CN208978010U - The fixed device of two-way multiple built-in fittings for casting concrete prefabricated member - Google Patents
The fixed device of two-way multiple built-in fittings for casting concrete prefabricated member Download PDFInfo
- Publication number
- CN208978010U CN208978010U CN201821233099.XU CN201821233099U CN208978010U CN 208978010 U CN208978010 U CN 208978010U CN 201821233099 U CN201821233099 U CN 201821233099U CN 208978010 U CN208978010 U CN 208978010U
- Authority
- CN
- China
- Prior art keywords
- diaphragm capsule
- pedestal
- mounting screw
- cross bar
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a kind of fixed device of two-way multiple built-in fittings for casting concrete prefabricated member, belongs to technical field of buildings.It solves the technical problems such as existing screw bushing structure mounting structure is not accurate.This is used for the fixed device of two-way multiple built-in fittings of casting concrete prefabricated member, diaphragm capsule including accommodating concrete, the diaphragm capsule structure in the shape of a frame, fixed bracket is removably connected on the diaphragm capsule, the fixed bracket includes two pedestals for being mounted on diaphragm capsule two sides, the pedestal is to be slidably connected with diaphragm capsule side, and the fastener for fixing position is provided on the pedestal, the cross bar for connection is provided between the pedestal, the mounting screw for fixing swivel nut position is vertically arranged on the cross bar, the mounting screw is located inside diaphragm capsule.The utility model, which passes through fixed bracket and the structure of mounting screw, can allow multiple nuts for being embedded to be fixed on a certain spatial position.
Description
Technical field
The utility model belongs to building field, specifically a kind of for the two-way multiple pre- of casting concrete prefabricated member
Embedded member fixing device.
Background technique
Along with the development of Urbanization in China, building industry has become one of mainstay of the national economy industry, and fills
It can unify the production of scale volume production in factory by it with formula Side fascia, then install at the construction field (site), reduce the construction of exterior wall
In working hour, the advantages of improving construction efficiency, more and more extensive is used in various buildings.
Carry out the processing of pipeline system, China's patent application text usually in factory to the processing of assembling type outer wall plate now
Offer (notification number: CN201279829Y;The day for announcing: 2009.7.29) in disclose a kind of diaphragm capsule of casting concrete component, including
Diaphragm capsule, for diaphragm capsule for accommodating concrete, concrete can solidify formation in diaphragm capsule, and then complete the processing of concrete component.
But component needs the swivel nut of the pre-buried connection in concrete component during processing, manually will usually all be
Swivel nut is inserted into concrete to be solidified, waits concrete settings later so that swivel nut is kept fixed.
Screw bushing structure mounting structure under this structure is not accurate, and swivel nut position is easy during concrete setting finishes
It is displaced.In a block concrete component, swivel nut, the trouble also compared are installed if necessary to multi-point.
Summary of the invention
The utility model aiming at the above problems existing in the prior art, provides a kind of for casting concrete assembled structure
The fixed device of two-way multiple built-in fittings of part, is embedded the technical problem to be solved by the utility model is to how to be used in mixed
Swivel nut in solidifying soil is fixed in position and convenient for adjusting.
The purpose of this utility model can be realized by the following technical scheme:
A kind of fixed device of two-way multiple built-in fittings for casting concrete prefabricated member, including accommodating concrete
Diaphragm capsule, the diaphragm capsule structure in the shape of a frame, which is characterized in that fixed bracket, the fixed branch are removably connected on the diaphragm capsule
Frame includes two pedestals for being mounted on diaphragm capsule two sides, and the pedestal is to be slidably connected, and be arranged on the pedestal with diaphragm capsule side
There is the fastener set for fixed bit, the cross bar for connection is provided between the pedestal, is vertically arranged on the cross bar
For fixing the mounting screw of swivel nut position, the mounting screw is located inside diaphragm capsule.
Additional increases a fixed bracket on diaphragm capsule, and then mounting screw can be allowed to be kept fixed knot inside diaphragm capsule
Structure, mounting screw can cooperate with swivel nut for fixing, so that swivel nut is fixed on some position in diaphragm capsule.Fixed bracket
Fixed point the two sides of diaphragm capsule are set, can ensure that the cross bar in middle position keeps higher stability in this way, on cross bar
Mounting screw is held in stable position when concreting.The sliding connection structure at pedestal and diaphragm capsule edge can
It allows cross bar to be located at position different in diaphragm capsule, and then allows swivel nut that can be fixed on different positions, be processed into different size
Concrete component.
In the above-mentioned fixed device of two-way multiple built-in fittings for casting concrete prefabricated member, the diaphragm capsule
It is provided with the chimb of protrusion on side, the sliding sleeve with chimb clamping is provided on the pedestal, the fastener is fastening screw,
The fastening screw is threadedly engaged with sliding sleeve, and the fastening screw end and chimb contradict.The cooperation of the structure of chimb and sliding sleeve
The sliding that slide can be allowed stable, when needing adjusting position, it is only necessary to unscrew and be fastened and fixed screw, then by pedestal tune
It is whole to arrive suitable position, then fixing screws are tightened.
In the above-mentioned fixed device of two-way multiple built-in fittings for casting concrete prefabricated member, on the cross bar
It is provided with the adjustment hole of kidney-shaped, the mounting screw quantity is multiple and is respectively positioned in adjustment hole, and mounting screw can be along adjusting
Hole horizontal displacement.The structure of adjustment hole can adjust mounting screw position and then swivel nut is allowed to be adjusted to suitable position, process
Swivel nut can be fixed on to different corresponding positions when the concrete of different size.
In the above-mentioned fixed device of two-way multiple built-in fittings for casting concrete prefabricated member, the installation spiral shell
Nail end is provided with nut, nut is also arranged on the mounting screw, the nut is clamped in the upper of cross bar with nut respectively
Lower two sides.Nut and being capable of forming for nut grip structure, and then are fixed in position mounting screw.
In the above-mentioned fixed device of two-way multiple built-in fittings for casting concrete prefabricated member, on the pedestal
It is provided with the height-regulating hole of linear distribution along the vertical direction, the height-regulating screw with the cooperation of height-regulating hole is provided on the cross bar.Pass through
Screw will be turned up to be docked on the height-regulating hole of different height, and then crossbeam can be allowed to be maintained at different height, it thus can be true
Swivel nut is fixed on some suitable height by security personnel's cartridge screw.
Compared with prior art, the utility model has the advantage that
1, multiple nuts for being embedded can be allowed to be fixed on a certain space by the structure of fixed bracket and mounting screw
Position.
2, mounting screw position can be adjusted by adjusting pore structure, so that the coagulation for the different swivel nut positions that diaphragm capsule is able to produce
Native component.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the present embodiment.
Fig. 2 is the enlarged drawing in Fig. 1 at A.
In figure, 1, diaphragm capsule;11, chimb;2, fixed bracket;21, pedestal;212, fastening screw;213, sliding sleeve;214, it is turned up
Hole;22, cross bar;221, screw is turned up;23, adjustment hole;3, mounting screw;31, nut;32, nut.
Specific embodiment
It is specific embodiment of the utility model and in conjunction with attached drawing below, the technical solution of the utility model is made further
Description, but the utility model is not limited to these examples.
As shown in Figure 1, a kind of fixed device of built-in fitting for casting concrete prefabricated member, including it is mixed for accommodating
Coagulate the diaphragm capsule 1 of soil, diaphragm capsule 1 is rectangle and for frame shape, inside can accommodate concrete for pouring.
Fixed bracket 2 is removably connected on the edge of diaphragm capsule 1, each fixed bracket 2 includes two pedestals 21 and one
The side of diaphragm capsule 1 is arranged in a cross bar 22, a pedestal 21, and the other side of diaphragm capsule 1, each pedestal is arranged in another pedestal 21
21 bottom is provided with a sliding sleeve 213, and useful chimb 11 is arranged on the edge of diaphragm capsule 1, and chimb 11 is protruded toward horizontal direction, sliding
Set 213 is slidably fastened on chimb 11, and then pedestal 21 can be along 1 boundary slip of diaphragm capsule.One is equipped on sliding sleeve 213
Fastener, fastener are fastening screw 212, and fastening screw 212 is vertically arranged, and fastening screw 212 is matched with 213 screw thread of sliding sleeve
It closes, and 212 end of fastening screw and chimb 11 contradict.
Cross bar 22 connects two pedestals 21, and cross bar 22 is in horizontally disposed.It is provided on each pedestal 21 along vertical side
To the height-regulating hole 214 of linear distribution, it is provided with the height-regulating screw 221 cooperated with height-regulating hole 214 on cross bar 22, screw 221 is turned up
It is kept fixed cross bar 22 with pedestal 21 and then being turned up on hole 214 by being threaded through to connect, the height-regulating hole 214 of different height
Cross bar 22 can be allowed to be fixed on different height.
As shown in Figures 1 and 2, it is provided with the adjustment hole 23 of at least one kidney-shaped on cross bar 22, is set vertically in adjustment hole 23
It is equipped at least one mounting screw 3, multiple mounting screws 3 are provided on each cross bar 22, mounting screw 3 is located at diaphragm capsule 1
It is internal.It is provided with nut 31 on 3 top of mounting screw, nut 32 is arranged on mounting screw 3, nut 32 presss from both sides respectively with nut 31
It holds in the two sides up and down of cross bar 22, and then mounting screw 3 is allowed to be fixed on some position.Need to adjust 3 position of mounting screw when
It waits, it can be by unscrewing nut 32, until again tightening nut 32 after having adjusted.Mounting screw 3 is through cross bar 22
The upper surface and the lower surface, nut 31 can guarantee the case where mounting screw 3 is less prone to excessively past bottom offset.
The bottom of mounting screw 3, which can be threadedly engaged setting, needs swivel nut to be mounted, passes through the knot of mounting screw 3 in this way
Structure can allow swivel nut to be stably fixed in the space inside diaphragm capsule 1.When carrying out concreting, first according to institute
Swivel nut position on the concrete component to be processed adjusts the position of pedestal 21 by fastening screw 212, by the way that screw is turned up
221 adjustment cross bar, 22 height, and by the position of the adjustment mounting screw 3 of adjustment hole 23, so that the position of swivel nut and number
Amount meets processing request, and swivel nut position is able to maintain fixation.
And after concrete setting finishes, mounting screw 3 can be allowed to divide from swivel nut by rotating mounting screw 3
From while also unscrewing for screw 221 and fastening screw 212 is turned up in cooperation, and then realizes component disassembly, and concrete component can be from
It is taken out in diaphragm capsule 1, structure simple effects are obvious.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute
Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar
Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.
Although 1, diaphragm capsule is used more herein;11, chimb;2, fixed bracket;21, pedestal;212, fastening screw;
213, sliding sleeve;214, hole is turned up;22, cross bar;221, screw is turned up;23, adjustment hole;3, mounting screw;31, nut;32, nut
Equal terms, but it does not exclude the possibility of using other terms.The use of these items is only for more easily describe to conciliate
Release the essence of the utility model;Being construed as any additional limitation is disagreed with the spirit of the present invention
's.
Claims (5)
1. a kind of fixed device of two-way multiple built-in fittings for casting concrete prefabricated member, the mould including accommodating concrete
Box (1), the diaphragm capsule (1) structure in the shape of a frame, which is characterized in that fixed bracket (2) are removably connected on the diaphragm capsule (1),
The fixed bracket (2) includes two pedestals (21) for being mounted on diaphragm capsule (1) two sides, the pedestal (21) and diaphragm capsule (1) side
It is provided with the fastener for fixing position to be slidably connected, and on the pedestal (21), is provided between the pedestal (21)
For the cross bar (22) of connection, the mounting screw (3) for fixing swivel nut position is vertically arranged on the cross bar (22), it is described
It is internal that mounting screw (3) is located at diaphragm capsule (1).
2. two-way multiple built-in fittings fixed device according to claim 1 for casting concrete prefabricated member,
It is characterized in that, the chimb (11) of protrusion is provided on the side of the diaphragm capsule (1), be provided on the pedestal (21) and chimb
(11) sliding sleeve (213) being clamped, the fastener are fastening screw (212), the fastening screw (212) and sliding sleeve (213) spiral shell
Line cooperation, and the fastening screw (212) end and chimb (11) contradict.
3. two-way multiple built-in fittings fixed device according to claim 1 for casting concrete prefabricated member,
It is characterized in that, the adjustment hole (23) of kidney-shaped is provided on the cross bar (22), and mounting screw (3) quantity is multiple and equal position
In adjustment hole (23), and mounting screw (3) can be along adjustment hole (23) horizontal displacement.
4. two-way multiple built-in fittings fixed device according to claim 3 for casting concrete prefabricated member,
It being characterized in that, mounting screw (3) end is provided with nut (31), nut (32) are also arranged on the mounting screw (3),
The nut (32) and nut (31) are clamped in the two sides up and down of cross bar (22) respectively.
5. two-way multiple built-in fittings fixed device according to claim 1 for casting concrete prefabricated member,
It is characterized in that, the height-regulating hole (214) of linear distribution along the vertical direction is provided on the pedestal (21), is set on the cross bar (22)
The height-regulating screw (221) for being equipped with and hole (214) cooperation being turned up.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821233099.XU CN208978010U (en) | 2018-08-01 | 2018-08-01 | The fixed device of two-way multiple built-in fittings for casting concrete prefabricated member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821233099.XU CN208978010U (en) | 2018-08-01 | 2018-08-01 | The fixed device of two-way multiple built-in fittings for casting concrete prefabricated member |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208978010U true CN208978010U (en) | 2019-06-14 |
Family
ID=66780798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821233099.XU Active CN208978010U (en) | 2018-08-01 | 2018-08-01 | The fixed device of two-way multiple built-in fittings for casting concrete prefabricated member |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208978010U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924535A (en) * | 2019-12-02 | 2020-03-27 | 杨涛 | Embedded part construction process for assembly type building |
CN111923197A (en) * | 2020-07-13 | 2020-11-13 | 亚泰集团沈阳现代建筑工业有限公司 | Wallboard mold with prefabricated components and assembling method thereof |
CN113787607A (en) * | 2021-09-16 | 2021-12-14 | 广西中交建设发展有限公司 | Fixed frock of mobilizable pc component built-in fitting |
-
2018
- 2018-08-01 CN CN201821233099.XU patent/CN208978010U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924535A (en) * | 2019-12-02 | 2020-03-27 | 杨涛 | Embedded part construction process for assembly type building |
CN111923197A (en) * | 2020-07-13 | 2020-11-13 | 亚泰集团沈阳现代建筑工业有限公司 | Wallboard mold with prefabricated components and assembling method thereof |
CN113787607A (en) * | 2021-09-16 | 2021-12-14 | 广西中交建设发展有限公司 | Fixed frock of mobilizable pc component built-in fitting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208978010U (en) | The fixed device of two-way multiple built-in fittings for casting concrete prefabricated member | |
CN202787849U (en) | Keel for mounting wall panel of building | |
CN201560432U (en) | Elevation and levelness adjusting device of pre-embedded steel sheet | |
CN106088587A (en) | A kind of Combined formwork support system | |
CN211502243U (en) | Parapet camera fixing frame | |
CN204174911U (en) | A kind of scaffold connecting device | |
CN213710393U (en) | Municipal administration road bridge construction is with novel template fastening device | |
CN207988413U (en) | Ground leveling component | |
CN210888068U (en) | Combined building template | |
CN207846781U (en) | A kind of curtain wall grille three dimensional adjustment device | |
CN204139401U (en) | A kind of curtain wall hanger system | |
CN108943373A (en) | A kind of movable tooling for concrete prefabricated element production | |
CN209350545U (en) | The fixed device of multiple spot built-in fitting for casting concrete prefabricated member | |
CN208978009U (en) | The fixed device of arbitrary point built-in fitting for casting concrete prefabricated member | |
CN107763416A (en) | A kind of moveable device for wall hanging display | |
CN113586835A (en) | Anti-seismic hanging bracket | |
CN202899643U (en) | Full steel pipe adjustable ejector rod support | |
CN110886427A (en) | Keel adjusting device and method | |
CN207739551U (en) | A kind of dry-hanging keel mounting structure | |
CN209350470U (en) | The fixed device of unidirectional adjustable built-in fitting for casting concrete prefabricated member | |
CN202299008U (en) | Unit curtain wall three-dimensional adjusting rotationally connecting system | |
CN106639312B (en) | A kind of adjustable end fitting of combined large steel model for wall | |
CN208965800U (en) | Prefabricated concrete board mounts node | |
CN105221836A (en) | Location of pipeline erecting device | |
CN220414832U (en) | Hinge type shaping die for construction of water distribution flower wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Two way multiple embedded fixings for casting concrete fabricated members Effective date of registration: 20221012 Granted publication date: 20190614 Pledgee: Agricultural Bank of China Limited Taizhou Bay New Area sub branch Pledgor: TAIZHOU PULIDE BUILDING TECHNOLOGY Co.,Ltd. Registration number: Y2022330002549 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |