CN106013432B - A kind of high ductility prefabricated integral frame interior joint connection structure and construction method - Google Patents

A kind of high ductility prefabricated integral frame interior joint connection structure and construction method Download PDF

Info

Publication number
CN106013432B
CN106013432B CN201610349356.5A CN201610349356A CN106013432B CN 106013432 B CN106013432 B CN 106013432B CN 201610349356 A CN201610349356 A CN 201610349356A CN 106013432 B CN106013432 B CN 106013432B
Authority
CN
China
Prior art keywords
column
prefabricated
node
prefabricated post
reserving hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610349356.5A
Other languages
Chinese (zh)
Other versions
CN106013432A (en
Inventor
潘金龙
苏浩
单奇峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201610349356.5A priority Critical patent/CN106013432B/en
Publication of CN106013432A publication Critical patent/CN106013432A/en
Application granted granted Critical
Publication of CN106013432B publication Critical patent/CN106013432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

It include prefabricated post and precast beam the invention discloses a kind of high ductility prefabricated integral frame interior joint connection structure and construction method, the component of use.The column of assembly concrete frame structure-column connection node is attached at every layer of inflection point or every two layers of inflection point using grout sleeve slip casting connection method;The connection of beam column interior joint is anchored using node reserves duct grouting, and the U-shaped muscle of top tension reinforcement and lower part passes through reserving hole channel and is in the milk, in overlapping beam-ends using the cast-in-place connection for realizing beam column of engineering fiber cement composites.The present invention is applied in prefabricated integral frame structure, realizes the aseismatic design concept of " strong column and weak beam ", " strong shear capacity and weak bending capacity " and " the strong weak component of node ", improves the anti-seismic performance of assembly concrete frame structure;Meanwhile vertical member is connected using grout sleeve, and it is convenient and efficient, accelerate speed of application.

Description

A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
Technical field
The invention belongs to structural engineering field, it is related to a kind of high ductility prefabricated integral frame interior joint connection structure and applies Work method is mainly used in prefabricated integral frame structure.
Background technique
The building trade of China is a time-honored conventional industries, construction industry not only to the contribution of national economy increasingly It highlights, and in promoting employment, other aspects such as Industrial Linkage have also played huge effect.
However, with the development of society, the more and more contradictions of building trade have highlighted: building trade energy consumption is excessively high, The filthy phenomenon in construction site is very universal, and construction quality is also difficult to ensure, labor cost goes up etc..Various these Phenomenon, illustrates more with traditional people, and the building trade of inefficient extensive construction is hard to carry on.In recent years, country and ground Side all starts to carry forward vigorously building industrialization and housing industrialization, makes great efforts to promote Residential structure upgrading and adjustment.
So-called housing industrialization is exactly in plant produced precast concrete, then by automobile, the machinery such as crane are set Complete assembled in received shipment to construction site.House is built by industrialized production method, is that mechanization degree is not high and extensive style The inevitable requirement of the production method upgrading of production.Compared to traditional architecture, prefabrication has the advantages that significant: Prefabricated components industrialized production;Site operation is convenient, and construction speed is fast;Environment-friendly and energy-saving emission-reduction is conducive to sustainable development;It is economical Remarkable benefit.The Green Development requirement that prefabricated assembled concrete structure is advantageously implemented " four sections, one environmental protection " is promoted, is realized low Energy consumption, low emission building course, the sound development of China's building trade can be promoted, realize scheduled target for energy-saving and emission-reduction, It is the developing direction of China's future architecture.
Frame structure is the most widely used structural system, and itself and shear wall structure, tube structure etc. can also combine At shear force of frame wall system, frame-tube system.Therefore, prefabricated assembly structural system is promoted, research precast frame beam column connects It is very necessary to connect mode.It is well known that frame structure can overall work, being reliably connected very between frame column and Vierendeel girder It is crucial.Conventional concrete construction is since concrete cast-in-situ, node region steel bar stress are continuously arranged, as long as configuring reasonable steel Muscle is generally not in continuous damage between component.But during the practice of construction of precast concrete, prefabricated components The construction positioning of junction is not easy, therefore reduces speed of application and efficiency;For precast concrete, the company of component Whether be key point that can total play design function, and usually precast construction junction if connecing quality and can be guaranteed Shear-carrying capacity and ductility it is poor, the weak part in structural system is easily become, so that the safety to total is made At threat;Existing some research achievements also indicate that, the anti-seismic performance and cast-in-place concrete structure of fabricated assembly overall structure Compared to poor, so the anti-seismic performance for how further increasing fabricated assembly overall structure is still worth carrying out deep grind Study carefully.
The bean column node and near zone of frame structure will bear very big internal force, existing assembled under geological process In frame structure interconnection technique scheme, the big more options in node area are cast-in-place at the construction field (site).Since new-to-old concrete interface bonding is strong Degree is insufficient, inevitably results in beam-ends insufficient rigidity, weakens the ductility and bearing capacity and node district concrete site operation of node Bring is inconvenient, and new-to-old concrete interface is caused remove too early or node premature failure, can not achieve " strong column and weak beam ", " by force Cut weak curved " and " the strong weak component of node " aseismic design concept and requirement.
ECC (Engineered Cementitious Composites) material is a kind of new type water with superpower toughness Then cement-based composite material, the material are added synthetic fibers and are formed using cement and fine sand as filler.Existing research achievement table Bright, the ultimate tensile strength value of the material can stably reach 3%-5%, 100~300 times of left sides of about common concrete material The right side is 5~10 times or so of reinforcing bar.ECC material not only has the toughness of superelevation, the characteristics of stitching stable state cracking, in safety more Property, durability, applicability etc. have excellent performance, can well solve conventional concrete due to fragility, weak drawing Many disadvantages caused by stretching property.ECC has stronger energy absorption capability simultaneously, and higher shearing strength is also anti-for structure Shake design provides new selection.Again since the price of ECC is relatively high, concrete is integrally replaced to be used to build ECC material Structure be clearly it is uneconomic also It is not necessary to.In prefabricated integral frame structure, the superiority of ECC material can be made full use of Can, it is substituted concrete and is used for key force part and connecting portion at node, to improve prefabricated integral frame structure Overall performance and anti-seismic performance.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the present invention provides a kind of easy for construction, scheme conjunction Manage, can be improved the interior joint connection structure and construction method of prefabricated integral frame structural seismic performance.
Technical solution: to achieve the above object, the present invention provides a kind of high ductility prefabricated integral frame interior joints to connect Girder construction and construction method are connect, the component which uses includes prefabricated post and precast beam.The column of frame structure-column connection Node at every layer of inflection point or every two layers of inflection point, be attached using grout sleeve slip casting connection method;Beam The connection of column interior joint is anchored using node reserves duct grouting, and the U-shaped muscle of top tension reinforcement and lower part passes through reserving hole channel and fills Slurry anchoring, in overlapping beam-ends using the cast-in-place connection for realizing beam column of engineering fiber cement composites, join domain length For 400mm~500mm;Meanwhile in order to weaken the insufficient influence of new-old concrete interface binding intensity, beam-ends rigidity is improved, is reached To by the purpose of plastic hinge, frosting treatment is carried out to prefabricated post end node bonding pad concrete interface, and save in beam column Stiffener is arranged in point junction, and stiffener is also by reserving hole channel and is in the milk.The present invention is applied to prefabricated integral frame The aseismatic design concept in structure, realizing " strong column and weak beam ", " strong shear capacity and weak bending capacity " and " the strong weak component of node ", improves assembled The anti-seismic performance of concrete frame structure;Meanwhile vertical member is connected using grout sleeve, and it is convenient and efficient, accelerate construction speed Degree.
The technical solution adopted by the present invention are as follows:
A kind of high ductility prefabricated integral frame interior joint connection structure, prefabricated post and horizontal direction including vertical direction Precast beam, the prefabricated post and precast beam two sides are symmetrically arranged with vertical muscle, internal equal along being equipped with the vertical muscle vertical direction Even parallel several stirrups;
The prefabricated post is equipped with node bonding pad, and being horizontally disposed in the node bonding pad has several reserving hole channels;
In the prefabricated post two sides, the end of two precast beams in left and right is respectively by described in the corresponding insertion of anchor bar In reserving hole channel, it is connected with the prefabricated post.
Further, the preformed hole is inserted by the way that vertical muscle and U-shaped muscle are corresponding respectively in the top and the bottom of the precast beam end The upper and lower layer duct in road is fixed.
Further, stiffener is arranged in the duct of the middle section of the reserving hole channel.
Further, in overlapping beam-ends using the cast-in-place connection for realizing beam column of engineering fiber cement composites, even Connecing zone length is 400mm~500mm.
Further, inflection point or every two layers of inflection point of the column of the prefabricated post-column connection node at every layer Place, is attached using grout sleeve slip casting connection method.
Further, the concrete interface of the node bonding pad of the prefabricated post carries out frosting treatment.
A kind of construction method of high ductility prefabricated integral frame interior joint connection structure, comprising the following steps:
1) mold of prefabricated post and precast beam, assembling reinforcement, the position of positioning reserving hole channel, grout sleeve, preparation are made The prefabricated components of prefabricated post and precast beam;
2) after prefabricated post and lower floor's post positioned in alignment are good, lateral support is added to fix in column side, then through grout sleeve under Layer column connects;
3) the stiffener and lower part U-shaped muscle intermediate by reserving hole channel setting, and it is closely knit to be in the milk;
4) precast beam lifting is in place, the vertical muscle on top is arranged by reserving hole channel, and it is closely knit to be in the milk;
5) stirrup of node bonding pad is bound;
6) engineering fiber cement composites are poured in node bonding pad.
The utility model has the advantages that high ductility prefabricated integral frame interior joint connection structure provided by the invention and construction method, and Existing prefabricated integral frame structure node interconnection technique scheme is compared, and is had the advantages that
Column fractionation position is selected at floor 1. existing fabricated construction is more, but is located near node area at floor, it is interior Power is complicated and larger, while component stitching portion is the weak part of structure again, if in the horizontal loadings such as earthquake or wind Under effect, structure may be made to be in the state being absolutely unsafe.Internal force analysis is carried out by finite element software it is found that frame column is perpendicular To under horizontal loads, be moment of flexure smaller part away from 1/3 to 1/2 place of styletable, therefore the present invention is proposed the fractionation position of column It is selected at every layer of inflection point or every two layers of inflection point, weak part can be made to avoid internal force maximum, improve structural elements Safety.Simultaneously in this height, also it is conducive to very much construction, it is convenient to bring to construction.
2. column is attached with column junction using grout sleeve slip casting connection method, constructs very convenient, can be improved Speed of application;And junction is at every layer of inflection point, and under horizontal earthquake action, which enables bonding pad Enough bearing capacities are enough provided.
3. the connection of existing fabricated construction cast-in-place concrete realization precast beam and prefabricated post mostly at node, therefore During practice of construction, the construction positioning of prefabricated components junction is not easy, and reduces speed of application and efficiency;And this kind of way is led It causes node area hooping bars layout overstocked, brings great difficulty to site operation, be easy to cause node or key position coagulation Soil vibrates leakiness, brings security risk.And node and prefabricated shell of column are realized into one-piece casting in factory in the present invention, both improved Speed of application and efficiency, in turn ensure the quality and bearing capacity in node area.
4. if production, the installation of template can be given being embedded to beam-ends top tension when pouring prefabricated post indulges muscle and the U-shaped muscle in lower part Great difficulty is brought with dismounting.Therefore, the method that the present invention uses reserving hole channel, duct is arranged when pouring prefabricated post, to Beam-ends top tension is penetrated when in-site installation and indulges muscle and the U-shaped muscle in lower part, and it is closely knit to be in the milk, and can effectively improve the production effect of prefabricated post Rate, while also facilitating lifting and transport.
5. the cast-in-place ECC material of beam-ends and prefabricated post interface binding intensity are insufficient, beam-ends insufficient rigidity is inevitably resulted in, is weakened The ductility and bearing capacity of node.Stiffener is set in node bonding pad, improves the rigidity of beam-ends, having reached will be outside plastic hinge The purpose of shifting, to improve the anti-seismic performance of node.
6. pair prefabricated post end node bonding pad concrete interface carries out frosting treatment, can improve to a certain extent new and old mixed The cohesive force of solidifying Soil Interface, improves beam-ends rigidity, new-old concrete interface is avoided to generate large fracture too early.
7. the crucial force part in joint cores and near zone structure mainly assumes responsibility for inhaling under geological process The effect of receipts and dissipation seismic energy, shows higher ductility and good energy-dissipating property using ECC material rear part.Pass through ECC Joints show compared with the conventional steel bar concrete bean column node of the identical ratio of reinforcement, every antidetonation of the invention Index shows clear superiority, and ECC node improves 20% than the ultimate bearing capacity of common RC node, and displacement improves when destruction 15%;After reaching the limit of load, bearing capacity does not decline rapidly ECC node, but has longer more stably descending branch, This is because ECC material has high tenacity, the development in crack can be inhibited, guarantee that node still has biggish carrying after surrender Power and deformability.
8. the present invention is by the beam-ends plastic hinge region for being used in nearly core space of this material of ECC, under geological process, this A little regions are by biggish moment of flexure, and crack is to occur here, develop first, finally when certain major fracture extends to one fixed width When, bearing capacity reduces rapidly, and component failure is destroyed.In this region, the microcrack of ECC material, which will carry out feature, to be played, This will delay major fracture time of occurrence, member for prolonging in the ductility for compared with the time to work under high-bearing capacity, improving structure entirety and Energy-dissipating property.
9. the present invention is all made of industrialized production, labor using prefabricated post and precast beam compared with cast-in-place armored concrete Dynamic high production efficiency, production environment are stablized, and the sizing and standardization of component are conducive to mechanization production, and strictly examine by standard Factory product is tested, thus is easier to control and guarantees quality.The use of ECC material, steel mesh when solving the construction of cast-in-place region Intensively, the not firm problem of concreting, join domain good integrity.
10. for existing fabricated construction, bonding pad is the weak part in structure, junction it is reliable whether relationship The safety of total.And the shear-carrying capacity and ductility of ECC is higher than normal concrete, by using ECC in bonding pad Material can effectively improve the energy-dissipating property and bearing capacity of existing assembling frame structure bonding pad.
11. every cubic metre of price is normal concrete more than 4 times, therefore this hair due to the higher cost of ECC material It is bright to propose that the application made in the key position (prefabricated components junction) of structure using ECC material it in practical projects is had Feasibility economically.
70% or more is flyash in 12.ECC material, the waste residue after being mainly derived from thermal power plant coal combustion, and is poured Prefabricated components made of building are the refuse reclamations to flyash, therefore ECC is a kind of environmentally friendly material, are guaranteeing component The recycling to resource is reached while superior performance, meets energy-saving and environment-friendly thought.
Detailed description of the invention
Fig. 1 is node schematic diagram of the invention;
Fig. 2 is the prefabricated post front detail of construction of the invention;
Fig. 3 is prefabricated post side surface configurations detail drawing of the invention;
Fig. 4 is the prefabricated post detail of construction after configuration of the invention vertical muscle, U-shaped muscle and stiffener;
Fig. 5 is the precast beam detail of construction of the invention;
Fig. 6 is overall construction detail drawing of the invention.
Have in figure: prefabricated post (1), precast beam (2), engineering fiber cement composites (3), grout sleeve (4), pre- It boxes out (5), indulge muscle (6), stirrup (7), U-shaped muscle (8) and stiffener (9).
Specific embodiment
The present invention will be further explained with reference to the accompanying drawing.
As shown in Figure 1, being a kind of high ductility prefabricated integral frame interior joint connection structure, including the prefabricated of vertical direction Column 1 and the precast beam of horizontal direction 2, the prefabricated post 1 and 2 two sides of precast beam are symmetrically arranged with vertical muscle 6, internal to indulge along with described 6 vertical direction of muscle is equipped with several stirrups 7 of uniform parallel;Prefabricated post 1 and precast beam 2 are poured in factory using normal concrete Build completion, internal pre-buried vertical muscle 6 and stirrup 7.
As shown in Figure 2,3, the prefabricated post 1 is equipped with node bonding pad, and being horizontally disposed in the node bonding pad has number Reserving hole channel 5;
As shown in Figure 4,5, 6, in 1 two sides of prefabricated post, the end of two precast beams 2 in left and right passes through anchoring respectively Reinforcing bar is corresponding to be inserted into the reserving hole channel 5, is connected with the prefabricated post 1.The top and the bottom of 2 end of precast beam pass through respectively Vertical muscle 6 and the corresponding upper and lower layer duct for being inserted into the reserving hole channel 5 of U-shaped muscle 8 are fixed.The middle section of the reserving hole channel 5 Stiffener 9 is arranged in duct.
As shown in Figure 1, the engineering cast-in-place connection for realizing beam column of fiber cement composites 3 is used in overlapping beam-ends, Join domain length is 400mm~500mm.
As shown in Fig. 2, inflection point or every two layers of recurvation of the column of the prefabricated post 1-column connection node at every layer At point, it is attached using 4 slip casting connection method of grout sleeve.
Preferably, the concrete interface of the node bonding pad of the prefabricated post 1 carries out frosting treatment.
A kind of construction method of high ductility prefabricated integral frame interior joint connection structure, comprising the following steps:
1) mold of prefabricated post 1 and precast beam 2 is made, assembling reinforcement 7 positions the position of reserving hole channel 5, grout sleeve, Prepare the prefabricated components of prefabricated post 1 and precast beam 2;
2) after prefabricated post 1 and lower floor's post positioned in alignment are good, lateral support is added to fix in column side, then through grout sleeve under Layer column connects;
3) the intermediate U-shaped muscle 8 of stiffener 9 and lower part is set by reserving hole channel 5, and it is closely knit to be in the milk;
4) precast beam 2 lifts in place, the vertical muscle 6 on top is arranged by reserving hole channel 5, and it is closely knit to be in the milk;
5) stirrup 7 of node bonding pad is bound;
6) engineering fiber cement composites 3 are poured in node bonding pad.
Embodiment
Column-column connection is attached using 4 slip casting connection method of grout sleeve.Across reserving hole channel 5 in beam column interior joint Junction setting stiffener 9 and anchoring of being in the milk are connected, beam section top tension indulges muscle 6 and the U-shaped muscle 8 in lower part passes through reserving hole channel 5 And anchoring of being in the milk, in overlapping beam-ends using the engineering cast-in-place connection for realizing beam column of fiber cement composites 3, join domain Length is 400mm~500mm.
It is prepared by a kind of present invention, that is, high ductility prefabricated integral frame interior joint connection beam column and the component of construction method Journey and application process are as follows:
1. determining the size of prefabricated integral frame precast beam, precast column unit, arrangement of reinforcement etc. according to actual design requirement.So After make mold, assembling reinforcement positions reserving hole channel, grout sleeve position.
2. according to casting concrete prefabricated components are required, and to shell of column node bonding pad concrete interface when close to final set Frosting treatment is carried out, forms prefabricated components within maintenance 28 days.
3. when construction, first by prefabricated post 1 lift in place, with lower floor's post positioned in alignment it is good after, add in column side and appropriate laterally prop up Support is fixed, then is connected by grout sleeve and lower floor's post;Secondly, stiffener 9 and lower part U is arranged by reserving hole channel 5 Type muscle 8, and it is closely knit to be in the milk;Then, precast beam 2 is lifted in place, is fixed temporarily, it is vertical that top tension is arranged by reserving hole channel 5 Muscle 6, and it is closely knit to be in the milk, and binds stirrup 7, and template is arranged in beam-to-column joint area side;Finally, pouring ECC in node bonding pad Material, the one-piece casting together with the laminated floor slab of setting reach after some strength i.e. collapsible die, complete the construction of beam-to-column joint area.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (3)

1. a kind of high ductility prefabricated integral frame interior joint connection structure, it is characterised in that: the prefabricated post including vertical direction (1) and the precast beam of horizontal direction (2), the prefabricated post (1) and precast beam (2) two sides are symmetrically arranged with vertical muscle (6), internal edge Several stirrups (7) of uniform parallel are equipped with vertical muscle (6) vertical direction;
The prefabricated post (1) is equipped with node bonding pad, and being horizontally disposed in the node bonding pad has several reserving hole channels (5);
In the prefabricated post (1) two sides, the end of two precast beams (2) in left and right passes through the corresponding insertion institute of anchor bar respectively It states in reserving hole channel (5), is connected with the prefabricated post (1);
In overlapping beam-ends using the engineering cast-in-place connection for realizing beam column of fiber cement composites (3), join domain length For 400mm ~ 500mm;
The reserving hole channel (5) is inserted by the way that vertical muscle (6) and U-shaped muscle (8) are corresponding respectively in the top and the bottom of precast beam (2) end Upper and lower layer duct fix;
Stiffener (9) are arranged in the duct of the middle section of the reserving hole channel (5);
The column of the prefabricated post (1)-column connection node is at every layer of inflection point or every two layers of inflection point, using grouting Sleeve (4) slip casting connection method is attached.
2. high ductility prefabricated integral frame interior joint connection structure according to claim 1, it is characterised in that: described pre- The concrete interface of the node bonding pad of column (1) processed carries out frosting treatment.
3. a kind of construction method of high ductility prefabricated integral frame interior joint connection structure according to claim 1 or 2, It is characterized by comprising following steps:
1) mold of prefabricated post (1) and precast beam (2) is made, assembling reinforcement (7) positions the position of reserving hole channel (5), grout sleeve It sets, prepares the prefabricated components of prefabricated post (1) and precast beam (2);
2) after prefabricated post (1) and lower floor's post positioned in alignment are good, add lateral support to fix in column side, then pass through grout sleeve and lower layer Column connects;
3) stiffener (9) and the lower part U-shaped muscle (8) intermediate by reserving hole channel (5) setting, and it is closely knit to be in the milk;
4) precast beam (2) lifting is in place, the vertical muscle (6) on top is arranged by reserving hole channel (5), and it is closely knit to be in the milk;
5) stirrup (7) of node bonding pad is bound;
6) engineering fiber cement composites (3) are poured in node bonding pad.
CN201610349356.5A 2016-05-24 2016-05-24 A kind of high ductility prefabricated integral frame interior joint connection structure and construction method Active CN106013432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610349356.5A CN106013432B (en) 2016-05-24 2016-05-24 A kind of high ductility prefabricated integral frame interior joint connection structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610349356.5A CN106013432B (en) 2016-05-24 2016-05-24 A kind of high ductility prefabricated integral frame interior joint connection structure and construction method

Publications (2)

Publication Number Publication Date
CN106013432A CN106013432A (en) 2016-10-12
CN106013432B true CN106013432B (en) 2019-05-17

Family

ID=57093399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610349356.5A Active CN106013432B (en) 2016-05-24 2016-05-24 A kind of high ductility prefabricated integral frame interior joint connection structure and construction method

Country Status (1)

Country Link
CN (1) CN106013432B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759882A (en) * 2017-01-18 2017-05-31 成张佳宁 Prefabricated post composite beam top story exterior joints connection method in assembled RC frame-shear structures
CN108951847B (en) * 2018-07-31 2020-03-24 同济大学 UHPC-based precast concrete frame structure system and construction method thereof
CN109356310A (en) * 2018-11-15 2019-02-19 东南大学 A kind of high-performance hollow floor slab-column connections
CN110080388A (en) * 2019-06-06 2019-08-02 福建工程学院 A kind of connection structure and its construction method improving PC frame joint anti-seismic performance
CN110512727B (en) * 2019-07-23 2020-10-27 江苏晟功建设集团有限公司 Fabricated building lotus root beam pre-embedded insulation board post-tensioning method anchoring node structure and construction method thereof
CN111395519A (en) * 2020-03-31 2020-07-10 同济大学建筑设计研究院(集团)有限公司 Construction method of assembled beam column
CN111910757A (en) * 2020-08-14 2020-11-10 中国十七冶集团有限公司 Strenghthened type keyway connected node beam column structure
CN112096116A (en) * 2020-10-10 2020-12-18 福州大学 Reinforcing structure for improving earthquake-proof performance of earthquake-damage assembled frame structure, construction method and testing method
CN112962807B (en) * 2021-01-21 2022-02-22 北京交通大学 Friction type self-resetting cast-in-situ beam column node

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003268875A (en) * 2002-03-15 2003-09-25 Toyota Soken Co Ltd Method for connecting precast concrete columns and precast concrete beams to each other, and the columns
CN102587576A (en) * 2012-03-02 2012-07-18 东南大学 Combined precast column with nodes
CN203320738U (en) * 2013-04-18 2013-12-04 沈阳建筑大学建筑设计研究院 Assembled concrete frame-shear wall structure
CN203334698U (en) * 2013-06-17 2013-12-11 南京长江都市建筑设计股份有限公司 Locating device of connector of prefabricated assembling column and rebar sleeve
CN103774755A (en) * 2014-01-07 2014-05-07 同济大学 Prestressed prefabricated ECC-RC combination beam column joint component
CN105155683A (en) * 2015-08-12 2015-12-16 四川省建筑设计研究院 Prefabricated beam-column connection in prefabricated concrete buildings and construction method thereof
CN105256891A (en) * 2015-09-17 2016-01-20 东南大学 Prefabricated concrete frame structure with high-strength bottom bars

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003268875A (en) * 2002-03-15 2003-09-25 Toyota Soken Co Ltd Method for connecting precast concrete columns and precast concrete beams to each other, and the columns
CN102587576A (en) * 2012-03-02 2012-07-18 东南大学 Combined precast column with nodes
CN203320738U (en) * 2013-04-18 2013-12-04 沈阳建筑大学建筑设计研究院 Assembled concrete frame-shear wall structure
CN203334698U (en) * 2013-06-17 2013-12-11 南京长江都市建筑设计股份有限公司 Locating device of connector of prefabricated assembling column and rebar sleeve
CN103774755A (en) * 2014-01-07 2014-05-07 同济大学 Prestressed prefabricated ECC-RC combination beam column joint component
CN105155683A (en) * 2015-08-12 2015-12-16 四川省建筑设计研究院 Prefabricated beam-column connection in prefabricated concrete buildings and construction method thereof
CN105256891A (en) * 2015-09-17 2016-01-20 东南大学 Prefabricated concrete frame structure with high-strength bottom bars

Also Published As

Publication number Publication date
CN106013432A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106013432B (en) A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN104831617B (en) Steel-ultra-high performance concrete combination beam based on fin-plate type bridge floor and construction method
CN107476476A (en) One kind is greatly across steel bar truss floor support plate and reinforced beam combination constructing method thereof
CN206428872U (en) A kind of close splicing seam superimposed sheet
CN106638274B (en) A kind of unidirectional prestressing force ultra-high performance concrete Thin-walled Box Girder standard segment
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN108978434A (en) A kind of Novel steel-is mixed to be combined Continuous Box Girder Bridge and its industrializes construction method without bracket
CN103711330B (en) A kind of prestressing force assembling precast reinforced concrete frame reinforces the method for existing structure
CN106639093A (en) Close splicing seam-type laminated slab
CN207419803U (en) A kind of high-strength connection structure of laminated floor slab and girder steel
CN103046463B (en) Assembly type saddle-shell-shaped bottom plate continuous box girder bridge and construction method thereof
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN105926771B (en) A kind of the interior joint connection structure and its construction method of prefabricated integral frame column beam
CN107675812B (en) Ultra-high performance concrete plate seam connection structure and its construction method
CN105951984B (en) A kind of high ductility prefabricated integral frame mid-side node connection structure and construction method
CN109914216A (en) A kind of assembled box beam combined type node across ultra-high performance concrete greatly and attaching method thereof
CN103195259A (en) Foam concrete prefabricated slab and method for reinforcing concrete structure by same
CN106012806A (en) Hollow slab hinge joint shear connection structure and construction process
CN108374356A (en) A kind of old hollow slab bridge of hinge seam longitudinal prestressing reinforcing single hole constructs and construction method
CN203640084U (en) Superimposed slab shear wall with restorable function
CN208501895U (en) A kind of partial precast assembly steel reinforced concrete mixed column
CN102587576B (en) Combined precast column with nodes
CN108468379A (en) A kind of novel precast prestressed continuous beam connecting node of assembly concrete
CN108316164A (en) It is a kind of to reinforce old assembled Hollow Slab Beam Bridge construction and construction method using new beam
CN208933811U (en) A kind of novel steel-concrete combination Continuous Box Girder Bridge of erection without scaffolding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant