CN209324359U - A kind of economical rock tunnel(ling) machine being adapted to great burying - Google Patents

A kind of economical rock tunnel(ling) machine being adapted to great burying Download PDF

Info

Publication number
CN209324359U
CN209324359U CN201821809895.3U CN201821809895U CN209324359U CN 209324359 U CN209324359 U CN 209324359U CN 201821809895 U CN201821809895 U CN 201821809895U CN 209324359 U CN209324359 U CN 209324359U
Authority
CN
China
Prior art keywords
cutterhead
machine
screw machine
ling
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821809895.3U
Other languages
Chinese (zh)
Inventor
高文梁
袁文征
王昆
李建斌
廖兆锦
叶蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201821809895.3U priority Critical patent/CN209324359U/en
Application granted granted Critical
Publication of CN209324359U publication Critical patent/CN209324359U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of economical rock tunnel(ling) machine for being adapted to great burying, solve the problems, such as that rock tunnel(ling) machine higher cost, applicability are bad, drivage efficiency is low in unstable geology in the prior art.The utility model includes shield body and rear corollary apparatus, cutterhead, screw machine are equipped in the shield body, corollary apparatus is equipped with dregs conveying device afterwards, the front of screw machine is connected with cutterhead, the rear portion of screw machine is connected with dregs conveying device, the cutterhead includes that female cutterhead and sub- cutterhead, female cutterhead are connected with driving device, and sub- cutterhead is connected with screw machine.The utility model is suitable for the geology such as poor weak soil, the ooze of geological stability, and equipment driving with pressure has the function of balancing area surface pressure.The utility model drives sub- cutterhead to slag tap using screw machine, when being used for major diameter tunnel excavation, can drive in screw machine and arrange a set of swing type mother cutterhead on the outside of cutterhead, carry out Double-cutter and excavated, improve and excavate efficiency.

Description

A kind of economical rock tunnel(ling) machine being adapted to great burying
Technical field
The utility model relates to shield machine technical fields, particularly relate to a kind of economical tunnel piercing for being adapted to great burying Machine.
Background technique
EPB shield (earth pressure balance development machine) and TBM(tunneling boring hard rock mole) it is to be excavated using rotating tool, simultaneously Country rock and driving in broken hole form novel, the advanced tunnel construction machinery of one kind in tunneling boring tunnel, are widely used in iron The fields such as road, water conservancy, electric power, nuclear power, traffic have many protrusions such as quick, high-quality, safety, economy, environmental protection to engineering construction Advantage is preferred arrangement and method for construction in tunnel construction.Currently, external correlation shield and TBM technology have been mature on the whole, it is domestic a whole set of Technology production domesticization ability is promoted steadily.With many Large-scale Project Constructions of country, domestic shield and TBM industry lead the country Manufacturing industry manufacturing technology level will extend to industry deeper time.
Since hard rock tunnel development machine TBM is adaptable for tunneling boring hard rock or middle soft rock, and earth pressure balanced shield, EPBS To adaptable compared in soft formation or the poor stratum of country rock, but conventional tunnel development machine whole set equipment is complicated, involves great expense, and sand The construction costs such as slurry, grease, water power, section of jurisdiction are higher, and most mountain tunnel construction costs is caused to greatly improve.Therefore one kind is developed Have that be adapted to mature, the cheap rock tunnel(ling) machine of complete set technology of great burying and the poor geology of stability be very must It wants.
Utility model content
For the deficiency in above-mentioned background technique, the utility model proposes a kind of economical tunnel diggings for being adapted to great burying Into machine, solve that rock tunnel(ling) machine higher cost, applicability in the prior art are bad, drivage efficiency is low in unstable geology Problem.
The technical solution of the utility model is achieved in that a kind of economical rock tunnel(ling) machine for being adapted to great burying, Including shield body and rear corollary apparatus, cutterhead, screw machine are equipped in the shield body, rear corollary apparatus is equipped with dregs conveying device, The front of screw machine is connected with cutterhead, and the rear portion of screw machine is connected with dregs conveying device, and the cutterhead includes female cutterhead With sub- cutterhead, female cutterhead is connected with driving device, and sub- cutterhead is connected with screw machine.
Corollary apparatus includes sequentially connected first trolley, the second trolley and third trolley after described, before the first trolley End is connected with equipment bridge, and the front end of equipment bridge is connected with screw machine, and equipment bridge is equipped with dregs conveying device and the first section of jurisdiction Loop wheel machine.
The dregs conveying device is belt feeder, and first trolley is equipped with concrete grouting tank, sets on the second trolley There is belt feeder slag notch, belt feeder slag notch is corresponding with belt feeder, and third trolley is equipped with section of jurisdiction gantry, sets on the gantry of section of jurisdiction There are section of jurisdiction demolition machine and the second segment crane.
The shield body includes anterior shield and tail shield, and front baffle is equipped in anterior shield, and rear bulkhead, driving device setting are equipped in tail shield In front baffle, the front end of screw machine is connected with front baffle, the rear end of screw machine pass through rear bulkhead and with dregs conveying device It is corresponding.
The screw machine includes bonnet body, is equipped with helical axis in bonnet body, helical axis is connected with sub- cutterhead, bonnet body Outer wall is equipped with peripheral drive unit, and the front end of bonnet body is connected with front baffle, and the rear end of bonnet body is equipped with late gate, back brake Door is corresponding with dregs conveying device.
The rear bulkhead is equipped with support wheel, and support wheel is equipped with rotation rolling disk, and rotation rolling disk can be rotated relative to rear bulkhead, It rotates rolling disk and is equipped with duct piece installation machine, rear bulkhead outer ring circumference is equipped with propelling cylinder.
The duct piece installation machine is equipped with snatch device, and snatch device is connected by radial expansion oil cylinder with fitting machine.
A kind of construction method for the economical rock tunnel(ling) machine being adapted to great burying, includes the following steps:
S1: when excavating major diameter tunnel, it is circular wobbling action that driving device, which drives female cutterhead to carry out swinging track, Face is cut, peripheral drive unit is rotated by helical axis band mover cutterhead and cut face;
S2: cutting the dregs to get off, is rotated by the scum board on sub- cutterhead and dregs is brought to screw machine center, pass through spiral shell Spin axis drains into dregs on belt feeder, spiral drive end unit setting late gate guarantee in Sand stratum can with quick closedown, Guarantee construction safety;
S3: carrying out preliminary bracing using formwork steel section of jurisdiction in tunneling process, after tail shield certain distance is deviate from formwork steel section of jurisdiction, Concrete grouting tank is directly injected into concrete to section of jurisdiction injection hole by Grouting Pipe, carries out supporting;
S4: propelling cylinder is tunneled by holding out against formwork steel section of jurisdiction offer counter-force, after tunneling certain distance, in section of jurisdiction bridge Formwork steel section of jurisdiction is dismantled by section of jurisdiction demolition machine at frame, formwork steel section of jurisdiction is then delivered to by section of jurisdiction by the first segment crane Near fitting machine, then will be in formwork steel pipe sheet assembling to tail shield by duct piece installation machine;
S5: repeating step S3 ~ S4, circuit sequentially, until completing to excavate work.
The utility model is suitable for the geology such as poor weak soil, the ooze of geological stability, and equipment driving with pressure has balance The function of area surface pressure.The utility model drives sub- cutterhead to slag tap using screw machine, can when being used for major diameter tunnel excavation A set of swing type mother cutterhead is arranged on the outside of screw machine driving cutterhead, is carried out Double-cutter excavation, is improved and excavate efficiency.This is practical new Type relates to use and is recycled detachable steel form section of jurisdiction, no synchronous grouting, behind assembled complete section of jurisdiction inside tail shield, in the second endless tube Concrete is injected on the inside of piece, guarantees that there is certain stability in tunnel.Behind assembled certain length formwork steel section of jurisdiction, in rear mating area Steel pipe sheet is removed in domain, is transported steel pipe sheet to host duct piece installation machine region by segment crane, assembled again to use.Originally it sets It is standby that there is matter adaptability strongly, while complete machine structure is relatively easy, mode conversion is convenient, interferes small, control to matching operation Convenient, equipment manufacturing cost is cheap, economical and practical.
Detailed description of the invention
It, below will be to attached drawing needed in embodiment description in order to illustrate more clearly of the utility model embodiment It is briefly described, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is the utility model entirety front portion structure schematic diagram.
Fig. 2 is the utility model entirety front middle part structural schematic diagram.
Fig. 3 is central structure schematic diagram after the utility model entirety.
Fig. 4 the utility model entirety rear structure schematic diagram.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are under that premise of not paying creative labor Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figs. 1-2, embodiment 1, a kind of economical rock tunnel(ling) machine being adapted to great burying, including shield body and after match Covering device, the shield body is interior to be equipped with cutterhead, screw machine 7, and cutterhead is located at the front of shield body, and the rear portion of cutterhead is connected with screw machine It connects, rear corollary apparatus is equipped with dregs conveying device, and the front of screw machine 7 is connected with cutterhead, the rear portion of screw machine 7 and dregs Conveying device is connected, and the dregs that cutterhead excavates is delivered to dregs conveying device through screw machine 7, then through dregs conveying device It is transported to designated position processed.The cutterhead includes that female cutterhead 2 and sub- cutterhead 4, female cutterhead 2 are connected with driving device 3, driving device 3 can be used hydraulic motor, and hydraulic motor is swung by crank handle turns mother cutterhead, and sub- cutterhead 4 is connected with screw machine 7, screw machine Helical axis band mover cutterhead rotate.Sub- cutterhead is located at the center of anterior shield, and female cutterhead at least 4, female cutterhead is with sub- knife The center of disk is that the center of circle is angularly circumferentially arranged.The utility model designs a kind of tool head, conventional at 3-5 meters of minor diameter Diameter 5-7 rice diameter shield, the utility model directly can directly drive sub- cutterhead using peripheral drive formula screw machine and rotate, real The excavation of existing face;And in major diameter tunnel, screw machine drives in sub- cutter head type due to intensity and torque, and sub- cutterhead is straight Diameter cannot design very greatly, therefore can design four drive motors in female cutterhead periphery, and the output end of drive motor is equipped with crank And realize that wobbling action, swinging track are circle by crank handle turns mother cutterhead, realize that face excavates.
Further, corollary apparatus includes sequentially connected first trolley 22, the second trolley 29 and third trolley 30 after described, The front end of first trolley 22 is connected with equipment bridge 19, and the front end of equipment bridge 19 is connected by dilatory oil cylinder 16 with screw machine 7, if Standby bridge 19 is equipped with dregs conveying device and the first segment crane 21, after the first segment crane 21 is located at dregs conveying device Side, for lifting formwork steel section of jurisdiction.The dregs conveying device is belt feeder 20, the front end of belt feeder 20 and slagging tap for screw machine Mouth is corresponding, and for receiving the dregs dropped out from screw machine, the first trolley 22 is equipped with concrete grouting tank 23, concrete grouting Tank 23 passes through Grouting Pipe slip casting into the injected hole of section of jurisdiction.Second trolley 29 is equipped with belt feeder slag notch 24, and belt feeder is slagged tap Mouth 24 is corresponding with belt feeder 20, and percutaneously band slag notch is transported to designated position to the dregs on belt feeder, then is transported to through dregs trolley Outside tunnel.Third trolley 30 is equipped with section of jurisdiction gantry 25, and section of jurisdiction gantry 25 is equipped with section of jurisdiction demolition machine 26 and the second segment crane 27.Section of jurisdiction demolition machine 26 is for removing the pre-splicing good formwork steel section of jurisdiction 15 in front, and the formwork steel section of jurisdiction 15 removed is again through the second pipe Piece loop wheel machine 27 is transported near fitting machine, realizes the recycling of formwork steel section of jurisdiction 15, reduces production cost.
As shown in Figure 3-4, embodiment 2, a kind of economical rock tunnel(ling) machine being adapted to great burying, before the shield body includes Shield 1 and tail shield 14, anterior shield 1 and tail shield 14 are tightly connected, and front baffle 31 is equipped in anterior shield 1, rear bulkhead 32 is equipped in tail shield 14, drives Dynamic device 3 is arranged in front baffle 31, and driving device 3 connects one to one with female cutterhead, provides power for mother's cutterhead.Screw machine 7 front end is connected by driving flange seat 5 with front baffle 31, and the rear end of screw machine 7 passes through rear bulkhead 32 and conveys with dregs Device is corresponding, and dregs is transported to dregs conveying device by screw machine 7, is further conveyed to dregs.The screw machine 7 includes Bonnet body 33, bonnet body 33 is interior to be equipped with helical axis 8, and helical axis 8 is connected with sub- cutterhead 4, and helical axis band mover cutterhead is turned Dynamic, the outer wall of 33 front end of bonnet body is equipped with peripheral drive unit 6, and peripheral drive unit 6 provides power for screw machine, and periphery is driven The forward loss of machine of torque of the activation point of moving cell is small, can export most of torque to sub- cutterhead, guarantees that cutterhead is normally cut and is Screw machine provides power, and the front end of bonnet body 33 is connected with front baffle 31, and the rear end of bonnet body 33 is equipped with late gate 18, back brake Door 18 is corresponding with dregs conveying device, and late gate 18 guarantees to guarantee construction peace in Sand stratum with quick closedown Entirely.
Further, the rear bulkhead 32 is equipped with support wheel 10, and support wheel 10 is equipped with rotation rolling disk 9, passes through hydraulic horse Rolling disk is rotated up to driving, realizes that rotation rolling disk 9 can be rotated relative to rear bulkhead 32, rotation rolling disk 9 is equipped with duct piece installation machine 28, pipe Piece fitting machine realizes 360 ° of rotations under the drive of rotation rolling disk 9, convenient for the installation to section of jurisdiction on circumference of duct piece installation machine, after 32 outer ring circumference of partition is equipped with propelling cylinder 11.Propelling cylinder 11 holds out against formwork steel section of jurisdiction 15 and pushes ahead, realize cutterhead to Preceding driving.The duct piece installation machine 28 is equipped with snatch device 12, and snatch device 12 passes through radial expansion oil cylinder 13 and fitting machine 28 are connected, and realize moving radially for snatch device, and snatch device is used for grasping pipe piece.
Other structures are same as Example 1.
A kind of construction method for the economical rock tunnel(ling) machine being adapted to great burying, includes the following steps:
S1: when excavating major diameter tunnel, it is that circular swing is moved that driving device 3, which drives female cutterhead 2 to carry out swinging track, Work cuts face, and peripheral drive unit 6 is rotated with mover cutterhead 4 by helical axis 8 and cut face;
S2: cutting the dregs to get off, is rotated by the scum board on sub- cutterhead 4 and dregs is brought to 7 center of screw machine, passed through Helical axis 8 drains into dregs on belt feeder, and 7 tail portion of screw machine setting late gate 18 guarantees can be quick in Sand stratum It closes, guarantees construction safety;
S3: preliminary bracing is carried out using formwork steel section of jurisdiction 15 in tunneling process, it is left that tail shield 3-5 ring is deviate from formwork steel section of jurisdiction 15 Behind the right side, concrete grouting tank is directly injected into concrete to section of jurisdiction injection hole 17 by Grouting Pipe, carries out supporting;
S4: propelling cylinder 11 is tunneled by holding out against the offer counter-force of formwork steel section of jurisdiction 15, when tunneling 30-50 ring or so, When section of jurisdiction gantry 25 is moved to formwork steel section of jurisdiction 15, formwork steel section of jurisdiction 15 is torn open by section of jurisdiction demolition machine 26 at section of jurisdiction gantry 25 Fall, then formwork steel section of jurisdiction 15 is delivered near duct piece installation machine 28 by the first segment crane 21, then is installed by section of jurisdiction Machine 28 will be in 15 assembly to tail shield 14 of formwork steel section of jurisdiction;S5: repeating step S3 ~ S4, circuit sequentially, until completing to excavate work. The construction not only can be to avoid the unstable caused safety problem of geology when construction, but also the circulation of formwork steel section of jurisdiction may be implemented It utilizes, and does not have to synchronous grouting, greatly reduce the construction cost and equipment cost in tunnel.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (7)

