CN209354088U - A kind of circulation brill construction slag removal tool - Google Patents

A kind of circulation brill construction slag removal tool Download PDF

Info

Publication number
CN209354088U
CN209354088U CN201822114866.1U CN201822114866U CN209354088U CN 209354088 U CN209354088 U CN 209354088U CN 201822114866 U CN201822114866 U CN 201822114866U CN 209354088 U CN209354088 U CN 209354088U
Authority
CN
China
Prior art keywords
bucket
steel strand
strand wires
removal tool
slag removal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822114866.1U
Other languages
Chinese (zh)
Inventor
张宇
赵三宝
赵省建
冉国建
张自欣
冯建庭
徐超
李宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Third Railway Survey and Design Institute Group Corp
Third Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Third Railway Survey and Design Institute Group Corp filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201822114866.1U priority Critical patent/CN209354088U/en
Application granted granted Critical
Publication of CN209354088U publication Critical patent/CN209354088U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

A kind of circulation brill construction slag removal tool, belong to drilled pile construction ancillary equipment technology, when can solve to encounter stone or bulk residue in drilling in circulating driller work progress, the problem of influencing construction quality and efficiency, including connecting rod and bore bucket, it is described to bore the closed at one end of bucket, another end opening, one end of connecting rod is connect with the top for boring bucket, the other end is equipped with the connector connecting with drilling rod, the outer diameter for boring bucket is less than the diameter of drilled pile, the inner sidewall bottom 5-8cm that distance bores bucket open end is equipped with several slanting steel strand wires, steel strand wires are arranged circumferentially about along the inner sidewall for boring bucket, the other end of steel strand wires is free end.The utility model may replace drill bit and connect with drilling rod, to achieve the purpose that scarfing cinder in access aperture.

Description

A kind of circulation brill construction slag removal tool
Technical field
The utility model belongs to drilled pile construction ancillary equipment technology, and in particular to a kind of circulation brill construction clinkerer Tool.
Background technique
When carrying out drilled pile construction using abrasion drill, there are commonly circulation drills and clean-out machine, using alloy Drill bit, rock bit, roller cutter bit drilling.But no matter bored using which kind of circulation, when encountering stone or bulk residue, drilling speed Degree slowly easily causes that drilling rod twists off, motor is burnt out.When encountering such situation in normal conditions, worker can use and mention repeatedly Brill bores the mode coaxd and pesterd unceasingly down and carries out, until stone is extruded on one side.However this method and its waste time, effect is paid no attention to Want there is certain influence to the quality of drilling, mentions repeatedly and bore aperture easy to increase or cause collapse hole, virtually increase construction cost.
Summary of the invention
When the utility model is for stone or bulk residue is encountered in drilling in circulating driller work progress, construction quality is influenced And the problem of efficiency, a kind of circulation brill construction slag removal tool is provided.
The utility model adopts the following technical solution:
A kind of circulation brill construction slag removal tool, including connecting rod and brill bucket, described to bore the closed at one end of bucket, the other end is opened Mouthful, one end of connecting rod is connect with the top for boring bucket, and the other end is equipped with the connector connecting with drilling rod, and the outer diameter for boring bucket, which is less than, to be bored The diameter of hole stake, the inner sidewall bottom 5-8cm that distance bores bucket open end are equipped with several slanting steel strand wires, and steel strand wires are along brill bucket Inner sidewall be arranged circumferentially about, the other ends of steel strand wires is free end.
The connecting rod and the link position for boring bucket are located at the center for boring bucket, guarantee not deviate in boring procedure.
The connecting rod and the connecting pin for boring bucket are set there are four slanting stiffening plate, and one end of stiffening plate and connecting rod connect Connect, the other end with bore bucket top connect, stiffening plate is arranged circumferentially about centered on connecting rod, can play processing connecting rod with Bore the connection of bucket.
The outer diameter for boring bucket is 5-10cm smaller than the diameter of drilled pile, guarantees the progress of drilling.
The steel strand wires and the angle for boring bucket bottom are 15-20 °, guarantee that residue is not fallen out.
Several steel strand wires are equally spaced along the inner wall for boring bucket.
The spacing of the connecting pin of the steel strand wires and the inner sidewall of brill bucket open end is 10cm, guarantees that residue enters brill bucket.
Spacing between the free end of the steel strand wires is less than 10cm, guarantees that residue is not fallen out.
The beneficial effects of the utility model are as follows:
1. the utility model structure is simple, easy to use.
2. the utility model may replace drill bit and connect with drilling rod, to achieve the purpose that scarfing cinder in access aperture.
3. the utility model is reusable, scarfing cinder when encountering stone or bulk residue during drilling in circulating driller It uses, stone can be entered in steel drum during the utility model rotates by lower mouth, and steel strand wires are able to maintain well Rigidity prevents stone from falling.It can be good at achieving the effect that quick scarfing cinder.
Detailed description of the invention
Fig. 1 is the utility model schematic view of the front view;
Fig. 2 is the steel drum present invention looks up structural representation of the utility model;
Fig. 3 is the utility model use state diagram I;
Wherein: 1- connecting rod;2- bores bucket;3- connector;4- steel strand wires;5- stiffening plate.
Specific embodiment
In conjunction with attached drawing, the utility model is described further.
A kind of circulation brill construction slag removal tool, including connecting rod 1 and brill bucket 2, closed at one end, the other end for boring bucket 2 Opening, one end of connecting rod 1 are connect with the top for boring bucket 2, and the other end is equipped with the connector 3 connecting with drilling rod, bores the outer diameter of bucket 2 Less than the diameter of drilled pile, the inner sidewall bottom 5-8cm that distance bores 2 open end of bucket is equipped with several slanting steel strand wires 4, steel strand wires 4 are arranged circumferentially about along the inner sidewall for boring bucket 2, and the other end of steel strand wires 4 is free end.
The connecting rod 1 and the connecting pin for boring bucket 2 set that there are four slanting stiffening plate 5, one end of stiffening plate 5 and connecting rods 1 connection, the other end are connect with the top for boring bucket 2, and stiffening plate 5 is arranged symmetrically centered on connecting rod 1.
The connecting rod 1 is located at the center for boring bucket 2 with the link position for boring bucket 2.
The outer diameter for boring bucket 2 is 5-10cm smaller than the diameter of drilled pile.
The steel strand wires 4 and the angle of brill 2 bottom of bucket are 15-20 °.
Several steel strand wires 4 are equally spaced along the inner wall for boring bucket 2.
The spacing of the steel strand wires 4 and the connecting pin for the inner sidewall for boring 2 open end of bucket is 10cm.
Spacing between the free end of the steel strand wires 4 is less than 10cm.
Wherein, by the steel plate rolling into barrel-shape of 2cm thickness, diameter can be determined according to drilled pile diameter.Steel drum is suitable for reading to be welded with steel plate It connects and shuts, and connect with the connecting rod of 1m long, while four blocks of reinforcement steel plates are welded in junction.Lower one circle steel strand wires of mouth welding, Together away from 10cm, and there is a inclination angle to inboard.In use, circulation drill bit is removed, the utility model is changed into, it is straight to increase drilling rod To bottom hole is goed deep into, circulation bores rotation, and stone is rotated into steel drum with the utility model.It is proposed dross extractor, Gong Renyong Iron hook removes stone and residue.It is set aside after use, to use next time.

Claims (8)

1. a kind of circulation bores construction slag removal tool, it is characterised in that: including connecting rod (1) and bucket (2) are bored, brill bucket (2) Closed at one end, another end opening, one end of connecting rod (1) connect with the top for boring bucket (2), and the other end with drilling rod equipped with connecting Connector (3), the outer diameter for boring bucket (2) are less than the diameter of drilled pile, and the inner sidewall bottom 5-8cm that distance bores bucket (2) open end is set Have several slanting steel strand wires (4), steel strand wires (4) are arranged circumferentially about along the inner sidewall for boring bucket (2), steel strand wires (4) it is another End is free end.
2. a kind of circulation according to claim 1 bores construction slag removal tool, it is characterised in that: the connecting rod (1) and brill The connecting pin of bucket (2) is set there are four slanting stiffening plate (5), and one end of stiffening plate (5) is connect with connecting rod (1), the other end and The top connection of bucket (2) is bored, stiffening plate (5) is arranged symmetrically centered on connecting rod (1).
3. a kind of circulation according to claim 1 bores construction slag removal tool, it is characterised in that: the connecting rod (1) and brill The link position of bucket (2) is located at the center for boring bucket (2).
4. a kind of circulation according to claim 1 bores construction slag removal tool, it is characterised in that: the outer diameter for boring bucket (2) It is 5-10cm smaller than the diameter of drilled pile.
5. a kind of circulation according to claim 1 bores construction slag removal tool, it is characterised in that: the steel strand wires (4) and brill The angle of bucket (2) bottom is 15-20 °.
6. a kind of circulation according to claim 1 bores construction slag removal tool, it is characterised in that: several steel strand wires (4) It is equally spaced along the inner wall for boring bucket (2).
7. a kind of circulation according to claim 1 bores construction slag removal tool, it is characterised in that: the steel strand wires (4) and brill The spacing of the connecting pin of the inner sidewall of bucket (2) open end is 10cm.
8. a kind of circulation according to claim 1 bores construction slag removal tool, it is characterised in that: the steel strand wires (4) from 10cm is less than by the spacing between end.
CN201822114866.1U 2018-12-17 2018-12-17 A kind of circulation brill construction slag removal tool Active CN209354088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822114866.1U CN209354088U (en) 2018-12-17 2018-12-17 A kind of circulation brill construction slag removal tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822114866.1U CN209354088U (en) 2018-12-17 2018-12-17 A kind of circulation brill construction slag removal tool

Publications (1)

Publication Number Publication Date
CN209354088U true CN209354088U (en) 2019-09-06

Family

ID=67799093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822114866.1U Active CN209354088U (en) 2018-12-17 2018-12-17 A kind of circulation brill construction slag removal tool

Country Status (1)

Country Link
CN (1) CN209354088U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116695714A (en) * 2023-08-08 2023-09-05 四川智能建造科技股份有限公司 Rectangular pile foundation hole waste residue cleaning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116695714A (en) * 2023-08-08 2023-09-05 四川智能建造科技股份有限公司 Rectangular pile foundation hole waste residue cleaning device
CN116695714B (en) * 2023-08-08 2023-11-07 四川智能建造科技股份有限公司 Rectangular pile foundation hole waste residue cleaning device

Similar Documents

Publication Publication Date Title
CN104832120B (en) Drill extractor of bored pile and method
CN110952986B (en) Shaft secondary expanding excavation method based on steel platform
CN102704852A (en) Hinged drill with openable and closable inner core
CN209354088U (en) A kind of circulation brill construction slag removal tool
CN105863499B (en) A kind of mine special synchronous rig
CN103277037A (en) Pipe pile leading-hole construction method under boulder cluster geological condition
CN215057213U (en) Rotary drill hole slag discharging and dust removing device with sealing device
CN215213380U (en) Hole opening slag discharging device of rotary drill
CN102409978A (en) Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction
CN220415262U (en) Rotary drilling variable-diameter pilot bit
CN112360468A (en) Excavation supporting method for vertical shaft slag sliding well
CN214033711U (en) Rotary drilling bit for removing waste pile
CN109403326A (en) Serious collapse hole occurs based on drilled pile and takes out steel reinforcement cage method
CN113931572B (en) Construction method of large-diameter pile foundation of composite stratum and drill bit system
CN216305830U (en) Rotary excavating type waste pile accurate cutting drill bit
CN215520782U (en) Novel rotary drilling primary-secondary drilling tool
CN105780783B (en) High inclination-angle abrupt slope rock forming construction method thereof
CN214118088U (en) Hole forming device for breaking old pile to improve land utilization rate
US5366029A (en) Large shaft over-reamer apparatus and method
CN210888805U (en) A reaming instrument for drill bit well falling is salvaged
CN207131362U (en) A kind of rig bit freezing processing unit
CN109837902A (en) A kind of application of hydraulic drill rig taper bit in processing steel-pipe pile base opening crimping
CN206503561U (en) A kind of drill bit for geotechnical boring
CN1258787A (en) Core-storing double circular auger
CN205349230U (en) A anti - drill bit that circulates for pile foundation drilling construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant