CN209226360U - A kind of multiscrew multi-storey building elevator - Google Patents

A kind of multiscrew multi-storey building elevator Download PDF

Info

Publication number
CN209226360U
CN209226360U CN201822112952.9U CN201822112952U CN209226360U CN 209226360 U CN209226360 U CN 209226360U CN 201822112952 U CN201822112952 U CN 201822112952U CN 209226360 U CN209226360 U CN 209226360U
Authority
CN
China
Prior art keywords
carriage
derrick
screw rod
multiscrew
climbs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822112952.9U
Other languages
Chinese (zh)
Inventor
张元�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of CN209226360U publication Critical patent/CN209226360U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model relates to civilian elevator technology fields, specifically disclose a kind of multiscrew multi-storey building elevator, wherein the multiscrew multi-storey building elevator includes: derrick, carriage, more screw rods and driving device;Derrick is set as elevator shaft;One end of every screw rod is hung on the derrick top plate of derrick, the other end of every screw rod with the derrick contacts baseplate of derrick;Carriage is located in derrick, and the seat assembly that climbs is provided on the outer surface of the carriage top plate of carriage, is provided with holding rod seat assembly on the outer surface of the car floor of carriage, and carriage is connect by climbing seat assembly and holding rod seat assembly with every screw rod;Driving device is arranged on the outer surface of carriage top plate, and connect with the seat assembly that climbs;Driving device can drive the seat assembly that climbs to rotate along screw rod to drive carriage to make elevating movement along screw rod.Multiscrew multi-storey building elevator structure provided by the utility model is simple, low in cost, it is easy to accomplish.

Description

A kind of multiscrew multi-storey building elevator
Technical field
The utility model relates to civilian elevator technology field more particularly to a kind of multiscrew multi-storey building elevators.
Background technique
Common multi-storey residential buildings are not no elevators.Last century eight, the nineties have built a large amount of multi-storey residential buildings, now live The family middle-aged and the old is in the majority.With aging of population, more and more the elderly's legs and feet are inconvenient, in addition other handicapped persons, The cry that old residential building installs elevator additional is higher and higher, it is accordingly required in particular to Wheelchair Accessible.Therefore, with social progress, multilayer is given Residential building installs the problem of elevator is paid close attention at the whole society additional.Routinely technology, the master to multi-storey residential buildings installation currently on the market Manifold formula elevator, cost is higher, and allowing old residential area resident to undertake, there are also no small difficulties.
Mainstream elevator currently on the market builds computer room, installation carriage and counterweight and guide rail in hoistway, computer room on hoistway top Interior setting traction machine and control cabinet, wirerope are that carriage and clump weight make counterweight elevating movement around traction sheave, both ends respectively. Such elevator haves the defects that involve great expense and later period maintenance expense is high.
Therefore, the residential lift for how providing a kind of low cost becomes those skilled in the art's technology urgently to be resolved and asks Topic.
Summary of the invention
The utility model aims to solve at least one of the technical problems existing in the prior art, provides a kind of multiscrew multilayer Residential lift, to solve the problems of the prior art.
As the one aspect of the utility model, a kind of multiscrew multi-storey building elevator is provided, wherein the multiscrew is more Layer residential lift includes: derrick, carriage, more screw rods and driving device;
The derrick is set as elevator shaft;
One end of every screw rod is hung on the derrick top plate of the derrick, the other end of every screw rod with the derrick Derrick contacts baseplate;
The carriage is located in the derrick, is provided with the seat assembly that climbs on the outer surface of the carriage top plate of the carriage, It is provided with holding rod seat assembly on the outer surface of the car floor of the carriage, the carriage passes through the seat assembly and described of climbing Holding rod seat assembly is connect with every screw rod;
The driving device is arranged on the outer surface of the carriage top plate, and connect with the seat assembly that climbs;
The driving device can drive the seat assembly that climbs to be rotated along the screw rod to drive the carriage described in Screw rod makees elevating movement.
Preferably, the seat assembly that climbs includes driven wheel and the nut that climbs that connect with the driven wheel, described to climb Nut is engaged on the screw rod, and the driven wheel and the nut that climbs are connect with the driving device, the driven wheel With it is described climb nut can under the driving of the driving device simultaneously, in the same direction and uniform velocity rotate.
Preferably, the driving device includes motor and transmission mechanism, and the motor is connect with the transmission mechanism, The transmission mechanism is connect with the driven wheel and the nut that climbs respectively, and the power of the motor operation can pass through institute It states transmission mechanism and passes to the driven wheel and the nut that climbs.
Preferably, the transmission mechanism includes drive sprocket, at least one gearing chain ring and steering sprocket assembly, alternatively, Active synchronization belt wheel, at least one synchronization band and synchronous belt stretching wheel assembly.
Preferably, the motor includes two motors, alternatively, a motor and a frequency converter.
Preferably, every screw rod runs through climb seat assembly and the holding rod seat assembly setting, and the screw rod with Seat assembly and the holding rod seat assembly one-to-one correspondence of climbing.
Preferably, more screw rods include any one in two screw rods, three screw rods and four screw rods.
Preferably, it connects to form car frame by four corner posts between the carriage top plate and the car floor, and Each corner post is each perpendicular to the carriage top plate and the car floor is arranged, and every screw rod runs through the equal energy in part of the carriage The enough hidden back side in the corner post, the car frame are arranged perpendicular to the carriage top plate and the facade of the car floor For car walls, at least one described car walls is set to car door.
Preferably, the derrick includes angle truss structure or square steel tube frame structure, and lightning protection is arranged in the derrick Ground connection, and sustaining wall steel arm is set between the exterior wall collar tie beam in nearby building.
Preferably, hoistway door, the hoistway door are respectively provided with floor face equal-height position on any facade of the derrick Hall door frame be fixed on the derrick mobile jib of the derrick, the hall door of hoistway door fan can be externally opened flat, and the electricity It strides between the hall door sill of terraced hall door and destination face or target resident's door and is connected or is connected with steel trestle.
Multiscrew multi-storey building elevator provided by the utility model, by the way that derrick is arranged near residential building as elevator Hoistway, and more screw rods are set and are connect with derrick, carriage is connect by climbing seat assembly with holding rod seat assembly with screw rod, is driven Device is connect with the seat assembly that climbs, and drives the seat assembly that climbs by driving device, the seat assembly that climbs drives carriage to rise along screw rod Drop movement, this multiscrew multi-storey building elevator structure are simple, it is easy to accomplish, and compared with elevator in the prior art, cost It is cheap, it is installed and used suitable for multilayer old residential area residential building.
Detailed description of the invention
Attached drawing is to be used to provide a further understanding of the present invention, and constitute part of specification, and following Specific embodiment be used to explain the utility model together, but do not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of multiscrew multi-storey building elevator provided by the utility model.
Fig. 2 is the carriage main view of multiscrew multi-storey building elevator provided by the utility model.
Fig. 3 is the main view of the seat assembly that climbs of multiscrew multi-storey building elevator provided by the utility model.
Fig. 4 is the main view of the holding rod seat assembly of multiscrew multi-storey building elevator provided by the utility model.
Fig. 5 is the top view of driving device in the car roof of multiscrew multi-storey building elevator provided by the utility model.
Fig. 6 is the main view of the driving device of multiscrew multi-storey building elevator provided by the utility model.
Fig. 7 is the left view of the driving device of multiscrew multi-storey building elevator provided by the utility model.
Fig. 8 is the steering sprocket assembly main view of multiscrew multi-storey building elevator provided by the utility model.
Fig. 9 is the screw rod upper end suspended structure schematic diagram of multiscrew multi-storey building elevator provided by the utility model.
Figure 10 is the screw rod joint structure schematic diagram of multiscrew multi-storey building elevator provided by the utility model.
Figure 11 is the first foundation structural schematic diagram of the derrick of multiscrew multi-storey building elevator provided by the utility model.
Figure 12 is the hall door structural schematic diagram of multiscrew multi-storey building elevator provided by the utility model.
Figure 13 is the second foundation structure schematic diagram of the derrick of multiscrew multi-storey building elevator provided by the utility model.
Figure 14 is the structural schematic diagram of the carriage top plate of multiscrew multi-storey building elevator provided by the utility model.
Figure 15 is the structural schematic diagram of the car floor of multiscrew multi-storey building elevator provided by the utility model.
Figure 16 is the cradle structure schematic diagram of multiscrew multi-storey building elevator provided by the utility model.
Figure 17 is the derrick geometry schematic diagram of multiscrew multi-storey building elevator provided by the utility model.
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with attached drawing.It should be understood that herein Described specific embodiment is only used for describing and explaining the present invention, and is not intended to limit the utility model.
It should be noted that " civil buildings design general rule " (GB50352-2005) is provided, residential housing is drawn by the number of plies Be divided into: 1 ~ 3 layer is low layer;4 ~ 6 layers are multilayer;7 ~ 9 layers are on the middle and senior level;10 layers the above are high levels.The reason of history, various regions are big absolutely Most residential building cells are all the multi-storey buildings built 70 ~ nineties of last century, in the majority with 6 floors, but are also no lack of 7 layers and live Residence.Multi-storey building does not set elevator usually.The utility model elevator to be proposed refer to can be mounted on it is mentioned above more In layer house, and it is generally arranged at the outside of multi-storey building, and connect installation with the alien invasion of multi-storey building and fix.
As the one aspect of the utility model, a kind of multiscrew multi-storey building elevator is provided, wherein as shown in Figure 1, institute Stating multiscrew multi-storey building elevator includes: derrick 1, carriage 2, more screw rods 3 and driving device 4;
The derrick 1 is set as elevator shaft;
One end of every screw rod 3 is hung on the derrick top plate 191 of the derrick 1, and the other end of every screw rod 3 is and institute State the derrick contacts baseplate of derrick 1;
The carriage 2 is located in the derrick 1, is provided with the seat that climbs on the outer surface of the carriage top plate 20 of the carriage 2 Assembly 60, holding rod seat assembly 70 is provided on the outer surface of the car floor 30 of the carriage 2, and the carriage 2 is climbed by described It seats up assembly 60 and the holding rod seat assembly 70 is connect with every screw rod 3;
The driving device 4 is arranged on the outer surface of the carriage top plate 20, and connect with the seat assembly 60 that climbs;
The driving device 4 can drive the seat assembly 60 that climbs to rotate along the screw rod 3 to drive 2 edge of carriage The screw rod 3 makees elevating movement.
Multiscrew multi-storey building elevator provided by the utility model, by the way that derrick is arranged near residential building as elevator Hoistway, and more screw rods are set and are connect with derrick, carriage is connect by climbing seat assembly with holding rod seat assembly with screw rod, is driven Device is connect with the seat assembly that climbs, and drives the seat assembly that climbs by driving device, the seat assembly that climbs drives carriage to rise along screw rod Drop movement, this multiscrew multi-storey building elevator structure are simple, it is easy to accomplish, and compared with elevator in the prior art, cost It is cheap, it is installed and used suitable for multilayer old residential area residential building.
Specifically, as shown in Figure 1, screw rod 3 is suspended on 1 top steel plate 191 of derrick;Screw rod 3 runs through carriage 2, and is climbed It seats up clamped by 60 and holding rod seat 70.
Specifically, in order to realize the work of the seat assembly that climbs, as shown in figure 3, the seat assembly 60 that climbs includes driven wheel 407 and the nut 427 that climbs that is connect with the driven wheel 407, the nut 427 that climbs be engaged on the screw rod 3, it is described from Driving wheel 407 and the nut 427 that climbs are connect with the driving device 4, the driven wheel 407 and the nut 427 that climbs Can under the driving of the driving device 4 simultaneously, in the same direction and uniform velocity rotate.
Further specifically, the seat assembly 60 that climbs holds driven wheel by top chock 421 and step 423 407 and one the nut 427 that climbs, the means of clamping are three long filament bolts 428 that trisection passes through on bearing block, clamping Result driven wheel 407 and be attached thereto the integrated nut 427 that climbs to be provided with the function rotated between metal (upper seat Energy.
It should be noted that the rotation of nut 427 of climbing is driven due to being attached thereto integrated driven wheel 407, i.e., The horizontal power that driving wheel passes over is received, thus is climbed around the slope of thread of screw rod 3 or downglide motion, The vertical stress component for driving carriage 2 to rise or decline is produced in the process, it is thus achieved that the conversion function of power direction, simultaneously The mechanics principle of " drag force is saved in inclined-plane movement " is utilized.
It should also be noted that, it is identical as the equal construction of seat assembly 60 that climbs of 3 quantity of screw rod, but body height is not Together, the difference is that the distance between respective driven synchronous pulley and step differ, multiple seat assemblies 60 that climb should be away from Arithmetic series is formed from value, difference is exactly the center of each active synchronization belt wheel on active wheel assembly central axis away from value.
Specifically, as shown in figure 3, the lower part of the long filament bolt 428 passes through three preformed holes on carriage top plate 20, then It is locked across load bearing spring 424 and spring base 425, then with two nuts 426;The load bearing spring is by the weight transfer of carriage 2 To nut 426, that is, long filament bolt 428 is passed to, that is, pass to the nut 427 that climbs, that is, passed to screw rod 3, also just pass to Derrick top plate 191 has been ultimately transferred to derrick 1.
Specifically, in order to realize the anti-overload feature of carriage, the load bearing spring 424 produces under the gravity compressing of carriage 2 Raw compression, the position of adjusting nut 426 can change the clearance delta between carriage top plate 20 and step 423, and carriage 2 is unloaded When gap be Δ 1, carriage 2 load when Δ 1 become larger, carriage top plate 20 upwards " Δ 1Limit" height place installation " overload limit open Close ", when 1=Δ of Δ 1LimitWhen, it is exactly that carriage 2 overloads, " overload limit switch " is just touched and transmits to control circuit, control The electric power loop of circuitry cuts motor processed, carriage 2 can not start, while the police whistle sound that sounds, and realize " the anti-overload feature of carriage ".
Specifically, as shown in figure 3, the top of the long filament bolt 428 passes through damping spring 420, is then passed through machine seat board 41 The gravity pressure of upper three preformed holes, machine seat board 41 and driving device 4 on damping spring 420, pass to top chock 421, i.e., The nut 427 that climbs is passed to;Damping spring 420 is compressed, and the damping to machine seat board 41 and entire driving device, drop are realized Noise function.
Further specifically, in order to realize carriage preventing colliding with top function, while the machine seat board 41 obtains damping effect, subtract It shakes spring 420 and obtains decrement Δ 2, if separately adding external force pressure machine seat board 41, Δ 2 just be will increase;It is upward in top chock 421 “Δ2Limit" height and position installation " limit switch of rushing to summit ";When machine seat board 41 rises with carriage 2, the upper surface of machine seat board 41 First close to " upper limit nut " for being placed in the nearly apical position of screw rod 3;When control circuit failure, the carriage of elevator are ceaselessly transported upwards It is dynamic, when tending to rush to summit, machine seat board 41 touches " upper limit nut ", is pressed downward urgent, and Δ 2 increases at once, when 2=Δ of Δ 2LimitWhen, " limit switch of rushing to summit ", which just touches, connects " emergency stop circuit ", cuts off total electrical circuit, realizes " carriage preventing colliding with top function ".
It should be understood that compressing power transmission by load bearing spring, belong to flexible cooperation, can occur to avoid rigid connection It is multiple climb nuts 407 rotation in the problem of suppressing strength.
Specifically, in the upper end of the long filament bolt 428, two nuts are locked, convenient for catching the lifting on machine seat board 41 Otic placode 4111 can sling whole carriage 2.
Specifically, the main view of the holding rod seat assembly 70 is as shown in figure 4, there is shell, interior outside the holding rod seat assembly 70 There is nylon sleeve (not shown), axle sleeve loosely holds screw rod 3 and plays sliding certralizing ability, and shell is fixed on three bolts Below car floor 30.
It should be noted that holding rod seat assembly 70 screw rod 3 suspension after there are no before positioning, this three bolts can only be loosely Ground is twisted, and wouldn't be fixed to holding rod seat.After more screw rods 3 are hung, carriage 2 is dropped to stops from derrick bottom plate 1m or so place Under, this three bolts are tightened with allen wrench, holding rod seat is fixed.
In order to tighten screw at this, the hoistway wallboard of 1 root surrounding of derrick is installed after can only staying, and otherwise wrench is twisted less than this Screw;Can certainly in carriage 2, in the root reservation operations hole of carriage corner post 50, for tightening screw at this.
As the specific embodiment of the driving device, the driving device 4 includes motor and transmission mechanism, described Motor is connect with the transmission mechanism, and the transmission mechanism connects with the driven wheel 407 and the nut 427 that climbs respectively It connects, the power of the motor operation can pass to the driven wheel 407 and the nut that climbs by the transmission mechanism 427。
The component parts of seat assembly it should be understood that the driven wheel 407 and the nut 427 that climbs belong to climb, It is mounted on the upper surface of carriage top plate 20.
Specifically, the transmission mechanism includes drive sprocket, at least one gearing chain ring and steering sprocket assembly, alternatively, Active synchronization belt wheel, at least one synchronization band and synchronous belt stretching wheel assembly.
Specifically, the gearing chain ring includes the gearing chain ring with bushroller chain.
Specifically, the motor includes two motors, alternatively, a motor and a frequency converter.
It is understood that may be implemented to operate in turn by the way that two motors are arranged, to provide two kinds of liftings for carriage 2 The power of speed.Furthermore it is also possible to provide variable speed by way of a motor and a frequency converter is arranged for carriage 2 Power.
Below to the work of driving device 4 provided by the utility model by taking double motor and Roller Chain Drive mechanism as an example It is described in detail as principle.Specifically, the quantity of screw rod 3 is for four.
As shown in figures 2 and 5, driving mechanism 4 is installed on above the top plate of carriage 2, including machine seat board 41, is installed with drive chain The main motor 411 of wheel 401, secondary motor 412, two the steering sprocket assemblies 403, Yi Jitao for being installed with auxiliary movable sprocket 402 Cylinder roller transmission chain 413 etc..
Specifically, as shown in figure 5, transmission chain 413 is by the drive sprocket 401 on main motor 411, on secondary motor Auxiliary movable sprocket 402 commutates via the turnover of two steering sprockets 4031, with four driven sprockets to climb on seat assembly 60 407 Winding is coupled circlewise.
Driving be by main motor 411 from secondary motor 412 successively but it is different when operating, drive sprocket 401 or auxiliary move Motor power is driven the synchronous constant speed rotation of four driven sprockets 407 by gearing chain ring by sprocket wheel 402, with driven sprocket 407 Four nuts 427 that climb of one, which just synchronize on four screw rods 3, to climb or glides, so that carriage 2 be driven to make elevating movement.
Chain conveyer rotating ratio n is specifically, the lifting speed of carriage 2 is main motor operating institute when secondary motor 412 operates The 1/2 of speed is provided, secondary motor 412 is run on 5 seconds of 2 starting stage of carriage and 2 leveling of carriage stop before 5 seconds when Section, the intermediate period that carriage 2 is run are operated by main motor 411.
The control circuit of two motors is chain and automatically switches, and the operating switching of starting stage is controlled by time circuit, Operating switching before leveling stops follows the instruction that level position switchs.
When design liter (drop) speed of lift car 2 is V, the screw pitch of screw rod 3 is t, the design speed for the nut 427 that climbs When rated speed for R, motor is r, drive sprocket 401 is with driven sprocket 407 and the revolving speed of the nut 427 that climbs rotation Than for n, relationship such as following formula between them:
(1) R=V/S;(2) n=R/r;
Assuming that: the lifting speed of carriage is 0.25m/S, and motor uses 4 pole asynchronous motors, and screw rod uses T50 × 8, Driven sprocket uses 3/4 inch × 21 teeth.
It calculates: R=250/8=31.25 turn/S=1875 turn/min;n=1875/1450=1.3.I.e. drive sprocket uses 3/4 Inch × (21 × 1.3=28) tooth;Auxiliary movable sprocket uses 3/4 inch × (28/2=14) tooth;Steering sprocket is used referring to driven sprocket 3/4 inch × 21 teeth.
It is calculated about major and minor motor power (output).
Specifically by taking screw rod 3 is T50 × 8 as an example.
A) known: 1., screw rod specification be T50 × 8, its helical angle=3.17 degree;
2., motor use 4 pole asynchronous motors, 1450 revs/min of revolving speed;
3., the raising speed of carriage be 0.25m/s
④,n = 1.3;The chain teeth number ratio 2:1 of major-minor motor
5., carriage self weight loading carry be 8KN
6., the nut that climbs rotates integrally with driven sprocket
B) when four nuts that climb rise with carriage, tractive force P is being needed along hand of spiral,
P=8 × Sin(180 o- 3.17o)=0.442KN;
Also need to overcome the force of sliding friction F of nut Yu screw rod matching surface,
F=8 × Sin(90 o+3.17o) × 0.1=0.798KN,
Therefore need to give the normal direction resultant force=0.442+0.798=1.24KN of four nuts.
C) this turning moment=1.24 × 23=28.52KNmm for being presented as nut with joint efforts.
D) torque=28.52 × 1.3=37.1KNmm for needing to export in main motor shaft.
E) main motor power=37.1 × 1450/9549=5.6 KW are needed, 5.5KW is taken.
F) pair motor power (output)=5.5/2=2.75KW, takes 3KW.
G) this power calculation is theoretical value, and experiment is also needed to correct.
H) in order to mitigate induction-motor load, flog a dead horse less, corrective measure is taken:
1. cutting lightening hole on carriage top plate 20, covered up with ventilative ceiling;
2. the manhole cover on carriage top plate 20 makes of plank;
3. using 10 steel plate of δ, remaining position 3 steel plate of δ in 30 surrounding 200mm width of car floor;
4. the lesser stainless steel tube winding gate of carriage winding gate quality;
5. car walls is closed using transparent or opaque hard plastic board.
Specifically, the machine seat board 41, in I-shaped, be in order to avoid " manhole " position on carriage top plate and itself Mitigation etc. needs.
Whole components of driving device 4 are arranged on machine seat board 41, as shown in Figure 5.It is electronic in main motor 411 and pair The installation site of machine 412 opens up motor embedded hole, and the half body of motor and master (auxiliary) movable sprocket are visited to hole, and motor is It under the action of one pusher shoe 431 and the second pusher shoe 436, can be translated in hole, so that gearing chain ring 413 is tensioned, such as Fig. 6 institute Show.Two motor use vertical type motor, and ring flange links the first motor seat board and the second motor seat board respectively.
It should be noted that the center of machine seat board 41 can be mounted on using the vertical type motor of an adjustable speed, Motor reel is by machine seat board, and using the central axis of shaft coupling connection active wheel assembly, the active wheel assembly is fixed on base The identical master of the and number of teeth equal with 3 quantity of screw rod is fixed with flat key in plate lower surface, central shaft upper end connection shaft coupling, middle section Dynamic synchronous pulley, each active synchronization belt wheel by an annular synchronous belt be intertwined and connected it is corresponding climb it is driven on seat assembly 60 Synchronous pulley.The active synchronization belt wheel number of teeth is with driven synchronous pulley teeth number form at the speed ratio of setting.Each driven synchronous pulley It is coupled as one, rotates integrally with the nut that climbs.
As shown in Figure 5 and Figure 6, it is mounted between motor seat board and machine seat board 41 with assembling bolt, every motor is with 4 sets Assembling bolt.Every set assembling bolt is by 4 root long silk bolts 430 and the first pusher shoe 431 or the second pusher shoe 436 and rectangular The composition such as gasket, nut, spring washer.The function of assembling bolt is, can be with by adjusting the position of 8 sets of assembling bolt upper nuts So that drive sprocket 401 and auxiliary movable sprocket 402 and four driven sprockets 407 is in same operating plane, 8 sets are tightened after adjusting The nut of " assembling bolt ".
Two steering sprocket assemblies 403 are installed on demand, as shown in Fig. 5, Fig. 7 and Fig. 8 on machine seat board 41.Steering sprocket assembly 403 are made of the steering sprocket 4031 that 3 long filament bolts 44 clamp top chock 444, step 445 and centre, are mounted on On machine seat board 41;End nut is just adjustable steering sprocket 4031 and is in four driven sprockets 407 on adjusting long filament bolt 44 Same operating plane.
Each steering sprocket seat is fixed on the design of the hole location on machine seat board 41, it is not possible to allow long filament bolt 44 and gearing chain ring Operating track clash.
It should be noted that sleeve roller chain transmission device can be replaced using synchronous belt transmission device, it can using one The vertical machine of speed regulation is mounted on the center of machine seat board 41, and motor shaft connects driving wheel by machine seat board, using shaft coupling The central axis of assembly, the active wheel assembly are fixed on machine seat board lower surface, and central shaft upper end connects shaft coupling, middle section is used and put down The identical active synchronization belt wheel of the fixed and number of teeth equal with 3 quantity of screw rod of key, each active synchronization belt wheel is by a synchronous belt Transmission ring is intertwined and connected the corresponding driven synchronous pulley to climb on seat assembly 60.The number of teeth of active synchronization belt wheel and driven synchronous belt The number of teeth of wheel forms the speed ratio of setting.Each driven synchronous pulley is coupled as one with the nut that climbs, and rotates integrally.
It should also be noted that, when using synchronous belt transmission device, the structure of the climb seat assembly 60 equal with 3 quantity of screw rod Make identical, but body height is different, the difference is that the distance between respective driven synchronous pulley and step differ, it is multiple Climb seat assembly 60 the distance value formed arithmetic series, difference is exactly each active synchronization belt wheel on active wheel assembly central axis Center away from value;When using synchronous belt transmission device, need that tensioning wheel is arranged for each toothed belt transmission ring.
Specifically, every screw rod 3 runs through climb seat assembly 60 and the holding rod seat assembly 70 setting, and the spiral shell Bar 3 and seat assembly 60 and the holding rod seat assembly 70 one-to-one correspondence of climbing.
It is understood that more screw rods 3 include any one in two screw rods, 3, three screw rods 3 and four screw rods 3.
As shown in figure 9, suspension arrangement schematic diagram of the screw rod 3 in crown, wherein screw rod 3 is said by taking T50*8 as an example It is bright.
1) upper end of screw rod 3 passes through preformed hole on derrick top plate 191, reserves aperture 80mm.
2) 192 bottom surface of ball bowl support is smeared in butter rear enclosure to screw rod 3, with 191 sliding contact of top plate.
3) spherical nut 410 be screwed on screw rod 3, tightened, knocking in retaining cone pin.
4) in four 3 installation processes of screw rod, freely sliding for ball bowl support 192 can find impetus accurately automatically.It installs Whether the gap of Bi Hou, measurement 2 surrounding of carriage and derrick 1 uniformly and to ball bowl support gives positioning adjustment, then to ball bowl branch It stays the gap 5mm, trisection to burn-on stop tab around seat, cancels the free sliding of ball bowl support.
5) often butter must be kept to lubricate on screw rod 3.Therefore it needs periodically to clean and smear butter to screw rod.To exempt from it By dust, guard bar dirt-proof boot can be installed.Usually carriage 2 is awaited orders in the first floor automatically, and dirt-proof boot gives whole screw rod 3 to cage It is covered;When carriage 2 rises, guard bar covers auto-folder and collapses.
6) multi-level elevator of the utility model is by taking 6 layers of elevator as an example, and the spiro rod length about 18m of 6 floor elevators, this is in factory Whole manufacture is unpractical, the utility model people's simple approach, long bolt 3 required for can obtaining easily and inexpensively.
Specifically, to screw rod 3 by taking certain multiscrew multi-storey building elevator needs 4 root long screw rods, joint length 18m as an example Manufacturing process is described in detail.
The source of goods: this 1m short screw is known as 1 section below by commercially available T50x8x1000 screw rod.
Buying: single 18m long bolt needs the short screw of 19 section 1m long, is formed by connecting after secondary operation.Therefore it purchases The section short screw of 19x4=76.
Vehicle system: to every section short screw by Figure 10 vehicle male and female head.When amount of purchase is big, producer perhaps can be according to provided figure It is sold to after paper generation processing.
Marshalling: it is one group that every 19 section short screw, which is compiled, every group of short screw number consecutively from the male head be 1# save, 2# Section ... 19# section.
It distinguishes: 76 section short screws point, 4 groups of difference spreadings.4 groups of screw rods are given to intersperse color respectively with the paint of 4 kinds of colors when spreading Mark, as a means of differentiation, every group since the 1# section, label connection serial number section by section.When elevator is installed, the order of connection of whole short screws is not It can be mixed.
The production of screw rod 3 can be carried out after preparation good material according to following processes.
A1, lathe clamp the male head of 1# section screw rod, prepare the end face for cutting its female head.
A2, the 2# male head saved is screwed into the female head of 1# section, the T50 thread of two sections is necessarily connected obstructed at this time.Measuring scale Turning 1# saves female end surface after very little;Then 2# is saved the 1# that is screwed into of male head again to save, sees whether two section threads have been turned on;If also It is not switched on, just cutting 1# saves female end surface again, and thread is just connected when two section screw rods are tightened.The standard of inspection is to use T50x8 nut can swimmingly be threaded through jointing line.It should be noted that must be examined in the case where tightening connector with tool, And turning is not rather few more every time.
A3, this two section tighten and thread connect along in the state of, joint bore 5 through-hole of Ф, as shown in Figure 9.
A4, it is marked with colored paint to serial number on 1# section and 2# node.
A5, connection 2# section is saved with 3# by the above process.
A6, like this method complete the connection of one group of 19 section.
A7, the connection that other three groups and each 19 section are completed according to the above method.
A8, by 4 steel ball nuts, screw on the male head end of 4 1# section, tighten, bore 5 through-hole of Ф, as shown in figure 9, on nut Point colour code.
Specifically, as shown in Fig. 2, being connected between the carriage top plate 20 and the car floor 30 by four corner posts 50 Car frame is formed, and each corner post 50 is each perpendicular to the carriage top plate 20 and is arranged with the car floor 30, every screw rod 3 Through the part of the carriage 2 can the hidden back side in the corner post 50, the car frame is perpendicular to the car roof Plate 20 and the facade of the car floor 30 are set as car walls, at least one described car walls is set to car door.
Specifically, the derrick 1 includes angle truss structure or square steel tube frame structure, and the setting of the derrick 1 is anti- Thunder ground connection, and sustaining wall steel arm is set between the exterior wall collar tie beam in nearby building.
It should be noted that hoistway used in multiscrew multi-storey building elevator provided by the utility model, using angle steel purlin Frame structure derrick, only needs whole plate shallow foundation, and occupied area is small, convenient for building terraced addressing;Derrick uses segmental hoisting, lifts the time It is short, reduce the factor that disturbs residents of constructing.
Preferably, as shown in figure 17, derrick 1 does mobile jib 11 with four 8# angle steel, makees horizontal web member 12 and tiltedly with 6# angle steel Web member 12, web member patch are welded in mobile jib outer surface, form steel truss structure, and derrick 1 is installed independently of outside building.
Four screw rods 3 are hung in four corners of derrick 1.Screw rod 3 is suspended on derrick top plate 191, and lower end is apart from derrick Surface of base 60mm ~ 70mm.
Specifically, hoistway door, the hoistway door are respectively provided with floor face equal-height position on any facade of the derrick 1 Hall door frame 101 be fixed on the derrick mobile jib 11 of the derrick 1, the hall door of hoistway door fan 102 can be externally opened flat, And it strides between the hall door sill of the hoistway door and destination face or target resident's door and is connected or is connected with steel trestle.
It should be noted that the height of the derrick 1=domestic floor height × number of plies+0.7m;As shown in figure 17, derrick 1 Top is set up defences the ceiling 13 of rain, and derrick root carries out lightning protection earthing by specification.
Preferably, in order to realize the production of derrick 1, standard paragraphs, different Lou Dongxu are made by mono- section of 6m in factory in derrick 1 Otherwise when level derrick, adjusted by the height dimension of topmost that section.Section is connected on the flat web member in end with section bores Hole is bolted at form of flanges with M16.
Installing elevator additional for multi-storey residential buildings will face the reality situation: the outer underground utilities of narrow space, staircase between building Gather, each building house type is not quite similar, in building main body not for installing the ready-made hole of hall door;Therefore, the utility model Use the way of subsidiary hall door on derrick to solve the above problems.
It is that the hall door of elevator does not have to the translation double door of conventional elevator, and uses average family security door first, doorframe 101 are directly installed on derrick mobile jib 11, as is illustrated by figs. 11 and 12.
Hall door is made of hall door frame 101, door leaf 102 and canopy 14.Stride rank between hall door sill and floor face or resident's door It connects or is connected with steel trestle, realize accessible connection.
Steel trestle asks Architecture Design Institute's amount body design, construction and installation company to give construction and installation.
Since three floor in building, in two blocks of patch wall steel plates of each outer wall of floor collar tie beam surface anchoring, every block of steel plate is with four The anchoring of M16 bar planting bolt, 300 × 300 × δ of plate size 16.
In addition to the first floor, 101 lower section of each layer hall door frame, opposite patch wall steel plate position derrick mobile jib 11 on, be welded 300 × 200 × δ, 16 sustaining wall arm seat plate 180, as shown in Figure 12 and Figure 13.
Be welded sustaining wall steel arm between sustaining wall arm seat plate 180 and patch wall steel plate, and two every layer.The specification of sustaining wall steel arm according to Depending on 1 distance from the wall of derrick, it can be designed in conjunction with the spandrel girder of steel trestle.
It should be noted that the installation in order to realize derrick, the utility model by taking the installation of six floor elevators as an example, according to Multiscrew multi-storey building elevator provided by the utility model builds up about 4 tons of the total weight (containing load) of six floor elevators, setting The whole plate basis of 1.6m × 1.6m area, is 0.016MPa to geostatic pressure;And when an adult male standing about to geostatic pressure 0.02Mpa, therefore, according to constructing whole plate shallow foundation shown in Figure 12 and Figure 13.
Figure 13 is to build base signal under the conditions of the hard places level ground such as cell concrete topping, and M24 foot is arranged in the mobile jib lower end of derrick 1 Bottom leveling bolt, bolt are stood in base steel plates 104, steel plate specification 1600mm × 1600mm × δ 20mm, are spread below steel plate 20mm cement mortar is clear and definite, and screed is exactly hard place level ground 106 below.So-called hard place level ground is exactly the concrete road terrace of cell.Then, The accessible ramp 108 that 10% is poured outside the threshold of first floor hall door is connected road.
Figure 12 is to build base signal under the conditions of the soft terraces such as greenbelt, digs 25cm heatable adobe sleeping platform from subsurface, pit bottom soil layer rams Real after-pouring 1800mm × 1800mm × 150mm concrete bottom plate 105, the interior setting specification of concrete bottom plate is 12 ×@of ∮ 100mm ×@100mm Lower layer's reinforcing bar 1051, bottom board concrete surface are directed at 11 position of derrick mobile jib and four pieces of 200mm × 200mm × δ 16mm pre-embedded steel slab are arranged 1052.The cast-in-place filling concrete 107 in 1 periphery of derrick is connected with original place level ground.Basis set draining, rain also must not ponding.
The following detailed description of the installation process of derrick 1.
It is the manufacturing process of derrick 1 first:
B1 the segmentation manufacture of each derrick 1) is completed in factory;
B2 it) manufactures and is completed " carriage assembly ", comprising: car frame and car door and car walls, all climb seat Assembly 60, holding rod seat assembly 70 and driving mechanism 4;It should be noted that needing after " carriage assembly " is completed by four Only climb seat assembly 60 step 423 lower surface and carriage top plate 20 between clearance delta be uniformly adjusted to 10mm;Tool Body method is that bridge crane is sling " carriage assembly " in workshop, and the knotted rope position of hoist cable is the lifting lug on machine seat board 41 4111, after " carriage assembly " hangs ground, weight equalizer is placed in carriage, so that carriage top plate 20 is in a horizontal state;Then The lower end nut 426 of 12 root long silk bolts 428 of four seat assemblies 60 that climb is adjusted, changes the position of lower end nut 426, just The measured value that Δ can be changed, until the Δ of quadrangle be equal to 10mm and also carriage top plate 20 or it is horizontal until, finally lock The lower end nut 426 of every root long silk bolt 428.
B3 it) hangs in " the carriage assembly " that factory finishes assembling into first section derrick;
B4 it) is prepared in factory and completes more screw rods 3, be at this time in short screw shape, arrive joint connection in site.
It should be understood that at this point, selected location has completed the basic construct of derrick by residential building.
Followed by on-site hoisting, two hour time is taken around through test.
C1) above-mentioned b1/b2/b3/b4 object is transported to erecting bed, is responsible for unloading and be hung with 16 tonnes of truck cranes Fill each section of derrick;
C2 on the basis of) first hanging onto first section derrick, second segment, third section ... are then successively lifted;Between section and section Flange bolt connects in time;
C3 it) lifts after connecting second segment, set in 12m height to derrick band and temporarily pull air hardening steel cord;Adjust the sole of mobile jib Bolt, the preliminary verticality for tuning up derrick.
Finally, fixed derrick 1, takes around two work Time of Day through test.
D1) in each floor collar tie beam of residential building exterior wall position steel planting, anchoring patch wall steel plate;
D2) between the sustaining wall arm seat plate 180 on patch wall steel plate and derrick, be welded sustaining wall steel arm;
D3) be welded before sustaining wall steel arm must using theodolite precise measurement, adjust the sole bolt of derrick mobile jib 11 to adjust The multi-faceted verticality of whole derrick 1;The sustaining wall steel arm that is welded also needs tracking measurement in the process, it is ensured that derrick 1 hangs down after the steel arm that has been welded It directly spends constant.
If the four sides of derrick 1 is closed with core pulling aluminium rivet it should be noted that not making sightseeing elevator about derrick 1 Opaque 3mm thickness PVC board, PVC board wallboard are close to 12 inner surface of web member, and rivet is taken root in web member;Sightseeing elevator is such as made, just It is skeleton with derrick 1, transparent glass curtain wall is installed.
Carriage top plate 20 and car floor 30 in multiscrew multi-storey building elevator provided by the utility model specifically can be with Using 1360mm × 1360mm × δ 10mm steel plate, four mobile jibs, 11 out-to-out 1.4m × 1.4m of derrick 1;Production full-page proof is shown in Shown in Figure 14 and Figure 15.
Manhole is provided on carriage top plate 20 and car floor 30, is equipped with the valve upwardly opened, is used as emergency assistance channel.
Car door is installed between two corner posts 50, and car door can be arranged in carriage four sides, to adapt to different buildings, more The needs of hall door and interface channel, the car door winding gate flexible using translation is arranged in direction.
The safety problem for doing hall door about gate-pulling type car door and security door is summarized as follows:
1. " door switch " all is arranged by hall door and car door, when all Men Zhongyou Yishanmens are not closed tight, elevator can not be opened It is dynamic;
2. hall door sets electronic lock, when carriage reaches target zone, the electronic lock automatic unlocking of this layer of hall door;
3. all hall doors are equipped with safety lock, elevator is locked in inoperative time safety goes up bolt to hall door automatically, and hall door can not be beaten It opens, safety cock automatically opens after call.
4. winding gate inner face sets soft canvas curtain, curtain does not keep off the opening and closing of winding gate, and people's hand in carriage can touch curtain But touch less than, also can't see well enclosure.
5. carriage runs to certain level when needing lower visitor, green light can be lighted above the car door of corresponding this layer of hall door give and mention Show.
Above functions is given by the control circuit of elevator and is realized.
About the specific embodiment of car walls, between the corner post 50 and corner post 50 of carriage 2 if do not set car door it is necessary to Close wall.If elevator does not need sightseeing effect, car walls just closes δ 2mm steel plate;Such as to need effect of going sightseeing, car walls Just inlay tempered glass.
By engineering calculation, the premise of the identical delivery scale of multiscrew multi-storey building elevator provided by the utility model Under, manufacturing cost is the one third of traditional elevator in the prior art.Importantly, it does not need setting carriage track, Or carriage relies on the sliding slot and pulley of sliding, is not necessarily to clump weight, without complicated door mechanism system, there are no need electricity in large scale Stair shaft.The door body of the settable opening in four faces of carriage or closure.Derrick 1 can in structural member factory pre-assembly, and It is assembled at the scene.Therefore, there is simple installation, advantage easy for construction.
The specific installation process of screw rod 3 is described in detail below.
It first has to " carriage assembly " to hang in advance into first section derrick 1, it before this must be first in derrick mobile jib 11 Side, at the 2m of lower end, rush diagonal and be welded four pieces " temporarily putting head ";The size of " putting head " is 120mm × 120mm × δ 10mm, when first section derrick 1 slings upright, carriage just stands on " temporarily putting head ", car floor 30 apart from 1 bottom surface of derrick about 2m。
3 installation steps of screw rod are as follows:
(1) steam crane installs derrick rigging out, sustaining wall steel arm;
(2) worker enters derrick 1 from first floor hall door, and " interim hanging basket " 80 is mounted below car floor, sees Figure 16.By 76 Section short screw is put into carriage.A ladder is put in carriage, convenient on operator to going in car roof.It is first in order to enter carriage Derrick wallboard above layer hall door canopy is not installed temporarily.
(3) it is performed the following operation by hoisting operation class:
One " 1 ton of hoist engine " is arranged near derrick;
One " 3 tons of 3 iron blocks " are mounted on derrick inner top crossbeam, as fixed pulley;
" 2 iron blocks, as movable pulley of spiral-lock one in the lifting ear plate 4111 of carriage;
The pulley blocks for being passed around 4 working ropes with 10 wirerope of Ф between movable pulley and fixed pulley, being formed 1:4.Wirerope Dynamic branch head passed around the monolithic on the outside of crown and turn to the monolithic of iron block and derrick root and turn to iron block, guide to elevator On machine.This is the interim power mechanism for promoting carriage.
(4) spreading screw rod 3:
1) one people of station transmits equipment in carriage;Two people that stand in car roof operate;
2) preparation work in car roof:
E1 the single-phase temporary electricity of 220V and 380V three-phase temporary electricity) are connected in car roof;
E2 it) takes one to be attached on the small size motor of a 500W with driven sprocket with the minor sprocket of modulus, uses two-direction switch Control its positive and negative rotation;
E3) to four seat assembly difference one interim chain rings of pocket that climb, diameter about 40cm coincide with driven sprocket;When When needing the rotation of certain driven sprocket, the sprocket wheel of small size motor is just inserted in this ring, operation two-direction switch can drive this from Movable sprocket and the nut that climbs rotation.
3) it is inserted into any one " climb seat assembly " upside down by the 5# section of first group of T50 screw rod is female, starts this and climbs Seat driven sprocket rotate in the forward direction, the 5# section screw rod just extend downwardly into carriage, when 5# section above the seat assembly that climbs also there are It is stretched under stopping when 20cm, screws on a T50 nut, this nut is during 3 spreading of screw rod whether to examine seam crossing screw thread It is smooth, it finally stays in 3 top of screw rod and makees " carriage runs upper limit stopper " at the about 50cm of carriage top plate 191.
4) 5# section upper end twist-on 4# section, screw up with a wrench, at analyzing adapter screw thread linking it is whether smooth, if smooth , so to aim at dowel hole (being at this moment also the datum hole of a Ф 5) of joint this hole with eye be necessarily also unimpeded 's.
5) manual reaming is carried out with 1:50 × 5mm taper reamer in order to be inserted into 1:50 × 5mm × 35mm conical dowel pin.Expand Hole process must be careful, and positioning pin repeatedly try to insert, until with hammer struck it is tight, strike extremely, the both ends of positioning pin are not at this time The rotation of T50 nut must be interfered, finally protrudes into dowel hole with 2.5mm welding rod, with the dead positioning pin of electrical pads.
6) secondary to rotate in the forward direction driven sprocket using small size motor, 4# section and 5# section screw rod are stretched downwards, until 4# section exists Climbing, also there are stretch under stopping when 20cm for seat assembly top.When stretching under screw rod, that T50 nut needs hold, do not allow it It is moved downwardly together with screw rod.
7) according to it is above 4) ~ 6) step repetitive operation, be sequentially connected 3# section, 2# section and 1# save, complete 1# section connection when, will The upper end of 1# section is adjusted to above machine seat board at about 1.7 m, that T50 centimetres rotation is put into distance 1# section upper end 50cm Place.
8) when being stretched under having connected connector, screw rod of the 3# section with 4# section and having started, it is necessary to separately have worker stand the lower section of carriage 2, Take aim at and guide the female head of 5# section by holding rod seat assembly, at this time the set screw of holding rod seat assembly still loosely, holding rod seat Assembly can be moved slightly in car floor, so that screw rod extends through.
9) according to it is above 3) ~ 8) step, repetitive operation, the attended operation for being sequentially completed other three groups of 5# sections ~ 1# section, remove Four interim chain rings.
10) heavy industry operates by: starting hoist engine, and carriage is promoted to crown, the 1# of four screw rods is made to save male head Preformed hole on derrick top plate, and emitted top plate 20cm.
11) four pieces " ball bowl support plates " are put on screw rod, butter is spread in the bottom surface of ball seat plate.
12) four " steel ball nut " control colour codes screwed on into the male head of four 1# sections, tightened.It is aimed on steel ball with eye at this time Dowel hole (being at this moment also the datum hole of a Ф 5) this hole be necessarily also it is smooth, then manual reaming, knocks in positioning Pin, the dead positioning pin of electrical pads.
13) hoist engine slowly puts rope, carriage slowly declines, and four bulbs implement in ball bowl seat, and the weight of carriage is by four Steel ball nut and ball bowl support pass to derrick top plate, and wirerope loosens, removes pulley blocks on hoist engine.
14) four driven sprockets be can be manually rotated, be adjusted to the top chock surface of four seat assemblies 60 that climb in same water Plane;
15) gap between inspection carriage top plate 20 and four sides and derrick web member 12 of bottom plate 30, design gaps 20mm, With surrounding numerical value unanimously for target.If inconsistent, ball bowl support position is just adjusted;
16) height for adjusting drive sprocket 401, auxiliary movable sprocket 402 and two steering sprockets 4031 on machine seat board 41, makes They and four driven sprockets 407 are in same plane.Then chain 413, the first pusher shoe of turn 431 and the first passage are installed 8 sets of 436 tension chain ring of part, tightening assembling bolts.
17) temporary electricity is connected to secondary motor, operation two-direction switch can be with temporary up-down carriage.
18) installation personnel under the manhole on the manhole and bottom plate on carriage top plate by arriving in interim hanging basket.People is in hanging basket It is interior to continue the downward screw rod of spreading
19) according to it is above 4) ~ 6) step, repetitive operation, be sequentially connected 6# section, 7# section, 8# save ... 19# save, Process is specific as follows:
F1) four groups of screw rods must synchronize spreading, as soon as every spreading section, is powered to secondary motor and inverts, carriage just declines;
F2) when cage descending is to " carriage temporarily puts head " being originally welded, this four pieces " temporarily putting head " is removed, weldering is ground off Scar.
F3) when cage descending is to apart from derrick bottom plate 1.8m, interim hanging basket is removed.
F4) when spreading to 19# saves screw rod, screw rod will be bottomed out.At this time the actual needs length of measurement 19# section, by 19# The extra size of section is clipped from female head end;
F5) 19# section is connected to 18# section after truncating, and screw rod lower end should be there are also 60mm ~ 70mm apart from derrick bottom plate at this time.
F6) before 19# section is screwed to 18# section, one spring of set, four screw rods needs four, spring, internal diameter are saved to 19# Slightly larger than screw rod 3;This four springs are located at derrick footing surface naturally, and when carriage drops to first floor leveling, this spring is answered The compression about 50mm.The specification of spring is determined by test.This four springs have buffer protection function at carriage seat bottom.
20) measure the gap between carriage surrounding and derrick, seen it is unchanged, if it find that improper, it is necessary to search Reason is given and is eliminated.
21) repeatedly lifting test is carried out to carriage, observes clearance condition repeatedly, confirmed errorless.
22) change the outfit 50mm × 50mm × small steel plate of δ 10mm at the periphery 5mm of every 192 trisection of ball bowl support, small steel Plate is endways to be welded on derrick top plate 191, is positioned to ball bowl support.
23) temporary electricity is removed, elevator carries out laying cable and control system installation.
24) elevator static check, elevator dynamic no-load test and adjustment.
25) elevator heavy duty 300kg × 1.2 times=360KG test.
26) elevator rated load is tested, and accurately adjusts leveling.
27) it delivers professional unit detection, examine.
The used time estimation of above-mentioned installation process is lifted the derrick used time about 2 hours, derrick sustaining wall about 2 through overtesting Working day, screw rod 3 install about 1 working day, install about 7 working days of electrical structure, debug about 2 working days.
It should be noted that the electric power of multiscrew multi-storey building elevator provided by the utility model needs three-phase dynamic electricity 10KVA can power in place to the pre- first to file of power department in advance.
It overcomes difficulties measure in addition, multiscrew multi-storey building elevator provided by the utility model also contemplates emergency, specific as follows:
(1) it is equipped with alarm button in carriage, is the police whistle sound that sounds in the corridor by elevator by lower button, prompts someone's quilt It is tired.
(2) top plate and bottom plate of carriage are equipped with " manhole valve ", and two valve consistencies from top to bottom can upwardly open.Floor On valve usually covered by plastic carpet.
(3) crown, be aligned valve center secondary crossbeam on mount a 300KG electric block.Have one on its suspension hook Pocket, built-in rope network.This rope network can by people from two thigh root networks, shirtfront and back bound by belt, so as to will People, which is erected, to sling or transfers.
(4) electric block category remote control operation, one formula of remote controler two:
1) remote controler is placed in the outer somewhere of derrick, can obtain outside elevator.It is for service personnel's preparation;It is also convenient for helping The person of helping others enters derrick from top layer hall door, oneself is hung in carriage, imposes and help to personnel in carriage by remote control suspension hook decentralization It helps;
2) another is placed in the storage box in carriage, in case people obtains in carriage.
(5) method overcome difficulties:
By aid worker remote control electric cucurbit, suspension hook (playing rope network) is operated, by two valve, trapped person is transferred to 1 bottom surface of derrick, is walked out from first floor hall door.
Multiscrew multi-storey building elevator safety provided by the utility model is high, particularly with regard to provided by the utility model more The safety analysis of screw rod multi-storey building elevator is as follows:
A, anti-fall ladder
(1) the rated load 300KG of multiscrew multi-storey building elevator provided by the utility model, lifting speed 0.25m/S, It is used enough for resident in old-fashioned residential building.
(2) as design object, the self weight of carriage 2 plus rated load are total to about 8KN.
(3) when the selection short screw of T50 × 8 connects into long bolt and by the vehicle of M30 × 2 both ends male and female head, single length The pulling force that allows to carry of screw rod is 180KN.Four screw mechanisms, then 180 × 4/8=90(times of safety coefficient)
(4) carriage self weight 300kg and manned load 300kg be by 12 428 power transmissions of long filament bolt to climb nut and Screw rod.The 428 use grade bolt of M16/8.8, it is 35KN that single branch, which allows to carry pulling force,.Then 35 × 12/(3+3)=70 (times safety coefficient).
Therefore, carriage is absolutely not because more screw rods 3 are broken or stripped thread, or because 12 long filament bolts 428 are broken or Stripped thread and free falling, therefore there is no the possibility of pendant ladder for the utility model elevator.
B, preventing colliding with top
T50 stop nut is equipped at derrick top plate 50cm on every 3 top of screw rod, when carriage is out of control to derrick top plate When close, this nut oppresses machine seat board 41 and damping spring 420 first, and spring-compressed touches uplink limit switch, four limits Any one is touched i.e. to motor implementation pressure power-off in switch, and warning indicator light lights.
Therefore, this double shield of uplink is blocked with stop nut by forcing power-off to be shut down, the utility model elevator can not It rushes to summit.Since forced stoppage signal is compressed from damping spring 420, personnel have no impact feeling in carriage.
C, anti-reduction of speed
(1) drive motor uses 4 pole motors, and revolving speed can not be more than rated speed, therefore it can not draw Nut be more than design speed and rotate.Therefore, carriage can only at the uniform velocity rise under motor energized state or uniform descent moves.
(2) when motor is with carriage uniform descent, if accident power-off and motor stall, or unexpected chain rupture and Freely, carriage will continue to glide driven sprocket because of inertia at this time.Inertia force at this time=aforementioned motor power calculation In P=0.442KN, and because inertia downslide need to overcome force of sliding friction=aforementioned F=0.798KN, due to inertia force 0.442KN < force of sliding friction 0.798KN, if meet with this two accidents during cage descending, carriage can be soon Slow down and stops.
D, anti-crouching bottom
According to the analysis of above-mentioned A and C, for carriage it is not possible that bottom of squatting at a high speed due to out of control, there is no need to high crouching bottom is arranged Buffer spring, i.e., no setting is required foundation pit.(there is the space of 15cm distance between car floor and derrick footing surface, to hold Receive the cable for hanging on cage bottom.)
In order to guard against cage descending to the first floor, because of leveling electric appliance failure, still will cause slight " crouching bottom ".It uses thus Above-mentioned set 19# section end four " buffer springs " work as a buffer, be located at this time near screw end " lower limit is opened Close " can the total electricity of cutting in time, motor stalling, carriage, which is just lifted in the elasticity of " buffer spring ", lower without impacting to be stopped.
E, power failure
When drive system is damaged in operation, the phenomenon of the failure that carriage stops lifting only occurring, will not lead to any Serious accident.
It to sum up analyzes, the design of multiscrew multi-storey building elevator provided by the utility model is safe.
In addition, it is necessary to explanation, multiscrew multi-storey building elevator provided by the utility model, wherein what is used is automatically controlled System and call display box etc. can be ordered by specialized factory.
To sum up, multiscrew multi-storey building elevator provided by the utility model compared with prior art, has below beneficial to effect Fruit:
(1) elevator structure is significantly simplified, manufacturing cost is reduced;
(2) adaptability to old multi-storey building in installation and use process is improved, and can adapt to the different numbers of plies Multi-storey building installation and use;
(3) by the screw rod of four corners setting guiding carriage elevating movement in derrick, the steady of elevator operation is improved Qualitative and reliability.
It is understood that embodiment of above is merely to illustrate that the principles of the present invention and uses exemplary Embodiment, however the utility model is not limited thereto.For those skilled in the art, this is not being departed from In the case where the spirit and essence of utility model, various changes and modifications can be made therein, these variations and modifications are also considered as this reality With novel protection scope.

Claims (10)

1. a kind of multiscrew multi-storey building elevator, which is characterized in that the multiscrew multi-storey building elevator includes: derrick (1), sedan-chair Compartment (2), more screw rods (3) and driving device (4);
The derrick (1) is set as elevator shaft;
One end of every screw rod (3) is hung on the derrick top plate (191) of the derrick (1), and the other end of every screw rod (3) is equal With the derrick contacts baseplate of the derrick (1);
The carriage (2) is located in the derrick (1), is provided with and climbs on the outer surface of the carriage top plate (20) of the carriage (2) It seats up assembly (60), is provided with holding rod seat assembly (70), the carriage on the outer surface of the car floor (30) of the carriage (2) (2) seat assembly (60) is climbed and the holding rod seat assembly (70) is connect with every screw rod (3) by described;
The driving device (4) is arranged on the outer surface of the carriage top plate (20), and even with the seat assembly that climbs (60) It connects;
The driving device (4) can drive the seat assembly (60) that climbs to rotate along the screw rod (3) to drive the carriage (2) make elevating movement along the screw rod (3).
2. multiscrew multi-storey building elevator according to claim 1, which is characterized in that the seat assembly that climbs (60) includes Driven wheel (407) and the nut that climbs (427) connecting with the driven wheel (407), the nut that climbs (427) are engaged in described On screw rod (3), the driven wheel (407) and the nut that climbs (427) are connect with the driving device (4), described driven Taking turns (407) and the nut that climbs (427) can be under the driving of the driving device (4) simultaneously, in the same direction and uniform velocity rotation.
3. multiscrew multi-storey building elevator according to claim 2, which is characterized in that the driving device (4) includes electricity Motivation and transmission mechanism, the motor are connect with the transmission mechanism, the transmission mechanism respectively with the driven wheel (407) Connected with the nut that climbs (427), the power of the motor operation can be passed to by the transmission mechanism it is described from Driving wheel (407) and the nut that climbs (427).
4. multiscrew multi-storey building elevator according to claim 3, which is characterized in that the transmission mechanism includes drive chain Wheel, at least one gearing chain ring and steering sprocket assembly, alternatively, active synchronization belt wheel, at least one synchronization band and synchronous belt Stretching wheel assembly.
5. multiscrew multi-storey building elevator according to claim 3, which is characterized in that the motor includes two electronic Machine a, alternatively, motor and a frequency converter.
6. multiscrew multi-storey building elevator as claimed in any of claims 1 to 5, which is characterized in that every screw rod (3) climb described in seat assembly (60) and the holding rod seat assembly (70) setting, and the screw rod (3) and the seat that climbs Assembly (60) and the holding rod seat assembly (70) correspond.
7. multiscrew multi-storey building elevator according to claim 6, which is characterized in that more screw rods (3) include two spiral shells Any one in bar (3), three screw rod (3) He Sigen screw rods (3).
8. multiscrew multi-storey building elevator as claimed in any of claims 1 to 5, which is characterized in that the carriage It connect to form car frame by four corner posts (50) between top plate (20) and the car floor (30), and each corner post (50) It is each perpendicular to the carriage top plate (20) and the car floor (30) is arranged, every screw rod (3) runs through the portion of the carriage (2) Point can the hidden back side in the corner post (50), the car frame is perpendicular to the carriage top plate (20) and the carriage The facade of bottom plate (30) is set as car walls, at least one described car walls is set to car door.
9. multiscrew multi-storey building elevator as claimed in any of claims 1 to 5, which is characterized in that the derrick (1) include angle truss structure or square steel tube frame structure, and the derrick (1) is arranged lightning protection, and with nearby building Exterior wall collar tie beam between be arranged sustaining wall steel arm.
10. multiscrew multi-storey building elevator according to claim 9, which is characterized in that any facade of the derrick (1) Upper and floor face equal-height position is respectively provided with hoistway door, and the hall door frame (101) of the hoistway door is fixed on the well of the derrick (1) On frame mobile jib (11), the hall door fan (102) of the hoistway door can be externally opened flat, and the hall door sill and mesh of the hoistway door It strides between mark floor face or target resident's door and is connected or is connected with steel trestle.
CN201822112952.9U 2018-08-14 2018-12-17 A kind of multiscrew multi-storey building elevator Expired - Fee Related CN209226360U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018109237792 2018-08-14
CN201810923779.2A CN109019254A (en) 2018-08-14 2018-08-14 A kind of multiscrew multi-storey building elevator

Publications (1)

Publication Number Publication Date
CN209226360U true CN209226360U (en) 2019-08-09

Family

ID=64631061

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201810923779.2A Pending CN109019254A (en) 2018-08-14 2018-08-14 A kind of multiscrew multi-storey building elevator
CN201811540532.9A Withdrawn CN109534130A (en) 2018-08-14 2018-12-17 A kind of multiscrew multi-storey building elevator
CN201822112952.9U Expired - Fee Related CN209226360U (en) 2018-08-14 2018-12-17 A kind of multiscrew multi-storey building elevator

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201810923779.2A Pending CN109019254A (en) 2018-08-14 2018-08-14 A kind of multiscrew multi-storey building elevator
CN201811540532.9A Withdrawn CN109534130A (en) 2018-08-14 2018-12-17 A kind of multiscrew multi-storey building elevator

Country Status (1)

Country Link
CN (3) CN109019254A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109534130A (en) * 2018-08-14 2019-03-29 张元� A kind of multiscrew multi-storey building elevator
CN113636429A (en) * 2021-10-13 2021-11-12 海门圣帕斯电梯配件有限公司 Adjusting guide rail for multi-well elevator

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111115414B (en) * 2019-12-25 2021-08-27 佛山市高明区安承升降装备研究院 Screw type elevator
CN111056405A (en) * 2019-12-25 2020-04-24 佛山市高明区安承升降装备研究院 Lifting device for elevator car
CN112340569B (en) * 2020-11-20 2022-05-31 刘洪润 Vertical lifting and horizontal moving cordless elevator system and control method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0020825A1 (en) * 1979-06-11 1981-01-07 Sanscord Australia Pty. Limited Apparatus for the transfer of loads from one level to another
JP3197388B2 (en) * 1993-05-21 2001-08-13 テイエチケー株式会社 elevator
DE4343685C2 (en) * 1993-12-21 1996-05-23 Nussbaum Otto Gmbh Co Kg Fall protection and holding device for a lifting device
JPH09188488A (en) * 1996-01-08 1997-07-22 Masao Okubo Elevator for small number of persons
JPH10167620A (en) * 1996-12-09 1998-06-23 Masao Okubo Elevator for small number of persons
CN1096407C (en) * 1999-07-16 2002-12-18 周治梅 Elevator for multistoried building
KR100441274B1 (en) * 2002-11-25 2004-07-21 주식회사 금호엘리베이터 elevator
JP5582801B2 (en) * 2010-01-27 2014-09-03 東芝エレベータ株式会社 Elevator car frame
CN107673167A (en) * 2017-09-14 2018-02-09 山东黄金电器有限公司 Home lift control device and control method
CN109019254A (en) * 2018-08-14 2018-12-18 张元� A kind of multiscrew multi-storey building elevator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109534130A (en) * 2018-08-14 2019-03-29 张元� A kind of multiscrew multi-storey building elevator
CN113636429A (en) * 2021-10-13 2021-11-12 海门圣帕斯电梯配件有限公司 Adjusting guide rail for multi-well elevator

Also Published As

Publication number Publication date
CN109019254A (en) 2018-12-18
CN109534130A (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN209226360U (en) A kind of multiscrew multi-storey building elevator
ES2939501T3 (en) Procedure to operate a work device and work device
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
CN202450720U (en) Concrete prefabricated stair component
CN101725271B (en) Rapid construction method of reinforced concrete chimney
CN212176541U (en) Light-duty high-efficient construction that can have enough to meet need makes building equipment
CN110371823B (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method
CN106150079A (en) Make building machine in the air
CN201330106Y (en) Elevator device without machine room on elevator shaft outside multi-storey building
CN109779244A (en) A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN108455449A (en) A kind of interior rail type mobile curtain wall Lift-on/Lift-off System
CN211058233U (en) Assembled steel construction does not have computer lab elevator well
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN107060152B (en) Attachment device and method between a kind of prefabricated internal partition wall of substation and floor
CN210735910U (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction
CN111762658A (en) Method for installing elevator in deep foundation pit construction by reverse construction method
CN215101404U (en) Construction elevator mounting structure in well
CN111501836A (en) Prefabricated inspection well and construction method thereof
CN106976780B (en) The plug-in rotating formula elevator that can be run in the stair shaft of staircase
CN205367457U (en) Cast member installs special hoist
CN110886214B (en) Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
KR20210068283A (en) Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing
CN209704009U (en) A kind of construction of lift well safety protection structure
CN221031587U (en) Aluminum mould operation floor elevator mouth edge protection device capable of being hoisted for multiple times

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809