A kind of simple and practical large-span steel girder construction method for hanging
Affiliated technical field
The invention belongs to technical field of buildings, be specifically related to the form of construction work of steel work crossbeam lifting.
Background technology
At present; Along with China's rapid development of economy; Improving constantly of people's living standard, for satisfying the growing material and cultural needs of people, public building usually adopts the gimmick of large-span space structure; Realize the requirement of function of use, the factory building crane girder of the conference room of public building, cinema, Zhongting, exhibition hall and industrial construction etc. has mostly adopted the steel beam structure of large span.For this steel beam structure; Mostly adopt behind the installation on ground again with the large tonnage crane integral hoisting or utilize that mechanical loose mail such as tower crane, mobile crane, hoist engine lifts, the job practices of installation at high altitude; These job practicess; Strong to space site requirements height and construction machinery dependence, beyond the machinery rotation radius, then can't implement, and cost is high.
Summary of the invention
To the deficiency that the place space requirement is high, the construction machinery dependence is strong, cost is high, the present invention provides a kind of simple and easy practical economic large-span steel girder construction method for hanging to existing hanging method.
Below introduce a kind of simple and easy practical economic large-span steel girder construction method for hanging of the present invention in detail, accomplish as follows:
1) large-span steel girder is divided into several segments,, utilizes tower crane that every segment girder steel is lifted to the flooring zone of constructing earlier in the overlayable zone of tower crane; 2), encryption needs the template framed bent in lifting zone, and sets up the cross bar of laying portable cucurbit hook position; 3) can not adopt steel pipe and crowbar to cooperate mobile segment girder steel in the scope of overwrite job at tower crane; When the segment girder steel moves to after the preset range end that the end of portable cucurbit is buckled in little girder steel, the other end is buckled on the template framed bent in girder steel the place ahead on the little cross bar, and 4) for convenient little girder steel moves horizontally, the steel pipe that supports the segment girder steel is vertical with little girder steel without exception; When the segment girder steel is pulled in the template framed bent behind the relevant position by portable cucurbit, carry out the vertical of segment girder steel and move; 5) the vertical of girder steel moves, and selects for use two portable cucurbits to be buckled in the back of little girder steel, and the other end of portable cucurbit is buckled on the little cross bar on girder steel top.For guaranteeing the stability of the little cross bar of moving process, little cross bar is reinforced, the both sides that on little cross bar, hang portable cucurbit respectively increase an oblique vertical rod with little cross bar is fixed with fastener, and vertical rod bottom and lower crosspiece are fixed with fastener, form stable three-legged structure; Guarantee girder steel lifting process safety; 6) after portable cucurbit rises to the segment girder steel predetermined absolute altitude, the end adopts high-strength bolt to be connected with the built-in fitting of structural column or beam, and other end bottom adds cross bar, carries girder steel, and cross bar adopts fastener to be connected with the both sides vertical rod, and the insurance fastener is set up in the bottom; After adopting levelling tube to check the both sides absolute altitude, the Support Position of adjustment cross bar.7) adopt with other sections girder steel in the quadrat method lifting completion span, accomplish assembly unit, in the assembly unit process, adopt levelling tube to check outside the whole section level absolute altitude, the horizontal range that also should adopt tape measure to check girder steel between each span meets design requirement.8) after girder steel is accomplished and installed, remove the lifting of carrying cross bar and portable cucurbit and use support body.
Advantage of the present invention is: adopting this method to carry out the large-span steel girder construction, all is artificial and simple portable cucurbit operation, under the conditions permit situation; Also can adopt the tower crane less important work; Simple, convenient, economical, reduce dependence to large tonnage crane and tower crane, reduce requirement to the space, place; Required framed bent is only done suitable adjustment and is got final product on original template supporting row frame basis, greatly reduce construction cost.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified
Fig. 1 is a steel lifting component drawing
Fig. 2 is that girder steel moves horizontally sketch map
Fig. 3 is that lifting girder steel level is with regard to bitmap
Fig. 4 is that a former full hall frame is set up lifting and used the support body sketch map
Fig. 5 is that girder steel vertically moves sketch map
Fig. 6 is that girder steel vertically moves elevation
Fig. 7 is the vertical mobile profile figure of girder steel
Fig. 8 is reinforcing figure at the bottom of the girder steel back rest in place
1. tower cranes among the figure, 2. suspension hook, 3. girder steel, 4. Chain block, 5. steel pipe, 6. girder steel back tie point, 7. reinforcing steel pipe
In Fig. 1, tower crane 1 utilizes 2 pairs of girder steels of suspension hook 3 to carry out upper air installing
In Fig. 2, girder steel 3 pads utilize manpower pulling Chain block 4, thereby girder steel 3 are moved horizontally on steel pipe 5
In Fig. 4, the both sides that on little cross bar, hang portable cucurbit respectively increase an oblique vertical rod with little cross bar is fixed with fastener, and vertical rod bottom and lower crosspiece are fixed with fastener, form stable three-legged structure
In Fig. 5, Chain block 4 is buckled on two tie points in back of girder steel 3, utilize manpower pulling Chain block 4, thereby girder steel 3 is vertically moved
In Fig. 7, after utilizing Chain block 4 girder steel 3 to be promoted to predetermined absolute altitude, adopt reinforcing steel pipe 7 to reinforce in the bottom of girder steel 3.