A kind of air draught screening structure for conveying for tieing up code printing of receiving
Technical field
The utility model relates to receive dimension code printing technical field, specially it is a kind of receive dimension code printing air draught screening conveying
Structure.
Background technique
It receives and ties up the code technological incorporation new-generation digital identification technology of nano material technology, photon technology and information technology,
By the way that Deta bearer in nano microcrystalline material, is formed amalgamation label in body surface, then carry out by special optical means
The quick identification of data.However it is existing receive dimension code printing device, need to receive dimension to needing to print in different stations respectively
The body surface of code printed, detected, baking process, and it is complicated to make entire print routine, so that receiving the printing effect of dimension code
Rate is low.
Summary of the invention
In view of the above-mentioned problems, the utility model provides a kind of air draught screening structure for conveying received and tie up code printing, it is applicable in
In in the case where slab construction printout surface receives dimension code, can rapidly and efficiently complete to receive printing, detection, the drying of dimension code, mention
High printing effect.
A kind of air draught screening structure for conveying for tieing up code printing of receiving, it is characterised in that: it includes frame body, the rack sheet
It is provided with material path on the length direction of body, the front end of the material path, which is disposed with, puts object and send object device, after the material path
End is disposed with material storing box, and the material path includes first circulation material strip, second circulation material strip, and the first circulation material strip passes through conveying
Roller, live-roller assemble to form closed material strip, and the second circulation material strip forms closed material strip, institute by corresponding live-roller
The external stepper motor of conveying roller is stated, striker plate, the striker plate are provided between the first circulation material strip, second circulation material strip
Lower part be provided with shaft, the shaft lower part is connected with corresponding screening motor by crank structure, and the striker plate is just
Splice with the first circulation material strip, second circulation material strip in same plane under normal state, the underface setting of the striker plate
There is oblique stock guide, the end of the oblique stock guide is provided with scrap collecting tank, the first circulation material strip second circulation material
The surface of band is evenly equipped with sucker, composed by the first circulation material strip it is interior it is intracavitary be provided with independent first shell, described
Composed by two cycle stock bands it is interior it is intracavitary be provided with independent second shell, the first shell, second shell side pass through
Pipeline is external to exhaust fan, the first shell, second shell upper surface be sky, the exhaust fan pumping is so that cycle stock band
Upper surface adsorb corresponding slab construction, the forward position of the first circulation material strip is provided with printing device station, institute
The printing device for stating printing device station is installed on the output end of three axle robert, and the printing portion of the printing device is taken pictures
It is partially toward the slab construction arrangement of lower section, the three axle robert is specially XYZ three axle robert, institute's second circulation material strip
Position directly above is provided with baking and curing station.
It is further characterized by:
It is described to put object and object device is sent to specifically include two side baffles, thickness adjustment device, the thickness adjustment device
The slab construction for ensuring that single enters material path is one;
The length direction both ends of the first circulation material strip are provided with corresponding driving front roller, conveying roller, the conveying roller
Side the shaft of bull wheel is driven by belt wheel, conveying band connection, the shaft of the transmission bull wheel is external by steamboat, conveyer belt
The output wheel of stepper motor, the transmission bull wheel, the reduction ratio collocation for being driven steamboat, it is ensured that after the output of stepper motor rotation
The transmitting range of cycle stock band can facilitate adjustment;
The front transfer roller of the second circulation material strip connects the first circulation material by the convex synchronous belt wheel structure in side
The respective side raised strips wheel of the conveying roller of band, so that first circulation material strip, second circulation material strip synchronization action and only needing a stepping
Motor, save the cost;
The XYZ three axle robert includes the X-axis guide rail arranged along material path two sides, crossbeam, the both ends point of the crossbeam
The X-axis guide rail is not installed in by guideway cooperation, wherein one end of the X-axis guide rail of side is disposed with X-axis motor, the X
Spindle motor connects the bottom X-axis nut of the crossbeam corresponding position by X-axis wire rod thread, and the front end face of the crossbeam is provided with
Y-axis guide rail seat, the end of the Y-axis guide rail seat are provided with y-axis motor, and the front end face of the Y-axis guide rail seat is provided with Y-axis and leads
Rail, Z axis mounting base are installed in corresponding Y-axis guide rail by guideway cooperation, and the y-axis motor is connected by Y-axis wire rod thread
The Y-axis nut of the Z axis mounting base corresponding end surface, the Z axis mounting base be provided with vertically to Z axis guide rail, printing device peace
Dress seat is installed in the Z axis guide rail by guideway cooperation, and the printing device is installed in the printing device mounting base, Z axis
Motor is installed on the upper end of the Z axis mounting base, and the Z axis motor connects the printing device installation by Z axis wire rod thread
The Z axis nut of seat corresponding position;
Several binders are respectively arranged on the length direction of the upper surface of the first circulation material strip, second circulation material strip to lead
To roller, it is ensured that the tiled state of slab construction;
The baking and curing device of the baking and curing station is installed in the surface of second circulation material strip by mounting bracket;
Be placed with exhaust fan in the frame body inner space, the bottom of the frame body be provided with roller structure,
Support foot is adjusted, ensure total facilitates carrying, fixation;
The forward position of the striker plate is provided with nip rolls, it is ensured that unqualified slab construction is under striker plate raised position
It enters oblique stock guide, eventually enter into scrap collecting tank.
After the utility model, slab construction is passed through later by putting object and object device being sent to enter in material path
The work of exhaust fan, so that slab construction is adsorbed, corresponding to stepper motor stepping work conveying slab construction to printing device
Print area, printing device makes printing device alignment need the slab construction that prints under the correction of XYZ three axle robert
Corresponding surface domain, later printing device complete printing, after the completion of printing, printing device synchronous photo taking, and then complete for printing
Whether He Ge judgement, stepper motor driving, qualified slab construction smoothly passes striker plate, so that slab construction enters baking
The region of material path corresponding to dry solidification equipment, baking and curing device work, completes the solidification for ink, later stepper motor
Drive again so that be completed receive dimension code printing and cured slab construction enter in material storing box, when printing device detects
After slab construction printing is unqualified, synchronous driving detection motor action, so that detection motor driven striker plate overturning, so that
Unqualified slab construction enters oblique stock guide, eventually enters into scrap collecting tank, without carrying out subsequent baking process;To sum up,
It is suitable in the case where slab construction printout surface receives dimension code, can rapidly and efficiently completing to receive printing, detection, the baking of dimension code
It is dry, improve printing effect.
Detailed description of the invention
Fig. 1 is one structural schematic diagram of perspective view of the utility model;
Fig. 2 is two structural schematic diagram of perspective view of the utility model;
Fig. 3 is the side view figure structure schematic representation of the utility model;
Title corresponding to serial number is as follows in figure:
Frame body 1 puts object and send object device 2, material storing box 3, first circulation material strip 4, second circulation material strip 5, defeated
Send roller 6, striker plate 7, shaft 8, crank structure 9, screening motor 10, oblique stock guide 11, scrap collecting tank 12, sucker 13, pipe
Road 14, exhaust fan 15, printing device station 16, XYZ three axle robert 17, X-axis guide rail 171, crossbeam 172, X-axis motor 173, Y
Spindle guide rail chair 174, y-axis motor 175, Y-axis guide rail 176, Z axis mounting base 177, Z axis guide rail 178, printing device mounting base 179, Z
Spindle motor 180, baking and curing station 18, baffle 19, thickness adjustment device 20, driving front roller 21, conveyer belt 22, transmission bull wheel
23, shaft 24, synchronous belt wheel structure 25, front transfer roller 26, binder guide roller 27, mounting bracket 28, roller structure 29, adjusting
Support foot 30, nip rolls 31.
Specific embodiment
A kind of receive ties up the air draught screening structure for conveying that code prints, and see Fig. 1-Fig. 3: it includes frame body 1, frame body 1
Length direction on be provided with material path, the front end of material path, which is disposed with, puts object and send object device 2, and the rear end of material path is disposed with storage
Hopper 3, material path include first circulation material strip 4, second circulation material strip 5, and first circulation material strip 4 is assembled by conveying roller 6, live-roller
Closed material strip is formed, second circulation material strip 5 forms closed material strip, the external stepping electricity of conveying roller 6 by corresponding live-roller
Machine, is provided with striker plate 7 between first circulation material strip 4, second circulation material strip 5, the lower part of striker plate 7 is provided with shaft 8, shaft
8 lower parts are connected with corresponding screening motor 10 by crank structure 9, striker plate 7 in normal state with first circulation material strip 4,
Second circulation material strip 5 splices in same plane, and the underface of striker plate 7 is provided with oblique stock guide 11, oblique stock guide 11
End is provided with scrap collecting tank 12, first circulation material strip 4, second circulation material strip 5 surface be evenly equipped with sucker 13, first circulation
Composed by material strip 4 it is interior it is intracavitary be provided with independent first shell, it is interior composed by second circulation material strip 5 intracavitary to be provided with independence
Second shell, first shell, second shell side exhaust fan 15, first shell, second shell are external to by pipeline 14
Upper surface be sky, exhaust fan 15 be evacuated so that the upper surface of cycle stock band adsorbs corresponding slab construction, first circulation material
Forward position with 4 is provided with printing device station 16, and the printing device (drawing in figure) of printing device station 16 is installed on
The output end of three axle robert, the printing portion of printing device, taking pictures is partially toward the slab construction arrangement of lower section, three shaft mechanicals
Hand is specially XYZ three axle robert 17, and the position directly above of institute's second circulation material strip 5 is provided with baking and curing station 18.
It puts object and object device 2 is sent to specifically include two side baffles 19, thickness adjustment device 20, thickness adjustment device 20 is true
The slab construction that declaration form time enters material path is one;
The length direction both ends of first circulation material strip 4 are provided with corresponding driving front roller 21, conveying roller 6, and the one of conveying roller 6
Side is driven the shaft 24 of bull wheel 23 by belt wheel, the connection of conveyer belt 22, and the shaft 24 of transmission bull wheel 23 passes through transmission steamboat, transmission
Output wheel with external stepper motor, transmission bull wheel 23, the reduction ratio collocation for being driven steamboat, it is ensured that the output of stepper motor rotation
The transmitting range of cycle stock band afterwards can facilitate adjustment;
The front transfer roller 26 of second circulation material strip 5 connects first circulation material strip 4 by the convex synchronous belt wheel structure 25 in side
Conveying roller 6 respective side raised strips wheel so that first circulation material strip 4,5 synchronization action of second circulation material strip and only need one step
Into motor, save the cost
XYZ three axle robert 17 includes the X-axis guide rail 171 arranged along material path two sides, crossbeam 172, the both ends of crossbeam 172
X-axis guide rail 171 is installed in by guideway cooperation respectively, wherein one end of the X-axis guide rail 171 of side is disposed with X-axis motor
173, X-axis motor 173 passes through the bottom X-axis nut of 172 corresponding position of X-axis wire rod thread connecting cross beam, the front end face of crossbeam 172
It is provided with Y-axis guide rail seat 174, the end of Y-axis guide rail seat 174 is provided with y-axis motor 175, and the front end face of Y-axis guide rail seat 174 is set
It is equipped with Y-axis guide rail 176, Z axis mounting base 177 is installed in corresponding Y-axis guide rail 176 by guideway cooperation, and y-axis motor 175 is logical
Cross Y-axis wire rod thread connection 177 corresponding end surface of Z axis mounting base Y-axis nut, Z axis mounting base 177 be provided with vertically to Z axis
Guide rail 178, printing device mounting base 179 are installed in Z axis guide rail 178 by guideway cooperation, and printing device is installed in printing and sets
Standby mounting base 179, Z axis motor 180 are installed on the upper end of Z axis mounting base 179, and Z axis motor 180 is connected by Z axis wire rod thread
The Z axis nut of 179 corresponding position of printing device mounting base;
Several binder guiding are respectively arranged on the length direction of the upper surface of first circulation material strip 4, second circulation material strip 5
Roller 27, it is ensured that the tiled state of slab construction;
The baking and curing device of baking and curing station 18 by mounting bracket 28 be installed in second circulation material strip 5 just on
Side;
Exhaust fan 15 is placed in 1 inner space of frame body, the bottom of frame body 1 is provided with roller structure 29, adjusts
Support foot 30 is saved, ensure total facilitates carrying, fixation;
The forward position of striker plate 7 is provided with nip rolls 31, it is ensured that unqualified slab construction is under 7 raised position of striker plate
It enters oblique stock guide 11, eventually enter into scrap collecting tank 12.
Slab construction include but is not limited to be paper, steel thin plate.
After the utility model, slab construction is passed through later by putting object and object device being sent to enter in material path
The work of exhaust fan, so that slab construction is adsorbed, corresponding to stepper motor stepping work conveying slab construction to printing device
Print area, printing device makes printing device alignment need the slab construction that prints under the correction of XYZ three axle robert
Corresponding surface domain, later printing device complete printing, after the completion of printing, printing device synchronous photo taking, and then complete for printing
Whether He Ge judgement, stepper motor driving, qualified slab construction smoothly passes striker plate, so that slab construction enters baking
The region of material path corresponding to dry solidification equipment, baking and curing device work, completes the solidification for ink, later stepper motor
Drive again so that be completed receive dimension code printing and cured slab construction enter in material storing box, when printing device detects
After slab construction printing is unqualified, synchronous driving detection motor action, so that detection motor driven striker plate overturning, so that
Unqualified slab construction enters oblique stock guide, eventually enters into scrap collecting tank, without carrying out subsequent baking process;To sum up,
It is suitable in the case where slab construction printout surface receives dimension code, can rapidly and efficiently completing to receive printing, detection, the baking of dimension code
It is dry, improve printing effect.
Specific embodiment of the utility model is described in detail above, but content is only what the utility model was created
Preferred embodiment should not be construed as limiting the practical range of the utility model creation.All create according to the utility model is applied
All the changes and improvements made by range etc., shall still fall within the scope of this patent.