CN208857768U - A kind of protection slope structure being easily installed - Google Patents
A kind of protection slope structure being easily installed Download PDFInfo
- Publication number
- CN208857768U CN208857768U CN201821183249.0U CN201821183249U CN208857768U CN 208857768 U CN208857768 U CN 208857768U CN 201821183249 U CN201821183249 U CN 201821183249U CN 208857768 U CN208857768 U CN 208857768U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- staking out
- water
- easily installed
- cross bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of protection slope structures being easily installed, including ground, riverbank, cross bar and vertical pole, the top of the ground has sequentially passed through far water staking out and nearly water staking out from left to right, the side of the far water staking out is fixedly connected with the side on riverbank, it is fixedly connected with geotextiles antiseepage film between the far water staking out and the opposite side of nearly water staking out, the utility model relates to hydraulic engineering technical fields.The protection slope structure being easily installed, cooperate the setting of cross bar, vertical pole and wooden peg, slope protection can be just put up in a short time, it is easy for installation, save a large amount of time, cross bar, vertical pole and wooden peg select wood materials production, the phenomenon that concrete structure influences ecologic structure is avoided, existing protective slope structure is solved since the gradient on river slope causes concrete to be difficult to tile, the installation of slope protection is made to encounter difficulties, trouble is brought to construction worker, fail to meet the time limit of a project the problem of being in progress.
Description
Technical field
The utility model relates to hydraulic engineering technical field, specially a kind of protection slope structure being easily installed.
Background technique
Slope protection refers to the various general designations paved and transplanted to prevent side slope from being washed away, done in slope surface, bridge site institute
In section, the concave bank on riverbank is met year by year by current scour, riverbank can be made constantly to collapse, for protection bridge and embankment safety, palpus
Build protective structure in concave bank, in addition, cause river water flow direction to change because setting bridge, concave bank and when jeopardizing farmland and villages and small towns,
Also protective structure must be built on riverbank, this building is also commonly known as shore protection, and the form of shore protection has directly protection and indirectly
Protection, directly protection be that Riparian buffers are directly reinforced, with resist water flow wash away and scour, commonly use jackstone, laid dry piece
Stone, mortar flag stone, gabion and fascine etc. are built, and protection is wider suitable for riverbed indirectly or protects the biggish section of length, can be repaired
Groynes, longitudinal dike and lattice dam etc. are built, water flow is chosen from riverbank.
Existing amber structure is mostly to have used concrete floor cooperation concrete to produce block to be covered on the surface He Po, is prevented and treated
Water flow is washed away, and such setting makes the installation of slope protection encounter difficulties, give since the gradient on river slope causes concrete to be difficult to tile
Construction worker brings trouble, and fail to meet the time limit of a project progress.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of protection slope structure being easily installed, solution
Existing protective slope structure determined since the gradient on river slope causes concrete to be difficult to tile, the installation of slope protection is made to encounter difficulties, to building
It builds worker and brings trouble, fail to meet the time limit of a project the problem of being in progress.
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of water conservancy being easily installed
Project post-evaluation structure, including ground, riverbank, cross bar and vertical pole, it is vertical that the top of the ground has sequentially passed through far water from left to right
Stake and nearly water staking out, the side of the far water staking out are fixedly connected with the side on riverbank, the far water staking out and nearly water staking out phase
Pair side between be fixedly connected with geotextiles antiseepage film, the top of the ground and the underfill for being located at geotextiles antiseepage film
There is pool slag blanket, the top of the geotextiles antiseepage film is filled with the first dirt bed, the side filling at the top of first dirt bed
There is crushed stone layer, the top and the other side at the top of the first dirt bed of the crushed stone layer are fixedly connected to anti-falling screen, and anti-
The side being caught is fixedly connected with the side of far water staking out, and the side of the other side of the anti-falling screen and nearly water staking out is fixed to be connected
It connects.
Preferably, the top of the anti-falling screen is filled with the second dirt bed, and the side of the cross bar and vertical pole is with the
The inside of two dirt beds is fixedly connected.
Preferably, the two of the rail surface offer first through hole, and the two sides on the vertical pole surface offer
The inner surface of two through-holes, the inner surface of the first through hole and the second through-hole slidably connects wooden peg, and one end of wooden peg with
The internal slide of second dirt bed connects.
Preferably, screen tube, the bottom of the screen tube are slidably connected between the cross bar and the opposite side of vertical pole
It is fixedly connected with the inside of the second dirt bed.
Preferably, the surface of the screen tube is provided with takes root in strain deeply.
Preferably, the side of the nearly water staking out is fixedly connected with reinforcing rod, and the inside of one end of reinforcing rod and ground
It is fixedly connected, is fixedly connected with connecting rod between the reinforcing rod and the opposite side of nearly water staking out.
Beneficial effect
The utility model provides a kind of protection slope structure being easily installed.Have it is following the utility model has the advantages that
(1), protection slope structure being easily installed, by having been sequentially passed through from left to right far at the top of ground
Water staking out and nearly water staking out, the side of far water staking out are fixedly connected with the side on riverbank, and far water staking out and nearly water staking out are opposite
It is fixedly connected with geotextiles antiseepage film between side, the top of the ground and underfill for being located at geotextiles antiseepage film has pool slag
Layer, the top of geotextiles antiseepage film are filled with the first dirt bed, and the side at the top of the first dirt bed is filled with crushed stone layer, rubble
The other side at the top of the top of block layer and the first dirt bed is fixedly connected to anti-falling screen, and the side of anti-falling screen and far water staking out
Side be fixedly connected, the other side of anti-falling screen is fixedly connected with the side of nearly water staking out, and cooperation cross bar, vertical pole and wooden peg are set
It sets, can just put up slope protection in a short time, it is easy for installation, a large amount of time is saved, cross bar, vertical pole and wooden peg select wood
Material production, avoids the phenomenon that concrete structure influences ecologic structure, solves existing protective slope structure due to river slope
The gradient causes concrete to be difficult to tile, and the installation of slope protection is made to encounter difficulties, and brings trouble to construction worker, fail to meet the time limit of a project into
The problem of exhibition.
(2), the protection slope structure being easily installed passes through the company of sliding between the opposite side of cross bar and vertical pole
It is connected to screen tube, the bottom of screen tube is embedded in the top of the second dirt bed, and the surface of screen tube, which is provided with, takes root in strain deeply, utilizes depth
Strain and the setting of screen tube are taken root in, be fastened screen tube and second of plant rhizome can be utilized after plant strain growth gets up
Dirt bed prevents soil erosion, slows down destruction of the water impact to ecological environment, strengthens the effect of slope protection protection riverbank soil
Fruit.
Detailed description of the invention
Fig. 1 is the external structure schematic diagram of the utility model;
Fig. 2 is the assembly structure diagram of the utility model cross bar and vertical pole;
Fig. 3 is the structural schematic diagram of the utility model cross bar;
Fig. 4 is the structural schematic diagram of the utility model vertical pole.
In figure: 1-ground, 2-riverbanks, 3-cross bars, 4-vertical poles, 5-far water staking outs, 6-nearly water staking outs, 7-geotechniques
Cloth antiseepage film, 8-pool slag blankets, the 9-the first dirt bed, 10-crushed stone layers, 11-anti-falling screens, the 12-the second dirt bed, 13-
First through hole, the 14-the second through-hole, 15-wooden pegs, 16-screen tubes, 17-reinforcing rods, 18-connecting rods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of protection slope knot being easily installed
Structure, including ground 1, riverbank 2, cross bar 3 and vertical pole 4, ground 1 is manufactured using the pool slag of compacting, for replacing concrete floor,
The two of 3 surface of cross bar offer first through hole 13, and the two sides on 4 surface of vertical pole offer the second through-hole 14, first through hole 13
Inner surface and the inner surface of the second through-hole 14 slidably connect wooden peg 15, and one end of wooden peg 15 and the second dirt bed 12
Internal slide connection, slidably connects screen tube 16 between cross bar 3 and the opposite side of vertical pole 4, the bottom of screen tube 16 and the
The inside of two dirt beds 12 is fixedly connected, and the surface of screen tube 16, which is provided with, takes root in strain deeply, takes root in strain and screen tube 16 using deep
Setting, can prevent after plant strain growth gets up using be fastened screen tube 16 and the second dirt bed 12 of plant rhizome
Only soil erosion slows down destruction of the water impact to ecological environment, strengthens the effect of slope protection protection riverbank soil, ground 1
Top has sequentially passed through far water staking out 5 and nearly water staking out 6 from left to right, and far water staking out 5 and nearly water staking out 6 are all to select wooden material
Material production, can play the role of preserving the ecological environment while support limit, the side of far water staking out 5 and the one of riverbank 2
Side is fixedly connected, and the side of nearly water staking out 6 is fixedly connected with reinforcing rod 17, and one end of reinforcing rod 17 and the inside of ground 1 are solid
Fixed connection, reinforcing rod 17 can reinforce nearly water staking out 6, prevent nearly water staking out 6 from bearing a large amount of active force and topple over
The case where, connecting rod 18 is fixedly connected between reinforcing rod 17 and the closely opposite side of water staking out 6, far water staking out 5 and nearly water are vertical
Geotextiles antiseepage film 7, the top of ground 1 and the bottom for being located at geotextiles antiseepage film 7 are fixedly connected between 6 opposite sides of stake
Filled with pool slag blanket 8, the top of geotextiles antiseepage film 7 is filled with the first dirt bed 9, the side filling at 9 top of the first dirt bed
There is crushed stone layer 10, the other side at 9 top of the top of crushed stone layer 10 and the first dirt bed is fixedly connected to anti-falling screen 11, prevents
The rubble that 11 can be effectively prevented crushed stone layer 10 of being caught slides, and the side of anti-falling screen 11 and the side of far water staking out 5 are fixed
Connection cooperates the setting of cross bar 3, vertical pole 4 and wooden peg 15, can just put up slope protection in a short time, easy for installation, saves
A large amount of time, cross bar 3, vertical pole 4 and wooden peg 15 select wood materials production, and avoiding concrete structure influences ecologic structure
The phenomenon that, it solves existing protective slope structure since the gradient on river slope causes concrete to be difficult to tile, the installation of slope protection occurs
Difficulty brings trouble to construction worker, and fail to meet the time limit of a project the problem of being in progress, the other side of anti-falling screen 11 and nearly water staking out 6
Side is fixedly connected, and the top of anti-falling screen 11 is filled with the second dirt bed 12, the side of cross bar 3 and vertical pole 4 with the second soil
The inside of layer 12 is fixedly connected.
When work, pool slag is concentrated compacting production ground 1 by worker, and far water staking out 5 and water inlet staking out 6 are erect on ground 1,
Pool slag blanket 8 is filled on ground, and then geotextiles antiseepage film 7 is laid on pool slag blanket 8, is laid in geotextiles antiseepage film 7
First dirt bed 9, then crushed stone layer 10 is laid on the first dirt bed 9, anti-falling screen 11 is layered on crushed stone layer 10, anti-fall
It is laid with the second dirt bed 12 on net 11, cross bar 3 and vertical pole 4 are embedded in the second dirt bed 12, wooden peg 15 is hammered into first through hole
13 and second in through-hole 14, completes to fix, then screen tube 16 is filled in the space that cross bar 3 and vertical pole 4 are formed, in screen tube 16
Upper plantation takes root in strain deeply, and after taking root in strain deeply and growing up to, the rhizome of plant can naturally consolidate screen tube 16 and the second dirt bed 12
It is fixed, complete the installation of slope protection.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of protection slope structure being easily installed, including ground (1), riverbank (2), cross bar (3) and vertical pole (4),
Be characterized in that: the top of the ground (1) has sequentially passed through far water staking out (5) He Jinshui staking out (6), the far water from left to right
The side of staking out (5) is fixedly connected with the side of riverbank (2), the opposite side of far water staking out (5) the He Jinshui staking out (6) it
Between be fixedly connected with geotextiles antiseepage film (7), the top of the ground (1) and be located at geotextiles antiseepage film (7) underfill
Have pool slag blanket (8), the top of the geotextiles antiseepage film (7) is filled with the first dirt bed (9), the first dirt bed (9) top
The side in portion is filled with crushed stone layer (10), the top and the other side at the top of the first dirt bed (9) of the crushed stone layer (10)
It is fixedly connected to anti-falling screen (11), and the side of anti-falling screen (11) is fixedly connected with the side of far water staking out (5), it is described anti-fall
The other side of net (11) is fixedly connected with the side of nearly water staking out (6).
2. a kind of protection slope structure being easily installed according to claim 1, it is characterised in that: the anti-falling screen
(11) top is filled with the second dirt bed (12), the side of the cross bar (3) and vertical pole (4) with the second dirt bed (12)
Inside is fixedly connected.
3. a kind of protection slope structure being easily installed according to claim 2, it is characterised in that: the cross bar
(3) the two of surface offer first through hole (13), and the two sides on vertical pole (4) surface offer the second through-hole (14), institute
The inner surface of the inner surface and the second through-hole (14) of stating first through hole (13) slidably connects wooden peg (15), and wooden peg (15)
One end is connect with the internal slide of the second dirt bed (12).
4. a kind of protection slope structure being easily installed according to claim 2, it is characterised in that: the cross bar
(3) it is slidably connected screen tube (16) between the opposite side of vertical pole (4), the bottom of the screen tube (16) and the second soil
The inside of layer (12) is fixedly connected.
5. a kind of protection slope structure being easily installed according to claim 4, it is characterised in that: the screen tube
(16) surface is provided with takes root in strain deeply.
6. a kind of protection slope structure being easily installed according to claim 1, it is characterised in that: the nearly water is vertical
The side of stake (6) is fixedly connected with reinforcing rod (17), and one end of reinforcing rod (17) is fixedly connected with the inside of ground (1), institute
It states and is fixedly connected with connecting rod (18) between the opposite side of reinforcing rod (17) He Jinshui staking out (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821183249.0U CN208857768U (en) | 2018-07-25 | 2018-07-25 | A kind of protection slope structure being easily installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821183249.0U CN208857768U (en) | 2018-07-25 | 2018-07-25 | A kind of protection slope structure being easily installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208857768U true CN208857768U (en) | 2019-05-14 |
Family
ID=66413208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821183249.0U Expired - Fee Related CN208857768U (en) | 2018-07-25 | 2018-07-25 | A kind of protection slope structure being easily installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208857768U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926766A (en) * | 2020-07-06 | 2020-11-13 | 上海崇明水利工程有限公司 | Soil erosion and water loss prevention type revetment structure |
CN113309042A (en) * | 2021-05-31 | 2021-08-27 | 云南建投第一水利水电建设有限公司 | Protection system for side slope of hydraulic and hydroelectric engineering and construction method thereof |
-
2018
- 2018-07-25 CN CN201821183249.0U patent/CN208857768U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926766A (en) * | 2020-07-06 | 2020-11-13 | 上海崇明水利工程有限公司 | Soil erosion and water loss prevention type revetment structure |
CN113309042A (en) * | 2021-05-31 | 2021-08-27 | 云南建投第一水利水电建设有限公司 | Protection system for side slope of hydraulic and hydroelectric engineering and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234061A (en) | Reinforced ecological concrete revetment and construction method thereof | |
CN208857768U (en) | A kind of protection slope structure being easily installed | |
CN106930231A (en) | A kind of construction method of the engineering flood bank reinforcing that is applied to pass the flood period | |
CN206693140U (en) | A kind of protection slope | |
CN110629770B (en) | Reservoir side slope hydro-fluctuation belt seepage-proofing slope protection structure and construction method thereof | |
CN213805480U (en) | Gabion retaining wall | |
CN111622234B (en) | Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process | |
CN110424283B (en) | Bamboo debris flow blocking device | |
CN109610407B (en) | Ecological barricade of landslide prevention based on dead weight is balanced | |
CN207919573U (en) | A kind of sheet-pile cofferdam structure suitable for soft soil foundation | |
CN110295573A (en) | Adapt to the channel revetment project post-evaluation structure of construction time severe hydrometeorological condition | |
CN102561368B (en) | Flexible supporting construction of pre-compaction reinforced soil piece | |
CN112663559B (en) | Slope type ecological seawall structure assembled with grid net and construction method thereof | |
KR101117924B1 (en) | Composite type steel temporary construction and construction method thereof | |
CN214993495U (en) | Slope type ecological sea wall structure assembled with grid net | |
CN112411620A (en) | Gabion retaining wall and construction method thereof | |
CN212103892U (en) | Ecological bank protection of high strength | |
CN210857103U (en) | Novel water conservancy prevention of seepage ecological waterproof dykes and dams | |
CN207828991U (en) | A kind of modularization cofferdam structure suitable for river hard ground | |
CN204000927U (en) | For the free frame of steel of transform mountains engineering, water conservancy and Communication and Transportation Engineering | |
CN113250149A (en) | Grid type concrete panel rock-fill dam | |
CN112609731A (en) | Flexible permeable cutting retaining wall and construction method | |
KR100662011B1 (en) | Construction method of shore protector using reinforcing strip | |
CN111996989A (en) | Slope protection structure based on construction waste and construction method thereof | |
CN114086505A (en) | River course slope protection structure for hydraulic engineering and laying construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190514 Termination date: 20200725 |
|
CF01 | Termination of patent right due to non-payment of annual fee |