CN208948922U - A kind of water process circular response tank arrangement - Google Patents

A kind of water process circular response tank arrangement Download PDF

Info

Publication number
CN208948922U
CN208948922U CN201821289266.2U CN201821289266U CN208948922U CN 208948922 U CN208948922 U CN 208948922U CN 201821289266 U CN201821289266 U CN 201821289266U CN 208948922 U CN208948922 U CN 208948922U
Authority
CN
China
Prior art keywords
tank
reactor tank
water
circulating
circular response
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821289266.2U
Other languages
Chinese (zh)
Inventor
王宇
熊俊超
陈占
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuang Technology Co.,Ltd.
Original Assignee
Shanghai Melts Water Borne Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Melts Water Borne Material Co Ltd filed Critical Shanghai Melts Water Borne Material Co Ltd
Priority to CN201821289266.2U priority Critical patent/CN208948922U/en
Application granted granted Critical
Publication of CN208948922U publication Critical patent/CN208948922U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Water By Oxidation Or Reduction (AREA)

Abstract

The utility model provides a kind of water process circular response tank arrangement, including reactor tank and circulating pump, and the bottom of reactor tank opens up circulating water outlet and discharge outlet, and top opens up water inlet, dosing mouth and circulation water inlet.Circulating water line, circulating water pipe road installation circulating pump, the first motor-driven valve of circulating water pipe road installation between circulating pump and circulating water outlet are connected between circulating water outlet and circulation water inlet.The inside of the reactor tank is respectively set several upper and lower interleaveds or between left and right every staggered baffle;Top liquid level mouth and lower part liquid level mouth are opened up in reactor tank, and level monitoring device is installed therebetween.Circulating pump by reactor tank sewage and medicament carry out circulation mixing, and have the baffle being staggered installation of in the interior design of reactor tank, it can be ensured that material is uniformly mixed, and is come into full contact with, and the degradation rate of hydrazine is fast, and treatment effeciency is high.Design has level monitoring device, can be precisely controlled the additional amount of medicament according to the sewage quantity being actually implanted into, controllability is good.

Description

A kind of water process circular response tank arrangement
Technical field
The utility model belongs to Treatment of Industrial Water technical field, specifically, being about a kind of water process circular response tank Device.
Background technique
It, must in the equipment acceptance stage during manufacturing of pressure vessel and equipment (such as boiler, nuclear power evaporator) It must carry out the water pressure test.The water pressure test is the test of the intensity and leakproofness that are carried out after pressure vessel assembly with pressure water. Water pressure test water temperature requires generally 20~70 DEG C, and the water pressure test generally requires 24~48h of pressure maintaining after reaching operating pressure.Pressure The material of force container is generally steel alloy or stainless steel, in order to guarantee equipment and materials under the prolonged experimental condition of high temperature not It is corroded, the method generallyd use at present is the hydrazine hydrate (also known as hydrazine) that high concentration is added, and carries out deoxygenation anticorrosion.
But hydrazine hydrate is a kind of high toxic material, it can be by sucking, eating and skin contact is rapidly absorbed by a human, Neng Gouyin Play the injury of dizzy, nausea and nervous centralis.After the water pressure test, needs to handle remaining hydrazine hydrate, reach It just can be carried out discharge after to the emission request of country and the relevant environmental protection standard of local government.
The processing method of hydrazine hydrate waste water containing high concentration mainly have dilution, stand natural decomposition, aeration accelerated decomposition and Chemical accelerated decomposition.The method of chemical accelerated decomposition is directed to that a certain amount of chemical agent is added in hydrazine waste water, promotes hydrazine Fast decoupled, while not generating new environmental pollution, this method has speed fast, easy to operate, at low cost etc., pollution-free etc. Advantage is commonly used in industrial circle at present.During chemical Treatment, in order to reach the quick oxygenolysis to hydrazine Processing, it usually needs so that water sample and the medicament of addition are in olderly flowage state, the full and uniform contact of ability, and then play Quick redox reaction.For large-scale pressure vessel, it is stirred by the interim agitating paddle of device to mix Uniformly.
It is stirred and has the disadvantages that one side blade is too small, being sufficiently mixed effect cannot be guaranteed, and handle the time It is long;On the other hand large-scale mechanical stirring paddle, installation is inconvenient, and expensive.
Therefore, it is necessary to new treatment reaction device be designed, to overcome above-mentioned technical problem in the prior art.
Utility model content
The purpose of this utility model is to provide a kind of water process circular response tank arrangements, to overcome in the prior art State technical problem.
To achieve the above object, the utility model uses following technical scheme:
A kind of water process circular response tank arrangement, including reactor tank and circulating pump, the bottom of the reactor tank open up circulation Water out and discharge outlet, top open up water inlet, dosing mouth and circulation water inlet, in which:
Circulating water line is connected between the circulating water outlet and the circulation water inlet, the circulating water pipe road is installed The circulating pump, the first motor-driven valve of circulating water pipe road installation between the circulating pump and the circulating water outlet;
The inside of the reactor tank is respectively set several upper and lower interleaveds or between left and right every staggered baffle;
Top liquid level mouth and lower part liquid level mouth, the top liquid level mouth and the lower part liquid level mouth are opened up in the reactor tank Between level monitoring device is installed.
According to the utility model, the water inlet connects inlet pipeline, on the inlet pipeline of the water inlet Second motor-driven valve is installed;
The discharge outlet connects discharge pipe line, installs drain valve on the discharge pipe line;
The external connection dosing pipe of the dosing mouth sets gradually third motor-driven valve and flow on the dosing pipe Meter.
According to the utility model, the dosing mouth is internally connected with the dosing charging for going deep into the bottom of the reactor tank Pipe.
According to the utility model, the circulating water outlet is provided with one end of the bottom of the reactor tank, the recirculated water Entrance is provided with the other end at the top of the reactor tank.
According to the utility model, sample tap is opened up in the reactor tank, the sample tap connects sampling line, the sampling Sampling valve is installed on pipeline.
Further, the side of the reactor tank is arranged in the sample tap.It is preferably arranged on the side of the reactor tank Face is at bottom.
The sample tap is also possible to the branch line pulled out from the discharge pipe line, and institute is arranged on the branch line State sampling valve.
According to the utility model, the level monitoring device is with graduated level monitoring pipe.
According to the utility model, exhaust outlet is opened up at the top of the reactor tank.
Further, when the top of the reactor tank has end socket, the highest of the end socket is arranged in the exhaust outlet Point.
According to the utility model, man-hole opening is opened up in the reactor tank.When for vertical response tank, and the vertical response tank Top have end socket when, the man-hole opening may be provided on the end socket, may also be arranged on the vertical of the vertical response tank The side surface upper part of tank body.
According to the utility model, the top of the reactor tank also opens up spare mouth.When for vertical response tank, and it is described vertical When the top of reactor tank has end socket, the spare mouth is arranged on the end socket.
According to the utility model, the reactor tank be horizontal reacting tank, including horizontal tank body and be located at the horizontal tank body The end socket at both ends.The baffle is respectively between left and right every being staggered above and below the inside of the horizontal tank body.
At this point, the sample tap may be provided on the end socket of the side of the reactor tank.It is preferably arranged on the end socket At bottom.
On the end socket of one end that the top liquid level mouth and lower part liquid level mouth are provided with the horizontal tank body.
The top of the horizontal tank body is arranged in the man-hole opening, spare mouth, exhaust outlet.
According to the utility model, the reactor tank is vertical response tank, and the baffle is respectively between the upper and lower every being staggered The left and right side of the inside of the vertical tank body.
According to the utility model, the reactor tank using resistant to chemical etching, high temperature resistant, anti abrasive PPH material.
Compared with prior art, the utility model has following advantageous effects:
1), the water process circular response tank arrangement of the utility model, by circulating pump by the sewage and medicament in reactor tank Circulation mixing is carried out, and has the baffle being staggered installation of in the interior design of reactor tank, generates resistance during Matter Transfer, it can Ensure that material is uniformly mixed, come into full contact with, the degradation rate of hydrazine is fast, and treatment effeciency is high.
2), the water process of the utility model circular response tank arrangement, design have level monitoring device, facilitate operator According to the sewage quantity being actually implanted into, the addition of medicament is accurately controlled, it is good to be applicable in controllability.
3), design have exhaust outlet, can meet in treatment process have gas generate (processing of such as hydrazine hydrate can generate largely Nitrogen) treatment process demand.
4), design has man-hole opening, and personnel convenient for safeguarding, which enter inside reactor tank, to clean or repair.
5), the water process of the utility model circular response tank arrangement can handle needs according to actual production, be prepared into Different size size, it can satisfy the needs of the processing sewage of all trades and professions, simple in equipment, industrial production practicability By force.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the water process circular response tank arrangement of one embodiment of the utility model.
Fig. 2 is the case where sampling line is the branch line of discharge pipe line in one embodiment.
Fig. 3 is the structural schematic diagram of the water process circular response tank arrangement of second embodiment of the utility model.
Fig. 4 is the structural schematic diagram of the water process circular response tank arrangement of the third embodiment of the utility model.
In figure: 1- reactor tank, 2- circulating pump, 3- level monitoring device, the horizontal tank body of 11-, 12- end socket, 111- recirculated water Outlet, 112- discharge outlet, 113- water inlet, 114- dosing mouth, 115- recycle water inlet, 116- circulating water pipeline, 117- first Motor-driven valve, 118- baffle, 119- inlet pipeline, the second motor-driven valve of 120-, the top 121- liquid level mouth, the lower part 122- liquid level mouth, 123- sample tap, 124- sampling line, 125- sampling valve, 130- discharge pipe line, 131- drain valve, 140- dosing pipe, 141- Third motor-driven valve, 142- flowmeter, 150- dosing feed pipe, 160- exhaust outlet, 170- man-hole opening, the spare mouth of 180-, 4- are vertical End socket, 6- bottom bulkhead at the top of tank body, 5-
Specific embodiment
With reference to the accompanying drawing, the technical solution of the utility model is described in further detail with specific embodiment.It answers Understand, following embodiment is merely to illustrate the utility model not for restriction the scope of the utility model.
As shown in Figure 1, the water process circular response tank arrangement of one embodiment of the utility model, including reactor tank 1 With circulating pump 2, the reactor tank 1 includes horizontal tank body 11 and the end socket 12 that 11 both ends of horizontal tank body are arranged in.It is described sleeping The bottom of formula tank body 11 opens up circulating water outlet 111 and discharge outlet 112, and top opens up water inlet 113, dosing mouth 114 and circulation Water inlet 115, in which:
Circulating water line 116, the recirculated water are connected between the circulating water outlet 111 and the circulation water inlet 115 The circulating pump 2, the circulating water line between the circulating pump 2 and the circulating water outlet 111 are installed on pipeline 116 First motor-driven valve 117 is installed on 116.
The top and bottom of the inside of the horizontal tank body 11 are respectively between left and right every several baffles 118 that are staggered.
Open up top liquid level mouth 121 and lower part liquid level mouth 122 on the end socket 12, the top liquid level mouth 121 with it is described Level monitoring device 3 is installed between lower part liquid level mouth 122.
The water process circular response tank arrangement of the utility model, by circulating pump 2 by reactor tank 1 sewage and medicament into Row circulation mixing, and have a baffle 118 being staggered installation of in 11 interior design of horizontal tank body of reactor tank 1, during Matter Transfer Generate resistance, it can be ensured that material is uniformly mixed, and is come into full contact with, and the degradation rate of hydrazine is fast, and treatment effeciency is high.Design has liquid level Monitoring device 3 facilitates operator according to the sewage quantity being actually implanted into, and accurately controls the addition of medicament, is applicable in controllability It is good.The situation of sewage, including sewage containing hydrazine hydrate are handled by the way that uniformly mixed react of medicament and sewage is added suitable for a variety of Process situation.
Further, the length of the baffle 118 is more than the center of the horizontal tank body 11.At this point it is possible to improve circulation Liquid mixability improves pollutant and eliminates efficiency.
According to the utility model, sample tap 123 is opened up on the end socket 12 of described 1 one end of reactor tank.The sample tap 123 connect sampling lines 124, install sampling valve 125 on the sampling line 124.
Further, the sample tap 123 opens up on the end socket 12 at one end, and the top liquid level mouth 121 is under Portion's liquid level mouth 122 is provided on the end socket 12 of the other end.
Further, the sample tap 123 is mounted on the end socket 12 at bottom.
According to the utility model, the water inlet 113 connects inlet pipeline 119, close to the water inlet 113 it is described into Second motor-driven valve 120 is installed in water lines 119.
The discharge outlet 112 connects discharge pipe line 130, installs drain valve 131 on the discharge pipe line 130.
It is electronic to set gradually third on the dosing pipe 140 for the external connection dosing pipe 140 of the dosing mouth 114 Valve 141 and flowmeter 142.
According to the utility model, as shown in Fig. 2, the sample tap 123 can also be provided on the discharge pipe line 130.From Branch line is pulled out on the discharge pipe line 130, and the sampling valve 125 is set on the branch line.At this point, the probe tube Road 124 is the branch line of the discharge pipe line 130.
According to the utility model, being internally connected with of the dosing mouth 114 go deep into the dosing of the bottom of the reactor tank 1 into Expects pipe 150.
Medicament can be spread apart after being added in bottom, facilitated the sufficient haptoreaction of pollutant in medicament and waste water, mentioned High treatment efficiency.
According to the utility model, the circulating water outlet 111 is provided with one end of the bottom of the horizontal tank body 11, described Circulation water inlet 115 is provided with the other end at the top of the horizontal tank body 11.
The recirculated water and medicament entered inside the horizontal tank body 11 from the circulation water inlet 115 is needed along described sleeping Formula tank body 11, which is recycled to the other end from one end, to flow out from the circulating water outlet of bottom, during which by staggered baffle into One step mixing, it is ensured that recirculated water and drug are sufficiently mixed, and impurity processed is sufficiently reacted with medicament in mixed process, is mentioned High water treatment efficiency.
According to the utility model, the level monitoring device 3 is with graduated level monitoring pipe.Level monitoring pipe is equipped with Level scale quickly determines actually required medicament convenient for facilitating the actual amount of water (volume of water) in monitoring horizontal reacting tank Additive amount.
Further, the level monitoring pipe is white clear silica gel hose, is convenient for the actual water of visual inspection, so as to Quickly determine actually required additive amount of medicament.
According to the utility model, the top of the horizontal tank body 11 opens up exhaust outlet 160.The design of exhaust outlet 160 can be with Meet the treatment process demand that gas (such as the processing of hydrazine hydrate can generate a large amount of nitrogen) can be generated in treatment process.
According to the utility model, the top of the horizontal tank body 11 opens up man-hole opening 170.The design of the man-hole opening 170 Maintenance personnel be can be convenient into cleaning or repair inside horizontal tank body 11.
According to the utility model, the top of the horizontal tank body 11 also opens up spare mouth 180.The spare mouth 180 improves The anti-risk performance of equipment.It once some mouth goes wrong, can be switched fast, ensure the lasting progress of water process, improve Treatment effeciency.
According to the utility model, the reactor tank 1 using resistant to chemical etching, high temperature resistant, anti abrasive PPH material.
According to the utility model, the reactor tank 1 further includes support, and the support includes being located at hold-down support and cunning Dynamic support.
The size of the reactor tank 1 can specifically be designed according to the scale that actual sewage is handled.
The pipe thickness of the reactor tank 1 is designed according to actual size size and selected material, meets stress nuclei It calculates, meets the relevant criterion of tank designs.
In the utility model, it can be horizontal reacting tank that the reactor tank 1, which is reactor tank form conventional in the prior art, Or vertical response tank, the reactor tank 1 can have end socket, it can also be without end socket.Each mouthful of position setting, can be according to reactor tank Concrete form, varied slightly on the basis of meeting relevant design standard.
Below by taking vertical response tank of the upper and lower ends with end socket as an example, further illustrate the technical side of the utility model Case.
As shown in figure 3, second embodiment according to the present utility model, the water process circular response of the utility model are canned It sets, basic structure is identical as one embodiment, and difference is, the reactor tank 1 is vertical response tank, including vertical tank body 4 With the top end socket 5 that 4 top of vertical tank body is arranged in.
The baffle 118 is respectively between the upper and lower every the left and right side in the inside of the vertical tank body 4 that is staggered.
Further, the length of the baffle 118 is more than center, so that the circulation fluid flowed down in a upper block baffle can be fallen In adjacent next block baffle, mixability is improved, accelerates the elimination of dirty water pollutant.
The circulating water outlet 111 and the discharge outlet 112 are separately positioned on the bottom of the vertical tank body 4.
The water inlet 113, dosing mouth 114, circulation water inlet 115, man-hole opening 170, spare mouth 180 are arranged at described On top end socket 5, the highest point of the end socket 5 is arranged in the exhaust outlet 160.
According to the utility model, the side of the vertical tank body 4 of the reactor tank 1 is arranged in the sample tap 123.
According to the utility model, the reactor tank 1 passes through supporting leg.
According to the utility model, the top liquid level mouth 121 is provided with the side surface upper part of the vertical tank body 4, under described Portion's liquid level mouth 122 is provided with the side lower of the vertical tank body 4.
According to the utility model, the man-hole opening 170 may also be arranged on the side of the vertical tank body 4.
According to the utility model, the dosing feed pipe 150 passes through the baffle 118.
As shown in figure 4, third embodiment according to the present utility model, the water process circular response of the utility model is canned Set, basic structure is identical as second embodiment, and difference is: the reactor tank 1 is vertical response tank, including vertical tank body 4, The top end socket 5 that 4 top of vertical tank body is set and the bottom bulkhead 6 that 4 bottom of vertical tank body is set.
The circulating water outlet 111, sample tap 123 and lower part liquid level mouth 122 are arranged on the bottom bulkhead 6.Institute State the minimum point that the bottom bulkhead 6 is arranged in discharge outlet 112.
The water process circular response tank arrangement of the utility model, when operation, using following steps:
(1), the sampling valve 125, drain valve 131 and first motor-driven valve are first checked for and ensured before water inlet 117 are in close state, and then open the second motor-driven valve 120, and treatment sewage is injected the reaction through the water inlet 113 In tank 1, the level monitoring device 3 carries out water level monitoring.When injecting the 1/5 of the volume that sewage is the reactor tank, open First motor-driven valve 117 and the circulating pump 2 open simultaneously the third motor-driven valve 141, control dosing flow, start material Circulation carries out sewage treatment.When handling sewage containing hydrazine hydrate, medicament (such as the hydrogen peroxide, hypochlorous acid except hydrazine is added Sodium).Liquid situation is monitored by the level monitoring device 3 simultaneously, after filling sewage, closes second motor-driven valve 120, Stop water filling;After being added to medicament, third motor-driven valve 141 is closed, stops dosing.
(2), circular treatment certain time, then opens the sampling valve 125, and sample detection water quality situation is reached through detection To after emission request, it is first shut off the circulating pump 2, is then shut off the first motor-driven valve 117, the drain valve 131 is opened and drains. After water in the horizontal reacting tank 1 is drained, the drain valve 131 is closed.
(3), repeat the sewage treatment or shutdown of next batch.
Specific embodiment of the utility model is described in detail above, but it is only used as example, the utility model It is not restricted to particular embodiments described above.To those skilled in the art, any that this practical is equal Modifications and substitutions are also all among the scope of the utility model.Therefore, the institute under the spirit and scope for not departing from the utility model The equal transformation and modification of work, should all cover in the scope of the utility model.

Claims (10)

1. a kind of water process circular response tank arrangement, which is characterized in that including reactor tank and circulating pump, the bottom of the reactor tank Circulating water outlet and discharge outlet are opened up, top opens up water inlet, dosing mouth and circulation water inlet, in which:
Circulating water line is connected between the circulating water outlet and the circulation water inlet, the circulating water pipe is on the road described in installation Circulating pump, the first motor-driven valve of circulating water pipe road installation between the circulating pump and the circulating water outlet;
The inside of the reactor tank is respectively set several upper and lower interleaveds or between left and right every staggered baffle;
Top liquid level mouth and lower part liquid level mouth are opened up in the reactor tank, between the top liquid level mouth and the lower part liquid level mouth Level monitoring device is installed.
2. water process circular response tank arrangement according to claim 1, which is characterized in that the water inlet connects water inlet pipe The second motor-driven valve is installed on the inlet pipeline of the water inlet in road;
The discharge outlet connects discharge pipe line, installs drain valve on the discharge pipe line;
The external connection dosing pipe of the dosing mouth sets gradually third motor-driven valve and flowmeter on the dosing pipe.
3. water process circular response tank arrangement according to claim 1, which is characterized in that the inside of the dosing mouth connects There is the dosing feed pipe for the bottom for going deep into the reactor tank.
4. water process circular response tank arrangement according to claim 1, which is characterized in that the circulating water outlet is provided with One end of the bottom of the reactor tank, the circulation water inlet are provided with the other end at the top of the reactor tank.
5. water process circular response tank arrangement according to claim 1, which is characterized in that open up sampling in the reactor tank Mouthful, the sample tap connects sampling line, installs sampling valve on the sampling line.
6. water process circular response tank arrangement according to claim 1, which is characterized in that the level monitoring device is band Graduated level monitoring pipe.
7. water process circular response tank arrangement according to claim 1, which is characterized in that opened up at the top of the reactor tank Exhaust outlet.
8. water process circular response tank arrangement according to claim 1, which is characterized in that open up manhole in the reactor tank Mouthful.
9. water process circular response tank arrangement according to claim 1 to 8, which is characterized in that the reactor tank For horizontal reacting tank, end socket including horizontal tank body and positioned at the horizontal tank body both ends, the baffle is respectively between left and right every friendship Mistake is arranged in above and below the inside of the horizontal tank body.
10. water process circular response tank arrangement according to claim 1 to 8, which is characterized in that the reaction Tank is vertical response tank, and the baffle is respectively between the upper and lower every the left and right side in the inside of the vertical tank body that is staggered.
CN201821289266.2U 2018-08-10 2018-08-10 A kind of water process circular response tank arrangement Active CN208948922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821289266.2U CN208948922U (en) 2018-08-10 2018-08-10 A kind of water process circular response tank arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821289266.2U CN208948922U (en) 2018-08-10 2018-08-10 A kind of water process circular response tank arrangement

Publications (1)

Publication Number Publication Date
CN208948922U true CN208948922U (en) 2019-06-07

Family

ID=66733530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821289266.2U Active CN208948922U (en) 2018-08-10 2018-08-10 A kind of water process circular response tank arrangement

Country Status (1)

Country Link
CN (1) CN208948922U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111495311A (en) * 2020-04-29 2020-08-07 沈阳工业大学 Horizontal continuous precipitation reaction device
CN112919935A (en) * 2021-03-20 2021-06-08 中鼎特金秦皇岛科技股份有限公司 Production system for preparing organic fertilizer by quickly and harmlessly treating livestock and poultry manure
CN114307934A (en) * 2021-12-24 2022-04-12 北京绿恒科技有限公司 Variable-circulation multi-directional-flow efficient mixing reaction device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111495311A (en) * 2020-04-29 2020-08-07 沈阳工业大学 Horizontal continuous precipitation reaction device
CN111495311B (en) * 2020-04-29 2022-08-23 沈阳工业大学 Horizontal continuous precipitation reaction device
CN112919935A (en) * 2021-03-20 2021-06-08 中鼎特金秦皇岛科技股份有限公司 Production system for preparing organic fertilizer by quickly and harmlessly treating livestock and poultry manure
CN114307934A (en) * 2021-12-24 2022-04-12 北京绿恒科技有限公司 Variable-circulation multi-directional-flow efficient mixing reaction device
CN114307934B (en) * 2021-12-24 2024-02-06 北京绿恒科技有限公司 Variable circulation multidirectional flow efficient mixing reaction device

Similar Documents

Publication Publication Date Title
CN208948922U (en) A kind of water process circular response tank arrangement
CN206837990U (en) A kind of experiment reagent device for formulating
CN210825582U (en) Acid-base neutralization treatment device for wastewater
CN207805367U (en) A kind of acid gas processing system
CN215743072U (en) Medicament mixing arrangement for water treatment
CN211497419U (en) Fertile preparation facilities of natural pond liquid with heating mechanism
CN208454585U (en) A kind of electroplating wastewater acid-base neutralization reaction device
CN220370766U (en) Hydrogen chloride gas treatment equipment
CN206156971U (en) Sewage treatment plant for chemical industry
CN209352580U (en) A kind of pneumatic stirring chemicals dosing plant
CN217173314U (en) Inorganic chemistry experiment sewage treatment plant
CN215516702U (en) Integrated nitrogen-containing wastewater treatment device
CN211051261U (en) MBR membrane cleaning system
CN212214680U (en) Defoaming system at power plant desulfurizing tower
CN218596146U (en) Sewage treatment plant based on septic tank
CN211990240U (en) Soil pollution prosthetic devices
CN214299605U (en) Fenton reaction device for triazone wastewater
CN220982836U (en) Cyanide detects appearance preprocessing device
CN212609623U (en) Batch treatment device for volatile wastewater
CN214182632U (en) Automatic ammonia water preparation device for liquid ammonia of thermal power plant
CN219128334U (en) Cleaning system of graphite bubble cap tower
CN212610015U (en) A add medicine waste fitting discharging for quality of water automatic control on-line measuring
CN217947908U (en) Biological total nitrogen removal device for sewage treatment
CN213570064U (en) Septic tank device free of cleaning
CN217725565U (en) Reactor for preparing ammonium sulfate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210408

Address after: 441000 No.101, Guanyu Road, high tech Zone, Xiangyang City, Hubei Province

Patentee after: Yuang Technology Co.,Ltd.

Address before: 201306 C, 888, west two road, Nanhui new town, Pudong New Area, Shanghai

Patentee before: SHANGHAI RONGCHE WATERBORNE MATERIALS Co.,Ltd.

TR01 Transfer of patent right