CN209227835U - A kind of recoverable steel pipe concrete frame compound shear wall - Google Patents

A kind of recoverable steel pipe concrete frame compound shear wall Download PDF

Info

Publication number
CN209227835U
CN209227835U CN201821023529.5U CN201821023529U CN209227835U CN 209227835 U CN209227835 U CN 209227835U CN 201821023529 U CN201821023529 U CN 201821023529U CN 209227835 U CN209227835 U CN 209227835U
Authority
CN
China
Prior art keywords
steel
steel pipe
shear wall
pipe concrete
concrete frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821023529.5U
Other languages
Chinese (zh)
Inventor
董宏英
李艳娜
曹万林
唐云鹏
武海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201821023529.5U priority Critical patent/CN209227835U/en
Application granted granted Critical
Publication of CN209227835U publication Critical patent/CN209227835U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

A kind of recoverable steel pipe concrete frame compound shear wall belongs to high-level structure applied technical field, is made of steel pipe concrete frame column, presstressed reinforcing steel and reinforced concrete shear wall.At shear wall both ends, steel pipe concrete frame column is set;Upper and lower part between two steel pipe concrete frame columns is connected with frame girder steel with lower frame girder steel respectively;Presstressed reinforcing steel is set inside steel pipe concrete frame column;Bind shear force wall reinforcing steel bar;The reinforcing bar of two sides is connected with each other with tension rib;Casting concrete;Prestressing force is applied using post stretching and constitutes a kind of recoverable steel pipe concrete frame compound shear wall.Relative shear sliding compared to common this wall of Self-resetting wall is substantially reduced, bearing capacity, ductility and energy dissipation capacity are more preferable than normal concrete shear wall, later period anti-seismic performance is relatively stable, and prestressing without bondn post-tensioning is easy for construction, can be used in high-rise or large complicated tier building.

Description

A kind of recoverable steel pipe concrete frame compound shear wall
Technical field
The utility model is a kind of recoverable steel pipe concrete frame compound shear wall, belongs to high-level structure application technology Field is a kind of Novel steel-combined concrete shear wall that can partially restore deformation.
Background technique
The generation of earthquake disaster often brings huge loss, and present skyscraper is increasing, and guarantees the reliable of building Property just seem particularly significant, meanwhile, requirement of the national regulation to building is increasingly stringenter, can from no collapsing with strong earthquake towards big shake Repair, it is self-healing to seek development, and the anti-seismic performance of shear wall structure is most important for securely and reliably having for skyscraper Effect, the concrete breakage easy to crack under geological process of existing ordinary reinforced concrete shear wall, ductility is poor, antidetonation effect Fruit is poor, this is very unfavorable to the anti-seismic performance of monolithic architecture structure.
Steel pipe concrete frame compound shear wall increases steel pipe concrete frame column in shear wall two sides, increases to mixed The binding effect for coagulating soil, improves the anti-seismic performance of its bearing capacity and shear wall, and being effectively improved corner concrete, locally crushing is opened The disadvantages of splitting, still, general steel pipe concrete frame compound shear wall, be displaced in seismic process it is larger, it is remaining after being damaged to become Shape is larger to be difficult to restore.And the wall of general Self-resetting shear wall and basis disconnect, and presstressed reinforcing steel is only added in wall by wall Body is connect with basis, or by the way that vertical energy-consuming parts are arranged at the bottom of the shear wall or set other companies of normally connection etc. for middle part The mode of connecing improves, and the self-healing of this wall is good, under low cycling loads effect, passes through the pact of presstressed reinforcing steel Beam, wall can restore original position, but this wall connect less, lateral resisting deficiency with basis.Therefore one kind is researched and developed The compound shear wall of the novel high-bearing capacity with certain recoverable function is very significant.
Summary of the invention
The utility model, which is directed to, solves the problems, such as that the anti-seismic performance of the irrecoverable and common shear wall in earthquake is insufficient.It will Presstressed reinforcing steel and steel pipe concrete frame combined concrete shear wall combine, and form the Novel steel-with certain restorability energy Combined concrete shear wall is mainly used for the shear wall structure or tube structure of skyscraper or large complicated tier building.
The technical solution adopted in the utility model is as follows:
A kind of recoverable steel pipe concrete frame compound shear wall, by steel pipe concrete frame column (1), presstressed reinforcing steel (2) it is formed with reinforced concrete shear wall, the steel mesh being made of horizontal and genesis analysis reinforcing bar is configured in shear wall slab, It is socketed between steel mesh with connecting lacing wire (7), main feature are as follows: the steel pipe concrete frame of the shapes such as rectangle is arranged in shear wall both ends Column (1), wall section be it is I-shaped, presstressed reinforcing steel 2 is built in the frame columns of steel pipe concrete frame compound shear wall;Two sides The upper and lower part of steel core concrete column be fixedly connected with lower frame girder steel (11) with frame girder steel (10);The two sides of wall It is arranged symmetrically the steel mesh being made of horizontal distribution reinforcing bar (5) and vertical distribution bar (6), and with socketing reinforcing bar (7) for two sides Steel mesh socket;Upper and lower position setting top grid beam (10) of wall and following grid beam or foundation beam (11);By steel pipe Concrete frame column (1), top grid beam (10), following grid beam or foundation beam (11) and reinforced concrete shear wall body pour and smash coagulation Soil forming;After molding, using post stretching by tension of prestressed tendon to designing prestress value, and it is fixed with anchorage (3), that is, constitute one The recoverable steel pipe concrete frame compound shear wall of kind.
" the steel pipe concrete frame combined shear " refers to by steel pipe concrete frame column 1, horizontal reinforcement (5) and longitudinal direction The steel-concrete compound shear wall of reinforcing bar (6) combination.
Further, steel pipe concrete frame column (1) section form can be rectangle and polygon etc., in thickness of wall body The size in direction is greater than thickness of wall body, and the construction measures such as steel reinforcement cage can be added inside frame columns, or increases partition and form multi-cavity The upper and lower part of body steel core concrete column, the steel core concrete column of two sides is solid with frame girder steel (8) and lower frame girder steel (9) Fixed connection, upper end lower end is respectively protruding into top grid beam (10) and following grid beam or foundation beam (11).
Further, the upper frame girder steel (8) and lower frame girder steel (9) can use i shaped steel, H profile steel, U-steel Deng other fashioned iron or steel plate strip, width is less than the interior clear distance of two sides reinforcing bar, and has enough width between reinforcing bar, ensures Concrete pours.
Further, the presstressed reinforcing steel (2) is un-bonded prestressed steel strand or prestressing force spiral, can be directlyed adopt Finished product un-bonded prestressed steel strand can also completely cut off concrete and pre- in common steel strand wires or deformed bar housing bellows etc. The method of stress rib bonding can be evenly arranged 1 or more presstressed reinforcing steels in frame columns, use after tensioned prestressing bar at both ends Anchorage (3) is fixed, and anchorage (3) is divided into fixing end anchorage and stretching end anchorage, is separately fixed at the two of steel pipe concrete frame column End, is pressed on backing plate.
Further, the backing plate (4) is at steel pipe concrete frame column both ends, and pad is in anchorage in the following, its length and width dimensions is big In the size of steel pipe, and the hole that reserved presstressed reinforcing steel passes through on backing plate.
Further, the horizontal distribution reinforcing bar (5) of the assembled wall is connect with steel pipe concrete frame column (1);Vertical point Cloth reinforcing bar (6) upper end lower end, which is respectively protruding into top grid beam (10) and following grid beam or foundation beam (11), carries out reliably rigid connect It connects.
Further, the steel tie (7) in the assembled wall divides by the horizontal distribution reinforcing bar (5) of wallboard two sides and vertically The reinforced mesh drawknot of cloth reinforcing bar (6) composition gets up.
Further, the top grid beam (10) and following grid beam or foundation beam (11) are reinforced beam, or are fashioned iron Beams of concrete, section are rectangle, concrete cast in situs.
A kind of way of recoverable steel pipe concrete frame compound shear wall, it is characterised in that: production order is as follows:
1) steel pipe, backing plate (4), upper frame girder steel (8) and lower frame girder steel (9) are made, is reserved on backing plate (4) across pre- Backing plate (4) is welded on the upper and lower ends of steel pipe by the circular hole of stress rib, by upper frame girder steel (8) and lower frame girder steel (9) difference It is welded on the upper and lower part between two steel pipe columns, fixed steel frame, it is ensured that position will not occur partially when pouring;
2) presstressed reinforcing steel (2) is put on into bellows, across the inside of steel pipe, the hole reserved from backing plate is pierced by, and under End is fixed with anchorage (3);
3) reinforcing bar of the following grid beam of binding concrete or foundation beam (11), and steel frame, the shearing that presstressed reinforcing steel will be had The vertical distribution bar of wall (6) is inserted into the steel reinforcement cage of following grid beam or foundation beam (11), is poured following grid beam or foundation beam (11) Concrete, guarantee that the anchorage of presstressed reinforcing steel bottom is close to lower part backing plate when pouring, it is vertical to keep, it is ensured that at presstressed reinforcing steel lower end After anchoring status, concrete curing consolidation, keep following grid beam or foundation beam (11) and steel pipe concrete frame, shear wall vertical Reliable rigid connection is realized in the bottom of distribution bar, and presstressed reinforcing steel lower part is in fixing end;
4) production technique reinforcing bar (5), and horizontal reinforcement and steel core concrete column are welded;With steel tie (7) by steel plate The horizontal reinforcement (5) and longitudinal reinforcement (6) of two sides socket;
5) top grid beam (10) are made, carries out it with steel pipe concrete frame column (1) and the vertical distribution bar of wallboard (6) Reliable rigid connection;
6) thickness of concrete cover, fixed steel pipe concrete frame are reserved by spacer in shear wall wallboard two sides The position of bellows in column, and be allowed to keep vertical, bellows opening by the gap between bellows and presstressed reinforcing steel into Row blocks, the template of the concrete of branch casting later;
7) pour steel pipe concrete frame column (1), shear wall wallboard, top grid beam (10) concrete, poured engineering There cannot be any concrete in the middle bellows for placing presstressed reinforcing steel, be demoulded after molding.
8) after forming, remove the plugging material between bellows and presstressed reinforcing steel, it is ensured that the soap-free emulsion polymeization of presstressed reinforcing steel is being applied Enough construction spaces can be provided for tensioning equipment in the reserved construction hole of stretching end in work, be opened presstressed reinforcing steel using post stretching It is pulled to design prestress value, and fixed with anchorage (3), space forms a kind of recoverable steel pipe concrete frame combined shear Wall.
The beneficial effects of the utility model are:
The utility model is that presstressed reinforcing steel and steel pipe concrete frame compound shear wall are carried out advantageous combination, using will be pre- Stress rib is arranged in the construction in the steel pipe concrete frame column of the biggish lower region of shear wall stress, not only gives full play to The excellent anti-seismic performance of steel pipe concrete frame shear wall also takes full advantage of the high-strength performance of unbonded prestressing tendon, reaches Recoverable effect.After adding presstressed reinforcing steel in the steel core concrete column of the novel compositions shear wall, have with lower stress and Functional characteristics: the steel core concrete column at wall both ends can effective confined concrete, improve the bearing capacity of concrete, enhance wall The anti-seismic performance of body, and the ductility of steel pipe can preferably give full play to the deformability of steel, when by tension and compression load, by Be in soap-free emulsion polymeization state in prestress wire or high tensile reinforcement so that under big shake shear wall bottom steel pipe concrete frame Close to when surrender, the un-bonded prestressed steel strand or high tensile reinforcement being arranged in steel pipe concrete frame also still in elasticity, Under tensile load, pulling force is born by presstressed reinforcing steel first, until steel pipe zero stress state just starts steel pipe and presstressed reinforcing steel is common Pulling force is born, concrete filled steel tube stretcher strain reduction, steel pipe surrender delays, rod piece tensile capacity significantly improves, when tension load After removal, stretcher strain can partly or entirely restore, and restore suitably to be repaired even if part to reach reusable Purpose, to make entire combined member that there is function restorability.It is connected between steel core concrete column with frame girder steel, and with Upper and lower side frame beam consolidation, horizontal bar and steel-pipe welding, two sides steel mesh tension rib drawknot, make steel construction and concrete wall at For an entirety, the globality of structure is effectively raised, so that each section gives full play to respective performance, is worked together, advantage It is complementary.
A kind of recoverable steel pipe concrete frame compound shear wall of the utility model has certain under geological process Restorability.In seismic energy input, reinforced concrete wall panel starts to play a role as one of anti-vibration defense lines, and steel pipe is mixed Solidifying soil frame also plays a role as another road defence line, and applying prestressing force to presstressed reinforcing steel can be constrained the deformation of wall, and The recoverable force for making wall to a certain extent effectively reduces integrally-built displacement, improves concrete panel vertical bearing capacity And restoring force.With the increase of input energy, for steel pipe concrete frame close to surrender, the interior nothing being arranged of steel pipe concrete frame is viscous Presstressed reinforcing steel is tied still in elasticity, the displacement of wall can be constrained.Opposite compared to common this wall of Self-resetting wall is cut It cuts sliding to be substantially reduced, bearing capacity, ductility and energy dissipation capacity are more preferable than normal concrete shear wall, and later period anti-seismic performance is relatively steady Fixed, prestressing without bondn post-tensioning is easy for construction, can be used in high-rise or large complicated tier building.
When building meets with violent earthquake, its earthquake can reduce, there is part recoverable function, while also improving knot The shock resistance and restoring force of structure entirety.
Detailed description of the invention
Fig. 1 is a kind of recoverable steel pipe concrete frame compound shear wall horizontal profile schematic diagram
Fig. 2 is compound shear wall wall elevational schematic view
Fig. 3 is vertical cross section schematic diagram at compound shear wall frame columns
Fig. 4 is compound shear wall wall vertical cross section schematic diagram
Attached drawing code name explanation: 1- steel pipe concrete frame column, 2- presstressed reinforcing steel, 3- anchorage, 4- backing plate, 5- horizontal distribution steel Muscle, the vertical distribution bar of 6-, 7- steel tie, 8- upper ledge girder steel, 9- lower frame girder steel, the top 10- grid beam, the following grid beam of 11- or Foundation beam.
Specific embodiment
The utility model is described further combined with specific embodiments below:
A kind of structural schematic diagram such as Fig. 1 of a structural unit of recoverable steel pipe concrete frame compound shear wall, Shown in Fig. 2, Fig. 3 and Fig. 4.
A kind of recoverable steel pipe concrete frame compound shear wall, by steel pipe concrete frame column 1,2 and of presstressed reinforcing steel Reinforced concrete shear wall composition, configures the steel mesh being made of horizontal and genesis analysis reinforcing bar, in reinforcing bar in shear wall slab It is socketed between net with connecting lacing wire 7, main feature are as follows: the steel pipe concrete frame column 1 of the shapes such as rectangle, wall is arranged in shear wall both ends Body section be it is I-shaped, presstressed reinforcing steel 2 is built in the frame columns of steel pipe concrete frame compound shear wall.
" the steel pipe concrete frame compound shear wall " refers to by steel pipe concrete frame column 1, horizontal reinforcement 5 and longitudinal direction The combined steel-concrete compound shear wall of reinforcing bar 6.
1 section form of steel pipe concrete frame column can be for rectangle and polygon etc., the ruler in thickness of wall body direction It is very little to be greater than thickness of wall body, the construction measures such as steel reinforcement cage can be added inside frame columns, or increase partition formation Multicarity steel pipe and mix Solidifying earth pillar, the upper and lower part of the steel core concrete column of two sides are fixedly connected with frame girder steel 8 with lower frame girder steel 9, upper end Lower end is respectively protruding into top grid beam 10 and following grid beam or foundation beam 11.
The upper frame girder steel 8 and lower frame girder steel 9 can using other fashioned iron such as i shaped steel, H profile steel, U-steels or Steel plate strip, width are less than the interior clear distance of two sides reinforcing bar, and have enough width between reinforcing bar, ensure pouring for concrete It builds.
The presstressed reinforcing steel 2 is un-bonded prestressed steel strand or prestressing force spiral, can directly adopt finished product without viscous Prestress wire is tied, concrete can also be completely cut off in common steel strand wires or deformed bar housing bellows etc. and presstressed reinforcing steel is viscous The method of knot can be evenly arranged 1 or more presstressed reinforcing steels in frame columns, be consolidated at both ends with anchorage 3 after tensioned prestressing bar Fixed, anchorage 3 divides for fixing end anchorage and stretching end anchorage, is separately fixed at the both ends of steel pipe concrete frame column, is pressed in backing plate On.
The backing plate 4 is at steel pipe concrete frame column both ends, and pad is in anchorage in the following, its length and width dimensions is all larger than the ruler of steel pipe It is very little, and the hole that reserved presstressed reinforcing steel passes through on backing plate.
The horizontal distribution reinforcing bar 5 of the assembled wall is connect with steel pipe concrete frame column 1;Vertical 6 upper end of distribution bar Lower end is respectively protruding into top grid beam 10 and following grid beam or foundation beam 11 and is reliably rigidly connected.
Steel tie 7 in the assembled wall forms the horizontal distribution reinforcing bar 5 of wallboard two sides and vertical distribution bar 6 Reinforced mesh drawknot get up.
The top grid beam 10 and following grid beam or foundation beam 11 are reinforced beam, or are girder with rolled steel section en cased in concrete, are cut Face is rectangle, concrete cast in situs.
A kind of recoverable steel pipe concrete frame compound shear wall, production order are as follows:
1) steel pipe, backing plate (4), upper frame girder steel (8) and lower frame girder steel (9) are made, is reserved on backing plate (4) across pre- Backing plate (4) is welded on the upper and lower ends of steel pipe by the circular hole of stress rib, by upper frame girder steel (8) and lower frame girder steel (9) difference It is welded on the upper and lower part between two steel pipe columns, fixed steel frame, it is ensured that position will not occur partially when pouring;
2) presstressed reinforcing steel (2) is put on into bellows, across the inside of steel pipe, the hole reserved from backing plate is pierced by, and under End is fixed with anchorage (3);
3) reinforcing bar of the following grid beam of binding concrete or foundation beam (11), and steel frame, the shearing that presstressed reinforcing steel will be had The vertical distribution bar of wall (6) is inserted into the steel reinforcement cage of following grid beam or foundation beam (11), is poured following grid beam or foundation beam (11) Concrete, guarantee that the anchorage of presstressed reinforcing steel bottom is close to lower part backing plate when pouring, it is vertical to keep, it is ensured that at presstressed reinforcing steel lower end After anchoring status, concrete curing consolidation, keep following grid beam or foundation beam (11) and steel pipe concrete frame, shear wall vertical Reliable rigid connection is realized in the bottom of distribution bar, and presstressed reinforcing steel lower part is in fixing end;
4) production technique reinforcing bar (5), and horizontal reinforcement and steel core concrete column are welded;With steel tie (7) by steel plate The horizontal reinforcement (5) and longitudinal reinforcement (6) of two sides socket;
5) top grid beam (10) are made, carries out it with steel pipe concrete frame column (1) and the vertical distribution bar of wallboard (6) Reliable rigid connection;
6) thickness of concrete cover, fixed steel pipe concrete frame are reserved by spacer in shear wall wallboard two sides The position of bellows in column, and be allowed to keep vertical, bellows opening by the gap between bellows and presstressed reinforcing steel into Row blocks, the template of the concrete of branch casting later;
7) pour steel pipe concrete frame column (1), shear wall wallboard, top grid beam (10) concrete, poured engineering There cannot be any concrete in the middle bellows for placing presstressed reinforcing steel, be demoulded after molding.
8) after forming, remove the plugging material between bellows and presstressed reinforcing steel, it is ensured that the soap-free emulsion polymeization of presstressed reinforcing steel is being applied Enough construction spaces can be provided for tensioning equipment in the reserved construction hole of stretching end in work, be opened presstressed reinforcing steel using post stretching It is pulled to design prestress value, and fixed with anchorage (3), space forms a kind of recoverable steel pipe concrete frame combined shear Wall.
It is an exemplary embodiments of the utility model above, the implementation of the utility model is without being limited thereto.

Claims (8)

1. a kind of recoverable steel pipe concrete frame compound shear wall, which is characterized in that including steel pipe concrete frame column (1), presstressed reinforcing steel (2) and reinforced concrete shear wall, configuration is made of horizontal and genesis analysis reinforcing bar in shear wall slab Steel mesh is socketed between steel mesh with steel tie (7), and steel pipe concrete frame column (1) is arranged in shear wall both ends, and wall is cut Face be it is I-shaped, presstressed reinforcing steel is built in the frame columns of steel pipe concrete frame compound shear wall;The concrete filled steel tube of two sides Frame girder steel (8) is used to be fixedly connected with lower frame girder steel (9) respectively in the upper and lower part of column;The two sides of wall be arranged symmetrically by The steel mesh of horizontal distribution reinforcing bar (5) and vertical distribution bar (6) composition, and drawn the steel mesh of two sides with steel tie (7) It picks up and;Upper and lower position setting top grid beam (10) of wall and following grid beam or foundation beam (11);By steel pipe concrete frame Column (1), top grid beam (10), following grid beam or foundation beam (11) and the forming of reinforced concrete shear wall body disturbing concrete;? The presstressed reinforcing steel for being pulled to design prestress value is fixed by anchorage (3).
2. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that: described Steel pipe concrete frame column (1) section form be rectangle or polygon, thickness of wall body direction size be greater than thickness of wall body, two The upper and lower part of the steel core concrete column of side is fixedly connected with frame girder steel (8) with lower frame girder steel (9), upper end lower end point Top grid beam (10) and following grid beam or foundation beam (11) are not protruded into.
3. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that: described Upper frame girder steel (8) and lower frame girder steel (9) use i shaped steel, H profile steel or U-steel, and width is less than two sides reinforcing bar Interior clear distance, and have enough width between reinforcing bar, ensure pouring for concrete.
4. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that: described Presstressed reinforcing steel (2) is un-bonded prestressed steel strand or prestressing force spiral, directlys adopt finished product prestressing without bondn steel strand Line, or in the method for common steel strand wires or deformed bar housing bellows isolation concrete and presstressed reinforcing steel bonding, on side 1 or more presstressed reinforcing steels, anchorage (3) point fixed with anchorage (3) at both ends after tensioned prestressing bar are evenly arranged in frame column For fixing end anchorage and stretching end anchorage, the both ends of steel pipe concrete frame column are separately fixed at, are pressed on backing plate.
5. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 4, it is characterised in that: described Backing plate (4) is padded in anchorage at steel pipe concrete frame column both ends in the following, its length and width dimensions is all larger than the size of steel pipe, and is padding The hole that presstressed reinforcing steel passes through is reserved on plate.
6. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that: horizontal Distribution bar (5) is connect with steel pipe concrete frame column (1);Vertical distribution bar (6) upper end lower end is respectively protruding into top grid beam (10) and in following grid beam or foundation beam (11) it is rigidly connected.
7. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that: drawknot Reinforcing bar (7) gets up the reinforced mesh drawknot that the horizontal distribution reinforcing bar (5) of wallboard two sides and vertical distribution bar (6) form.
8. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that: described Top grid beam (10) and following grid beam or foundation beam (11) are reinforced beam, or are girder with rolled steel section en cased in concrete, and section is rectangle.
CN201821023529.5U 2018-06-29 2018-06-29 A kind of recoverable steel pipe concrete frame compound shear wall Expired - Fee Related CN209227835U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821023529.5U CN209227835U (en) 2018-06-29 2018-06-29 A kind of recoverable steel pipe concrete frame compound shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821023529.5U CN209227835U (en) 2018-06-29 2018-06-29 A kind of recoverable steel pipe concrete frame compound shear wall

Publications (1)

Publication Number Publication Date
CN209227835U true CN209227835U (en) 2019-08-09

Family

ID=67496825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821023529.5U Expired - Fee Related CN209227835U (en) 2018-06-29 2018-06-29 A kind of recoverable steel pipe concrete frame compound shear wall

Country Status (1)

Country Link
CN (1) CN209227835U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678223A (en) * 2018-06-29 2018-10-19 北京工业大学 A kind of recoverable steel pipe concrete frame compound shear wall and the practice

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678223A (en) * 2018-06-29 2018-10-19 北京工业大学 A kind of recoverable steel pipe concrete frame compound shear wall and the practice

Similar Documents

Publication Publication Date Title
CN208668683U (en) The built-in built-in steel plate combined shear wall of presstressed reinforcing steel steel pipe concrete frame
CN106869316B (en) The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube
CN106869315B (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN108678225A (en) The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice
CN108560423A (en) A kind of construction method of regular reinforcement and finish rolling deformed bar hybrid reinforcement assembly pier
WO2019149270A1 (en) Assembled pier for mixed reinforcement of normal steel rebar and finished threaded steel bar
CN202247707U (en) Vertical external prestress and steel plate combined reinforcing box girder structure
CN108487461A (en) Precast prestressed concrete frame bean column node with additional bar and sleeve
CN106013432B (en) A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN103046645B (en) A kind of whole casting structure and construction method of Large-span Precast
CN106948481B (en) Prefabrication and assembly construction concrete frame beam-column connection based on the high strengthening tendons in part
CN108678227A (en) A kind of the band diagonal brace steel pipe concrete frame shear wall and the practice of built-in prestressed steel bar
CN108678223A (en) A kind of recoverable steel pipe concrete frame compound shear wall and the practice
CN104929278A (en) Assembly type dense column hollow shear wall structure
CN106958319A (en) Precast concrete post component and connected node
CN208668684U (en) Prestressed steel pipe concrete frame double steel plate shear wall built in one kind
CN106088412A (en) L-type steel beam column
CN108678226A (en) Prestressed steel pipe concrete frame profiled sheet shear wall and the practice built in one kind
CN205531016U (en) Precast concrete post component and connected node
CN209227835U (en) A kind of recoverable steel pipe concrete frame compound shear wall
CN214364376U (en) Strengthen built-up connection shear force wallboard and shear force wall
CN207079628U (en) A kind of open pore steel plate steel reinforced concrete assembling rectangle piping lane section
CN106869317B (en) The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube
KR101358878B1 (en) Reinforcement member and girder using the same
CN104264782B (en) Assembled integral pre-stressed concrete frame structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809