1. a kind of economical rock tunnel(ling) machine for being adapted to great burying, including shield body and rear corollary apparatus, it is characterised in that: described Cutterhead, screw machine (7) are equipped in shield body, rear corollary apparatus is equipped with dregs conveying device, front and the cutterhead phase of screw machine (7) Connection, the rear portion of screw machine (7) are connected with dregs conveying device, and the cutterhead includes female cutterhead (2) and sub- cutterhead (4), mother Cutterhead (2) is connected with driving device (3), and sub- cutterhead (4) is connected with screw machine (7).
2. the economical rock tunnel(ling) machine according to claim 1 for being adapted to great burying, it is characterised in that: mating after described Device includes sequentially connected first trolley (22), the second trolley (29) and third trolley (30), the front end of the first trolley (22) It is connected with equipment bridge (19), the front end of equipment bridge (19) is connected with screw machine (7), and equipment bridge (19) is equipped with dregs conveying dress It sets and the first segment crane (21).
3. the economical rock tunnel(ling) machine according to claim 2 for being adapted to great burying, it is characterised in that: the dregs is defeated Sending device is belt feeder (20), and first trolley (22) is equipped with concrete grouting tank (23), and the second trolley (29) is equipped with Belt feeder slag notch (24), belt feeder slag notch (24) is corresponding with belt feeder (20), and third trolley (30) is equipped with section of jurisdiction bridge Frame (25), section of jurisdiction gantry (25) are equipped with section of jurisdiction demolition machine (26) and the second segment crane (27).
4. described in any item economical rock tunnel(ling) machines for being adapted to great burying according to claim 1 ~ 3, it is characterised in that: institute Stating shield body includes anterior shield (1) and tail shield (14), is equipped with front baffle (31) in anterior shield (1), is equipped with rear bulkhead (32) in tail shield (14), Driving device (3) is arranged on front baffle (31), and the front end of screw machine (7) is connected with front baffle (31), after screw machine (7) End is across rear bulkhead (32) and corresponding with dregs conveying device.
5. the economical rock tunnel(ling) machine according to claim 4 for being adapted to great burying, it is characterised in that: the screw machine (7) include bonnet body (33), be equipped with helical axis (8) in bonnet body (33), helical axis (8) is connected with sub- cutterhead (4), bonnet body (33) outer wall is equipped with peripheral drive unit (6), and the front end of bonnet body (33) is connected with front baffle (31), bonnet body (33) Rear end be equipped with late gate (18), late gate (18) is corresponding with dregs conveying device.
6. the economical rock tunnel(ling) machine according to claim 4 for being adapted to great burying, it is characterised in that: the rear bulkhead (32) support wheel (10) are equipped with, support wheel (10) is equipped with rotation rolling disk (9), and rotation rolling disk (9) energy is opposite rear bulkhead (32) Rotation, rotation rolling disk (9) are equipped with duct piece installation machine (28), and rear bulkhead (32) outer ring circumference is equipped with propelling cylinder (11).
7. the economical rock tunnel(ling) machine according to claim 6 for being adapted to great burying, it is characterised in that: the section of jurisdiction peace (28) are installed equipped with snatch device (12), snatch device (12) is connected by radial expansion oil cylinder (13) with fitting machine (28) It connects.
CN201821809895.3U 2018-11-05 2018-11-05 A kind of economical rock tunnel(ling) machine being adapted to great burying Active CN209324359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821809895.3U CN209324359U (en) 2018-11-05 2018-11-05 A kind of economical rock tunnel(ling) machine being adapted to great burying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821809895.3U CN209324359U (en) 2018-11-05 2018-11-05 A kind of economical rock tunnel(ling) machine being adapted to great burying

Publications (1)

Publication Number Publication Date
CN209324359U true CN209324359U (en) 2019-08-30

Family

ID=67709370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821809895.3U Active CN209324359U (en) 2018-11-05 2018-11-05 A kind of economical rock tunnel(ling) machine being adapted to great burying

Country Status (1)

Country Link
CN (1) CN209324359U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339809A (en) * 2018-11-05 2019-02-15 中铁工程装备集团有限公司 A kind of economical rock tunnel(ling) machine being adapted to great burying and its construction method
CN113107519A (en) * 2021-03-17 2021-07-13 中铁工程装备集团有限公司 TBM host and TBM

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339809A (en) * 2018-11-05 2019-02-15 中铁工程装备集团有限公司 A kind of economical rock tunnel(ling) machine being adapted to great burying and its construction method
CN113107519A (en) * 2021-03-17 2021-07-13 中铁工程装备集团有限公司 TBM host and TBM
CN113107519B (en) * 2021-03-17 2022-03-22 中铁工程装备集团有限公司 TBM host and TBM

Similar Documents

Publication Publication Date Title
CN109339809A (en) A kind of economical rock tunnel(ling) machine being adapted to great burying and its construction method
CN102410027B (en) Dual-mode TBM (tunnel boring machine) and control method thereof
CN102364049B (en) Hard rock composite TBM (Tunnel Boring Machine) suitable for composite stratum and tunneling mode thereof
CN108756913A (en) A kind of small-sized mining hard rock shield excavation machine
CN202441383U (en) Hybird TBM with multiple driving modes and tunnel support modes
CN103452559B (en) Vertical shaft shield machine
CN107218048B (en) Horseshoe-shaped heading machine propelled by crawler belt
CN102359379B (en) Tunnel construction method
CN100491694C (en) Dismountable type shield cutter head drive unit inside machine and its dismounting and replacing method
CN202391431U (en) Hard rock composite type TBM (tunnel boring machine) suitable for composite stratum
CN102383805A (en) Mixed TBM (Tunnel Boring Machine) with multiple-boring mode and tunnel supporting mode
LU101977B1 (en) Shield system capable of effectively reducing disturbance of surrounding rocks
CN109630148B (en) Double-thrust multi-cutterhead tunnel boring machine and boring method thereof
CN206753589U (en) Earth pressure balance rectangle heals up shield machine
CN209324359U (en) A kind of economical rock tunnel(ling) machine being adapted to great burying
CN208619109U (en) A kind of small-sized mining hard rock shield excavation machine
CN111636885B (en) Pipe jacking machine and construction method with recyclable main machine thereof
CN105297807A (en) Integrated trench open cutting heading machine with automatic backfill function
CN1186551C (en) Laying machine with combined cutterhead for laying rectangulare top pipe with balanced earth pressure
CN111206931B (en) Use method of cantilever shaft tunneling machine
CN109869161A (en) A kind of mini-sized tunnelling machine
CN108729922B (en) Push bench and retractable push bench construction method
CN112664197A (en) Shaft excavation device, large-diameter shaft heading machine and construction method
CN108071403B (en) Split starting equipment for tunnel excavation
CN210564541U (en) Quick heading machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant