CN208563886U - Pin-connected panel elevator pit - Google Patents

Pin-connected panel elevator pit Download PDF

Info

Publication number
CN208563886U
CN208563886U CN201820857929.XU CN201820857929U CN208563886U CN 208563886 U CN208563886 U CN 208563886U CN 201820857929 U CN201820857929 U CN 201820857929U CN 208563886 U CN208563886 U CN 208563886U
Authority
CN
China
Prior art keywords
pit
hoistway
side walls
pin
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820857929.XU
Other languages
Chinese (zh)
Inventor
邹雍然
蒋乐
潘锦强
刘兆辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Winone Elevator Co Ltd
Original Assignee
Winone Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Winone Elevator Co Ltd filed Critical Winone Elevator Co Ltd
Priority to CN201820857929.XU priority Critical patent/CN208563886U/en
Application granted granted Critical
Publication of CN208563886U publication Critical patent/CN208563886U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to elevators to install mating structure of capital construction, especially a kind of pin-connected panel elevator pit.The pit includes pit foundation platform made of site operation, pit foundation platform include the pedestal of a cubic shaped and be located at pedestal upper surface middle part a square or rectangle recessed position;One prefabricated pit hoistway combination plane is installed in the recessed position on pit foundation platform, pit side wall sub-assembly is equipped with above pit hoistway combination plane, pit side wall engaging member passes through the square or rectangle composite structure that four prefabricated concrete side walls are vertically spliced to form.The utility model is made of precast concrete, reduce the time and expense for needing to wait with concrete casting of precisely digging pit at scene, accelerate the construction speed at scene, reduce the noise effect to neighbouring resident, it only needs to match ground level platform structures and several pit plane fixation holes, the local backfilled with earth hollowed out outside hoistway wall after the completion of engineering by size requirement to building-site.

Description

Pin-connected panel elevator pit
Technical field
The utility model relates to elevators to install mating structure of capital construction, especially a kind of pin-connected panel elevator pit.
Background technique
With the development of elevator technology, more and more middle layers facilitate without elevator residential building also by elevator is installed additional now The upper of resident is gone downstairs, and the old man and child especially given in the aging blocks for staying in higher floor brings great life convenient.
The general step that existing aging blocks elevator installs additional is the pit construction for carrying out hoistway first, after pit is built up again Hoistway is built, then elevator is installed in hoistway, in the construction of pit, existing mode is usually to dig in the bottom surface of preset location If a melt pit, the pit capital construction of armored concrete is then formed by way of pouring in pit, due to when it is existing live Elevator installation is carried out outside the building in residence building, so during on-site construction, the material and facilities such as tool, sandstone need to occupy original outdoor Certain obstacle is caused to the normal pass of resident in space, and the solidification of concrete takes a long time, and is easy by weather Influence, also need to build canopy etc. in rainy day and dark and damp weather to assist, to site operation bring it is biggish uncertain and Trouble, is not easy to pit and forms in high quality.
Utility model content
One of the purpose of this utility model is to provide a kind of spelling of efficiency and quality that can effectively improve pit construction Dress formula elevator pit.
The pit includes pit foundation platform made of site operation, and the pit foundation platform includes one cube shaped The pedestal of shape and be located at pedestal upper surface middle part one square or rectangle recessed position;On the pit foundation platform Recessed position in a prefabricated pit hoistway combination plane is installed, be equipped with pit side above the pit hoistway combination plane Wall sub-assembly, the square or rectangle that pit side wall engaging member is vertically spliced to form by four prefabricated concrete side walls combine Structure.
Preferably, the area of the recessed position is greater than the area of pit hoistway combination plane, pit hoistway combination plane It is placed on after recessed position, forms channel-shaped gap around pit hoistway combination plane;In pit foundation platform, pit hoistway knot Conjunction plane and pit side wall sub-assembly channel-shaped gap described by concrete or soil compaction filling after being installed.
Preferably, the recessed position is equipped with the vertical fixed mounting hole of multiple perforation pit foundation platforms, the bottom Combination plane in mine pit road is equipped with the hollow connecting column of corresponding vertical fixed mounting hole.
Preferably, the vertical fixed mounting hole is hung down set on the bottom surface that pit foundation platform surrounding corresponds to concrete side walls It delivers directly within the scope of shadow covering surface, one side wall fixing pipe is mounted on the bottom surface of each concrete side walls, the side wall is solid Determine pipe and penetrates into underground below pit foundation platform across hollow connecting column and pit foundation platform.
Preferably, the endface that the side of each concrete side walls corresponds to adjacent concrete side wall is equipped with a L shape Notch, each concrete side walls pass sequentially through the L-shaped notch square being spliced to form vertical with adjacent concrete side walls Or the seam on four corner angle sides is filled and bonded after rectangle composite structure by water-impervious glue.
Preferably, the width of L v notch v is equal to the thickness of concrete side walls.
Preferably, one jiao of fixing seat, the angle fixing seat are equipped at the top of the adjoiner of each concrete side walls Including the bottom plate mutually fixed for two concrete side walls with adjoiner and for carrying and fixing upper frame well The upper supporting plate of road bracket is equipped with support frame between bottom plate and upper supporting plate.
Preferably, the support frame includes two vertical channel steels backwards to setting.
The pin-connected panel elevator pit elevator pit of the utility model is made of precast concrete, the essence at the scene of reducing Standard, which is digged pit, is poured the time and expense for needing to wait with concrete, accelerates the construction speed at scene, and reduction makes an uproar to neighbouring resident Sound influences, it is only necessary to match ground level platform structures and several pit plane fixation holes, engineering by size requirement to building-site The local backfilled with earth hollowed out outside hoistway wall after the completion.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model embodiment;
Fig. 2 is the explosive view of the utility model embodiment;
Fig. 3 is that the side wall of the utility model embodiment splices fixed structure schematic diagram;
Fig. 4 is the hollow connecting column structural schematic diagram of the utility model embodiment;
Fig. 5 is the side wall fixing pipe structural schematic diagram of the utility model embodiment.
Specific embodiment
As Figure 1-Figure 5, the pin-connected panel elevator pit of the present embodiment includes pit foundation platform made of site operation 1, the one of the pedestal 11 of the pit foundation platform 1 an including cubic shaped and the upper surface middle part for being located at pedestal 11 is just Rectangular or rectangle recessed position 12;One prefabricated pit hoistway is installed in the recessed position 12 on the pit foundation platform 1 In conjunction with plane 2, pit side wall sub-assembly 3 is equipped with above the pit hoistway combination plane 2, pit side wall engaging member 3 passes through The square or rectangle composite structure that four prefabricated concrete side walls 31 are vertically spliced to form.
In said structure, pit foundation platform 1 is made of scene, since it is poured in pit, and whole knot Structure is stablized, it is possible to which quickly solidification encounters anomalous weather, and pit covering, which can avoid rainwater, using covering influences it Solidification progress and quality, and foundation structure is simple, it is few using material, without furnishing a large amount of material and construction device at the scene Tool;Remaining component such as pit hoistway combination plane and concrete side walls are all to transport to scene after being made in advance, then carry out group The construction of pit structure can be completed in dress, is equivalent to completely by being greatly shortened existing for the molding pit of cast in situs The construction time of field and intensity.
In construction, due to being usually associated with certain rolling when pit hoistway combination plane 2 is lifted into recessed position 12 It is dynamic, in order to which pit hoistway combination plane 2 is smoothly lifted into predetermined position, in the present embodiment, the face of the recessed position 12 Product is greater than the area of pit hoistway combination plane 2, and pit hoistway combination plane 2 is placed on after recessed position 12, in pit hoistway Channel-shaped gap is formed in conjunction with 2 surrounding of plane;In pit foundation platform 1, pit hoistway combination plane 2 and pit side wall sub-assembly 3 be installed after the channel-shaped gap described by concrete or soil compaction filling.
When concatenation at the scene, since the operation bonded by cement is more time-consuming, for not only proof strength, but also energy Rapidly, it accurately completes to splice, in the present embodiment, the recessed position 12 is equipped with the vertical solid of multiple perforation pit foundation platforms Determine mounting hole 13, the pit hoistway combination plane 2 is equipped with the hollow connecting column 21 of corresponding vertical fixed mounting hole.It is hollow Connecting column 21 can be used metal or be made also by concrete, the outer wall of hollow connecting column 21 and vertical fixed mounting hole 13 Inner wall interference fit realizes the fastening installation of the hollow plane 2 in conjunction with pit hoistway of connecting column 21, then by hollow connecting column pair The position insertion of quasi- vertical fixed mounting hole 13, makes the bottom surface of pit hoistway combination plane 2 be bonded the surface of recessed position 12, completes Installation.
When pit side wall engaging member 3 is installed, in order to utilize the rock-steady structure of the structural member to be fixedly mounted, and avoid pair Existing component bores more holes and influences the intensity of pit foundation platform 1 and pit hoistway combination plane 2, improves the stabilization of structure Property, in the present embodiment, the vertical fixed mounting hole 13 is set to the bottom that 1 surrounding of pit foundation platform corresponds to concrete side walls 31 Within the scope of the upright projection covering surface of face, one side wall fixing pipe 32 is mounted on the bottom surface of each concrete side walls 31, it is described Side wall fixing pipe 32 pass through hollow connecting column 21 and pit foundation platform 1 and penetrate into 1 lower section underground of pit foundation platform.
In above-mentioned fixed structure, due to installing and fixing pit hoistway combination plane 2 on pit foundation platform 1 It has needed to install multiple vertical fixed mounting holes 13, has been combined in order to which multiple vertical fixed mounting holes 13 are used pit side wall During the installation of part 3 is fixed, avoid solely in order to pit side wall engaging member 3 is installed and in addition in pit foundation platform 1 and pit well It drills in road combination plane 2, so vertical fixed mounting hole 13, which is set to 1 surrounding of pit foundation platform, corresponds to concrete side walls 31 Plane perpendicular projection covering surface within the scope of, then side wall fixing pipe 32 is installed in each concrete side walls 31, when installation, side Wall fixing pipe 31, hollow connecting column 21 and vertical fixed mounting hole 13 form the structure of a suit, pass through the installation of sleeve structure Mode had both reduced in addition extra tap operation, and ensure that the structural strength of each component, while also increasing each component Structural constraint, improve whole installation strength.
On the splicing construction of pit side wall engaging member 3, in the present embodiment, the side of each concrete side walls 31 The endface of corresponding adjacent concrete side wall 31 is equipped with a L-shaped notch 34;Each concrete side walls pass sequentially through L-shaped notch After 34 squares being spliced to form vertical with adjacent concrete side walls or rectangle composite structure simultaneously by the filling of water-impervious glue Bond the seam on four corner angle sides.
Accurately cooperate and limit to can be carried out in splicing, in the present embodiment, the width of L v notch v 32 is equal to coagulation The thickness of native side wall 31.
In order to further fix adjacent concrete side walls 31, intensity is improved, in the present embodiment, each concrete One jiao of fixing seat 33 is equipped at the top of the adjoiner of side wall 31, the angle fixing seat 33 includes for two coagulations with adjoiner The bottom plate 331 that native side wall is mutually fixed and the upper supporting plate 332 for carrying and fixing upper frame hoistway bracket, it is lower solid Support frame 333 is equipped between fixed board 331 and upper supporting plate 332.
In order to improve manufactured stability, in the present embodiment, the support frame 333 includes two vertical backwards to setting Channel steel.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model, Equivalent structure or equivalent flow shift made by using the description of the utility model and the drawings, is directly or indirectly transported Used in other related technical areas, it is also included in the patent protection scope of the utility model.

Claims (8)

1. pin-connected panel elevator pit, it is characterised in that: including pit foundation platform made of site operation, the pit ground Platform include the pedestal of a cubic shaped and be located at pedestal upper surface middle part one square or rectangle recessed position;Institute One prefabricated pit hoistway combination plane is installed, the pit hoistway combines in the recessed position on pit foundation platform stated Pit side wall sub-assembly is equipped with above plane, pit side wall engaging member is vertically spliced to form by four prefabricated concrete side walls Square or rectangle composite structure.
2. pin-connected panel elevator pit as described in claim 1, it is characterised in that: the area of the recessed position is greater than pit well The area of road combination plane, pit hoistway combination plane are placed on after recessed position, are formed around pit hoistway combination plane Channel-shaped gap;By mixed after pit foundation platform, pit hoistway combination plane and pit side wall sub-assembly are installed Channel-shaped gap described in solidifying soil or soil compaction filling.
3. pin-connected panel elevator pit as claimed in claim 1 or 2, it is characterised in that: the recessed position is equipped with multiple perforations The vertical fixed mounting hole of pit foundation platform, the pit hoistway combination plane are equipped with corresponding vertical fixed mounting hole Hollow connecting column.
4. pin-connected panel elevator pit as claimed in claim 3, it is characterised in that: the vertical fixed mounting hole is set to pit Foundation platform surrounding corresponds within the scope of the plane perpendicular projection covering surface of concrete side walls, pacifies on the bottom surface of each concrete side walls Dress is fixed with one side wall fixing pipe, and the side wall fixing pipe passes through hollow connecting column and pit foundation platform with penetrating into pit Underground below based platform.
5. pin-connected panel elevator pit as claimed in claim 1 or 2, it is characterised in that: the one of each concrete side walls Side correspond to adjacent concrete side wall endface be equipped with a L-shaped notch, each concrete side walls pass sequentially through L-shaped notch with It fills and bonds by water-impervious glue after square or rectangle composite structure that adjacent concrete side walls are vertically spliced to form The seam on four corner angle sides.
6. pin-connected panel elevator pit as claimed in claim 5, it is characterised in that: the width of L v notch v is equal to concrete side walls Thickness.
7. pin-connected panel elevator pit as claimed in claim 1 or 2, it is characterised in that: the neighbour of each concrete side walls It connects place top and is equipped with one jiao of fixing seat, the angle fixing seat includes mutually fixed for two concrete side walls with adjoiner Bottom plate and upper supporting plate for carrying and fixing upper frame hoistway bracket, set between bottom plate and upper supporting plate There is support frame.
8. pin-connected panel elevator pit as claimed in claim 7, it is characterised in that: the support frame include two it is vertical backwards The channel steel of setting.
CN201820857929.XU 2018-06-04 2018-06-04 Pin-connected panel elevator pit Active CN208563886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820857929.XU CN208563886U (en) 2018-06-04 2018-06-04 Pin-connected panel elevator pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820857929.XU CN208563886U (en) 2018-06-04 2018-06-04 Pin-connected panel elevator pit

Publications (1)

Publication Number Publication Date
CN208563886U true CN208563886U (en) 2019-03-01

Family

ID=65484487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820857929.XU Active CN208563886U (en) 2018-06-04 2018-06-04 Pin-connected panel elevator pit

Country Status (1)

Country Link
CN (1) CN208563886U (en)

Similar Documents

Publication Publication Date Title
CN104018436B (en) Prefabricated box culvert system and its installation method
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN109898642A (en) A kind of plug-in type assembled house
US20040040239A1 (en) Prefabricated thin wall concrete panel
CN106759420B (en) A kind of prefabricated assembled transformer substation foundation structure
CN206545215U (en) A kind of precast spliced sinking type garage parking
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
CN109372018A (en) Soft base Self-sinking type underground space structure construction and construction technology
JP2001241053A (en) Method for constructing underground structure
CN108643219A (en) A kind of assembled transmission line of electricity anchor rod static pressure Minitype pile foundation and its construction method
KR20110004541A (en) Downward construction method of basement applying scf(sliding channel form)
KR20190022132A (en) Top-down method using precast-concrete colum
JP2006328666A (en) Construction method for integrating pile with column
CN108824763A (en) Pin-connected panel elevator pit
CN208563886U (en) Pin-connected panel elevator pit
JP3107716B2 (en) Soil retaining wall
JP4083334B2 (en) Underground structure having arch roof and method for constructing the same
KR101534641B1 (en) The method for constructing the basement
CN110904992A (en) Elevator foundation member for integrally assembling elevator and construction method thereof
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
JP3641227B2 (en) Construction method of underground structure
CN214302989U (en) Build assembled garage parking on ground additional
JP2003003690A (en) Base isolation building and method for base isolation of exisiting building
CN209293069U (en) Soft base Self-sinking type underground space structure construction
JPH09111776A (en) Basement and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 528200 North Park of Shishan Science and Technology Industrial Park, Shishan town, Nanhai District, Foshan City, Guangdong Province

Patentee after: Lingwang Elevator Co.,Ltd.

Address before: 528200 North Park of Shishan Science and Technology Industrial Park, Shishan town, Nanhai District, Foshan City, Guangdong Province

Patentee before: WINONE ELEVATOR Co.,Ltd.