
81- telescopic mast;82- spacing collar.
Specific embodiment
The embodiments of the present invention is illustrated by particular specific embodiment below, those skilled in the art can be by this Content disclosed by specification understands other advantages and effect of the utility model easily, it is clear that described embodiment is The utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the utility model protection Range.
As shown in Figure 1 to Figure 3, the utility model provides a kind of drilling equipment of bridge construction, including is vertically arranged Scaffold 1, be horizontally installed with the bridge plate fixing piece 2 for fixing bridge plate on the scaffold 1 and drilling work carried out to bridge plate The boring assemblies of industry, the bridge plate fixing piece 2 are connected to the middle part of scaffold 1, and the boring assemblies are provided with two groups and symmetrical The upper and lower of the bridge plate fixing piece 2 is set.
The utility model disposably can carry out bore operations to two pieces of bridge plates, by bridge plate fixing piece 2 to two pieces of bridge plates into Row is fixed, then is drilled simultaneously to bridge plate by upper and lower two boring assemblies, and drilling time is saved in two-way drilling, improves brill Hole efficiency, and ensure that the consistency of bore position and the size that drills, it is assembled convenient for bridge plate.
Specifically, the boring assemblies include the fixed station 3 connecting with scaffold 1, and the fixed station 3 passes through telescopic putter 4 are connected with telescopic block 5, and driving motor 6 is provided in the telescopic block 5, and the output shaft of the driving motor 6 is connected with drill bit 7.
The bridge plate fixing piece 2 is made of the upper clamp plate 21 and lower clamp plate 22 of consistency of thickness, one end of the lower clamp plate 22 It is fixedly connected with scaffold 1, the upper surface of upper clamp plate 21 is arranged in for fixing bridge plate, and the upper clamp plate in the upper clamp plate 21 21 and lower clamp plate 22 on offer drill bit positioning through hole 23.
When the utility model is used, the bridge plate superposition of two pieces of connections to be assembled is fixed on upper clamp plate 21 and lower folder first Between plate 22, and its position hole to be drilled is directed at drill bit positioning through hole 23, under the elongation effect of telescopic putter 4, upper and lower two A drill bit 7 rotates inward advance by drill bit positioning through hole 23 respectively, until drill successfully, the drilling size of two pieces of bridge plates, position It sets and is consistent, convenient for assembly.
Herein, because two pieces of bridge plates stress simultaneously up and down, reduces and require the fixed of bridge plate fixing piece 2, without Artificial hand pressing, lower clamp plate 22 plays the role of support to bridge plate, and upper clamp plate 21 is placed on the upper surface pair of lower clamp plate 22 Bridge plate plays the role of certain pressure, and upper clamp plate 21 and lower clamp plate 22 can have some strength and again using steel plate, iron plate etc. The plate of amount.
In order to guarantee the positioning accuracy of drill bit positioning through hole 23 and the drilling proper alignment of upper and lower two pieces of bridge plates, the brill The center of head positioning through hole 23 should be overlapped with the axis of upper and lower two drill bits 7, and the diameter of the drill bit positioning through hole 23 is greater than The diameter of the drill bit 7.
As the further preferred of the utility model, the utility model be also connected in the telescopic block 5 there are two drilling Depth limited post 8, the drilling depth limited post 8 are located at the two sides of drill bit 7, and the drilling depth limited post 8 includes stretching Contracting column 81 and the spacing collar 82 being set in outside telescopic mast 81, and the bottom of the spacing collar 82 and the telescopic mast 81 It is connected between bottom by spring 83.
In bore operation, telescopic mast receives pressure effect constantly to spacing collar internal contraction until being fully inserted into limit The inside of sleeve, thus drill depth capacity be equal to drill bit height subtract spacing collar height subtract again upper clamp plate or The height of lower clamp plate.
In order to avoid upper and lower two drill bits 7 are turning to move on after drilling to two pieces of bridge plates respectively, collide with each other, it is described The difference of the height of drill bit 7 and the height of the spacing collar 82 be equal to bridge plate and upper clamp plate 21 or lower clamp plate 22 thickness it With.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, these modifications or improvements on the basis of without departing from the spirit of the present invention, belong to the utility model and want Seek the range of protection.

Claims (5)

1. a kind of drilling equipment of bridge construction, including vertically disposed scaffold (1), which is characterized in that the scaffold (1) it is horizontally installed with the bridge plate fixing piece (2) for fixing bridge plate on and carries out the boring assemblies of bore operation to bridge plate, it is described Bridge plate fixing piece (2) is connected to the middle part of scaffold (1), and the boring assemblies are provided with two groups and are symmetricly set on the bridge plate The top and bottom of fixing piece (2);
The boring assemblies include the fixed station (3) connecting with scaffold (1), and the fixed station (3) is connected by telescopic putter (4) It is connected to telescopic block (5), is provided with driving motor (6) in the telescopic block (5), the output shaft of the driving motor (6) is connected with Drill bit (7), is also connected with that there are two drilling depth limited post (8), the drilling depth limited posts (8) point on the telescopic block (5) Not Wei Yu drill bit (7) two sides.
2. a kind of drilling equipment of bridge construction according to claim 1, which is characterized in that the bridge plate fixing piece (2) it is made of the upper clamp plate of consistency of thickness (21) and lower clamp plate (22), one end of the lower clamp plate (22) and scaffold (1) are fixed Connection, the upper clamp plate (21) are arranged in the upper surface of upper clamp plate (21), and on the upper clamp plate (21) and lower clamp plate (22) Offer drill bit positioning through hole (23).
3. a kind of drilling equipment of bridge construction according to claim 2, which is characterized in that the drill bit positioning through hole (23) axis at center and upper and lower two drill bits (7) is overlapped, and the diameter of the drill bit positioning through hole (23) is greater than the brill The diameter of head (7).
4. a kind of drilling equipment of bridge construction according to claim 1, which is characterized in that the drilling depth limit Column (8) includes telescopic mast (81) and is set in the external spacing collar (82) of telescopic mast (81), and the spacing collar (82) It is connected between bottom and the bottom of the telescopic mast (81) by spring (83).
5. a kind of drilling equipment of bridge construction according to claim 4, which is characterized in that the height of the drill bit (7) The difference of the height of degree and the spacing collar (82) is equal to the sum of the thickness of bridge plate and upper clamp plate (21) or lower clamp plate (22).
CN201920367883.8U 2019-03-22 2019-03-22 A kind of drilling equipment of bridge construction Expired - Fee Related CN209647646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920367883.8U CN209647646U (en) 2019-03-22 2019-03-22 A kind of drilling equipment of bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920367883.8U CN209647646U (en) 2019-03-22 2019-03-22 A kind of drilling equipment of bridge construction

Publications (1)

Publication Number Publication Date
CN209647646U true CN209647646U (en) 2019-11-19

Family

ID=68527655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920367883.8U Expired - Fee Related CN209647646U (en) 2019-03-22 2019-03-22 A kind of drilling equipment of bridge construction

Country Status (1)

Country Link
CN (1) CN209647646U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112620813A (en) * 2020-12-26 2021-04-09 广州奕极机电科技有限公司 Building steel plate perforating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112620813A (en) * 2020-12-26 2021-04-09 广州奕极机电科技有限公司 Building steel plate perforating device

Similar Documents

Publication Publication Date Title
CN108104832B (en) underground engineering assembled confined concrete arch center and mechanized construction method
CN206844322U (en) Rigid connection node of steel pipe column and H-shaped steel beam
CN209647646U (en) A kind of drilling equipment of bridge construction
CN105862589A (en) Manufacturing method for broken-line-shaped double-joint stud welded chord member with anchor boxes
CN208467319U (en) A kind of plate rapid drilling device
CN208330185U (en) A kind of subway work rotary drilling rig drilling pouring pile hole device
CN202969589U (en) H-type steel beam and rectangular steel tube column variable-beam depth assembly type node
CN205421562U (en) H type cantilever girder steel post mosaic structure
CN207057656U (en) A kind of drilling equipment of the quick anglec of rotation
CN110315267B (en) Tower crane slice type standard knot assembly welding positioning tool
CN212984177U (en) Prefabricated building structure post
CN208276888U (en) A kind of device for the quick accurate integral marking of transverse and longitudinal beam
CN209482461U (en) A kind of steel-structure beam-column node attachment device
CN106638945A (en) Six-rod-tetrahedral-module-unit assembled cover-plate-and-bolt-connected sphere joint and assembling method thereof
CN206219078U (en) A kind of novel modularized attaching frame of tower crane
CN207127563U (en) A kind of round steel symmetrical holes perforate fixture
CN201165636Y (en) Crawl type cable robot clamp device
CN206815191U (en) A kind of full framing space beam-ends cable guide pipe positioner
CN213419045U (en) Self-connection type spiral drill rod
CN216633177U (en) Positioning assembly welding tool for connecting sleeve of main chord member of standard knot of tower crane
CN213143042U (en) Reinforcing apparatus of building engineering pile foundation
CN212477706U (en) Precast concrete square pile joint convenient to cup joint
CN219826749U (en) Drilling and workover derrick assembly
CN218990160U (en) Static pressure guiding hole integrated tubular pile sinking equipment
CN206110364U (en) Main couple and jack truss splicing joint structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211029

Address after: 410000 No. 158 Zhongyi Road, Yuhua District, Changsha, Hunan

Patentee after: CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 264200 No. 18, Taihe mansion, Shanhua, Weihai Economic and Technological Development Zone, Shandong Province

Patentee before: Du Xinning

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191119

CF01 Termination of patent right due to non-payment of annual fee