CN209025668U - A kind of Shield-bored tunnels pass through river construction grouting equipment - Google Patents

A kind of Shield-bored tunnels pass through river construction grouting equipment Download PDF

Info

Publication number
CN209025668U
CN209025668U CN201821437945.XU CN201821437945U CN209025668U CN 209025668 U CN209025668 U CN 209025668U CN 201821437945 U CN201821437945 U CN 201821437945U CN 209025668 U CN209025668 U CN 209025668U
Authority
CN
China
Prior art keywords
shield
injection pipe
slurries
waterglass
gram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821437945.XU
Other languages
Chinese (zh)
Inventor
时维允
党军兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN201821437945.XU priority Critical patent/CN209025668U/en
Application granted granted Critical
Publication of CN209025668U publication Critical patent/CN209025668U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of Shield-bored tunnels to pass through river construction grouting equipment, including carrying out the intracorporal slurries mixture of shield that is mixed and being delivered to shield machine and conveying device to grouting serous fluid, the forward upper of middle shield, which is equipped with, is injected into the middle shield injection pipe on the outside of shield body for grouting serous fluid, is equipped on the native storehouse rear wall of shield machine grouting serous fluid being injected into the intracorporal native storehouse injection pipe of soil on front side of cutterhead by Tu Cang;The inlet of middle shield injection pipe and native storehouse injection pipe is connect with the liquid outlet of slurries mixture and conveying device.The utility model simple structure and reasonable design and it is easy to use, using effect is good, slurries are injected to shield body side by middle shield injection pipe during shield-tunneling construction, and slurries can be injected into the soil body on front side of shield body by native storehouse injection pipe, ensure the Tunnel stability of safety for tunnel engineering and construction molding, the purpose of synchronous grouting during realization shield-tunneling construction, and construction efficiency is high, economical and practical.

Description

A kind of Shield-bored tunnels pass through river construction grouting equipment
Technical field
The utility model belongs to Shield Construction Technique field, passes through river construction more particularly, to a kind of Shield-bored tunnels Use grouting equipment.
Background technique
Shield method is a kind of Fully-mechanized construction method of modern constructing tunnel, and leading mechanical equipment to be used is shield Machine uses the molding subway tunnel of shield construction for Shield-bored tunnels.The shield body of shield machine by anterior shield, middle shield and shield tail from Assemble front to back, anterior shield front is equipped with cutterhead.When shield construction, the purpose of slip casting is starched by the slip casting injected The purpose of liquid is filled the intracorporal gap of soil, realizes soil stabilization, control soil body sedimentation.
According to general knowledge known in this field, the grouting serous fluid injected during shield-tunneling construction at present (abbreviation slurries) includes single Slurry and two kinds of dual slurry, wherein dual slurry includes that the dual slurry of cement and waterglass composition, a gram mud effect are formed with waterglass Dual slurry etc..Wherein, gram mud effectiveness is derivative by synthesizing calcium base clay mineral, cellulose in Tunnel Engineering periphery filler Agent, colloid stabilizer and dispersing agent are constituted, advantage: if first is that settled in shield machine driving, cavity, the danger feelings such as gush When condition, what the characteristics such as sealing, filling and support of the material can be instant reaches the branch remedied, and will not generate prohibitively expensive Out, usage mode is also simple and fast;Second is that in addition other expensive equipment need not be added, use on shield machine with can be convenient High-speed mixer mixes to realize that gram mud imitates a slurries (i.e. gram mud imitates the slurries being mixed to form with water, and also referred to as gram mud imitates solution), and Injected via pump, injection valve group and injection pipe above gram mud effect slurries and waterglass to native storehouse injection hole or shield machine surrounding into It is mixed and is injected to mouth, effectively achieve the effect that sealing, filling and support.
River refers to the route that river water flows through, and is often referred to the water route that can be opened the navigation or air flight.Using shield method to the subway for passing through river When tunnel is constructed, since constructed subway tunnel is located at below river, to avoid constructing tunnel process bring water source dirty The problems such as dye, river sedimentation, difficulty of construction is larger, and construction environment safety requirements is higher.Nowadays, using shield method to wearing When the subway tunnel in more river is constructed, focus on ensure construction environment safety, not polluted source, do not influence river and use Aspect, there are mainly two types of conventional construction method: the first is the method improved to the following soil body of river original ground, such as The original ground following soil body in river is improved using high-pressure rotary jet grouting pile, high-pressure slip-casting etc.;Second is to shield machine front end soil The method of body progress pre-grouting.But when practice of construction, there are river sedimentations to be difficult to control for first method, settles larger, water The problems such as source pollution is more serious, second method pre-grouting synchronous cannot be carried out with the work progress of shield-tunneling construction, and shield is applied Work low efficiency, used resource and expense are larger, and input cost is high.Such as using shield method to the tunnel in the south water to north trunk canal passed through When engineering is constructed, since the settlement request in south water to north trunk canal is high, water source is forbidden polluting, and above-mentioned first method can not be real It applies, and second method be since pre-grouting and shield-tunneling construction synchronous cannot carry out, construction efficiency is low and input cost is high.
Utility model content
The technical problem to be solved by the utility model is in view of the deficiency of the prior art, provide a kind of subway Shield driven tunnel crossing river construction use grouting equipment, simple structure and reasonable design and it is easy to use, using effect is good, Slurries are injected to shield body side by middle shield injection pipe during shield-tunneling construction, and can be native to shield body front side by native storehouse injection pipe Injection slurries in vivo, it is ensured that the Tunnel stability of safety for tunnel engineering and construction molding realizes that shield-tunneling construction is synchronous in the process The purpose of slip casting, and construction efficiency is high, it is economical and practical.
In order to solve the above technical problems, the technical solution adopted in the utility model is: a kind of Shield-bored tunnels pass through river Road construction grouting equipment, it is characterised in that: including carrying out the intracorporal slurry of shield that is mixed and being delivered to shield machine to grouting serous fluid Liquid mixture and conveying device, the shield body are assembled from front to back by anterior shield, middle shield and shield tail, and the anterior shield front is equipped with Cutterhead;The forward upper of the middle shield, which is equipped with, is injected into the middle shield injection pipe on the outside of shield body, the middle shield for the grouting serous fluid Forward upper be provided with supply in shield injection pipe installation middle shield injected hole;Being equipped on the native storehouse rear wall of the shield machine will be described Grouting serous fluid is injected into the intracorporal native storehouse injection pipe of soil on front side of the cutterhead by Tu Cang, is provided with confession on the rear wall of the Tu Cang The native storehouse injected hole of native storehouse injection pipe installation, the middle shield injected hole are located on rear side of the native storehouse injected hole;The middle shield injection The inlet of pipe and native storehouse injection pipe is connect with the liquid outlet of the slurries mixture and conveying device.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: the soil storehouse slip casting hole location The rear wall top of Yu Tucang.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: it is described soil storehouse injected hole and The middle shield injected hole is respectively positioned on the dead astern of the cutterhead.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: it is described soil storehouse injection pipe with Shield body is laid in parallel, and the soil storehouse injection pipe and middle shield injection pipe are respectively positioned on right above the central axis of shield body;The middle shield Injection pipe and the perpendicular laying of native storehouse injection pipe, the middle shield injection pipe are laid on a cross section of shield body.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: the slurries are mixed and defeated Send device include gram mud effect is stirred with water and is obtained a gram high-speed mixer for mud effect slurries, will described gram of mud effect slurries with Slurries delivery pipe that waterglass mixes and forms the dual slurry injection pipe of the grouting serous fluid, connect with dual slurry injection pipe, will Described gram of mud effect slurries are pumped to gram mud effect pumping installations of dual slurry injection pipe and waterglass are pumped to dual slurry injection pipe Waterglass pumping installations, with dual slurry injection pipe, the liquid outlet of the high-speed mixer imitates pumping installations by described gram of mud It is connect with the inlet of dual slurry injection pipe, the liquid outlet of the waterglass pumping installations and the inlet of dual slurry injection pipe connect It connects;The liquid outlet of the dual slurry injection pipe is connect with the inlet of slurries delivery pipe, the middle shield injection pipe and Tu Cang injection The inlet of pipe is connect with the liquid outlet of slurries delivery pipe.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: described gram of mud effect pumping dress It sets and imitates delivery pipe including gram mud conveyed to described gram of mud effect slurries, described gram of mud effect delivery pipe is connected to high-speed mixer Liquid outlet and dual slurry injection pipe inlet between, the first hydraulic pump is housed in described gram of mud effect delivery pipe;
The waterglass pumping installations includes for the waterglass storage box of waterglass storage and to described gram of mud effect slurry The waterglass delivery pipe that liquid is conveyed, the waterglass delivery pipe is connected to the liquid outlet of waterglass storage box and dual slurry is infused Enter between the inlet of pipe, the second hydraulic pump is housed in the waterglass delivery pipe.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: first hydraulic pump and Second hydraulic pump is variable-frequency electric hydraulic pump;
First flowmeter and first pressure gauge be housed, equipped with the in the waterglass delivery pipe in described gram of mud effect delivery pipe Two flowmeters and second pressure gauge.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: the slurries are mixed and defeated Sending device further includes the water filling device filled the water into high-speed mixer, and the water filling port of the water filling device stretches to high-speed mixer Stir chamber in.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: the dual slurry injection pipe For the tube body of inner hollow.
A kind of above-mentioned Shield-bored tunnels pass through river construction grouting equipment, it is characterized in that: the middle shield injection pipe and Native storehouse injection pipe is straight tube, and the upper end of the middle shield injection pipe stretches on the outside of shield body, and the front end of soil storehouse injection pipe is stretched Enter to native storehouse.
Compared with the prior art, the utility model has the following advantages:
1, simple structure and reasonable design and input cost is lower.
2, easy to use, easy for construction and using effect is good, has the advantage that first, Shield Construction Method Used mistake Cheng Zhong, it is synchronous to carry out slip casting, Shield Construction Method Used efficiency can be effectively improved, resource input is reduced, reduces construction cost;The second, Slurries mixture, conveying and injection can be automatically performed;Third, construction location are unrestricted, and slip casting position is flexible, thus can be effectively reduced Slip casting expense;4th, slip casting effect is good, can be reduced construction safety risk, it is ensured that shield-tunneling construction process safety, can to shield body with open It digs the gap of outer profile, excavate medium internal clearance, shield machine front hole, sandblasting, the leak region of the appearance of shield machine front etc. It is handled, reaches sealing, the only resultant effects such as slurry, filling and support, while can effectively avoid settling excessive, customer service, periphery There are holes, sandblasting for the soil body;5th, environmental pollution can be effectively reduced, and can be effectively controlled underground water loss; 6th, it is suitable for various driving media, is particularly suitable for passing through the shield tunnel construction mistake of river, existing building and structures Journey, popularization and application foreground are extensive.
In conclusion the utility model simple structure and reasonable design and it is easy to use, using effect is good, shield is applied Slurries are injected to shield body side by middle shield injection pipe during work, and can be infused by native storehouse injection pipe into the soil body on front side of shield body Enter slurries, it is ensured that the Tunnel stability of safety for tunnel engineering and construction molding realizes synchronous grouting during shield-tunneling construction Purpose, and construction efficiency is high, it is economical and practical.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the layout position illustration of shield injection pipe and native storehouse injection pipe in the utility model.
Description of symbols:
1-high-speed mixer;2-waterglass storage boxes;The first hydraulic pump of 3-1-;
The second hydraulic pump of 3-2-;4-1-first flowmeter;4-2-second flowmeter;
5-1-first pressure gauge;5-2-second pressure gauge;6-dual slurry injection pipes;
7-middle shield injection pipes;8-native storehouse injection pipes;9-Tu Cang;
10-shield bodies;11-slurries delivery pipes;12-grams of mud imitate delivery pipe;
13-waterglass delivery pipes;14-water tanks;15-water injection pipes;
16-waterglass injection pipes.
Specific embodiment
As shown in Figure 1 and Figure 2, the utility model includes the shield body 10 for carrying out mixture to grouting serous fluid and being delivered to shield machine Interior slurries mixture and conveying device, the shield body 10 is assembled from front to back by anterior shield, middle shield and shield tail, before the anterior shield Portion is equipped with cutterhead;The forward upper of the middle shield is equipped with the middle shield injection pipe that the grouting serous fluid is injected into 10 outside of shield body 7, the forward upper of the middle shield is provided with the middle shield injected hole that shield injection pipe 7 is installed in confession;9 rear wall of native storehouse of the shield machine The grouting serous fluid is injected into the intracorporal soil storehouse injection pipe 8 of soil on front side of the cutterhead, the native storehouse 9 by native storehouse 9 by upper be equipped with Rear wall on be provided with native storehouse injected hole for the installation of native storehouse injection pipe 8, the middle shield injected hole is located at the native storehouse injected hole Rear side;Liquid outlet of the inlet of the middle shield injection pipe 7 and native storehouse injection pipe 8 with the slurries mixture and conveying device connects It connects.
The grouting serous fluid is the common slurries of shield-tunneling construction, both can be single slurry, and be also possible to dual slurry.It is described double Slurry can be formed using the dual slurry (i.e. cement-sodium silicate double liquid) of cement and waterglass composition, gram mud effect with waterglass Dual slurry (i.e. gram mud effect-waterglass dual slurry) etc., use gram mud effect-waterglass dual slurry, specifically conventional gram of mud herein Imitate slurries employed in engineering method.During practice of construction, the grouting serous fluid can be using note synchronous during shield-tunneling construction Grouting serous fluid used when slurry, slurries used when can also use secondary grouting, practice of construction is flexible, the material of grouting serous fluid It is unlimited, thus use is very easy, it is easy for construction and flexible.
In the present embodiment, the soil storehouse injected hole is located at the rear wall top in native storehouse 9.
Also, the soil storehouse injected hole and the middle shield injected hole are respectively positioned on the dead astern of the cutterhead.
As shown in Fig. 2, soil storehouse injection pipe 8 is laid with shield body 10 in parallel, soil storehouse injection pipe 8 and the injection of middle shield Pipe 7 is respectively positioned on right above the central axis of shield body 10;The middle shield injection pipe 7 and the perpendicular laying of native storehouse injection pipe 8, it is described in Shield injection pipe 7 is laid on a cross section of shield body 10.
In the present embodiment, the perpendicular laying of rear wall of the soil storehouse injection pipe 8 and native storehouse 9, the middle shield injection pipe 7 with The rear wall in native storehouse 9 is laid in parallel.
It, can be right according to practice of construction situation using the utility model during carrying out Shield Construction Method Used using shield machine Different slip casting positions carry out slip casting.Wherein, there are portals in front of hole or shield machine leak, sandblasting etc. occurs in front of shield machine When situation, the grouting serous fluid is injected using the utility model and by native storehouse injection pipe 8, the grouting serous fluid injected is logical It crosses native storehouse 9 to enter cutterhead and enter the soil body in front of shield machine after being thoroughly mixed by the cutterhead, exist to front Hole filled, the region for leak, sandblasting occur blocked, complete soil stabilization in front of shield machine, thus can have It imitates and the soil body of development end in front of shield machine is reinforced, continue to construct after front development end is stablized, can effectively ensure to construct Safety, and construction speed will not be affected greatly, Shield Construction Method Used is high-efficient;When needing to control in shield tunneling process When the soil body is settled or need to be reinforced to the shield machine side soil body above shield machine, infused using the utility model and by middle shield Enter pipe 7 to injecting the grouting serous fluid on the outside of shield body 10, the grouting serous fluid from the middle shield top of shield machine injection shield body 10 with Outside is excavated in the gap between medium (i.e. the soil body) and the excavation media voids on the outside of shield machine, to reach slip casting effect Fruit effectively controls the safety and subsequent sedimentation value of shield-tunneling construction process, can accomplish close to zero sedimentation, while can also be effectively ensured Under wear the normal use of existing engineering.
As shown in Figure 1, the slurries mixture and conveying device include being stirred simultaneously to gram mud effect with water in the present embodiment A gram high-speed mixer 1 for mud effect slurries is obtained, described gram of mud effect slurries are mixed with waterglass and form the grouting serous fluid Described gram of mud effect slurries are pumped to dual slurry by dual slurry injection pipe 6, the slurries delivery pipe 11 connecting with dual slurry injection pipe 6 Gram mud effect pumping installations of injection pipe 6 and the waterglass pumping installations and dual slurry that waterglass is pumped to dual slurry injection pipe 6 Injection pipe 6, the liquid outlet of the high-speed mixer 1 imitate the inlet of pumping installations and dual slurry injection pipe 6 by described gram of mud Connection, the liquid outlet of the waterglass pumping installations are connect with the inlet of dual slurry injection pipe 6;The dual slurry injection pipe 6 Liquid outlet connect with the inlet of slurries delivery pipe 11, the inlet of the middle shield injection pipe 7 and native storehouse injection pipe 8 with slurry The liquid outlet of liquid delivery pipe 11 connects.When practice of construction, the grouting serous fluid is gram mud effect-water that conventional shield machine slip casting uses Glass dual slurry.
In the present embodiment, described gram of mud effect pumping installations includes gram mud effect conveying conveyed to described gram of mud effect slurries Pipe 12, described gram of mud effect delivery pipe 12 are connected between the liquid outlet of high-speed mixer 1 and the inlet of dual slurry injection pipe 6, First hydraulic pump 3-1 is housed in described gram of mud effect delivery pipe 12;
The waterglass pumping installations includes for the waterglass storage box 2 of waterglass storage and to described gram of mud effect slurry The waterglass delivery pipe 13 that liquid is conveyed, the waterglass delivery pipe 13 are connected to the liquid outlet of waterglass storage box 2 and double Between the inlet of slurry injection pipe 6, the second hydraulic pump 3-2 is housed in the waterglass delivery pipe 13.
In the present embodiment also, the first hydraulic pump 3-1 and the second hydraulic pump 3-2 are variable-frequency electric hydraulic pump.And And the first hydraulic pump 3-1 and the second hydraulic pump 3-2 are high-pressure pump.In actual use, the first hydraulic pump 3-1 and Second hydraulic pump 3-2 can also use other types of electric hydraulic pump.
In actual use, the first hydraulic pump 3-1 and the second hydraulic pump 3-2 be pumped by effect under, make to pump It can be carried out and be sufficiently mixed to described in dual slurry injection pipe 6 grams of mud effect slurries and waterglass, and pumped in the grouting serous fluid It can enter the soil body after to slip casting position and be sufficiently mixed, to effectively improve slip casting effect, reach sealing, only slurry, filling and branch Support and other effects.
It is described equipped with first flowmeter 4-1 and first pressure gauge 5-1 in described gram of mud effect delivery pipe 12 in the present embodiment Second flowmeter 4-2 and second pressure gauge 5-2 is housed in waterglass delivery pipe 13.
As shown in Figure 1, the dual slurry injection pipe 6 is the tube body of inner hollow in the present embodiment.Also, the biliquid There are two the inlets and one and slurry that connect respectively with gram mud effect delivery pipe 12 and waterglass delivery pipe 13 for band on slurry injection pipe 6 The liquid outlet that liquid delivery pipe 11 connects.
For convenience of connection, between the liquid outlet of the slurries delivery pipe 11 and middle shield injection pipe 7 and native storehouse injection pipe 8 respectively It is connected by a connecting tube.Also, connected between two connecting tubes and the liquid outlet of slurries delivery pipe 11 by tee tube It connects.
In the present embodiment, the middle shield injection pipe 7 and native storehouse injection pipe 8 are straight tube, the upper end of the middle shield injection pipe 7 10 outside of shield body is stretched to, the front end of soil storehouse injection pipe 8 stretches in native storehouse 9.
To be easy to use, the slurries mixture and conveying device further include the water filling device filled the water into high-speed mixer 1, The water filling port of the water filling device stretches in the stir chamber of high-speed mixer 1.The water filling device include water tank 14 and with The water injection pipe 15 of the water outlet connection of water tank 14, the water outlet of the water injection pipe 15 are the water filling port of the water filling device.Together When, equipped with the waterglass injection pipe 16 for injecting waterglass in the waterglass storage box 2, the waterglass injection pipe 16 Liquid outlet stretches in waterglass storage box 2.
When practice of construction, a gram mud effect is stirred with water and obtains gram mud by high-speed mixer 1 and imitates slurries, then is passed through Described gram of mud effect slurries are pumped to dual slurry injection pipe 6 by described gram of mud effect pumping installations, while being pumped by the waterglass Waterglass pump is synchronized and is sent to dual slurry injection pipe 6 by device;Also, in the effect of the first hydraulic pump 3-1 and the second hydraulic pump 3-2 Under, grouting serous fluid is formed after gram mud effect slurries and the waterglass mixing that are pumped in dual slurry injection pipe 6 and is conveyed by slurries Pipe 11 and middle shield injection pipe 7 and/or slurries delivery pipe 11 and native storehouse injection pipe 8 inject corresponding slip casting position, expected from realization Slip casting effect.
The above is only the preferred embodiment of the utility model, not imposes any restrictions to the utility model, all According to any simple modification to the above embodiments of the utility model technical spirit, change and equivalent structural changes, still Belong in the protection scope of technical solutions of the utility model.

Claims (10)

1. a kind of Shield-bored tunnels pass through river construction grouting equipment, it is characterised in that: including being mixed to grouting serous fluid Match and be delivered to slurries mixture and the conveying device in the shield body (10) of shield machine, the shield body (10) is by anterior shield, middle shield and shield Tail assembles from front to back, and the anterior shield front is equipped with cutterhead;The forward upper of the middle shield is equipped with and starches the slip casting Liquid is injected into the middle shield injection pipe (7) on the outside of shield body (10), and the forward upper of the middle shield is provided with shield injection pipe (7) installation in confession Middle shield injected hole;It is equipped on Tu Cang (9) rear wall of the shield machine and the grouting serous fluid is injected into institute by Tu Cang (9) The intracorporal native storehouse injection pipe (8) of soil on front side of cutterhead is stated, is provided on the rear wall of the Tu Cang (9) and is installed for native storehouse injection pipe (8) Native storehouse injected hole, the middle shield injected hole is located on rear side of the native storehouse injected hole;The middle shield injection pipe (7) and Tu Cang injection The inlet for managing (8) is connect with the liquid outlet of the slurries mixture and conveying device.
2. a kind of Shield-bored tunnels described in accordance with the claim 1 pass through river construction grouting equipment, it is characterised in that: institute State the rear wall top that native storehouse injected hole is located at Tu Cang (9).
3. a kind of Shield-bored tunnels according to claim 1 or 2 pass through river construction grouting equipment, feature exists In: the soil storehouse injected hole and the middle shield injected hole are respectively positioned on the dead astern of the cutterhead.
4. a kind of Shield-bored tunnels according to claim 1 or 2 pass through river construction grouting equipment, feature exists In: the soil storehouse injection pipe (8) is laid with shield body (10) in parallel, described soil storehouse injection pipe (8) and middle shield injection pipe (7) equal position Right above the central axis of shield body (10);The middle shield injection pipe (7) and native storehouse injection pipe (8) perpendicular laying, it is described in Shield injection pipe (7) is laid on a cross section of shield body (10).
5. a kind of Shield-bored tunnels according to claim 1 or 2 pass through river construction grouting equipment, feature exists In: the slurries are mixed and conveying device includes being stirred and obtaining a gram high-speed mixer for mud effect slurries with water to gram mud effect (1), described gram of mud effect slurries are mixed with waterglass and forms the dual slurry injection pipe (6) and dual slurry of the grouting serous fluid The slurries delivery pipe (11) of injection pipe (6) connection, gram mud effect pump that described gram of mud effect slurries are pumped to dual slurry injection pipe (6) It send device and waterglass is pumped to waterglass pumping installations and dual slurry injection pipe (6) of dual slurry injection pipe (6), it is described The liquid outlet of high-speed mixer (1) is imitated pumping installations by described gram of mud and is connect with the inlet of dual slurry injection pipe (6), described The liquid outlet of waterglass pumping installations is connect with the inlet of dual slurry injection pipe (6);The dual slurry injection pipe (6) goes out liquid Mouthful connect with the inlet of slurries delivery pipe (11), the inlet of middle shield injection pipe (7) the He Tucang injection pipe (8) with slurry The liquid outlet of liquid delivery pipe (11) connects.
6. a kind of Shield-bored tunnels pass through river construction grouting equipment according to claim 5, it is characterised in that: institute Stating a gram mud effect pumping installations includes gram mud effect delivery pipe (12) conveyed to described gram of mud effect slurries, described gram of mud effect conveying Pipe (12) is connected between the liquid outlet of high-speed mixer (1) and the inlet of dual slurry injection pipe (6), described gram of mud effect conveying It manages and the first hydraulic pump (3-1) is housed on (12);
The waterglass pumping installations includes for the waterglass storage box (2) of waterglass storage and imitating slurries to described gram of mud The waterglass delivery pipe (13) conveyed, the waterglass delivery pipe (13) are connected to the liquid outlet of waterglass storage box (2) Between the inlet of dual slurry injection pipe (6), the second hydraulic pump (3-2) is housed on the waterglass delivery pipe (13).
7. a kind of Shield-bored tunnels pass through river construction grouting equipment according to claim 6, it is characterised in that: institute Stating the first hydraulic pump (3-1) and the second hydraulic pump (3-2) is variable-frequency electric hydraulic pump;
First flowmeter (4-1) and first pressure gauge (5-1), the waterglass conveying are housed on described gram of mud effect delivery pipe (12) It manages and second flowmeter (4-2) and second pressure gauge (5-2) is housed on (13).
8. a kind of Shield-bored tunnels pass through river construction grouting equipment according to claim 5, it is characterised in that: institute It states slurries mixture and conveying device further includes the water filling device filled the water into high-speed mixer (1), the water filling of the water filling device Mouth stretches in the stir chamber of high-speed mixer (1).
9. a kind of Shield-bored tunnels pass through river construction grouting equipment according to claim 5, it is characterised in that: institute State the tube body that dual slurry injection pipe (6) are inner hollow.
10. a kind of Shield-bored tunnels according to claim 1 or 2 pass through river construction grouting equipment, feature exists In: middle shield injection pipe (7) the He Tucang injection pipe (8) is straight tube, and the upper end of the middle shield injection pipe (7) stretches to shield body (10) front end in outside, the soil storehouse injection pipe (8) stretches in Tu Cang (9).
CN201821437945.XU 2018-09-04 2018-09-04 A kind of Shield-bored tunnels pass through river construction grouting equipment Active CN209025668U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821437945.XU CN209025668U (en) 2018-09-04 2018-09-04 A kind of Shield-bored tunnels pass through river construction grouting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821437945.XU CN209025668U (en) 2018-09-04 2018-09-04 A kind of Shield-bored tunnels pass through river construction grouting equipment

Publications (1)

Publication Number Publication Date
CN209025668U true CN209025668U (en) 2019-06-25

Family

ID=66877036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821437945.XU Active CN209025668U (en) 2018-09-04 2018-09-04 A kind of Shield-bored tunnels pass through river construction grouting equipment

Country Status (1)

Country Link
CN (1) CN209025668U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113153321A (en) * 2021-03-30 2021-07-23 中建八局轨道交通建设有限公司 Muck improvement system for shield construction and construction method thereof
TWI784775B (en) * 2021-10-29 2022-11-21 潛盾工程有限公司 The second backfill grouting structure for the protection of underground engineering shield tunnel buildings

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113153321A (en) * 2021-03-30 2021-07-23 中建八局轨道交通建设有限公司 Muck improvement system for shield construction and construction method thereof
CN113153321B (en) * 2021-03-30 2023-03-14 中建八局轨道交通建设有限公司 Muck improvement system for shield construction and construction method thereof
TWI784775B (en) * 2021-10-29 2022-11-21 潛盾工程有限公司 The second backfill grouting structure for the protection of underground engineering shield tunnel buildings

Similar Documents

Publication Publication Date Title
CN107120121B (en) A kind of shield-tunneling construction supplements slip casting anti-settling control method in real time
CN105804770B (en) The earth-filling method and its equipment in TBM method tunnel or tunnel construction
CN205477628U (en) Biliquid thick liquid device is annotated in step in shield driving
CN209025668U (en) A kind of Shield-bored tunnels pass through river construction grouting equipment
CN202140088U (en) Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously
CN105649650A (en) Back pea gravel blow filling grouting construction method for single-shield hard rock roadheader after installing TBM pipe piece
CN109749748A (en) A kind of rich water round gravel stratum shield sediment improvement method and sediment improvement agent
CN105386435A (en) Double-liquid grouting system used for cement and water glass solution and construction process of double-liquid grouting system
CN105257303A (en) Construction method capable of achieving synchronous double-grout grouting during shield tunneling
CN108166983B (en) Novel shield tail wall back grouting liquid capable of preventing loss
CN207377573U (en) Colluvial clay tunneltron booth structure
CN206737922U (en) A kind of shield machine shield endnote sizing device
CN210714722U (en) Synchronous double-liquid-slurry grouting system
CN207619995U (en) A kind of material for diaphragm wall of Cofferdam construction high-pressure rotary jet grouting pile equipment
CN101892847A (en) Novel double liquid grout injecting mixer
CN107387121A (en) The all-hydraulic coupling control system of novel double liquid grout injecting
CN206487492U (en) A kind of shield machine single fluid grouting pipe rapid translating two-liquid grouting device
CN109162667A (en) Coal mining two-liquid grouting device
CN108587583A (en) A kind of high proportion rectangular top pipe mud and preparation method thereof and construction method
CN103114601B (en) The rapid hardening high pressure jet grouting of strong absorbent formation cuts infiltration method and device thereof
CN103015428B (en) Double-pump pipe inserting and grouting adjusting and controlling device and double-pump pipe inserting and grouting adjusting and controlling method
CN110295599A (en) A kind of proportioner suitable for biliquid single system chemical grouting
CN109707339A (en) A kind of method for sealing of coal column grouting and reinforcing
CN206668271U (en) A kind of shield machine grouting at the tail of the shield machine structure
CN201666156U (en) Novel two-shot grouting mixer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant