CN202140088U - Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously - Google Patents

Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously Download PDF

Info

Publication number
CN202140088U
CN202140088U CN201120260346U CN201120260346U CN202140088U CN 202140088 U CN202140088 U CN 202140088U CN 201120260346 U CN201120260346 U CN 201120260346U CN 201120260346 U CN201120260346 U CN 201120260346U CN 202140088 U CN202140088 U CN 202140088U
Authority
CN
China
Prior art keywords
bentonite
pipe
foam
swell soil
injecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120260346U
Other languages
Chinese (zh)
Inventor
翟先习
万维燕
廖剑平
杨梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Urban Rail Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Urban Rail Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Urban Rail Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201120260346U priority Critical patent/CN202140088U/en
Application granted granted Critical
Publication of CN202140088U publication Critical patent/CN202140088U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a shield machine foam agent injecting pipeline system capable of injecting bentonite simultaneously. The shield machine foam agent injecting pipeline system comprises a plurality of foam agent mixed liquid injecting pipes, air inlet pipes, a foam generator and foam pipes, wherein the air outlet end of each air inlet pipe is communicated with the foam generator. The shield machine foam agent injecting pipeline system is characterized by also comprising a bentonite tank, a master bentonite injecting pipe, and branch bentonite injecting pipes the number of which is the same as that of the foam pipes; the bentonite outlet end of each branch bentonite injecting pipe is communicated with one foam pipe, and the connection part between the bentonite outlet end of each branch bentonite injecting pie and the foam pipe is arranged on a pipeline between a first one-way control valve and a cutter disk as well as a bentonite cabin; and each branch bentonite injecting pipe is provided with a second one-way control ball valve. The shield machine foam agent injecting pipeline system can inject bentonite and foam agents into the bentonite cabin and the cutter disk independently, and can inject the bentonite and the foam agents simultaneously under specific geological conditions, thereby expanding the bentonite injecting point and enhancing the adaptability of shield driving.

Description

A kind ofly can inject bentonitic shield machine foaming agent filling line system simultaneously
Technical field
The utility model relates to shield machine foaming agent filling line system, particularly a kind ofly can inject bentonitic shield machine foaming agent filling line system simultaneously.
Background technology
The shield structure is the main method in the constructing metro tunnel, and under the complicated geological situation, shield machine is the driving of smooth safety fast, depends on the use to additive to a great extent.Additive commonly used has foaming agent, swell soil and polymer, and foaming agent and swell soil then are to carry out dregs in the present shield driving construction to improve topmost additive.Foaming agent can prevent that the clay that can reinvent is formed centrally mud cake in cutterhead, reduces frictional force, and energy efficient reduces the wearing and tearing to cutterhead, increases the compressibility of the soil body, is easy to the control of earth pressure balance; Swell soil is difficult for solidifying, and intensity is extremely low after solidifying, and its easy imbibition also has lubricity, can effectively reduce the permeability of dregs.When in the stratum that is prone to unstability, overhauling shield machine for a long time, Xiang Tucang injects swell soil, can keep native storehouse pressure, stops the water and soil in the stratum to get into Tu Cang and cause surface settlement; Can change the workability of dregs in addition, improve the plasticity of sand property soil, be convenient to be unearthed, minimizing is gushed.
Foaming agent pipe-line system and swell soil pipe-line system adhere to two additive systems, the two independently working separately in shield machine.As shown in Figure 1, existing foaming agent pipe-line system comprises three foaming agent mixed liquor ascending pipes and three air inlet pipelines, three air inlet pipe respectively with foaming agent mixed liquor ascending pipe on foam maker be communicated with.During the cutterhead excavation, foaming agent is injected into Tu Cang and cutterhead through the foaming agent pipe, can reduce the friction between the cutter and the excavation soil body effectively, protection cutterhead and cutter.
Existing swell soil pipe-line system comprises the swell soil case, and the swell soil case is connected with the swell soil ascending pipe, and the swell soil ascending pipe is provided with swell soil control valve, swell soil pump, pressure meter, swell soil flow meter and non-return valve, and the swell soil inlet is positioned at Tu Cang top.In the shield-tunneling construction; For making the dregs that excavates have certain fluidity and sealing property, swell soil pumps into the swell soil pipeline through the swell soil pump from the swell soil case, thereby is injected in the native storehouse; Play the underground water that reduces the excavation face and in pressure chamber, gush out, reduce the generation of gushing.
In the shield driving process, the ground quality condition of being faced is complicated, be not only sometimes independent injection foaming agent or swell soil at the relevant soil body, just can satisfy construction requirement.When in sand-pebble layer, tunneling, foaming agent is not good to the improved effect of the face soil body, even the cutterhead pile penetration is not high; Thrust is little; But the cutterhead moment of torsion increases obviously, at this moment takes swell soil to inject the cutterhead face, then can obviously reduce the cutterhead moment of torsion; If after adding foaming agent and bentonitic mixture, effect is better.Original additive injected system swell soil can not be injected into card, can not realize the function that foaming agent mixes with swell soil, causes when in such stratum, tunneling; The cutterhead moment of torsion is big, and is big to the disturbance of the soil body, knife disc tool heavy wear; Need the phenomenon of frequent tool changing; Simultaneously also bring the tool changing risk, influenced construction speed, caused the certain economic loss.
Summary of the invention
The purpose of the utility model provides a kind ofly can inject bentonitic shield machine foaming agent filling line system simultaneously; Can enlarge bentonitic injection scope; Can be according to the actual conditions of dregs; Select to inject or inject simultaneously respectively swell soil and foaming agent, solve the narrow problem of soil body mode of ameliorating.
Saidly a kind ofly can inject bentonitic shield machine foaming agent filling line system simultaneously; Comprise many foaming agent mixed liquor ascending pipes, air inlet pipe and foamed pipe; The every foaming agent mixed liquor ascending pipe port of export is provided with foam maker; The foam inlet of every foamed pipe is communicated with the outlet of foam maker; Be provided with foam generation inspection cock in the junction, on foamed pipe, be provided with pressure sensor, ball valve and first one-way control valve successively from the foam inlet end, the outlet side of every air inlet pipe is communicated with foam maker; It is characterized in that: said pipe-line system comprises also that a swell soil case, swell soil filling main and the swell soil identical with foamed pipe quantity inject and is in charge of; Every swell soil injects the swell soil port of export be in charge of and is communicated with foamed pipe wherein, and its junction is in charge of every swell soil injection and is provided with the second unidirectional control ball valve on the pipeline between first one-way control valve and Tu Cang and the cutterhead.
The swell soil port of export from the swell soil case on the swell soil filling main is provided with swell soil filling main control valve, swell soil pump, pressure meter and mechanical meters successively.
Said foaming agent mixed liquor ascending pipe, air inlet pipe, foamed pipe and swell soil inject to be in charge of has three respectively.
The utility model has increased the swell soil filling line in original foaming agent filling line system, and on every pipeline, is provided with control valve.But the utility model both Xiang Tucang and cutterhead injects swell soil and foaming agent separately, also can under specific geological condition, inject foaming agent and swell soil simultaneously, has enlarged bentonitic decanting point, has increased the compliance of shield driving.
Description of drawings
Fig. 1 is the structural representation of existing foaming agent filling line system;
Fig. 2 is that the utility model improves back pipeline structure sketch map.
Among the figure: 1-foaming agent mixed liquor ascending pipe, 2-air inlet pipe, 3-foam maker, 4-foamed pipe, 4-1-foam generation inspection cock; The 4-2-pressure sensor, 4-3-ball valve, 4-4-first one-way control valve, 5-swell soil case, 6-swell soil filling main control valve; 7-swell soil pump, 8-swell soil filling main, 8-1-pressure meter, 8-2-mechanical meters; The 8-3-swell soil injects is in charge of the 8-4-second unidirectional control ball valve, 9-Tu Cang, 10-cutterhead.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.Among Fig. 2; Saidly a kind ofly can inject bentonitic shield machine foaming agent filling line system simultaneously; Comprise many foaming agent mixed liquor ascending pipes 1, air inlet pipe 2 and foamed pipe 4; Every foaming agent mixed liquor ascending pipe 1 port of export is provided with foam maker 3, and the foam inlet of every foamed pipe 4 is communicated with the outlet of foam maker 3, is provided with foam generation inspection cock 4-1 in the junction; On foamed pipe 4, be provided with pressure sensor 4-2, ball valve 4-3 and the first one-way control valve 4-4 successively from the foam inlet end; The outlet side of every air inlet pipe 2 is communicated with foam maker 3, it is characterized in that: said pipe-line system comprises also that a swell soil case 5, swell soil filling main 8 inject with the swell soil identical with foamed pipe 4 quantity and is in charge of 8-3, and every swell soil injects to be in charge of the swell soil port of export of 8-3 and to be communicated with foamed pipe 4 wherein; Its junction is injected to be in charge of at every swell soil and is provided with the second unidirectional control ball valve 8-4 on the 8-3 on the pipeline between the first one-way control valve 4-4 and native storehouse 9 and the cutterhead 10.
On swell soil filling main 8, go out end and be provided with swell soil filling main control valve 6, swell soil pump 7, pressure meter 8-1 and mechanical meters 8-2 successively from the swell soil of swell soil case 5.
Said foaming agent mixed liquor ascending pipe 1, air inlet pipe 2, foamed pipe 4 and swell soil inject to be in charge of 8-3 and to have three respectively.
According to the needs of dregs improvement, the unlatching of adjustment pipe valve.When the dregs improvement only needs foaming agent; Swell soil filling main control valve 6 on the swell soil filling main road 8 is in closed condition; Foaming agent mixed liquor ascending pipe 1, air inlet pipe 2 are worked simultaneously, after foam maker 3 is accomplished foaming, get into cutterhead and Tu Cang through foamed pipe 4; When the dregs improvement need add swell soil; In swell soil case 5, add swell soil; Open swell soil and get into the swell soil filling main control valve 6 on the house steward 8; Open swell soil pump 7, swell soil injects through every swell soil along swell soil filling main 8 is in charge of 8-3 entering foamed pipe 4, thereby gets into native storehouse 9 and cutterhead 10; When needs foaming agent and swell soil add fashionablely simultaneously, open all valves simultaneously.
The bentonitic injection scope that the utility model enlarges can not only be injected into Tu Cang, also can directly be injected into card, both can satisfy cutterhead and Tu Cang and inject foaming agent or inject bentonitic independently working requirement, can inject swell soil and foaming agent simultaneously again.Enlarged the scope that in the shield driving process dregs is improved, improved the compliance of shield structure different geological conditions.

Claims (3)

1. one kind can be injected bentonitic shield machine foaming agent filling line system simultaneously; Comprise many foaming agent mixed liquor ascending pipes (1), air inlet pipe (2) and foamed pipe (4); Every foaming agent mixed liquor ascending pipe (1) port of export is provided with foam maker (3); The foam inlet of every foamed pipe (4) is communicated with the outlet of foam maker (3); Be provided with foam generation inspection cock (4-1) in the junction; Upward be provided with pressure sensor (4-2), ball valve (4-3) and first one-way control valve (4-4) successively in foamed pipe (4) from the foam inlet end; The outlet side of every air inlet pipe (2) is communicated with foam maker (3), it is characterized in that: said pipe-line system comprises also that a swell soil case (5), swell soil filling main (8) and the swell soil identical with foamed pipe (4) quantity inject and is in charge of (8-3), and every swell soil injects to be in charge of the swell soil port of export of (8-3) and to be communicated with a foamed pipe (4) wherein; Its junction is injected to be in charge of at every swell soil and is provided with the second unidirectional control ball valve (8-4) on (8-3) on the pipeline between first one-way control valve (4-4) and Tu Cang (9) and the cutterhead (10).
2. according to claim 1ly a kind ofly can inject bentonitic shield machine foaming agent filling line system simultaneously, it is characterized in that: go up from the swell soil port of export of swell soil case (5) at swell soil filling main (8) and be provided with swell soil filling main control valve (6), swell soil pump (7), pressure meter (8-1) and mechanical meters (8-2) successively.
3. according to claim 1 and 2ly a kind ofly can inject bentonitic shield machine foam filling line system simultaneously, it is characterized in that: said foaming agent mixed liquor ascending pipe (1), air inlet pipe (2), foamed pipe (4) and swell soil inject to be in charge of (8-3) and to have three respectively.
CN201120260346U 2011-07-22 2011-07-22 Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously Expired - Fee Related CN202140088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120260346U CN202140088U (en) 2011-07-22 2011-07-22 Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120260346U CN202140088U (en) 2011-07-22 2011-07-22 Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously

Publications (1)

Publication Number Publication Date
CN202140088U true CN202140088U (en) 2012-02-08

Family

ID=45551149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120260346U Expired - Fee Related CN202140088U (en) 2011-07-22 2011-07-22 Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously

Country Status (1)

Country Link
CN (1) CN202140088U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606164A (en) * 2012-04-13 2012-07-25 大连华氏流体设备有限公司 Foam injection system for shield machine and operating method of foam injection system
CN103291313A (en) * 2013-06-08 2013-09-11 中铁隧道装备制造有限公司 Arch crown pressure supporting system of excavation of earth pressure shield and construction method thereof
CN104234719A (en) * 2014-09-20 2014-12-24 辽宁三三工业有限公司 Foaming system of shield tunneling machine
CN105041326A (en) * 2015-06-12 2015-11-11 北京城建设计发展集团股份有限公司 Water-rich diabase and slate irregular mutual invasion rock shield residue soil improving method
CN107091100A (en) * 2017-06-09 2017-08-25 中国铁建重工集团有限公司 A kind of abrasion reducing system of rectangular pipe jacking machine
CN108425681A (en) * 2017-10-27 2018-08-21 宏润建设集团股份有限公司 A kind of gas soil joint balance shield machine and its face balance control method
CN109026040A (en) * 2018-08-03 2018-12-18 中国电建集团铁路建设有限公司 A kind of synchronization bi-material layers sediment improvement system for earth pressure balanced shield, EPBS
CN109915159A (en) * 2019-04-28 2019-06-21 中铁隧道股份有限公司 Shield body is solved with detachable pipe-line system
CN113323681A (en) * 2021-07-15 2021-08-31 中铁六局集团有限公司 Shield constructs quick-witted soil storehouse device of adding water
CN114033395A (en) * 2021-10-28 2022-02-11 中交第二航务工程局有限公司 Mud cake preventing device and method for earth pressure balance type shield machine
CN115506800A (en) * 2022-10-28 2022-12-23 中铁一局集团有限公司 Earth pressure balance shield machine earth bin pressure compensation system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606164B (en) * 2012-04-13 2014-02-19 大连华峰发展公司 Foam injection system for shield machine and operating method of foam injection system
CN102606164A (en) * 2012-04-13 2012-07-25 大连华氏流体设备有限公司 Foam injection system for shield machine and operating method of foam injection system
CN103291313A (en) * 2013-06-08 2013-09-11 中铁隧道装备制造有限公司 Arch crown pressure supporting system of excavation of earth pressure shield and construction method thereof
CN104234719A (en) * 2014-09-20 2014-12-24 辽宁三三工业有限公司 Foaming system of shield tunneling machine
CN105041326A (en) * 2015-06-12 2015-11-11 北京城建设计发展集团股份有限公司 Water-rich diabase and slate irregular mutual invasion rock shield residue soil improving method
CN107091100B (en) * 2017-06-09 2023-10-17 中国铁建重工集团股份有限公司 Antifriction system of rectangle push bench
CN107091100A (en) * 2017-06-09 2017-08-25 中国铁建重工集团有限公司 A kind of abrasion reducing system of rectangular pipe jacking machine
CN108425681A (en) * 2017-10-27 2018-08-21 宏润建设集团股份有限公司 A kind of gas soil joint balance shield machine and its face balance control method
CN109026040A (en) * 2018-08-03 2018-12-18 中国电建集团铁路建设有限公司 A kind of synchronization bi-material layers sediment improvement system for earth pressure balanced shield, EPBS
CN109915159A (en) * 2019-04-28 2019-06-21 中铁隧道股份有限公司 Shield body is solved with detachable pipe-line system
CN109915159B (en) * 2019-04-28 2024-04-05 中铁隧道股份有限公司 Detachable shield body with easy-to-disassemble pipeline system
CN113323681A (en) * 2021-07-15 2021-08-31 中铁六局集团有限公司 Shield constructs quick-witted soil storehouse device of adding water
CN114033395A (en) * 2021-10-28 2022-02-11 中交第二航务工程局有限公司 Mud cake preventing device and method for earth pressure balance type shield machine
CN115506800A (en) * 2022-10-28 2022-12-23 中铁一局集团有限公司 Earth pressure balance shield machine earth bin pressure compensation system

Similar Documents

Publication Publication Date Title
CN202140088U (en) Shield machine foam agent injecting pipeline system capable of injecting bentonite symultaneously
CN104534167B (en) The drag reduction method of thixotropic slurry
CN103510964B (en) A kind of method when using shield formula TBM to construct to beans gravel rockfill grouting
CN102900089B (en) With the combination piling bar cofferdam of hydro-expansive rubber waterproof fore shaft
CN104453923B (en) A kind of take foam as the choosing method of the gummy formation earth pressure balanced shield, EPBS sediment improvement parameter of additive
CN205477628U (en) Biliquid thick liquid device is annotated in step in shield driving
CN102003189A (en) Mold bag grouting method and device for quickly and uniformly reinforcing soft stratum
CN103603670A (en) Construction method of ultra-deep-earthed shield crossing complex formations
WO2019228041A1 (en) Grouting reinforcement method for ground drilling to coal seam broken roof, and grouting apparatus
CN109594990B (en) Large-section jacking pipe construction method for complex stratum
CN101086164A (en) Highly effective quick-speed anti-seep plugging technology for cofferdam
CN103644305B (en) A kind of HBW grease system of compound stratum shield machine primary seal
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN103291313A (en) Arch crown pressure supporting system of excavation of earth pressure shield and construction method thereof
CN104314106A (en) Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof
CN107387121B (en) Novel double-liquid grouting full-hydraulic coupling control system
CN210714722U (en) Synchronous double-liquid-slurry grouting system
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN103174135A (en) Repair method of unqualified post-grouting bored concrete pile
CN107387105B (en) Soil pressure shield bentonite pressure maintaining equipment and method
CN208918541U (en) A kind of device for abolishing cutterhead mud cake
CN100497845C (en) Mixed grouting device for blocking high-pressure groundwater and mixing method grouting process therefor
CN108587583A (en) A kind of high proportion rectangular top pipe mud and preparation method thereof and construction method
CN105019458A (en) Deep and thick sand layer covered karst cave grouting system device and construction method
CN115030733A (en) Grouting method for preventing stratum soil loss or ground surface settlement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: CHINA RAILROAD 11 BUREAU GROUP CO. LTD.

Effective date: 20131121

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131121

Address after: 430074 No. 23, Jiayuan Road, East Lake Development Zone, Hubei, Wuhan

Patentee after: Urban Mass Transit Engineering Co., Ltd. of China Railway 11th Bureau Group

Address before: 430074 No. 23, Jiayuan Road, East Lake Development Zone, Hubei, Wuhan

Patentee before: Urban Mass Transit Engineering Co., Ltd. of China Railway 11th Bureau Group

Patentee before: China Railroad 11 Bureau Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120208

Termination date: 20160722