CN102777037A - Simple and practical hoisting construction method of long-span steel girder - Google Patents

Simple and practical hoisting construction method of long-span steel girder Download PDF

Info

Publication number
CN102777037A
CN102777037A CN2011101234633A CN201110123463A CN102777037A CN 102777037 A CN102777037 A CN 102777037A CN 2011101234633 A CN2011101234633 A CN 2011101234633A CN 201110123463 A CN201110123463 A CN 201110123463A CN 102777037 A CN102777037 A CN 102777037A
Authority
CN
China
Prior art keywords
cross bar
girder
steel
span
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101234633A
Other languages
Chinese (zh)
Other versions
CN102777037B (en
Inventor
孙晓阳
颜卫东
王小波
黄丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201110123463.3A priority Critical patent/CN102777037B/en
Publication of CN102777037A publication Critical patent/CN102777037A/en
Application granted granted Critical
Publication of CN102777037B publication Critical patent/CN102777037B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a simple, practical and economic hoisting construction method of a long-span steel girder. The method comprises (1) dividing the long-span steel girder into several small sections according to construction requirements, using a tower crane or a winding engine to hoist each section of the steel girder to a close construction area, and adopting a steel tube and a crowbar to move steel girders in small sections in a matched mode on the outside of operation radius; (2) strengthening an original full frame and additionally installing a cross bar for placing a portable calabash hook position, respectively adding a slant upright bar and a small cross bar which are fixed through a fastener on two sides of cross bar provided with a portable calabash in a hanging mode, and fixing the bottom of the upright bar and the cross bar on the lower portion through the fastener; (3) lifting the steel girder in the small sections to a scheduled elevation through the portable calabash, enabling the end portion or an embedded part of a girder to be connected through a high-strength bolt, and additionally installing a cross bar on the bottom at the other end for bearing the girder; (4) adopting a spirit level to recheck the elevation on the two sides, adjusting a support position of the cross bar; and (5) adopting the same method to hoist and complete the steel girders in other sections in the span to complete assembly.

Description

A kind of simple and practical large-span steel girder construction method for hanging
Affiliated technical field
The invention belongs to technical field of buildings, be specifically related to the form of construction work of steel work crossbeam lifting.
Background technology
At present; Along with China's rapid development of economy; Improving constantly of people's living standard, for satisfying the growing material and cultural needs of people, public building usually adopts the gimmick of large-span space structure; Realize the requirement of function of use, the factory building crane girder of the conference room of public building, cinema, Zhongting, exhibition hall and industrial construction etc. has mostly adopted the steel beam structure of large span.For this steel beam structure; Mostly adopt behind the installation on ground again with the large tonnage crane integral hoisting or utilize that mechanical loose mail such as tower crane, mobile crane, hoist engine lifts, the job practices of installation at high altitude; These job practicess; Strong to space site requirements height and construction machinery dependence, beyond the machinery rotation radius, then can't implement, and cost is high.
Summary of the invention
To the deficiency that the place space requirement is high, the construction machinery dependence is strong, cost is high, the present invention provides a kind of simple and easy practical economic large-span steel girder construction method for hanging to existing hanging method.
Below introduce a kind of simple and easy practical economic large-span steel girder construction method for hanging of the present invention in detail, accomplish as follows:
1) large-span steel girder is divided into several segments,, utilizes tower crane that every segment girder steel is lifted to the flooring zone of constructing earlier in the overlayable zone of tower crane; 2), encryption needs the template framed bent in lifting zone, and sets up the cross bar of laying portable cucurbit hook position; 3) can not adopt steel pipe and crowbar to cooperate mobile segment girder steel in the scope of overwrite job at tower crane; When the segment girder steel moves to after the preset range end that the end of portable cucurbit is buckled in little girder steel, the other end is buckled on the template framed bent in girder steel the place ahead on the little cross bar, and 4) for convenient little girder steel moves horizontally, the steel pipe that supports the segment girder steel is vertical with little girder steel without exception; When the segment girder steel is pulled in the template framed bent behind the relevant position by portable cucurbit, carry out the vertical of segment girder steel and move; 5) the vertical of girder steel moves, and selects for use two portable cucurbits to be buckled in the back of little girder steel, and the other end of portable cucurbit is buckled on the little cross bar on girder steel top.For guaranteeing the stability of the little cross bar of moving process, little cross bar is reinforced, the both sides that on little cross bar, hang portable cucurbit respectively increase an oblique vertical rod with little cross bar is fixed with fastener, and vertical rod bottom and lower crosspiece are fixed with fastener, form stable three-legged structure; Guarantee girder steel lifting process safety; 6) after portable cucurbit rises to the segment girder steel predetermined absolute altitude, the end adopts high-strength bolt to be connected with the built-in fitting of structural column or beam, and other end bottom adds cross bar, carries girder steel, and cross bar adopts fastener to be connected with the both sides vertical rod, and the insurance fastener is set up in the bottom; After adopting levelling tube to check the both sides absolute altitude, the Support Position of adjustment cross bar.7) adopt with other sections girder steel in the quadrat method lifting completion span, accomplish assembly unit, in the assembly unit process, adopt levelling tube to check outside the whole section level absolute altitude, the horizontal range that also should adopt tape measure to check girder steel between each span meets design requirement.8) after girder steel is accomplished and installed, remove the lifting of carrying cross bar and portable cucurbit and use support body.
Advantage of the present invention is: adopting this method to carry out the large-span steel girder construction, all is artificial and simple portable cucurbit operation, under the conditions permit situation; Also can adopt the tower crane less important work; Simple, convenient, economical, reduce dependence to large tonnage crane and tower crane, reduce requirement to the space, place; Required framed bent is only done suitable adjustment and is got final product on original template supporting row frame basis, greatly reduce construction cost.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified
Fig. 1 is a steel lifting component drawing
Fig. 2 is that girder steel moves horizontally sketch map
Fig. 3 is that lifting girder steel level is with regard to bitmap
Fig. 4 is that a former full hall frame is set up lifting and used the support body sketch map
Fig. 5 is that girder steel vertically moves sketch map
Fig. 6 is that girder steel vertically moves elevation
Fig. 7 is the vertical mobile profile figure of girder steel
Fig. 8 is reinforcing figure at the bottom of the girder steel back rest in place
1. tower cranes among the figure, 2. suspension hook, 3. girder steel, 4. Chain block, 5. steel pipe, 6. girder steel back tie point, 7. reinforcing steel pipe
In Fig. 1, tower crane 1 utilizes 2 pairs of girder steels of suspension hook 3 to carry out upper air installing
In Fig. 2, girder steel 3 pads utilize manpower pulling Chain block 4, thereby girder steel 3 are moved horizontally on steel pipe 5
In Fig. 4, the both sides that on little cross bar, hang portable cucurbit respectively increase an oblique vertical rod with little cross bar is fixed with fastener, and vertical rod bottom and lower crosspiece are fixed with fastener, form stable three-legged structure
In Fig. 5, Chain block 4 is buckled on two tie points in back of girder steel 3, utilize manpower pulling Chain block 4, thereby girder steel 3 is vertically moved
In Fig. 7, after utilizing Chain block 4 girder steel 3 to be promoted to predetermined absolute altitude, adopt reinforcing steel pipe 7 to reinforce in the bottom of girder steel 3.

Claims (1)

1. simple and practical large-span steel girder construction method for hanging is characterized in that accomplishing as follows:
1) according to construction requirement large-span steel girder is divided into several segments, utilizes tower crane or hoist engine that every section girder steel is lifted to closing on construction area, operating radius then adopts steel pipe and crowbar to cooperate outward and moves the segment girder steel;
2) add Guyuan full hall frame and set up the cross bar of laying portable cucurbit hook position, the both sides that on cross bar, hang portable cucurbit respectively increase an oblique vertical rod with little cross bar is fixed with fastener, and vertical rod bottom and lower crosspiece are fixed with fastener;
3) with portable cucurbit the segment girder steel is risen to predetermined absolute altitude, the end adopts high-strength bolt to be connected with the built-in fitting of structural column or beam, and other end bottom adds cross bar, and cross bar adopts fastener to be connected with the both sides vertical rod, divides into two fasteners, carries girder steel;
4) after the employing levelling tube is checked the both sides absolute altitude, the Support Position of adjustment cross bar; Use with the quadrat method lifting and accomplish other sections girder steel in the span, accomplish assembly unit.
5) adopt with other span girder steels of quadrat method lifting completion, and accomplish assembly unit, girder steel adopts invar tape to check the horizontal range of girder steel between each span, makes to adhere to specification.
6) after the girder steel assembly unit is accomplished, remove lifting, set up template die, concreting with auxiliary cross bar and vertical rod.
CN201110123463.3A 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder Active CN102777037B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110123463.3A CN102777037B (en) 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110123463.3A CN102777037B (en) 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder

Publications (2)

Publication Number Publication Date
CN102777037A true CN102777037A (en) 2012-11-14
CN102777037B CN102777037B (en) 2014-11-26

Family

ID=47122131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110123463.3A Active CN102777037B (en) 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder

Country Status (1)

Country Link
CN (1) CN102777037B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989590A (en) * 2019-04-09 2019-07-09 中建一局集团建设发展有限公司 For the auxiliary fixing device of roof overlength steel girder erection and the hanging method of girder steel
CN110040632A (en) * 2019-04-01 2019-07-23 杭州通达集团有限公司 A kind of segmental hoisting construction method of large span section steel beam
CN110342413A (en) * 2018-04-04 2019-10-18 中国二十冶集团有限公司 Simple traction method for prestressed girder
CN110984611A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Narrow space steel column installation method
CN113090023A (en) * 2021-03-31 2021-07-09 德才装饰股份有限公司 Large-span steel beam hoisting construction method
CN115818418A (en) * 2022-11-28 2023-03-21 中建八局第三建设有限公司 Hoisting method for prefabricated stand board in limited space

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074060A (en) * 1993-06-14 1995-01-10 Toyo Eng Corp Lift-up execution equipment for multistoried building
CN2216104Y (en) * 1994-12-14 1995-12-27 周忠 Hanging lift scaffold
CN101684638A (en) * 2008-09-23 2010-03-31 中交第三航务工程局有限公司 Assembly method of section box girder
CN101845848A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel connecting bridge and integral hoisting method thereof
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method
CN102030272A (en) * 2009-09-29 2011-04-27 中天建设集团有限公司 Building equipment hoisting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074060A (en) * 1993-06-14 1995-01-10 Toyo Eng Corp Lift-up execution equipment for multistoried building
CN2216104Y (en) * 1994-12-14 1995-12-27 周忠 Hanging lift scaffold
CN101684638A (en) * 2008-09-23 2010-03-31 中交第三航务工程局有限公司 Assembly method of section box girder
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method
CN102030272A (en) * 2009-09-29 2011-04-27 中天建设集团有限公司 Building equipment hoisting device
CN101845848A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel connecting bridge and integral hoisting method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110342413A (en) * 2018-04-04 2019-10-18 中国二十冶集团有限公司 Simple traction method for prestressed girder
CN110040632A (en) * 2019-04-01 2019-07-23 杭州通达集团有限公司 A kind of segmental hoisting construction method of large span section steel beam
CN109989590A (en) * 2019-04-09 2019-07-09 中建一局集团建设发展有限公司 For the auxiliary fixing device of roof overlength steel girder erection and the hanging method of girder steel
CN109989590B (en) * 2019-04-09 2024-01-23 中建一局集团建设发展有限公司 Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN110984611A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Narrow space steel column installation method
CN113090023A (en) * 2021-03-31 2021-07-09 德才装饰股份有限公司 Large-span steel beam hoisting construction method
CN115818418A (en) * 2022-11-28 2023-03-21 中建八局第三建设有限公司 Hoisting method for prefabricated stand board in limited space
CN115818418B (en) * 2022-11-28 2024-01-16 中建八局第三建设有限公司 Hoisting method for prefabricated stand board in limited space

Also Published As

Publication number Publication date
CN102777037B (en) 2014-11-26

Similar Documents

Publication Publication Date Title
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN105604334B (en) A kind of rapid constructing method for large span steel truss integral installation
CN106703416B (en) Steel roof truss dead man hanging method in small space
CN106013419B (en) Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN103290784A (en) Arched beam combination bridge lifting construction method
CN110552502A (en) Construction method of C-shaped stock yard intermediate retaining wall overhanging platform
CN207998792U (en) A kind of Hanging Basket rack mounting structure
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN103061514A (en) Long-span steel structure corridor construction method
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN102691267A (en) High pier construction method for external whole operation platform
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN206319628U (en) One kind building assembled wallboard fitting machine
CN206267519U (en) A kind of light engine position hydraulic climbing die block system
CN109537912A (en) A kind of safe and stable type Provincial Rink and its construction technology
CN205531268U (en) A moving platform guide rail strutting arrangement for daylighting top application worker
CN205591587U (en) Steel structure box formula board house
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN108792963A (en) A kind of Steel Space Truss formula tower crane wall-attached supporting seat method for high-rise roof framework
CN105220609B (en) Combined beam self-anchored suspension bridge and construction process thereof
CN210658449U (en) Remove aluminum alloy template structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Xiaoyang

Inventor after: Yan Weidong

Inventor after: Feng Yuehui

Inventor after: Wang Xiaobo

Inventor after: Huang Lijuan

Inventor before: Sun Xiaoyang

Inventor before: Yan Weidong

Inventor before: Wang Xiaobo

Inventor before: Huang Lijuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN XIAOYANG YAN WEIDONG WANG XIAOBO HUANG LIJUAN TO: SUN XIAOYANG YAN WEIDONG FENG YUEHUI WANG XIAOBO HUANG LIJUAN

C14 Grant of patent or utility model
GR01 Patent grant