CN209114884U - A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed - Google Patents

A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed Download PDF

Info

Publication number
CN209114884U
CN209114884U CN201821440009.4U CN201821440009U CN209114884U CN 209114884 U CN209114884 U CN 209114884U CN 201821440009 U CN201821440009 U CN 201821440009U CN 209114884 U CN209114884 U CN 209114884U
Authority
CN
China
Prior art keywords
steel
moulding bed
steel pipe
profile
profile steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821440009.4U
Other languages
Chinese (zh)
Inventor
孙武
顾洪平
张春春
吴彪
梅伟
李启宏
沈治
吴燕飞
高磊
许锐锋
朱斌
徐庆平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Provincial Construction Group Co Ltd
Nanjing Tongli Construction Group Co Ltd
Original Assignee
Jiangsu Provincial Construction Group Co Ltd
Nanjing Tongli Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Provincial Construction Group Co Ltd, Nanjing Tongli Construction Group Co Ltd filed Critical Jiangsu Provincial Construction Group Co Ltd
Priority to CN201821440009.4U priority Critical patent/CN209114884U/en
Application granted granted Critical
Publication of CN209114884U publication Critical patent/CN209114884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding beds, it applies in steel structural roof construction field, its key points of the technical solution are that: including pouring armored concrete terrace, full hall fastener type steel pipe scaffold and the steel column that steel pipe truss beam both ends are arranged on the ground, full hall fastener type steel pipe scaffold is equipped with several double steel pipe main joists being parallel to each other, several flitches are equipped on double steel pipe main joist, for two neighboring flitch by the rivet interlacement of U-shaped, flitch bottom surface is equipped with the wooden frame for blocking double steel pipe main joist;Flitch is equipped with H profile steel moulding bed, H profile steel moulding bed is equipped with several jack for being used to support steel pipe truss beam, vertical spandrel girder there are two being poured on armored concrete terrace, spandrel girder is equipped with the preformed hole being inserted into for steel bar column, preformed hole bottom hole is equipped with several vertical reinforcing bars, its advantage is that: since full hall fastener type steel pipe scaffold is dismountable and recycle after construction, reduce construction cost.

Description

A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed
Technical field
The utility model relates to steel structural roof construction field, in particular to a kind of high-altitude steel structure on-site consolidation H-type Steel track formula moulding bed.
Background technique
The structure that steel construction is made of steel material is one of main building construction types, and structure is mainly by fashioned iron With the components composition such as joist steel, steel column, steel truss made of billet etc., have that self weight is relatively light, antivibration (shake) property, anti-impacts of steel The advantages that hitting property is good.
When modern large space structure public building is constructed, since its span is big, space is high, and roofing generallys use steel construction Roofing mainly includes beam across steel pipe truss greatly, H profile steel secondary beam and jack truss beam.
But during actual construction, it is confined to the local industrialized level of construction, no large-scale steel structure processing factory, without large size Hoisting and hanging is mechanical, therefore the main member greatly across steel pipe truss beam is taken after being transported to scene in installation position by factory's sectional making If high-altitude operation platform completes aerial spelling, and heavy temporary support columns is arranged in segmentation junction, while considering steel pipe purlin That sets a roof beam in place is installed as one-off construction process, and heavy temporary support columns (lattice column) complete in factory together and transport to applying Building site, due to lattice column be it is disposable, amortization can not be formed, non-recovery utility value increases so as to cause construction cost.
Utility model content
The purpose of the utility model is to provide a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed, advantages It is: since full hall fastener type steel pipe scaffold is dismountable and recycle after construction, reduces construction cost.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of high-altitude steel structure is existing Field is assembled to use H profile steel rail mounted moulding bed, including pouring armored concrete terrace, full hall fastener type steel pipe scaffold on the ground With the steel column that steel pipe truss beam both ends are arranged in, the full hall fastener type steel pipe scaffold is equipped with several double steel being parallel to each other Pipe main joist, is equipped with several flitches on the double steel pipe main joist, the two neighboring flitch by the rivet interlacement of U-shaped, The flitch bottom surface is equipped with the wooden frame for blocking double steel pipe main joist;
The flitch is equipped with H profile steel moulding bed, and the H profile steel moulding bed is used to support the thousand of steel pipe truss beam equipped with several Jin pushes up, and is poured on the armored concrete terrace there are two vertical spandrel girder, and the spandrel girder is equipped with to be inserted into for steel bar column Preformed hole, the preformed hole bottom hole be equipped with several vertical reinforcing bars.
Through the above technical solutions, operator passes through crane for each of steel pipe truss beam in spelling steel pipe truss beam Duan Yici is hoisted to above jack, and is supported by the mandril of jack, to be welded on one for each section of steel pipe truss beam Rise after, by steel column together with reinforcement welding and in preformed hole casting concrete, steel pipe truss roof beam structure is lived by spandrel girder, The mandril of descending jack later;Full hall fastener type steel pipe scaffold provides carrying base to the splicing of steel pipe truss beam Plinth, and full hall fastener type steel pipe scaffold can be dismantled, be reused by operator after construction, be saved engineering resource, be reduced Construction cost;H profile steel moulding bed can also be disassembled recycling simultaneously, further reduce the waste of resource.
The utility model is further arranged to: the H profile steel moulding bed is equipped with several along the distribution of H profile steel moulding bed length direction Crossbeam, the both ends of the crossbeam are all provided with that there are two the upright bars that are parallel to each other.
Through the above technical solutions, when steel pipe truss beam is supported on the mandril of jack, the lower purlin of steel pipe truss beam Bar is located between the upright bar that two are parallel to each other, and is reduced the shaking that steel pipe truss beam occurs in spelling, be ensure that group The precision of spelling.
The utility model is further arranged to: the bearing height of the jack from the middle part of steel pipe truss beam to both ends by Grade reduces.
Through the above technical solutions, springing height when according to specification regulation girder truss installation, reduces jack and withdraws Afterwards steel pipe truss beam occur deforming or under a possibility that disturbing.
The utility model is further arranged to: the H profile steel moulding bed is equipped with billet, and the jack is arranged in steel pad On plate, fixed cylinder is arranged on the mandril of the jack, the fixed cylinder is equipped with arc steel pallet.
Through the above technical solutions, the billet of setting plays the contact area for increasing jack and H profile steel moulding bed, point The pressure effect of jack is dissipated;The arc steel pallet of setting then reduces mandril of lifting jack and directly contacts truss steel pipe, causes The case where steel pipe Inward deflection, occurs, conducive to the sliding of steel pipe truss beam and precisely in place.
The utility model is further arranged to: be welded on the billet two it is symmetrical about axis Angle steel.
Through the above technical solutions, not only having played the positioning action to jack by angle steel, but also reduces jack and exist The case where being deviated during carrying and unloading.
The utility model is further arranged to: the H profile steel moulding bed includes two the first H profile steels being parallel to each other and several The second H profile steel between two the first H profile steels is set, and second H profile steel is perpendicular to the first H profile steel, the billet point Cloth is on the node that the first H profile steel is connected with the second H profile steel, the steel pad of the two neighboring diagonal Node distribution of second H profile steel Plate is connected by bridging.
Through the above technical solutions, the connection between billet and H profile steel moulding bed is strengthened by bridging, simultaneously because cutting The length of knife support is fixed, and quick positioning of the operator to billet position is facilitated.
The utility model is further arranged to: the full hall fastener type steel pipe scaffold is equipped with flak jacket column in flitch side Bar, the flak jacket railing are equipped with safety net.
Through the above technical solutions, the flak jacket railing and safety net of setting play protective action, reduces operator and exist When construction the case where accidental falling.
The utility model is further arranged to: the flitch is with a thickness of 60mm.
Through the above technical solutions, the flitch of 60mm thickness ensure that its reliability as carrying basis.
The utility model is further arranged to: the flitch is equipped with dry powder extinguisher.
Through the above technical solutions, some burst feelings when the dry powder extinguisher of setting makes operator that can cope with construction Condition provides guarantee to the personal safety of operator.
In conclusion the utility model has the following beneficial effects: full hall design of coupler scaffold is mentioned to steel pipe truss beam When for carrying basis and operation platform, itself is detachable and reuses, and saves the waste of resource, reduces construction cost; The case where being pressed by the steel pipe that arc steel pallet reduces steel pipe truss beam by the mandril of jack;Simultaneously in crossbeam and upright bar Cooperation under, reduce shaking of the steel pipe truss beam in spelling, to operator spelling work provide convenience.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present embodiment;
Fig. 2 is the structural schematic diagram that the present embodiment is used to embody H profile steel moulding bed;
Fig. 3 is enlarged drawing at A in Fig. 2;
Fig. 4 is the structural schematic diagram that the present embodiment is used to embody wooden frame;
Fig. 5 is the structural schematic diagram that the present embodiment is used to embody rivet;
Fig. 6 is the structural schematic diagram that the present embodiment is used to embody arc steel pallet;
Fig. 7 is enlarged drawing at B in Fig. 6;
Fig. 8 is the present embodiment for embodying the structural schematic diagram that steel column is connected with reinforcing bar;
Fig. 9 is the structural schematic diagram that the present embodiment is used to embody safety net.
Appended drawing reference: 1, armored concrete terrace;11, full hall fastener type steel pipe scaffold;12, double steel pipe main joist;13, Flitch;131, wooden frame;132, rivet;14, H profile steel moulding bed;141, the first H profile steel;142, the second H profile steel;15, jack;16, Spandrel girder;161, preformed hole;162, reinforcing bar;17, crossbeam;171, upright bar;18, steel column;2, billet;21, fixed cylinder;22, arc Shape steel pallet;23, angle steel;24, bridging;3, flak jacket railing;31, safety net;32, dry powder extinguisher.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment: a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed, as shown in Figure 1, including being cast in ground Armored concrete terrace 1, full hall fastener type steel pipe scaffold 11 on face and the steel column 18 that steel pipe truss beam both ends are set, steel Basis of the reinforced concrete terrace 1 as full hall fastener type steel pipe scaffold 11, can be by the complete of full hall fastener type steel pipe scaffold 11 Portion's load is directly passed to ground.
As shown in Figures 2 and 3, full hall fastener type steel pipe scaffold 11 is equipped with several double steel pipe main joists being parallel to each other 12, several flitches 13 along the distribution of 12 length direction of double steel pipe main joist are equipped on double steel pipe main joist 12, using as operation Platform and bearing platform, flitch 13 with a thickness of 60mm, and two neighboring flitch 13 passes through rivet 132(such as Fig. 5 of U-shaped) even It connects, so that flitch 13 is linked to be an entirety, guarantees the bearing capacity of flitch 13.
As shown in figure 4,13 bottom surface of flitch is equipped with the wooden frame 131 for blocking double steel pipe main joist 12, convenient for limitation flitch 13 in longitudinal sliding, and in actual installation, since flitch 13 is linked together by rivet 132 in advance, operator is only Wooden frame 131 need to be set in 13 bottom surface of part flitch, to save timber and construction time, while operator can also be equipped with wood Sunk screw is set on the flitch 13 of frame 131, make sunk screw sequentially pass through after flitch 13 and wooden frame 131 with the main dragon of double steel pipe Bone 12 is threaded togather, and to limit flitch 13 in lateral sliding, improves the stability that flitch 13 carries.
As shown in Figure 6 and Figure 7, flitch 13 is equipped with H profile steel moulding bed 14, and H profile steel moulding bed 14 is equipped with several be used to support The jack 15 of steel pipe truss beam, fixed cylinder 21 is arranged on the mandril of jack 15, and fixed cylinder 21 is equipped with arc steel pallet 22, the Internal periphery of arc steel pallet 22 is adapted with the lower purlin of steel pipe truss beam.
As shown in figure 8, being poured on armored concrete terrace 1 there are two vertical spandrel girder 16, spandrel girder 16, which is equipped with, to be supplied The preformed hole 161 of 162 column of reinforcing bar insertion, 161 bottom hole of preformed hole are equipped with several vertical reinforcing bars 162, and reinforcing bar 162 is in circumferential point Cloth.
Construction procedure: operator first adjusts the absolute altitude of each arc steel pallet 22, recycles truck crane by steel pipe truss On girder steel segmental hoisting to arc steel pallet 22, and it is inserted into steel column 18 among circumferentially distributed reinforcing bar 162, to each arc-shaped steel Supporting plate 22 will carry out welding spelling work after steel pipe truss beam supporting & stablizing;Steel pipe truss beam integrally stands 72 hours later, It is fully cooled each weld seam;Steel column 18 and reinforcing bar 162, and the casting concrete in preformed hole 161 are welded, steel column 18 and load-bearing are made Beam 16 is consolidated, and is supported steel pipe truss beam by spandrel girder 16;Finally dismantle full hall fastener type steel pipe scaffold 11 And remaining support member;Due to the full hall fastener type steel pipe scaffold 11 as offer carrying platform, component part weight Gently, convenient transportation, and it is reusable, buildings and resources are not only saved, but also reduce construction cost.
As shown in fig. 6, H profile steel moulding bed 14 is equipped with several crossbeams 17 along the distribution of 14 length direction of H profile steel moulding bed, crossbeam 17 both ends, which are all provided with, works as steel pipe so that the both ends of crossbeam 17 respectively form a U-frame frame there are two the upright bar 171 that is parallel to each other When girder truss is supported in arc steel pallet 22, the lower purlin of steel pipe truss beam is located in two U-frame framves, limits steel Tubular truss beam occurs longitudinal shaking in spelling, improves welding quality.
As shown in fig. 6, it is further, arch camber, therefore jack 15 are answered according to specification regulation steel pipe truss beam during installation Bearing height reduced step by step from the middle part of steel pipe truss beam to both ends, conducive to reduce steel pipe truss beam removed after spelling Occur deforming when jack 15 or under a possibility that disturbing.
As shown in fig. 6, H profile steel moulding bed 14 is equipped with billet 2, billet 2 is connect with H profile steel moulding bed 14 by spot welding, Jack 15 is supported on billet 2 at this time, and when ballast of the jack 15 by steel pipe truss beam, pressure passes through jack 15 It is distributed on billet 2, then the stabilization that on the one hand ensure that jack 15 is supported to H profile steel moulding bed 14 is dispersed by billet 2 The case where property, on the other hand also reduce jack 15 directly contacts with flitch 13, and flitch 13 is caused to be destroyed;Jack simultaneously When 15 insufficient height, operator can also stack multilayer billet 2, increase the relative altitude of jack 15.
As shown in fig. 7, two angle steel 23 about the distribution of 15 axisymmetrical of jack are welded on billet 2, jack 15 pedestal is located between two angle steel 23 and blocks with by angle steel 23, reduces jack 15 and is displaced under external collision The case where.
As shown in fig. 6, H profile steel moulding bed 14 includes two the first H profile steels 141 being parallel to each other and several settings at two the The second H profile steel 142 between one H profile steel 141, the second H profile steel 142 is perpendicular to the first H profile steel 141, so that two the first H profile steels It is divided into rectangular area one by one between 141.
As shown in fig. 6, several jack 15 are divided into two groups at this time, two groups of jack, 15 correspondences, one the first H profile steel 141, while billet 2 is distributed on the node of the first H profile steel 141 and the connection of the second H profile steel 142, two neighboring second H profile steel The billet 2 of 142 diagonal Node distributions is connected by bridging 24, i.e., the four of bridging 24 end is separately connected a steel pad Plate 2 ensure that the reliability that billet 2 connects.Simultaneously because the distance that jack 15 is spaced is identical, bridging 24 is rectangle Two diagonal lines in region, the length that operator need to only control bridging 24 can position the position of billet 2, convenient and efficient.
As shown in figure 9, in addition, full hall fastener type steel pipe scaffold 11 is equipped with flak jacket railing 3, flak jacket column in 13 side of flitch Bar 3 is equipped with safety net 31, reduces a possibility that operator surprisingly falls from flitch 13 in construction;Simultaneously on flitch 13 It is additionally provided with dry powder extinguisher 32, in order to which operator copes with some emergency cases.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (9)

1. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed, it is characterised in that: including pouring steel on the ground Reinforced concrete terrace (1), full hall fastener type steel pipe scaffold (11) and the steel column (18) that steel pipe truss beam both ends are set, it is described Full hall fastener type steel pipe scaffold (11) are equipped with several double steel pipe main joists (12) being parallel to each other, the double steel pipe main joist (12) it is equipped on several flitches (13), the two neighboring flitch (13) is connected by the rivet (132) of U-shaped, the flitch (13) bottom surface is equipped with the wooden frame (131) for blocking double steel pipe main joist (12);
The flitch (13) is equipped with H profile steel moulding bed (14), and the H profile steel moulding bed (14) is used to support steel pipe purlin equipped with several The jack (15) set a roof beam in place, pours that there are two vertical spandrel girder (16), the spandrel girders on the armored concrete terrace (1) (16) it is equipped with the preformed hole (161) being inserted into for reinforcing bar (162) column, preformed hole (161) bottom hole is equipped with several vertical steel Muscle (162).
2. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 1, it is characterised in that: The H profile steel moulding bed (14) is equipped with several crossbeams (17) along the distribution of H profile steel moulding bed (14) length direction, the crossbeam (17) Both ends be all provided with that there are two the upright bars (171) that are parallel to each other.
3. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 1, it is characterised in that: The bearing height of the jack (15) reduces step by step from the middle part of steel pipe truss beam to both ends.
4. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 3, it is characterised in that: The H profile steel moulding bed (14) is equipped with billet (2), and the jack (15) is arranged on billet (2), the jack (15) it is arranged on mandril fixed cylinder (21), the fixed cylinder (21) is equipped with arc steel pallet (22).
5. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 4, it is characterised in that: Two angle steel (23) about the distribution of jack (15) axisymmetrical are welded on the billet (2).
6. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 5, it is characterised in that: The H profile steel moulding bed (14) includes two the first H profile steels (141) being parallel to each other and several settings in two the first H profile steels (141) the second H profile steel (142) between, second H profile steel (142) is perpendicular to the first H profile steel (141), the billet (2) it is distributed on the node of the first H profile steel (141) and the second H profile steel (142) connection, two neighboring second H profile steel (142) billet (2) of diagonal Node distribution is connected by bridging (24).
7. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 1, it is characterised in that: Full hall fastener type steel pipe scaffold (11) are equipped with flak jacket railing (3) in flitch (13) side, set on the flak jacket railing (3) There are safety net (31).
8. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 7, it is characterised in that: The flitch (13) is with a thickness of 60mm.
9. a kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed according to claim 8, it is characterised in that: The flitch (13) is equipped with dry powder extinguisher (32).
CN201821440009.4U 2018-09-03 2018-09-03 A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed Active CN209114884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821440009.4U CN209114884U (en) 2018-09-03 2018-09-03 A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821440009.4U CN209114884U (en) 2018-09-03 2018-09-03 A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed

Publications (1)

Publication Number Publication Date
CN209114884U true CN209114884U (en) 2019-07-16

Family

ID=67197871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821440009.4U Active CN209114884U (en) 2018-09-03 2018-09-03 A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed

Country Status (1)

Country Link
CN (1) CN209114884U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854140A (en) * 2021-01-08 2021-05-28 中国地质调查局成都地质调查中心 Intercepting truss dam for middle and upper reaches of debris flow channel and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854140A (en) * 2021-01-08 2021-05-28 中国地质调查局成都地质调查中心 Intercepting truss dam for middle and upper reaches of debris flow channel and construction method thereof

Similar Documents

Publication Publication Date Title
KR20140084107A (en) Self-Launching Movable Scaffolding System
US5471694A (en) Prefabricated bridge with prestressed elements
CN102154988B (en) Arch-after-girder construction method of large-span steel box tacked arch bridge
JP7172916B2 (en) Bridge superstructure removal method
CN107653781A (en) Big steel pipe truss and construction method for bent cap cast-in-place construction
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN104060542A (en) Transverse bridge direction prestress exerting device for combined beam cable-stayed bridge and transverse bridge direction prestress exerting method
CN109098441A (en) H profile steel rail mounted moulding bed with stopper
CN209114884U (en) A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed
CN102251666B (en) Overhanging type discharging platform
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN114197325A (en) Pier shaft construction safety protection platform
CN211340840U (en) Tower crane foundation of internal climbing tower crane
CN113684958A (en) Construction method for assembling steel bar truss composite floor slab of reinforced concrete frame structure
CN206329024U (en) Hanging large-span steel-reinforced concrete structure construction steel platform
CN107882065B (en) Operating platform for concrete beam construction above rail-mounted area and building method thereof
CN102587649B (en) Template profiled bar supporting system of high and large cantilever structure
CN115341701A (en) High-altitude overhanging steel bar truss floor support plate hanging formwork construction method
CN105544402B (en) A kind of hanging gang form support frame and construction method for pier capping beam high
KR101765845B1 (en) Temporary prestress deck for steel bridge
CN112854702A (en) Large-span silo roof construction platform and erection method
CN206844680U (en) Steel gallery ground assembly load transfer device
CN219908600U (en) Reinforcing steel bar binding and concrete construction platform for pier column construction
CN217399442U (en) Cast-in-place bridge floor flange plate construction structures of U shaped steel case combination beam
CN215167934U (en) Large-span silo roofing construction platform bottom pillar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant