CN209228391U - A kind of tunnel lining structure - Google Patents

A kind of tunnel lining structure Download PDF

Info

Publication number
CN209228391U
CN209228391U CN201821766243.6U CN201821766243U CN209228391U CN 209228391 U CN209228391 U CN 209228391U CN 201821766243 U CN201821766243 U CN 201821766243U CN 209228391 U CN209228391 U CN 209228391U
Authority
CN
China
Prior art keywords
waterproof
tunnel
splash guard
locating
locating rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821766243.6U
Other languages
Chinese (zh)
Inventor
甘目飞
陈国栋
尚寒春
王微嘉
郦亚军
刘雄伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Chengdu Survey Design and Research Co Ltd
Original Assignee
CREEC Chengdu Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Chengdu Survey Design and Research Co Ltd filed Critical CREEC Chengdu Survey Design and Research Co Ltd
Priority to CN201821766243.6U priority Critical patent/CN209228391U/en
Application granted granted Critical
Publication of CN209228391U publication Critical patent/CN209228391U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a kind of tunnel lining structures, belong to constructing tunnel field, including tunnel ontology, the surface of tunnel ontology is provided with preliminary bracing and secondary lining, waterproof layer is provided between preliminary bracing and secondary lining, between waterproof layer and secondary lining, the length direction of tunnel ontology is provided with multiple ring direction drainpipes, waterproof layer includes multiple waterproof brackets being arranged, waterproof bracket is bonded setting with preliminary bracing, multiple locating rods are provided between adjacent waterproof bracket, multiple locating rods are uniformly arranged along the length direction of waterproof bracket, locating rod is removably connected on the waterproof bracket of two sides, splash guard is provided between adjacent locating rod, length direction in locating rod along locating rod is provided with locating slot, the cross-sectional shape of locating slot is I-shaped, the both ends of the locating slot of I-shaped are perforation setting , the positioning strip being provided on splash guard in the locating slot for being slidably connected to two sides, the utility model has the effect of easy for installation.

Description

A kind of tunnel lining structure
Technical field
The utility model relates to the technical fields of constructing tunnel, more particularly, to a kind of tunnel lining structure.
Background technique
Tunnel-liner refers to prevent surrouding rock deformation or collapsing, builds along materials such as tunnel trunk periphery armored concrete Permanent supporting construction, effect be: support and maintenance tunnel stabilization, keep train operation needed for space, prevent from enclosing The weathering of rock releases the influence etc. of underground water, and therefore, tunnel-liner must have sufficient intensity, durability and centainly freeze proof, anti- Corrosion resistance is blended, tunnel-liner is mainly made of arch ring, abutment wall, inverted arch and several parts of bottom plate.
Existing Authorization Notice No. is that the Chinese patent of CN207332909U discloses a kind of tunnel-liner waterproof construction knot Structure, waterproof matrix and waterproof layer including being arranged on the outside of construction tunnel preliminary bracing are set in institute's construction tunnel preliminary bracing It is equipped with multiple installations hook for waterproof layer installation, is provided with link on the inside of waterproof layer, waterproof layer includes multiple splash guards, phase By being welded to connect between adjacent two splash guards, the inspection for detecting waterproof layer leakproofness is provided between two neighboring splash guard Device is surveyed, buffer layer is provided between waterproof matrix and waterproof layer, buffer layer is connect with waterproof matrix by connector, buffer layer It is Nian Jie with waterproof layer.
Prior art among the above has the following deficiencies: in construction waterproof layer, needs splash guard passing through cement Nail or expansion bolt are connected with buffer layer, and are fixed with preliminary bracing, so that splash guard and the closely connected waterproof that plays of buffer layer are made With, but when connecting splash guard and buffer layer, need cement nail or expansion bolt being evenly distributed on entire tunnel surface, from And worker is needed to go that each cement nail or expansion bolt are successively installed, it installs cumbersome.
Utility model content
The purpose of the utility model is to provide it is a kind of splash guard is fixed on waterproof bracket, tunnel-liner easy for installation Structure.
The purpose of this utility model has the technical scheme that
A kind of tunnel lining structure, including tunnel ontology, the surface of the tunnel ontology are provided with preliminary bracing and secondary Lining cutting is provided with waterproof layer between the preliminary bracing and secondary lining, between the waterproof layer and secondary lining, along tunnel sheet The length direction of body is provided with multiple ring direction drainpipes, and the waterproof layer includes multiple waterproof brackets being arranged, described anti- Water bracket is bonded setting with preliminary bracing, and multiple locating rods, multiple positioning are provided between the adjacent waterproof bracket Bar is uniformly arranged along the length direction of waterproof bracket, and the length direction that the length direction of the locating rod is parallel to tunnel ontology is set It sets, the locating rod is removably connected on the waterproof bracket of two sides, is provided with splash guard between the adjacent locating rod, described Splash guard is bonded setting with preliminary bracing, and the length direction in the locating rod along locating rod is provided with locating slot, the positioning The cross-sectional shape of slot is I-shaped, and the both ends of the locating slot of I-shaped are perforation setting, is set on the splash guard The positioning strip being equipped in the locating slot for being slidably connected to two sides.
By using above-mentioned technical proposal, after preliminary bracing of having constructed, when waterproof layer is installed, waterproof bracket is placed in tunnel In ontology, locating rod is placed between two waterproof brackets, and be close to locating slot with preliminary bracing, then passes through splash guard One end of locating slot, never one end of construction waterproof layer towards construction waterproof layer is inserted into locating slot, so that splash guard and just Phase supporting is close to and is located on waterproof bracket, so that splash guard closes the gap between two waterproof brackets, then circumferential direction is arranged Water pipe is placed on splash guard, secondary lining of then constructing, by the setting of waterproof bracket and splash guard, so that construction waterproof Waterproof bracket only need to be first installed when layer, then splash guard is installed, no longer needed to cement nail or expansion bolt by splash guard and just Phase supporting is fixed, and the installation of waterproof layer is facilitated.
The utility model is further arranged to: the both ends of the locating rod are respectively arranged with fixed block, two adjacent institutes State the fixing groove offered on waterproof bracket for fixed block grafting.
It, only need to be by the fixed block grafting in locating rod when locating rod and locating slot are installed by using above-mentioned technical proposal In fixing groove on the face opposite to two adjacent waterproof brackets, so that locating rod is fixed between two waterproof brackets, lead to The setting of fixing groove is crossed, so that locating rod is removably connected on waterproof bracket, it is therefore prevented that can not be more when locating rod is damaged The problem of changing.
The utility model is further arranged to: the splash guard is provided with connection in the one side of tunnel body length direction Item offers the link slot being equipped with connection strap on the splash guard adjacent thereto along the tunnel body length direction.
The connection strap on splash guard is plugged to another piece of waterproof when splash guard is installed by using above-mentioned technical proposal In the link slot of plate, so that the connection between the adjacent splash guard of tunnel body length direction is even closer, waterproof is improved Waterproof effect between plate.
The utility model is further arranged to: the link slot and connection strap are set as multiple and are correspondingly arranged.
By using above-mentioned technical proposal, multiple link slots and connection strap can further improve the effect of the waterproof between splash guard Fruit.
The utility model is further arranged to: the holding tank moved into for ring direction drainpipe, institute are provided in the locating rod The length direction setting that holding tank is parallel to waterproof bracket is stated, the opening of the holding tank is arranged towards splash guard.
Ring direction drainpipe can be placed in by holding tank anti-when ring direction drainpipe is installed by using above-mentioned technical proposal On water bracket, when can prevent construction secondary lining, concrete causes compressing to ring direction drainpipe and damages.
The utility model is further arranged to: on the waterproof bracket perpendicular to waterproof bracket, be directed away from preliminary bracing Direction be extended have multiple connecting rods, the connecting rod is located in secondary lining.
By using above-mentioned technical proposal, after secondary lining of constructing, connecting rod will be located in secondary lining, enhance anti- The connection effect of water bracket and secondary lining, so that entire tunnel lining structure is more stable.
The utility model is further arranged to: the splash guard is set as plastic material.
By using above-mentioned technical proposal, the splash guard of plastic material makes the weight saving of splash guard, further facilitates The installation of splash guard.
The utility model is further arranged to: being offered multiple supply water in the locating rod and is entered the water conservancy diversion of ring direction drainpipe Slot.
By using above-mentioned technical proposal, the water of the gap exudation between splash guard and locating slot is flow in locating rod, It can be by the diversion tank platoon to ring direction drainpipe in locating rod, it is therefore prevented that water is seeped into secondary lining, improves splash guard Waterproof effect.
In conclusion the advantageous effects of the utility model are as follows:
1. after waterproof bracket is placed in tunnel ontology, then splash guard is placed in by locating slot by the locating slot in locating rod It is interior, it is bonded splash guard with preliminary bracing, and the gap between waterproof bracket is closed, to complete applying for entire waterproof layer Work no longer needs to install each cement nail or expansion bolt, so that splash guard is easier for installation;
2. link slot and connection strap are respectively arranged on the face that two splash guards abut, so that the connection between splash guard is more Step up close, improves the waterproof effect of entire waterproof layer;
3. the holding tank being arranged in connecting rod can facilitate the installation of ring direction drainpipe, while the diversion trench in connecting rod can incite somebody to action Moisture drains into discharge in ring direction drainpipe, further improves the waterproof effect of waterproof layer.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model embodiment;
Fig. 2 is that the utility model embodiment hides the overall structure signal after tunnel ontology, preliminary bracing and secondary lining Figure;
Fig. 3 is the partial enlargement diagram of part A in Fig. 2;
Fig. 4 is the cut-away section structural schematic diagram that the utility model embodiment is used to show waterproof layer;
Fig. 5 is the partial enlargement diagram of part B in Fig. 4;
Fig. 6 is the partial enlargement diagram of C portion in Fig. 4.
In figure, 1, tunnel ontology;11, preliminary bracing;12, secondary lining;13, waterproof layer;14, ring direction drainpipe;2, prevent Water bracket;21, locating rod;211, fixed block;212, diversion trench;22, splash guard;221, positioning strip;222, connection strap;223, even Access slot;23, locating slot;24, fixing groove;25, holding tank;26, connecting rod.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Figures 1 and 2, is a kind of tunnel lining structure disclosed by the utility model, including tunnel ontology 1, tunnel sheet The surface of body 1 is provided with preliminary bracing 11 and secondary lining 12, is provided with waterproof layer between preliminary bracing 11 and secondary lining 12 13, waterproof layer 13 includes multiple waterproof brackets 2 being arranged along 1 length direction of tunnel ontology;Between adjacent waterproof bracket 2 Multiple locating rods 21 are provided with, multiple locating rods 21 are uniformly arranged along the length direction of waterproof bracket 2, the length side of locating rod 21 To the length direction for being parallel to tunnel ontology 1, the both ends of locating rod 21 are provided with fixed block 211, offer confession on waterproof bracket 2 The fixing groove 24(that fixed block 211 is inserted into is shown in Fig. 3), the length direction in locating rod 21 along locating rod 21 is provided with locating slot 23, The cross-sectional shape of locating slot 23 is I-shaped, and the both ends of the locating slot 23 of I-shaped are perforation setting;Adjacent two It is provided with splash guard 22 between locating slot 23, the positioning strip being slidably connected in two sides locating slot 23 is provided on splash guard 22 221。
In order to mitigate the weight of splash guard 22, set PVC material for splash guard 22, at the same in order to improve waterproof layer 13 with Connection effect between secondary lining 12, on waterproof bracket 2 far from preliminary bracing 11 face on, be directed away from waterproof bracket 2 Direction be extended have multiple connecting rods 26;In the present embodiment, the cross-sectional shape of fixing groove 24 and fixed block 211 is set as " u "-shaped, so that more convenient when installation and removal locating rod 21.
After preliminary bracing 11 is constructed, in construction waterproof layer 13, waterproof bracket 2 is installed to tunnel ontology 1, together When locating rod 21 and locating slot 23 are plugged between two waterproof brackets 2 by fixing groove 24 and fixed block 211, and make to position The top of slot 23 and preliminary bracing 11 are close to, and after installing all locating rod 21 and locating slot 23, it is fixed that splash guard 22 is passed through Position item 221 is plugged in each adjacent locating slot 23, so that splash guard 22 is by the gap between two adjacent waterproof brackets 2 Closing, while splash guard 22 and preliminary bracing 11 being made to be bonded setting, secondary lining 12 of then constructing is located at connecting rod 26 secondary In lining cutting 12, that is, the construction of entire tunnel lining structure is completed, waterproof layer 13, nothing are formed by waterproof bracket 2 and splash guard 22 It need to go that cement nail or expansion bolt are successively installed, thus fixed splash guard 22, so that construction and the splash guard 22 of waterproof layer 13 It is easier for installation.
Referring to Fig. 4 and Fig. 5, along 1 length direction of tunnel ontology two adjacent splash guards 22 on the face of abutting, respectively It is provided with the link slot 223 and connection strap 222 worked in coordination, link slot 223 and connection strap 222 are set as two and respectively correspond It is arranged, the holding tank 25 of single hop is provided in locating rod 21, the cross section of holding tank 25 is set as semicircular arc, holding tank 25 Opening is arranged towards splash guard 22, is provided with ring direction drainpipe 14, length of the ring direction drainpipe 14 along tunnel ontology 1 in holding tank 25 Degree direction is uniformly arranged, and the permeable hole (not marking in figure) to supply water into ring direction drainpipe 14 is provided on ring direction drainpipe 14, Multiple diversion trench 212(are offered in locating rod 21 sees Fig. 6), each diversion trench 212 is towards the position where ring direction drainpipe 14 It sets extended.
When locating rod 21 is installed, while holding tank 25 in locating rod 21 is spliced to together, so that entire holding tank 25 are parallel to the length direction of waterproof bracket 2, and then ring direction drainpipe 14 is placed in holding tank 25, so that seeping waterproof layer 13 Water be discharged by ring direction drainpipe 14, when splash guard 22 is installed, the connection strap 222 on splash guard 22 is made to enter adjacent splash guard In link slot 223 on 22, so that the connection between adjacent splash guard 22 is even closer, the waterproof effect of waterproof layer 13 is improved Fruit, and connecting rod is passed through when being moved in connecting rod 26 by the water that the gap between splash guard 22 and locating slot 23 enters Diversion trench 212 on 26 is movable in holding tank 25 and enters in ring direction drainpipe 14 and be discharged, and further improves anti- The waterproof effect of water layer 13.
The implementation principle of the present embodiment are as follows: after During Initial Stage Construction supporting 11, after adjoining rock stability can construction waterproof layer 13, this When waterproof bracket 2 is placed in tunnel ontology 1, and be oppositely arranged with the previous waterproof bracket 2 of construction waterproof layer, then will Locating rod 21 and locating slot 23 are placed between two waterproof brackets 2 by the fixing groove 24 on waterproof bracket 2, in installation locating rod When 21, while making the splicing of holding tank 25 to together, and holding tank 25 is integrally arranged in parallel with waterproof bracket 2, then peace Splash guard 22 is filled, by different splash guards 22 by positioning strip 221, never one end of construction waterproof layer is towards construction waterproof layer One end is inserted into adjacent locating slot 23, and the connection strap 222 on splash guard 22 is made to be plugged to previous splash guard 22 in the process Link slot 223 in so that the connection effect between splash guard 22 is more preferable, while making to be close to preliminary bracing 11, finally make Splash guard 22 closes the gap between two waterproof brackets 2, is then fixed on ring direction drainpipe 14 by holding tank 25 anti- Between water plate 22 and the recess of holding tank 25, that is, the construction of entire waterproof layer 13 is completed, secondary lining 12 of then constructing again, By the way that splash guard 22 to be fixed on waterproof bracket 2, so that splash guard 22 is easier for installation, no longer need to successively install every A cement nail or expansion bolt are fixed by splash guard 22, while saving manpower.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. the surface of a kind of tunnel lining structure, including tunnel ontology (1), the tunnel ontology (1) is provided with preliminary bracing (11) and secondary lining (12) it, is provided with waterproof layer (13) between the preliminary bracing (11) and secondary lining (12), it is described anti- Multiple ring direction drainpipes (14) are provided between water layer (13) and secondary lining (12), along the length direction of tunnel ontology (1), Be characterized in that: the waterproof layer (13) includes multiple waterproof brackets (2) being arranged, the waterproof bracket (2) and initial stage branch (11) fitting setting is protected, is provided with multiple locating rods (21) between the adjacent waterproof bracket (2), multiple locating rods (21) length direction along waterproof bracket (2) is uniformly arranged, and the length direction of the locating rod (21) is parallel to tunnel ontology (1) Length direction setting, the locating rod (21) is removably connected on two sides waterproof bracket (2), the adjacent locating rod (21) it is provided between splash guard (22), the splash guard (22) is bonded setting, the locating rod (21) with preliminary bracing (11) On be provided with locating slot (23) along the length direction of locating rod (21), the cross-sectional shape of the locating slot (23) is " work " word Shape, the both ends of the locating slot (23) of I-shaped are perforation setting, are provided with and are slidably connected on the splash guard (22) Positioning strip (221) in the locating slot (23) of two sides.
2. a kind of tunnel lining structure according to claim 1, it is characterised in that: distinguish at the both ends of the locating rod (21) It is provided with fixed block (211), the fixation for fixed block (211) grafting is offered on the waterproof bracket (2) of adjacent two Slot (24).
3. a kind of tunnel lining structure according to claim 1, it is characterised in that: the splash guard (22) is along tunnel ontology (1) it is provided in the one side of length direction connection strap (222), the waterproof adjacent thereto along tunnel ontology (1) length direction The link slot (223) being equipped with connection strap (222) is offered on plate (22).
4. a kind of tunnel lining structure according to claim 3, it is characterised in that: the link slot (223) and connection strap (222) it is set as multiple and is correspondingly arranged.
5. a kind of tunnel lining structure according to claim 1, it is characterised in that: be provided with confession on the locating rod (21) The holding tank (25) that ring direction drainpipe (14) moves into, the holding tank (25) are parallel to the length direction setting of waterproof bracket (2), The opening of the holding tank (25) is arranged towards splash guard (22).
6. a kind of tunnel lining structure according to claim 1, it is characterised in that: on the waterproof bracket (2) perpendicular to Waterproof bracket (2), be directed away from preliminary bracing (11) direction be extended have multiple connecting rods (26), the connecting rod (26) In secondary lining (12).
7. a kind of tunnel lining structure according to claim 1, it is characterised in that: the splash guard (22) is set as plastics Material.
8. a kind of tunnel lining structure according to claim 1, it is characterised in that: offered on the locating rod (21) more A supply water enters the diversion trench (212) of ring direction drainpipe (14).
CN201821766243.6U 2018-10-26 2018-10-26 A kind of tunnel lining structure Expired - Fee Related CN209228391U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821766243.6U CN209228391U (en) 2018-10-26 2018-10-26 A kind of tunnel lining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821766243.6U CN209228391U (en) 2018-10-26 2018-10-26 A kind of tunnel lining structure

Publications (1)

Publication Number Publication Date
CN209228391U true CN209228391U (en) 2019-08-09

Family

ID=67501288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821766243.6U Expired - Fee Related CN209228391U (en) 2018-10-26 2018-10-26 A kind of tunnel lining structure

Country Status (1)

Country Link
CN (1) CN209228391U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049032A (en) * 2020-07-27 2020-12-08 成龙建设集团有限公司 Method for reinforcing municipal highway door opening

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049032A (en) * 2020-07-27 2020-12-08 成龙建设集团有限公司 Method for reinforcing municipal highway door opening
CN112049032B (en) * 2020-07-27 2022-05-17 成龙建设集团有限公司 Method for reinforcing municipal highway door opening

Similar Documents

Publication Publication Date Title
KR100922599B1 (en) Apparatus for preventing water leakage of bridge
CN109736353A (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
KR100878323B1 (en) Monitoring device of cavity in Tunnel lining concrete
CN209228391U (en) A kind of tunnel lining structure
CN207004570U (en) A kind of tunnel longitudinal drainage blind pipe fixed structure
KR101188724B1 (en) Reverse tank apparatus and method for repairing the sewerage
CN209099168U (en) A kind of box beam expansion joint guarded drainage device
CN209494575U (en) A kind of push pipe portal sealing device under low Water And Earth Pressures
KR100951086B1 (en) Device for fixing the road pole
CN106677821A (en) Assembly type tunnel lining back circumferential drainage structure and implementation method thereof
CN206571526U (en) A kind of pin-connected panel tunnel-liner behind circle draining construction
CN206204992U (en) Detachable waterproof node structure between prefabricated comprehensive pipe gallery joints
CN209636932U (en) Reinforce the prefabricated pipe section structure of subdrainage box drain
CN209179016U (en) Safeguard structure between a kind of foundation pit pile being easily installed
CN109140046B (en) Method for plugging end of pipe jacking pipe curtain
CN103774620B (en) The vertical water-stopping structure fixture in a kind of concrete work shrinkage joint
CN213842969U (en) Shield constructs section of jurisdiction infiltration performance experimental apparatus
CN220687400U (en) Embedded tunnel waterproof and drainage plate structure convenient for installation and construction
IT201900012477A1 (en) PROCEDURE FOR SEALING JOINTS BETWEEN PREFABRICATED SEGMENTS OR SIMILAR CONSTRUCTION ELEMENTS, IN PARTICULAR IN THE CONSTRUCTION OF TUNNELS AND TUNNELS, AND CORRESPONDING SYSTEM AND SEALING STRIP
CN104727275A (en) Method for application of concrete work expansion joint vertical water sealing structure fixing element
KR102207179B1 (en) Reinforced structure of water conveyance tunnel
CN109339215B (en) Device and method for replacing water inlet and outlet gates without water interruption
CN110409508B (en) Post-cast strip waterproof structure and construction method thereof
SU994781A1 (en) Filling bridge
SU1569498A1 (en) Suspension unit for underground pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809

CF01 Termination of patent right due to non-payment of annual fee