CN209052240U - A kind of tool for super high-rise building duplex elevator vertical transport - Google Patents
A kind of tool for super high-rise building duplex elevator vertical transport Download PDFInfo
- Publication number
- CN209052240U CN209052240U CN201821892412.0U CN201821892412U CN209052240U CN 209052240 U CN209052240 U CN 209052240U CN 201821892412 U CN201821892412 U CN 201821892412U CN 209052240 U CN209052240 U CN 209052240U
- Authority
- CN
- China
- Prior art keywords
- elevator
- protective platform
- tool
- super high
- rise building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
A kind of tool for super high-rise building duplex elevator vertical transport, including lift car, moving machine room, hanging beam, workbench and the protective platform component being sequentially arranged from bottom to top, protective platform component includes the third layer protective platform being sequentially arranged from bottom to top, second layer protective platform and the oblique protective platform of the first floor;Moving machine room includes motor, elevator traction machine and control cabinet, and the wirerope of elevator traction machine is stored on the hoist ropes ropewinder near elevator pit.The utility model greatly improves the conevying efficiency of construction stage construction personnel and material, permanent elevator is realized simultaneously to come into operation as early as possible, service floor will be synchronized and be climbed as civil engineering structure increases, its environmental protection, energy conservation, the advantage for dropping low cost aspect are played, and conevying efficiency, safety, reliability are much higher than traditional architecture construction elevator.
Description
Technical field
The utility model belongs in construction the technical field for being directed to construction of super highrise building, and in particular to one kind is used for
The tool of super high-rise building duplex elevator vertical transport.
Background technique
With the development of domestic economy, many terrestrial reference super high-rise buildings gradually emerge.Super high-rise building is in large scale,
Construction site workload is big, it is ensured that construction personnel fast reaches operation side, is baptism to vertical transport system.Tradition
Under engineering construction mode, the main tool that super high-rise building uses attached wall type temporary construction elevator to transport as personnel substantially is faced
When the construction elevator speed of service is slow, conevying efficiency is low, and live temporary construction elevator position is limited, it cannot be guaranteed that solving Super High
The transport power demand of construction site;The hoistway of formal elevator is occupied, and holding time is long, influences the peace of later period formal elevator
Dress, can adversely affect the whole duration of engineering;Therefore, solving the vertical transport power of super high-rise building becomes the difficulty in constructing
Topic.
Duplex elevator is to be initially formed elevator shaft when horizontal structure construction is in lowrise layer, install duplex elevator, check and accept
It comes into operation after.The computer room of duplex elevator be can self climbing temporary machine room, rise to ten layers, i.e. Core Walls Structure and building every time
Plate ten floors of every rising, elevator(lift) machine room rebound once.Top out and elevator(lift) machine room completion after, by new elevator traction
The calculator room equipments such as machine control cabinet are mounted in final computer room, can be exchanged into final formal elevator after replacing corresponding component.
Utility model content
The purpose of the utility model is to provide a kind of tools for super high-rise building duplex elevator vertical transport, to solve
The slow technical problem of the conventional lift speed of service of the prior art;And solve the problems, such as that prior art safety, reliability are low.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of tool for super high-rise building duplex elevator vertical transport, it is characterised in that: including from bottom to top sequentially
Lift car, moving machine room, hanging beam, workbench and the protective platform component of setting, the protective platform component include under
Third layer protective platform, second layer protective platform and the oblique protective platform of the first floor being sequentially arranged on and;The moving machine room packet
Motor, control cabinet and elevator traction machine are included, the spare wirerope of the elevator traction machine is stored near elevator pit
On hoist ropes ropewinder.
It is further preferred that the hanging beam is scalable hanging beam, telescopic arms one end, which is fallen, connects the wall after being set to elevator
In hole to be provided, the other end is overlapped on floor.
Further, midfoot support frame is equipped between the third layer protective platform and second layer protective platform, including
Top chan frame, lower part chan frame, and and the column that is supported between top chan frame and lower part chan frame.
Further, waterproof layer is affixed between the second layer protective platform and hoistway inner wall.
Further, pulling apparatus crane is installed on the workbench.
Further, the hanging beam is lifted up by the lifting rope that workbench is transferred.
In addition, the moving machine room is equipped with from lifting device.
It is connect after being set to elevator in the hole to be provided of wall it is further preferred that third layer protective platform one end is fallen, the other end
It is overlapped on floor.
Compared with prior art the utility model have the characteristics that and the utility model has the advantages that
It is 4m/s, load-carrying number that the load-carrying of the utility model design duplex elevator, which is 1800Kg and 3600Kg, the speed of service,
It is 24 people and 46 people, the speed of service is approximately 4 times of common construction elevator, and passenger's transport power of separate unit duplex elevator is same specification construction
About 12 times of elevator, greatly improve the efficiency of construction stage personnel transport, while realizing permanent elevator and coming into operation as early as possible, Services Building
Layer will be synchronized and be climbed as civil engineering structure increases, and play its environmental protection, energy conservation, the advantage for dropping low cost aspect, and Transportation Efficiency
Rate, safety, reliability are much higher than traditional architecture construction elevator.
The utility model has the characteristics that safety, is applicable in, and has good promotion and practical value, after extensive popularization and application
Good economic benefit can be generated.
Detailed description of the invention
Fig. 1 is the initial mounting state figure of the utility model;
Fig. 2 is that the utility model relates to the structural schematic diagrams that protective platform component ramps up;
Fig. 3 be the utility model relates to the structural schematic diagram that is lifted up of workbench;
Fig. 4 be the utility model relates to the structural schematic diagram that is lifted up of hanging beam;
Fig. 5 the utility model relates to moving machine room and the structural schematic diagram that is lifted up of carriage.
Appended drawing reference: 1- lift car;2- moving machine room;3- hanging beam;5- workbench;6- second layer protective platform;7-
The oblique protective platform of the first floor;8- third layer protective platform;9- hoist ropes ropewinder;10- hole to be provided;11- floor;Branch in the middle part of 12-
Support frame frame;13- lifting rope;14- control cabinet;15- motor;16- elevator traction machine.
Specific embodiment
To make technological means of the utility model, character of innovation, reaching purpose and effect is easy to understand, below
The present invention will be further described.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model
Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute
For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein
The technical solution of any obvious substitutions and modifications out.
A kind of tool for super high-rise building duplex elevator vertical transport, as shown in Figure 1, including sequentially setting from bottom to top
Lift car 1, moving machine room 2, hanging beam 3, workbench 5 and the protective platform component set, protective platform component include from lower and
On the oblique protective platform 7 of third layer protective platform 8, second layer protective platform 6 and the first floor that is sequentially arranged;Moving machine room 2 includes
Including motor 15, elevator traction machine 16 and control cabinet 14, the wirerope of elevator traction machine 16 is stored near elevator pit
Hoist ropes ropewinder 9 on;Hanging beam 3 is scalable hanging beam, and telescopic arms one end falls the hole to be provided for connecing the wall after being set to elevator
In 10, the other end is overlapped on floor 11;Midfoot support frame is equipped between third layer protective platform 8 and second layer protective platform 6
Frame 12, including top chan frame, lower part chan frame, and and be supported between top chan frame and lower part chan frame
Column;Waterproof layer is affixed between second layer protective platform 6 and hoistway inner wall;Pulling apparatus is installed to rise on workbench 5
Heavy-duty machine;Hanging beam 3 is lifted up by the lifting rope 13 that workbench 5 is transferred;Moving machine room 2 is equipped with from lifting device;Third layer
8 one end of protective platform, which is fallen, to be connect after being set to elevator in the hole to be provided 10 of wall, and the other end is overlapped on floor 11.
Fig. 1 is the initial mounting state figure of the utility model, and specific step is as follows, and a. completes hoistway wall, utilizes inner cylinder
Steel beam lifting equipment installs hoistway high position sizing protective platform, carries out waterproof measure, in case rainwater, sundries enter hoistway;B. pacify
Fill every layer of hall door of guide rail and elevator;D., moving machine room is installed, is attached on guide rail, using itself lifting device, is installed
Afterwards from being promoted, running space is moved out of to carriage;E. routinely assembled carriage;F. pit and electric component installation, debugging;
Fig. 2 shows the preparation stage one is risen to, using hoist engine or other lifting means, upper protective component, and benefit are promoted
The hole to be provided reserved with wall after hoistway, the platform that properly protects are fixed;
Fig. 3, which is shown, rises to the preparation stage two, using workbench installation guide rail, bracket and entrance hall, is equipped on workbench
Pulling apparatus crane has suspension pulling apparatus rope on the girder steel of third layer protective platform lower part, and installment work platform can edge
Guide rail is run up and down, and elevator can operate normally during this period, and only during cage guide is elevated into hoistway, elevator needs of short duration
It stops operation;
Fig. 4 shows elevator hop step one, promotes workbench, while promoting scalable hang using two pulling apparatus
Beam.Scalable backbar one end is put off in wall reserving hole by semi-girder, and the other end is then supported on (floor on hall door floor
Lower section has floor beam to share stress), in the case where promoting operating condition, then acted on appropriate by the lifting rope that installment work platform in top is transferred
50mm is mentioned, the contracting mechanism in driving beam carries out whole promotion so that backbar semi-girder is retracted and is detached from support.
Fig. 5 shows elevator hop step two, promotes moving machine room and carriage.It should check that rope and associated safety are arranged before jump
After applying satisfaction, using moving machine room from lifting device, using the scalable hanging beam in top as spandrel girder, computer room and carriage are carried out simultaneously
Slowly promoted.After the completion of jump, the installment works such as hoistway signaling switch, hall door and calling, the Show Button of subsequent installation are carried out,
Then official acceptance enables.
The duplex elevator described in the utility model above-described embodiment finally completes elevator shaft computer room construction, removes anti-
Fall platform, removes mounting platform, and carriage and hanger are moved on the position of final elevator conversion and install last root guide rail.
After the completion of computer room secondary structure, start finally to be converted.Electric component and loss component are replaced, elevator debugs examination again
After can come into operation.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (8)
1. a kind of tool for super high-rise building duplex elevator vertical transport, it is characterised in that: including sequentially setting from bottom to top
Lift car (1), moving machine room (2), hanging beam (3), the workbench (5), protective platform component set, the protective platform component
Including the third layer protective platform (8), second layer protective platform (6) and the oblique protective platform of the first floor being sequentially arranged from bottom to top
(7);The moving machine room (2) includes motor (15), elevator traction machine (16) and control cabinet (14), the elevator traction machine (16)
Wirerope be stored on the hoist ropes ropewinder (9) near elevator pit.
2. a kind of tool for super high-rise building duplex elevator vertical transport as described in claim 1, it is characterised in that: institute
Stating hanging beam (3) is scalable hanging beam, and telescopic arms one end, which is fallen, to be connect after being set to elevator shaft in the hole to be provided (10) of wall, another
End is overlapped on floor (11).
3. a kind of tool for super high-rise building duplex elevator vertical transport as described in claim 1, it is characterised in that: institute
It states and is equipped with midfoot support frame (12) between third layer protective platform (8) and second layer protective platform (6), including upper slot steel framework
Frame, lower part chan frame, and and the column that is supported between top chan frame and lower part chan frame.
4. a kind of tool for super high-rise building duplex elevator vertical transport as described in claim 1, it is characterised in that: institute
It states and is affixed with waterproof layer between second layer protective platform (6) and hoistway inner wall.
5. a kind of tool for super high-rise building duplex elevator vertical transport as described in claim 1, it is characterised in that: institute
It states and pulling apparatus crane is installed on workbench (5).
6. a kind of tool for super high-rise building duplex elevator vertical transport as described in claim 1, it is characterised in that: institute
Hanging beam (3) are stated to be lifted up by the lifting rope (13) that workbench (5) are transferred.
7. a kind of tool for super high-rise building duplex elevator vertical transport as described in claim 1, it is characterised in that: institute
Moving machine room (2) are stated to be equipped with from lifting device.
8. a kind of tool for super high-rise building duplex elevator vertical transport as described in claim 1 ~ 7 any one,
Be characterized in that: described third layer protective platform (8) one end, which is fallen, to be connect after being set to elevator in the hole to be provided (10) of wall, other end overlap joint
On floor (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821892412.0U CN209052240U (en) | 2018-11-16 | 2018-11-16 | A kind of tool for super high-rise building duplex elevator vertical transport |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821892412.0U CN209052240U (en) | 2018-11-16 | 2018-11-16 | A kind of tool for super high-rise building duplex elevator vertical transport |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209052240U true CN209052240U (en) | 2019-07-02 |
Family
ID=67053544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821892412.0U Active CN209052240U (en) | 2018-11-16 | 2018-11-16 | A kind of tool for super high-rise building duplex elevator vertical transport |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209052240U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110817661A (en) * | 2019-10-22 | 2020-02-21 | 日立电梯(上海)有限公司 | Elevator system used during construction |
CN112938670A (en) * | 2021-02-26 | 2021-06-11 | 日立电梯(上海)有限公司 | Skip-floor elevator terminal station protection device and debugging method thereof |
CN113581982A (en) * | 2021-08-02 | 2021-11-02 | 美迪斯电梯有限公司 | Skip floor elevator using elevator guide rail to ascend |
CN114380179A (en) * | 2021-12-27 | 2022-04-22 | 上海建工四建集团有限公司 | Safety construction method for hoistway elevator |
US11396442B2 (en) | 2020-05-09 | 2022-07-26 | Otis Elevator Company | Low cost roped jump lift concept |
CN114829288A (en) * | 2019-12-19 | 2022-07-29 | 通力股份公司 | Elevator arrangement and method |
-
2018
- 2018-11-16 CN CN201821892412.0U patent/CN209052240U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110817661A (en) * | 2019-10-22 | 2020-02-21 | 日立电梯(上海)有限公司 | Elevator system used during construction |
CN114829288A (en) * | 2019-12-19 | 2022-07-29 | 通力股份公司 | Elevator arrangement and method |
US11993484B2 (en) | 2019-12-19 | 2024-05-28 | Kone Corporation | Elevator arrangement and method |
US11396442B2 (en) | 2020-05-09 | 2022-07-26 | Otis Elevator Company | Low cost roped jump lift concept |
CN112938670A (en) * | 2021-02-26 | 2021-06-11 | 日立电梯(上海)有限公司 | Skip-floor elevator terminal station protection device and debugging method thereof |
CN112938670B (en) * | 2021-02-26 | 2023-03-10 | 日立电梯(上海)有限公司 | Skip-floor elevator terminal station protection device and debugging method thereof |
CN113581982A (en) * | 2021-08-02 | 2021-11-02 | 美迪斯电梯有限公司 | Skip floor elevator using elevator guide rail to ascend |
CN114380179A (en) * | 2021-12-27 | 2022-04-22 | 上海建工四建集团有限公司 | Safety construction method for hoistway elevator |
CN114380179B (en) * | 2021-12-27 | 2023-05-26 | 上海建工四建集团有限公司 | Safety construction method of hoistway elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209052240U (en) | A kind of tool for super high-rise building duplex elevator vertical transport | |
US7635049B2 (en) | Method and apparatus for installing an elevator during the construction of a building | |
EP1583710B1 (en) | Method and apparatus for installing an elevator during construction of a building | |
EP2490973B1 (en) | Method in the manufacture of an elevator | |
CN110228743B (en) | Overhead two-to-one suspension ratio construction elevator for elevator shaft traction and operation method thereof | |
CN107399656B (en) | Outdoor elevator and construction method thereof | |
CN110371823B (en) | Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method | |
CN103195256A (en) | Hanging column type steel structure jig frame construction method | |
CN109779244A (en) | A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction | |
CN102502378A (en) | Climbing elevator for building construction | |
CN106121255A (en) | Apparatus installed by a kind of Super High glass curtain wall | |
CN113137054A (en) | Method for setting inverted hoisting power equipment in attached lifting scaffold | |
CN106567542B (en) | A kind of Super High two tall buildings Steel corridor assemble method | |
CN115538792A (en) | Residential building machine installation construction method and structure | |
CN108286332A (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method | |
CN102718109A (en) | Method for transforming construction elevator into passenger-goods elevator | |
CN210735910U (en) | Self-lifting hoisting equipment suitable for assembly type additional elevator construction | |
CN203097281U (en) | Nuclear power station double-layer containment vessel hydraulic creeping formwork | |
CN201460186U (en) | Adhesive lifting scaffold | |
CN208648493U (en) | A kind of no scaffold installation elevator operation platform device | |
CN113175203A (en) | Method for setting lifting power equipment in attached lifting scaffold | |
CN209481015U (en) | A kind of Miniature stair | |
CN208122299U (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system | |
CN203269287U (en) | Underneath type elevator without machine room | |
CN113323368A (en) | Lifting construction method for external protection hanging frame of assembled building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |