CN208991804U - Girder steel clamping fixture for drilling - Google Patents

Girder steel clamping fixture for drilling Download PDF

Info

Publication number
CN208991804U
CN208991804U CN201821787546.6U CN201821787546U CN208991804U CN 208991804 U CN208991804 U CN 208991804U CN 201821787546 U CN201821787546 U CN 201821787546U CN 208991804 U CN208991804 U CN 208991804U
Authority
CN
China
Prior art keywords
drilling
girder steel
drilling platform
clamping fixture
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821787546.6U
Other languages
Chinese (zh)
Inventor
陈宇斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC heavy industry (Xinjiang) Co.,Ltd.
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201821787546.6U priority Critical patent/CN208991804U/en
Application granted granted Critical
Publication of CN208991804U publication Critical patent/CN208991804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to fabricated construction girder steel field, especially a kind of girder steel clamping fixture for drilling, including drilling platform is provided with sliding rail below drilling platform, and drilling platform is connect with sliding rail;Fixed stop is provided on the left of drilling platform, right side is provided with round steel.The utility model has the advantages of simple structure, easy to operate, saves the access times of crane, improves drilling efficiency, reduces production cost.

Description

Girder steel clamping fixture for drilling
Technical field
The utility model relates to fabricated construction girder steel field, especially a kind of girder steel clamping fixture for drilling.
Background technique
In fabricated construction girder steel boring procedure, have since steel beam web plate is elongated wear muscle hole with the bolt at both ends connects Hole, and aperture is larger, it is necessary to it is drilled using radial drilling machine.Using conventional boring method, need to be moved back with crane The position of dynamic girder steel drills, and processing efficiency is low, at high cost.
Utility model content
In order to solve the above technical problems, the utility model proposes a kind of structure is simple, the high girder steel drilling tire of drilling efficiency Tool.
The utility model adopts the following technical solution:
A kind of girder steel clamping fixture for drilling, including drilling platform are provided with sliding rail, drilling platform and sliding rail below drilling platform Connection;Fixed stop is provided on the left of drilling platform, right side is provided with round steel.
Compared with prior art, the utility model has the beneficial effects that
The utility model solves the problems, such as that assembled girder steel drilling efficiency is low, has both reduced the access times of crane, section The about traveling time of crane handling girder steel, and the efficiency of drilling is improved, reduce construction cost.
Further, the preferred embodiment that the utility model uses is:
Jack is provided on drilling platform, round steel is arranged on drilling platform by jack.
Girder steel is placed between fixed stop and round steel, and wedge-shaped iron block is arranged between round steel and girder steel.
It is provided with supporting leg below drilling platform, supporting leg bottom is equipped with idler wheel.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the side view of Fig. 1;
In figure: sliding rail 1;Girder steel 2;Drilling platform 3;Supporting leg 4;Fixed stop 5;Idler wheel 6;Round steel 7;Iron block 8;Jack 9;It bores Bed 10.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.
Referring to attached drawing: a kind of girder steel clamping fixture for drilling, there are four supporting leg 4, each 4 bottoms of supporting leg for setting below drilling platform 3 Idler wheel 6 is installed, the sliding rail 1 of 3 lower section of idler wheel 6 and drilling platform is cooperatively connected, is welded on the left side of 3 table top of drilling platform solid To determine block 5, six row jacks 9 are provided on the right side of table top, the every row of the first row, the third line, fifth line is each provided with five jacks 9, Second row, fourth line, the 6th every row of row are each provided with four jacks 9, and each jack 9 of even number line is respectively placed in odd-numbered line phase Between adjacent two jacks 9, the jack 9 of suitable position is selected according to the width of girder steel 2, length and round steel 7 is plugged on jack 9 In.
Mould is placed on 10 side of drilling machine, by girder steel 2 by the way that on crane lifting to mould, the left side of girder steel 2 is kept off with fixed The right side of block 5 is bonded (referring to attached drawing 3), and it is fixed that jack 9 by round steel 7 is inserted into the right side of girder steel 2, round steel 7 and girder steel 2 it Between wedge-shaped iron block 8 is set, be used for reinforcing steel beam 2, prevent girder steel 2 from deviation phenomenon occurring in boring procedure.After being drilled one group of hole, It pushes mould whole, drill bit is enable to be directed at the position of 2 lower one groups of needs of girder steel punching, bore operation is carried out to girder steel 2 again.
Girder steel 2 is fixed on mould by the utility model, is replaced bore position by mobile mould, is both reduced crane Access times, have saved the traveling time of crane handling girder steel 2, and improve the efficiency of drilling, reduce construction cost.
The above is only the specific embodiments of the utility model, but not limited to this to the protection of the utility model, owns The substitution or transformation equivalent to the technical program technical characteristic that those skilled in the art propose all covers practical at this Within novel protection scope.

Claims (4)

1. a kind of girder steel clamping fixture for drilling, including drilling platform, it is characterised in that: be provided with sliding rail below drilling platform, drill Platform is connect with sliding rail;Fixed stop is provided on the left of drilling platform, right side is provided with round steel.
2. girder steel clamping fixture for drilling according to claim 1, it is characterised in that: be provided with jack on drilling platform, round steel is logical Jack is crossed to be arranged on drilling platform.
3. girder steel clamping fixture for drilling according to claim 1, it is characterised in that: girder steel is placed between fixed stop and round steel, And wedge-shaped iron block is set between round steel and girder steel.
4. girder steel clamping fixture for drilling according to claim 1, it is characterised in that: be provided with supporting leg, supporting leg below drilling platform Bottom is equipped with idler wheel.
CN201821787546.6U 2018-11-01 2018-11-01 Girder steel clamping fixture for drilling Active CN208991804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821787546.6U CN208991804U (en) 2018-11-01 2018-11-01 Girder steel clamping fixture for drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821787546.6U CN208991804U (en) 2018-11-01 2018-11-01 Girder steel clamping fixture for drilling

Publications (1)

Publication Number Publication Date
CN208991804U true CN208991804U (en) 2019-06-18

Family

ID=66806083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821787546.6U Active CN208991804U (en) 2018-11-01 2018-11-01 Girder steel clamping fixture for drilling

Country Status (1)

Country Link
CN (1) CN208991804U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109047850A (en) * 2018-11-01 2018-12-21 中国二十二冶集团有限公司 Girder steel clamping fixture for drilling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109047850A (en) * 2018-11-01 2018-12-21 中国二十二冶集团有限公司 Girder steel clamping fixture for drilling

Similar Documents

Publication Publication Date Title
US20140262562A1 (en) Rig walking system with cantilever-mounted lifting jack assemblies
CN109611112A (en) A kind of tunnel excavation driving bull rock drilling machine
CN102587918B (en) High-strength reducing template for construction of coal mine freezing vertical shaft
CN208991804U (en) Girder steel clamping fixture for drilling
CN110145639A (en) A kind of guide rail of relaying well replacement push-bench quick-assembling push-bench head
CN206241715U (en) Longitudinal beam of automobile frame clamps support platform
CN209469436U (en) Tunnel excavation driving bull rock drilling machine
CN109047850A (en) Girder steel clamping fixture for drilling
CN108301783B (en) Integral moving device for drilling machine
CN201560798U (en) Horizontal directional drilling machine framework
CN203684113U (en) Automatic beam placement platform device
CN103712811B (en) Combination beam pre-stress type is hydraulic bracket test-bed
CN208934591U (en) Integral type full-sleeve full-rotation drill
CN210236845U (en) Adjustable hanger for component steel reinforcement cage
CN204212059U (en) A kind of dilatory with large span heavy duty slipway beam
CN208913182U (en) A kind of big Workpiece boring equipment
CN203141138U (en) Horizontal type hook body machining center positioning device
CN208997098U (en) A kind of H profile steel convenient for connection
CN105275390A (en) Single-arm double-drill hydraulic drill carriage
CN206544041U (en) A grade frock is opened in a kind of double four groups of sections fork milling
CN204898708U (en) Assembled steel construction conversion layer of tower crane
CN206784105U (en) A kind of board-like steel roadbed box unit connecting structure of Special multi-hole
CN204442952U (en) A kind of jacking system
CN201714312U (en) Drilling rig derrick
CN204398951U (en) A kind of non-excavation type pipe laying transport trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210830

Address after: 830000 No. 668, North Petrochemical Road, Midong District, Urumqi City, Xinjiang Uygur Autonomous Region

Patentee after: MCC heavy industry (Xinjiang) Co.,Ltd.

Address before: 064000 happiness Road 16, Fengrun District, Hebei, Tangshan City

Patentee before: CHINA 22MCC GROUP Corp.,Ltd.