CN209082498U - Locator under a kind of pile foundation construction casing - Google Patents

Locator under a kind of pile foundation construction casing Download PDF

Info

Publication number
CN209082498U
CN209082498U CN201821273505.5U CN201821273505U CN209082498U CN 209082498 U CN209082498 U CN 209082498U CN 201821273505 U CN201821273505 U CN 201821273505U CN 209082498 U CN209082498 U CN 209082498U
Authority
CN
China
Prior art keywords
leading truck
pile foundation
pedestal
casing
foundation construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821273505.5U
Other languages
Chinese (zh)
Inventor
Yundong Ma
马云东
Jinming Xin
辛金明
Yuepeng Hou
侯跃鹏
Huaizheng Chen
陈怀铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201821273505.5U priority Critical patent/CN209082498U/en
Application granted granted Critical
Publication of CN209082498U publication Critical patent/CN209082498U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)

Abstract

The utility model discloses locators under a kind of pile foundation construction casing, are made of device noumenon, including the pedestal being fixedly mounted on construction base surface, are vertically mounted on leading truck on pedestal, for internal placement casing by fastener;The relative position of leading truck lateral surface is provided at least two pairs of verticality regulating parts, and is at least two groups up and down, for adjusting the verticality of shield bucket and pedestal.Wherein, pedestal is the rectangular configuration of steel frame, is welded with triangle support frame between the leading truck left and right sides;Leading truck is also steel-frame structure, and horizontal cross-section is one of polygon, circle, ellipse.Verticality regulating part can be essence and prick screw thread or screw rod.The utility model is able to satisfy locator under the pile foundation construction casing of solution cavity area, solves the problems, such as that solution cavity area hole depth is relatively deep, more demanding to verticality etc.;The precision and stability for improving casing vertical direction, save operating space at the scene, save the time, reduce project cost.

Description

Locator under a kind of pile foundation construction casing
Technical field
The utility model belongs to bridging technical field, and in particular to locator under a kind of pile foundation construction casing.
Background technique
The newly-built Wuhan that China Construction the Sixth Engineering Bureau Co., Ltd undertakes the construction of to two ridge Biao great Hua goods yard of Huangshi inter-city passenger rail Engineering is located at Wuhan City Jiangxia District.The ridge great Hua downlink grand bridge 0-9# pier (the beginning and the end mileage be GXSJDK1+092.735~ It GXSJDK1+391.620) is a part for connecting the ridge the great Hua ridge Zhan He great Hua goods yard downlink and discongesting line.The section superstratum point Wei not plough plant soil or plain fill, the 4th system update system rush proluvial cohesive soil, under cover basement rock be K-E argillaceous limestone based on, karst hair It educates, uncertain factor is more, and neighbouring existing Beijing-Guangzhou Railway and Wuchang main road, should guarantee existing Beijing-Guangzhou Railway and Wuchang in construction The traffic safety in main road guarantees man-machine safety, it is also to be ensured that pile quality, difficulty of construction is big.
Utility model content
The purpose of the utility model is to provide locators under a kind of pile foundation construction casing, to improve the precision hung, Reduce difficulty of construction.
The utility model to achieve the above object, takes following technical scheme:
Locator under a kind of pile foundation construction casing, is made of device noumenon.Described device ontology includes construction basis The pedestal being fixedly mounted on face, the middle part of the pedestal are equipped with the internal leading truck for placing casing vertically upward;The guiding The relative position of frame lateral surface is provided with the verticality regulating part of at least two pairs the adjustment casings and the pedestal verticality, and At least up and down two groups.
The pedestal is the rectangular configuration of steel frame, is welded with triangular support between the leading truck left and right sides Frame.
The leading truck is also steel-frame structure, and horizontal cross-section is one of polygon, circle, ellipse.
The horizontal cross-section of the leading truck is square.
The triangle support frame is I12.6 I-steel.
The steel-frame structure is I28b I-steel.
The verticality regulating part is the essence bundle screw thread or screw rod for being arranged symmetrically in two groups of opposite exterior lateral sides faces of the leading truck.
The utility model has the beneficial effect that compared with prior art
Locator under the pile foundation construction casing of the utility model is not only able to satisfy under the pile foundation construction casing of solution cavity area Locator, moreover it is possible to solve that solution cavity area hole depth is deeper, the problem more demanding to verticality etc..
Compared with existing guiding trestle, the advantages of the utility model tooling is on the basis of meeting construction basic function, to improve The precision and stability of casing vertical direction, saves operating space at the scene, saves the time, reduce project cost.
Detailed description of the invention
Fig. 1 is the utility model structure schematic view of the front view.
Fig. 2 is the utility model structure side structural representation view.
Fig. 3 is the utility model structure overlooking structure diagram.
Fig. 4 is I-I cross section structure schematic diagram in Fig. 1.
Wherein: 1- casing 2-32 finish rolling screw thread or screw rod 3- pedestal 4- leading truck 5- triangle support frame 6- guiding Frame horizontal bracing 7- leading truck vertical bracing
Specific embodiment
The utility model is described in detail in 1~4 specific embodiment with reference to the accompanying drawing:
The pedestal 3 and leading truck 4 of device noumenon are formed by I28b I-steel welding production.Pedestal 3 is rectangle plane steel framework Frame is placed on workbench positioned at the lower part of whole device.Pedestal 3 is steady for increasing its vertical direction using expansion frame It is qualitative.Leading truck 4 is square the three-dimensional steel-frame structure in section, is welded on 3 center of pedestal, inside uses I12.6 I-steel Leading truck vertical bracing 7, to leading truck 4 carry out rigidity reinforcement.On the outside of 3 rectangular frame of pedestal, 4 left and right sides of leading truck, The symmetrical triangle support frame 5 for laying I12.6 I-steel is used as diagonal brace, and pedestal 3 and leading truck 4 is integrally welded, guarantees to lead To the rigidity and stability of frame 4 in vertical direction.It omits the every side of 4 horizontal cross-section I-steel square frame inside dimension of leading truck Greater than 1 outer diameter of casing (5-10cm), and four right angles, up and down direction lay the leading truck of no less than 2 groups of I12.6 I-steel Horizontal bracing 6 reinforces the structural stability of leading truck 4.Close to two water of upper/lower terminal in the middle part of four sides of leading truck 4 Prosposition is set, and is laid with two groups, each 4 32 essences bundle screw rod 2, symmetrically altogether to adjust the verticality of casing 1 Yu pedestal 3.
4 horizontal cross-section side length of leading truck is 150cm, a height of 300cm of square frame;The widened steel frame pedestal 3 in lower part is long For the rectangle of 630cm × 208cm;Triangle support frame 5 lower part connection on the base 3, apart from leading truck 4 be 150cm at, it is right Claim to lay diagonal brace on the side wall of leading truck 4, it is integrally welded.
When work, moving hanging basket is installed by 25T crane.Device noumenon is steadily sling with crane, is moved closer to Stake holes is then placed on Pile Installation Platform.Positioning reinforcing is carried out to pedestal 3 using bolt, it is consolidated and is mounted on pile foundation On operation platform.Confirm whether each component connection such as pedestal 3, leading truck 4, triangle support frame 5 is solid and reliable, is then protected Cylinder 1 is hung.When casing 1 is hung, by two rows adjustment screw 2, verticality of the casing 1 relative to pedestal 3, casing 1 are adjusted One section of every follow-up (about 2m), detects pile foundation pedestal 3 and the verticality of casing 1 when decentralization, and discovery deviation passes through tune in time Whole screw rod 2 is adjusted, until casing 1 is perpendicular to pile foundation pedestal 3, and is transferred to predetermined position.
The tooling can be used as the temporary fastening device of casing spreading welding simultaneously.The locator under pile foundation construction casing On above the casing that has descended, lift by crane spreading casing with crane, be slowly put into leading truck.Weld job face is placed on two as far as possible Arrange the operation interval of adjustment screw, conducive to adjustment need to lengthen casing under good casing concentricity, it is correct to weld.
The above is the preferred embodiment of the utility model, not does limitation in any form to the utility model, All contents without departing from technical solutions of the utility model, it is made by the above technical examples according to the technical essence of the present invention The simple replacement of simple modification, equivalent variations and profile in any structure, belongs to the guarantor of technical solutions of the utility model Protect range.

Claims (7)

1. locator under a kind of pile foundation construction casing, is made of device noumenon, characterized in that described device ontology includes applying The pedestal being fixedly mounted on work base surface, the middle part of the pedestal are equipped with the internal leading truck for placing casing vertically upward;Institute The relative position for stating leading truck lateral surface is provided with the verticality tune of at least two pairs the adjustment casings and the pedestal verticality Part is saved, and is at least two groups up and down.
2. locator under pile foundation construction casing as described in claim 1, it is characterised in that the pedestal is steel frame Triangle support frame is welded between at left and right sides of rectangular configuration, with the leading truck.
3. locator under pile foundation construction casing as described in claim 1, it is characterised in that the leading truck is steel frame Structure, horizontal cross-section are one of polygon, circle, ellipse.
4. locator under pile foundation construction casing as claimed in claim 3, it is characterised in that the level of the leading truck is cut Face is square.
5. locator under pile foundation construction casing as claimed in claim 2, it is characterised in that the triangle support frame is I12.6 I-steel.
6. locator under the pile foundation construction casing as described in claim 2~4 is any, it is characterised in that the steel frame knot Structure is I28b I-steel.
7. locator under pile foundation construction casing as described in claim 1, it is characterised in that the verticality regulating part is The essence for being arranged symmetrically in two groups of opposite exterior lateral sides faces of the leading truck pricks screw thread or screw rod.
CN201821273505.5U 2018-08-08 2018-08-08 Locator under a kind of pile foundation construction casing Active CN209082498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821273505.5U CN209082498U (en) 2018-08-08 2018-08-08 Locator under a kind of pile foundation construction casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821273505.5U CN209082498U (en) 2018-08-08 2018-08-08 Locator under a kind of pile foundation construction casing

Publications (1)

Publication Number Publication Date
CN209082498U true CN209082498U (en) 2019-07-09

Family

ID=67114494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821273505.5U Active CN209082498U (en) 2018-08-08 2018-08-08 Locator under a kind of pile foundation construction casing

Country Status (1)

Country Link
CN (1) CN209082498U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110438994A (en) * 2019-07-16 2019-11-12 中交一公局第二工程有限公司 Guide frame for steel casing
WO2022121554A1 (en) * 2021-07-05 2022-06-16 中铁上海工程局集团有限公司 Protective casing guide frame structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110438994A (en) * 2019-07-16 2019-11-12 中交一公局第二工程有限公司 Guide frame for steel casing
WO2022121554A1 (en) * 2021-07-05 2022-06-16 中铁上海工程局集团有限公司 Protective casing guide frame structure

Similar Documents

Publication Publication Date Title
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN104389313A (en) Positioning perpendicularity adjusting device and method of dual-spliced I-shaped steel latticed column
CN204126230U (en) Assembly scaffold unit
CN209082498U (en) Locator under a kind of pile foundation construction casing
CN204040035U (en) A kind of positioning guiding structure of steel pile casting
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN109267493A (en) A kind of construction method installed across river steel lid beam
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN102777037A (en) Simple and practical hoisting construction method of long-span steel girder
CN206636168U (en) Overhanging type scaffold system
CN105297731A (en) Reverse construction method steel stand column positioning device and positioning method
CN102767378B (en) Double-column type tunnel portal method for bent frame construction tunnel
CN204662929U (en) A kind of cross-line walking fence operation device
CN103967332A (en) Construction method of building site barrier
CN216081351U (en) Verticality measuring device suitable for hydraulic creeping formwork
CN205954495U (en) Formwork system is used in construction of large -span continuous beam bridge bridge pier in deep water mound back timber section
CN206768836U (en) A kind of I-steel gabion assembles counterfort supporting construction
CN205134323U (en) Reverse construction method steel stand positioner
CN204343294U (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column
CN210946870U (en) Vertical and horizontal positioner of lattice column
CN204753602U (en) Subassembly is strutted to foundation ditch external corner position self -balancing
CN113047594A (en) Movable climbing frame for elevator shaft and erection method thereof
CN207749521U (en) The real-time monitoring instrument of moveable construction of prefabricated piles for building
CN113668401A (en) Hoisting process based on installation and transportation platform on long-span bridge pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant