CN106677821A - Assembly type tunnel lining back circumferential drainage structure and implementation method thereof - Google Patents

Assembly type tunnel lining back circumferential drainage structure and implementation method thereof Download PDF

Info

Publication number
CN106677821A
CN106677821A CN201710072733.XA CN201710072733A CN106677821A CN 106677821 A CN106677821 A CN 106677821A CN 201710072733 A CN201710072733 A CN 201710072733A CN 106677821 A CN106677821 A CN 106677821A
Authority
CN
China
Prior art keywords
tunnel
circle draining
drainage
constructed
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710072733.XA
Other languages
Chinese (zh)
Other versions
CN106677821B (en
Inventor
蒋雅君
潘基先
李彬
何雨帝
赵菊梅
李国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201710072733.XA priority Critical patent/CN106677821B/en
Publication of CN106677821A publication Critical patent/CN106677821A/en
Application granted granted Critical
Publication of CN106677821B publication Critical patent/CN106677821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses an assembly type tunnel lining back circumferential drainage structure and an implementation method thereof. The structure comprises drainage module units for assembling, wherein each drainage module unit comprises a pushing plate and side walls vertically fixed on the two sides of the pushing plate. The multiple drainage module units are circumferentially assembled along a tunnel to form a circumferential drainage space. Permeable holes are formed in the side walls, and the bottoms of the side walls are provided with flanges used for fixing the drainage module units on an initial support base surface of the tunnel. After the construction position of the circumferential drainage structure is determined on an initial support surface, the drainage module units are sequentially and circumferentially fixed in a splicing mode along the determined position on the initial support surface of the tunnel to form a circumferential drainage space, and are connected with longitudinal drainage facilities on the two sides of the arch foot of the tunnel. After the construction, sequential construction is conducted. Mounting is convenient and quick, joints are easy to treat, the adaptability of the base surface is good, permeability performance is good, meanwhile, cleaning, maintenance and replacement of the circumferential drainage system are facilitated during operation, and maintainability is good.

Description

A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation
Technical field
The present invention relates to tunnel drainage technical field, specially a kind of pin-connected panel tunnel-liner behind circle draining construction and Its implementation.
Background technology
Generally consider that combined type tunnel lining structure is prevented by the way of " anti-row's combination " in Tunnel Engineering field at present Drain structure is designed, it is necessary to form perfect drainage system in lining cutting(Including circle draining blind pipe, longitudinal drainage blind pipe, horizontal stroke To draining blind pipe, Central drain etc.), wherein the ring direction drainpipe mesh laid along the m of Tunnel surface longitudinal 5~10 Preceding use more is flexible porous tube.Such as《The railway tunnel guarded drainage construction technology guides of TZ 331-2009》(Implement day Phase:On April 13rd, 2009, the 7th chapter lining cutting behind drainage system)Describe tunnel ring blind pipe applying using flexible porous tube Work technique;Document disclosed in Huang Caidou(《Earth working material --- flexible porous tube quality testing is inquired into》,《Build in Chongqing》, 2005, 8th phase, the 49-50 pages, in August, 2005), describe essential structure and the detection method of flexible porous tube.Flexible porous tube leads to It is often the rolled products produced in factory, tunnel construction site is blocked or spliced according to the section girth in tunnel, and with swollen Swollen bolt and colligation silk are fixed on Tunnel surface, and the problem easily existed in construction is usual for the length of flexible porous tube Can not be consistent with the section girth in tunnel, there is a problem of that joint is difficult to deal carefully with.
In tunnel stratum due to underground water in may containing silt or easily crystallization material, also can be in the draining system in tunnel Formed in system and block influence drainage effect(Especially in the lower curtate in tunnel), the document as disclosed in Chen Li《In railway tunnel construction Drainpipe blockage problem is probed into》,《Technology and market》, the 4th phase of volume 22, page 80, in April, 2015 in 2015), it is indicated that tunnel Road drainage system be vulnerable to silt, the influence of calcareous crystal and form blocking.Although also there is some to be directed to drainage system at present The method repaired, cleared up, but be typically only capable to be to carry out desilting at drainpipe mouth of pipe position, is not easy to drainpipe in itself Damaged location is changed and repaired, and effect is limited.
Therefore, the examination and maintenance problem during the convenience for construction of current tunnel circle draining blind pipe, operation is not yet obtained To preferable solution.
The content of the invention
Ring direction drainpipe in drainage system can be improved in combined type tunnel-liner it is an object of the invention to provide one kind Construction convenience and solve maintainable problem during its operation pin-connected panel tunnel-liner behind circle draining construction and Its implementation.Technical scheme is as follows:
A kind of pin-connected panel tunnel-liner behind circle draining construction, including for assembled drain module unit, the draining mould Module unit includes top board and is vertically fixed on the side wall of top board both sides, and multiple drain module units are constituted along tunnel ring is assembled Circle draining space;The side wall is provided with permeable hole, and sidewall bottom is provided with for drain module unit to be fixed on into tunnel The edge of a wing on preliminary bracing basal plane.
Further, the circle draining spatial interpolation is equipped with the material with filtering and water permeability.
Further, the material with filtering and water permeability is ribbon plastic drainage French drain material material.
Further, the edge of a wing is to be fixed on the lath on the outside of sidewall bottom, mounting hole is offered thereon, with pad The nailing or expansion bolt of circle fix drain module unit through mounting hole.
Further, the stitching portion of adjacent drainage channel modular unit is closed by jointing tape.
Further, also including being arranged on the circle draining facility checkout window of Tunnel Second Lining.
Further, the single splicing of the drain module unit is installed or multiple rows of parallel ring is installed.
A kind of implementation of pin-connected panel tunnel-liner behind circle draining construction, comprises the following steps:
Step 1:Tunnel excavation and preliminary bracing is applied after finishing, what supporting surface determined circle draining construction in the early stage applies position Put;
Step 2:Drain module unit is spliced into fixation successively along Tunnel surface defined location ring, ring is formed To drainage space, and it is connected with the longitudinal drainage facility of tunnel arch foot both sides;
Step 3:Seam areas between two neighboring drain module unit are closed with adhesive tape;
Step 4:After the tunnel circle draining facility of a section is applied and finished, tunnel-liner non-woven fabrics and splash guard paving are carried out If, and implement Tunnel Second Lining.
Further, it is additionally included in the circle draining space that to insert banded plastic draining blind after the step Ditch material.
Further, reserved part space forms the inspection window of circle draining facility in Tunnel Second Lining.
The beneficial effects of the invention are as follows:Circle draining space in composite lining tunnel of the invention passes through drain module Unit splicing is formed, and install convenient, joint be disposable, water permeability good to the adaptability of basal plane is good, while also allowing for the operation phase Between to the cleaning of circle draining system, maintenance, change, it is maintainable good.
Brief description of the drawings
Fig. 1 is drain module unit of the invention and splices and combines schematic diagram.
Fig. 2 is generalized section of the present invention in combined type tunnel-liner.
Fig. 3 is the structural representation that the present invention places the embodiments of adrainage material such as plastic drainage French drain in drainage space Figure.
Fig. 4 is the structural representation of the embodiment that the present invention is provided with circle draining facility checkout window in Tunnel Second Lining Figure.
Fig. 5 is the composite lining tunnel guarded drainage system of the embodiment of the present invention(Half bag water proof type)Schematic diagram.
Fig. 6 is the section arrangement schematic diagram of the embodiment of the present invention 1(1-1 sections in Fig. 5).
Fig. 7 is the section arrangement schematic diagram of the embodiment of the present invention 2(1-1 sections in Fig. 5).
In figure:1- drain module units;The 2- edges of a wing;3- mounting holes;4- sides wall;5- permeable holes;6- seam areas;7- is gluing Band;8- plastic drainage French drain material material;21- preliminary bracings;22- non-woven fabrics;23- splash guards;24- secondary linings;25- just branch infiltrations Point;Nailing or expansion bolt of the 26- with packing ring;27- checks window.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is further described.As shown in figure 1, a kind of pin-connected panel tunnel Lining cutting behind circle draining construction, it is characterised in that including for assembled drain module unit 1, the drain module unit 1 Include top board and be vertically fixed on the side wall 4 of top board both sides, multiple drain module units 1 constitute ring along tunnel ring is assembled Drainage space;The side wall 4 is provided with permeable hole 5, and the bottom of side wall 4 is provided with for drain module unit 1 to be fixed on into tunnel The edge of a wing 2 on the basal plane of preliminary bracing 21.
The edge of a wing 2 is the lath for being fixed on the bottom outside of side wall 4, mounting hole 3 is offered thereon, the nailing with packing ring Or expansion bolt 26 fixes drain module unit 1 through mounting hole 3.
Embodiment 1:Can be in composite lining of tunnel(By taking half bag waterproof pattern shown in Fig. 5 as an example)Between realizing necessarily Every loopful or local ring drainage space.
Tunnel-liner behind circle draining tectonic type in the present embodiment is as shown in Figure 6:Loopful pumping equipment is along tunnel One determining deviation of road longitudinal direction is set, and is the longitudinal drainage facility from side arch springing to opposite side arch springing along the circumferentially disposed scope in tunnel Position;When the position of larger infiltration locally occurs in the surface of Tunnel 21, it is also possible to which the local ring pumping equipment of laying will Longitudinal drainage facility at infiltration ejectment to homonymy arch springing;Above-mentioned loopful or local ring pumping equipment, using drain module list Unit 1 is spliced to form along tunnel ring, and each drain module unit 1 is fixed on tunnel with nailing or expansion bolt 26 with packing ring The surface of preliminary bracing 21;Closed with adhesive tape 7 at drain module unit spliced seam position 6;It is spliced to form in drain module unit 1 Circle draining space in, the materials such as plastic drainage French drain 8 can be placed to prevent silting, the draining structure that the present embodiment is formed Make it is specific as shown in Figure 2 and Figure 3.
Implementation step is as follows:
Step 1:Tunnel excavation and preliminary bracing 21 is applied after finishing, the surface of supporting in the early stage 21 determines loopful and local ring row Drainage facility applies position.
Step 2:By drain module unit 1 along the surface defined location of Tunnel 21, with penetrating with packing ring Nail or expansion bolt 26 are fixed on the surface of Tunnel 21 through its mounting hole 3.
Step 3:Drain module unit 1 is spliced fixed successively along the surface ring of Tunnel 21 and is encircleed with tunnel The longitudinal drainage facility connection of pin both sides, also can gradually insert band in the circle draining space for gradually forming in this step Shape plastic drainage French drain material material 8.
Step 4:Seam areas 6 between drain module unit 1 are closed with adhesive tape 7.
Step 5:After the tunnel circle draining facility of a section is applied and finished, other follow-up works of constructing tunnel are carried out Sequence, such as non-woven fabrics 22 and splash guard 23 are laid, the reinforcing bar colligation and concreting of secondary lining 24, are formed complete tunnel and are answered Box-like liner structure.
Embodiment 2:In composite lining of tunnel(By taking half bag waterproof pattern shown in Fig. 5 as an example)Realize certain intervals Loopful or local ring drainage space, and circle draining facility can be checked during runing, desilting, replacing.
Tunnel-liner behind circle draining tectonic type in the present embodiment is as shown in Figure 7:Loopful pumping equipment is along tunnel One determining deviation of road longitudinal direction is set, and is the longitudinal drainage facility from side arch springing to opposite side arch springing along the circumferentially disposed scope in tunnel Position;When the position of larger infiltration locally occurs in the surface of Tunnel 21, it is also possible to which the local ring pumping equipment of laying will Longitudinal drainage facility at infiltration ejectment to homonymy arch springing;Above-mentioned loopful or local ring pumping equipment, using drain module list Unit 1 is spliced to form along tunnel ring, and each drain module unit 1 is fixed on tunnel with nailing or expansion bolt 26 with packing ring The surface of preliminary bracing 21;Closed with adhesive tape 7 at drain module unit spliced seam position 6;It is spliced to form in drain module unit 1 Circle draining space in, the materials such as plastic drainage French drain 8 can be placed to prevent silting;It is local in Tunnel Second Lining 24 Inspection window 27 is provided with, examination and maintenance can be carried out to circle draining facility.The drain structure that the present embodiment is formed is specific such as Shown in Fig. 4.
Implementation step is as follows:
Step 1~step 4:With embodiment 1.
Step 5:After the tunnel circle draining facility of a section is applied and finished, carry out tunnel-liner non-woven fabrics 22 and prevent Water plate 23 is laid, and the device of repeatable opening and closing is set on the reserved splash guard 23 and non-woven fabrics 22 for checking the position of window 27 As zip mode is pulled open and locking device.
Step 6:In the reinforcing bar colligation and concreting of Tunnel Second Lining 24, window is checked in reserved pumping equipment 27 position planks or other isolated materials reserve the space for checking window, it is to avoid reinforcing bar colligation and concreting are invaded and checks window 27 headspace.
During tunnel is runed, periodically check that circle draining facility of the splash guard 23 pairs of window portion at this is carried out by opening Check and desilting, and to damage drain module unit 1 change.When circle draining facility silting is serious, portion can be laid down Point drain module unit 1, extracts plastic drainage French drain material material 8 therein out, cleans out or is refilled after changing and backs into circle draining In facility, and the drain module unit 1 that will be laid down is reinstalled.

Claims (10)

1. a kind of pin-connected panel tunnel-liner behind circle draining is constructed, it is characterised in that including for assembled drain module list Unit(1), the drain module unit(1)Include top board and be vertically fixed on the side wall of top board both sides(4), multiple drain modules Unit(1)Circle draining space is constituted along tunnel ring is assembled;The side wall(4)It is provided with permeable hole(5), side wall(4)Bottom It is provided with for by drain module unit(1)It is fixed on Tunnel(21)The edge of a wing on basal plane(2).
2. pin-connected panel tunnel-liner behind circle draining according to claim 1 is constructed, it is characterised in that the ring row The material with filtering and water permeability is fitted with hydrospace.
3. pin-connected panel tunnel-liner behind circle draining according to claim 2 is constructed, it is characterised in that described to have The material of filter and water permeability is ribbon plastic drainage French drain material material(8).
4. pin-connected panel tunnel-liner behind circle draining according to claim 1 is constructed, it is characterised in that the edge of a wing (2)To be fixed on side wall(4)The lath of bottom outside, offers mounting hole thereon(3), nailing or expansion bolt with packing ring (26)Through mounting hole(3)By drain module unit(1)It is fixed.
5. pin-connected panel tunnel-liner behind circle draining according to claim 1 is constructed, it is characterised in that adjacent drainage channel mould Module unit(1)Stitching portion pass through jointing tape(7)Closing.
6. pin-connected panel tunnel-liner behind circle draining according to claim 1 is constructed, it is characterised in that also including setting In Tunnel Second Lining(24)Circle draining facility checkout window(27).
7. pin-connected panel tunnel-liner behind circle draining according to claim 1 is constructed, it is characterised in that the draining mould Module unit(1)Single splicing is installed or multiple rows of parallel ring is installed.
8. a kind of implementation that pin-connected panel tunnel-liner behind circle draining as claimed in claim 1 is constructed, its feature exists In comprising the following steps:
Step 1:Tunnel excavation and preliminary bracing(21)Apply after finishing, in the early stage supporting(21)Surface determines that circle draining is constructed Apply position;
Step 2:By drain module unit(1)Along Tunnel(21)Surface defined location ring splices solid successively It is fixed, circle draining space is formed, and be connected with the longitudinal drainage facility of tunnel arch foot both sides;
Step 3:In two neighboring drain module unit(1)Between seam areas(6)Use adhesive tape(7)Closed;
Step 4:After the tunnel circle draining facility of a section is applied and finished, tunnel-liner non-woven fabrics is carried out(22)And waterproof Plate(23)Laying, and implement Tunnel Second Lining(24).
9. the implementation that pin-connected panel tunnel-liner behind circle draining according to claim 8 is constructed, it is characterised in that The step 2 inserts banded plastic drainage French drain material material in being additionally included in the circle draining space afterwards(8).
10. the implementation that pin-connected panel tunnel-liner behind circle draining according to claim 8 is constructed, its feature exists In in Tunnel Second Lining(24)Reserved part space forms the inspection window of circle draining facility at middle correspondence circle draining construction (27).
CN201710072733.XA 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method Active CN106677821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710072733.XA CN106677821B (en) 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710072733.XA CN106677821B (en) 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method

Publications (2)

Publication Number Publication Date
CN106677821A true CN106677821A (en) 2017-05-17
CN106677821B CN106677821B (en) 2019-01-25

Family

ID=58860856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710072733.XA Active CN106677821B (en) 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method

Country Status (1)

Country Link
CN (1) CN106677821B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178393A (en) * 2017-07-07 2017-09-19 中铁第四勘察设计院集团有限公司 A kind of Tunnel Second Lining water pressure control structure
CN109681271A (en) * 2019-01-04 2019-04-26 交通运输部公路科学研究所 A kind of built-in type tunnel ring direction drainpipe method for arranging
CN110374638A (en) * 2019-07-31 2019-10-25 山东大学 A kind of anchor bar of waterproof plate in tunnels zip mode connection system and its construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004183338A (en) * 2002-12-04 2004-07-02 Maeda Corp Tunnel cut-off structure and construction method therefor
CN202926388U (en) * 2012-11-26 2013-05-08 宁波交通工程建设集团有限公司 Drainage facility for road surface bubbling water of highway tunnel
CN203702185U (en) * 2014-02-19 2014-07-09 中铁第一勘察设计院集团有限公司 Tunnel lining structure for preventing bottom plate from water seepage
CN205677631U (en) * 2016-06-12 2016-11-09 中铁二院工程集团有限责任公司 It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN206571526U (en) * 2017-02-10 2017-10-20 西南交通大学 A kind of pin-connected panel tunnel-liner behind circle draining construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004183338A (en) * 2002-12-04 2004-07-02 Maeda Corp Tunnel cut-off structure and construction method therefor
CN202926388U (en) * 2012-11-26 2013-05-08 宁波交通工程建设集团有限公司 Drainage facility for road surface bubbling water of highway tunnel
CN203702185U (en) * 2014-02-19 2014-07-09 中铁第一勘察设计院集团有限公司 Tunnel lining structure for preventing bottom plate from water seepage
CN205677631U (en) * 2016-06-12 2016-11-09 中铁二院工程集团有限责任公司 It is combined arch tunnel lining structure at the bottom of the box tunnel with hydrophobic function
CN206571526U (en) * 2017-02-10 2017-10-20 西南交通大学 A kind of pin-connected panel tunnel-liner behind circle draining construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王帅: "截水槽法治理隧道渗漏水施工技术", 《隧道建设》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178393A (en) * 2017-07-07 2017-09-19 中铁第四勘察设计院集团有限公司 A kind of Tunnel Second Lining water pressure control structure
CN107178393B (en) * 2017-07-07 2023-08-25 中铁第四勘察设计院集团有限公司 Tunnel secondary lining water pressure control structure
CN109681271A (en) * 2019-01-04 2019-04-26 交通运输部公路科学研究所 A kind of built-in type tunnel ring direction drainpipe method for arranging
CN110374638A (en) * 2019-07-31 2019-10-25 山东大学 A kind of anchor bar of waterproof plate in tunnels zip mode connection system and its construction method

Also Published As

Publication number Publication date
CN106677821B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CA2870715C (en) System and method for waterproofing below-grade wall structures
EP1856344B1 (en) Device for post-installation in-situ barrier creation and method of use thereof
CA2908651C (en) Method and device for covering and waterproofing joints in hydraulic works
EP3175045B1 (en) Method, waterproof liner and waterproof panels for installation in basins and canals
CN106677821A (en) Assembly type tunnel lining back circumferential drainage structure and implementation method thereof
CN111691467B (en) Construction method for basement water prevention and drainage combination
CN107327308A (en) A kind of Railway Tunnel waterproof method
KR101017117B1 (en) Method and device for waterproofing steel pipe loop structure by a water drainage process for constructing underground structure by non-excavation
CN206571526U (en) A kind of pin-connected panel tunnel-liner behind circle draining construction
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
KR100756932B1 (en) Pipe gutter repair method whithout digging
JP4044719B2 (en) Method and apparatus for extending waterproof sheet or gap suppressing material to tunnel
KR102037135B1 (en) Waterproof Sheet with Protective Material for Exterior-Waterproof of Underground Structure and Exterior-Waterproofing Method Using the Same
KR101524461B1 (en) Expansion joint with fiber reinforcement for waterway and the construction method thereof
CN115898469A (en) Tunnel secondary lining construction method
KR100701630B1 (en) Center Wall of Two Arch Tunnel
RU2272869C2 (en) Storage pit building method
JP7182176B2 (en) Tunnel lining method
CN208633159U (en) A kind of underground pipe gallery waterproof structure for deformation seams
KR20110080652A (en) Method for compartmentalized tunnel waterproofing
KR100941438B1 (en) Upper girder part waterproof method for 2 arch tunnel
KR100757202B1 (en) Center Wall of Two Arch Tunnel
JP7261409B2 (en) Tunnel lining method
JP4588232B2 (en) Installation method of water barrier in shield tunnel
CN118008392A (en) Waterproof system for rigid-flexible combination of connecting channel and positive line tunnel segment joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant