CN208545767U - A kind of load retaining wall peg board barricade - Google Patents

A kind of load retaining wall peg board barricade Download PDF

Info

Publication number
CN208545767U
CN208545767U CN201820770038.0U CN201820770038U CN208545767U CN 208545767 U CN208545767 U CN 208545767U CN 201820770038 U CN201820770038 U CN 201820770038U CN 208545767 U CN208545767 U CN 208545767U
Authority
CN
China
Prior art keywords
wall
retaining wall
lower wall
peg board
breast boards
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820770038.0U
Other languages
Chinese (zh)
Inventor
顾问天
胡云龙
刘峰
马驰
庞小朝
梁月英
肖文海
江辉煌
刘鸣
刘一鸣
刘国楠
马华
徐玉胜
张治平
胡荣华
刘永春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Academy Of Iron Sciences (shenzhen) Research And Design Institute Co Ltd
China Academy of Railway Sciences Corp Ltd CARS
Original Assignee
SHENZHEN RESEARCH AND DESIGN INSTITUTE OF CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN RESEARCH AND DESIGN INSTITUTE OF CARS filed Critical SHENZHEN RESEARCH AND DESIGN INSTITUTE OF CARS
Priority to CN201820770038.0U priority Critical patent/CN208545767U/en
Application granted granted Critical
Publication of CN208545767U publication Critical patent/CN208545767U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

A kind of load retaining wall peg board barricade, the fore shaft beam and cast-in-situ bored pile of the lower wall breast boards of upper wall and relieving slab, middle part including top and lower wall rib column and lower part, the upper wall and relieving slab on top are using rigid connection, the lower wall breast boards at middle part and the cast-in-situ bored pile of lower part are connected using armored concrete, and Shang Qiang connect support by lower wall rib column with lower wall breast boards.Its advantage is that relieving slab is connect with upper wall using armored concrete, reduce the soil body after wall to the soil pressure of lower wall, the self weight of earthing body for whole retaining wall structure provides a recurvation square to act on the moment of flexure generated on the wall with soil pressure contrary in another aspect.Therefore soil pressure can be largely reduced, limits the deformation of retaining wall structure, the effect of balance retaining wall structure section turn moment and whole stability against overturning.Compared with traditional cantilever retaining wall and anchored pile supporting, have that structure is simple, occupy little space, easy construction, durability are good and the distinguishing features such as saving construction cost.

Description

A kind of load retaining wall peg board barricade
Technical field
The utility model relates to retaining wall or protecting wall, espespecially a kind of load retaining wall peg board barricade.
Background technique
Retaining structure includes earth-retaining, antiskid structure and earth-retaining skid resistant composite structure, and primary structure form has gravity type Retaining wall, counterfort wall, antiskid retaining wall, friction pile and piled anchor barricade, reinforced earth (anchor pole) barricade etc. and various other anchorings Composite structure.The structure types such as Gravity Retaining Wall, counterfort wall have been widely used in all kinds of engineerings, to adapt to specific engineering Condition has developed various form of fracture.Friction pile and piled anchor structure have obtained increasingly extensive application since recent two decades, main The advantages of wanting is: 1) flexible arrangement, can be arranged in middle part or the leading edge on landslide, to obtain preferable anti-slippery effect;2) it applies Work safety influences stability of slide body small because working face is small;3) can verify that geologic information in work progress, find the problem can and When remedy.Anti-slide pile structure is commonly used in major landslip processing engineering, such as in yellow Belling's landslide control of Shenzhen area, water shellfish Anti-slide pile structure has been all made of in landslide control and Lian Tang water factory landslide control engineering.But anti-slide pile structure project amount is larger, The utilization rate of material is not high, and engineering cost is very high.In order to improve the stress of stake, the utilization rate of material is improved, anchoring is commonly used Technology cooperates friction pile to use, referred to as piled anchor structure.Piled anchor structure can reduce the design section of stake to a certain extent, but apply Work require it is high, and rich groundwater and to steel be corrosive environment lower bolt (rope) endurance issues it is prominent, total Technical and economy is less desirable on body.
Therefore, it is necessary to it is a kind of can suitable for bottom bearing capacity ground, durability be good and new supporting and retaining system of the height difference greater than 10m Structure technology guarantees the safety and stablization of slope retaining.
Utility model content
In view of the shortcomings of the prior art, the purpose of this utility model is to provide a kind of load retaining wall peg board barricades.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of load retaining wall peg board barricade is provided, Be characterized in that: the fore shaft beam of the lower wall breast boards of upper wall and relieving slab, middle part including top and lower wall rib column and lower part and Cast-in-situ bored pile, the upper wall and relieving slab on top are using rigid connection, the cast-in-situ bored pile of lower the wall breast boards and lower part at middle part It is connected using armored concrete, Shang Qiang connect support by lower wall rib column with lower wall breast boards.
Further:
The thickness of the relieving slab can be divided into several type according to concrete engineering amount, and such as tri- kinds of 0.8m, 1.0m and 1.2m Type, width can be divided into 4.0m and two kinds of specifications of 5.0m, and longitudinal length can be retaining wall length.
Array pitch can be 3.0m between the lower wall rib column, and vertical height can be the difference in height of the outer soil body of foundation pit and hole, cut Face can use upper section for 0.8 × 1.0m, and lower section is the variable cross-section of 0.8 × 1.4m.
The fore shaft beam longitudinal length can be retaining wall length, and width can be 1.4~1.6m, highly can be 1.0m。
The diameter of the cast-in-situ bored pile can be 1.4m, and array pitch can be 3.0m, and length can be according to support engineering Specific requirement value, value range can be 10m~15m.
The ratio between the Shang Qiang and lower wall breast boards height can be 1:1.
The beneficial effects of the utility model are: relieving slab is connect with upper wall using armored concrete, on the one hand reduce wall The soil body is to the soil pressure of lower wall afterwards, and the self weight of earthing body provides a recurvation square i.e. for whole retaining wall structure in another aspect It is contrary with the moment of flexure that soil pressure effect generates on the wall.Therefore soil pressure can be largely reduced, retaining wall is limited The deformation of structure, the effect of balance retaining wall structure section turn moment and whole stability against overturning.It is kept off with traditional cantilevered Cob wall is compared with anchored pile supporting, has that structure is simple, occupy little space, easy construction, durability are good and saving construction cost Etc. distinguishing features.
Detailed description of the invention
The utility model will be further described with reference to the accompanying drawing.
Fig. 1 is the schematic three dimensional views of the utility model;
Fig. 2 is the side schematic view of the utility model.
In figure: wall rib column, 5- fore shaft beam, 6- cast-in-situ bored pile under wall breast boards, 4- under the upper wall of 1-, 2- relieving slab, 3-.
Specific embodiment
Referring to attached drawing, a kind of load retaining wall peg board barricade of the utility model, it is characterised in that: upper wall 1 including top and unload The fore shaft beam 5 and cast-in-situ bored pile 6 of lotus plate 2, the lower wall breast boards 3 at middle part and lower wall rib column 4 and lower part, the upper wall 1 on top With relieving slab 2 using being rigidly connected, the lower wall breast boards 3 at middle part is connect with the cast-in-situ bored pile 6 of lower part using armored concrete, Upper wall 1 connect support by lower wall rib column 4 with lower wall breast boards 3.
In the embodiments of the present invention:
The thickness of the relieving slab 2 is divided into 0.8m, 1.0m and 1.2m three types according to concrete engineering amount, and width is divided into 4.0m and two kinds of specifications of 5.0m, longitudinal length are retaining wall length.
Described 4 array pitch of lower wall rib column are 3.0m, and vertical height is foundation pit and the difference in height for cheating the outer soil body, and section is using upper Section is 0.8 × 1.0m, and lower section is the variable cross-section of 0.8 × 1.4m.
5 longitudinal length of fore shaft beam is retaining wall length, and it is highly 1.0m that width, which is 1.4~1.6m,.
The diameter of the cast-in-situ bored pile 6 is 1.4m, and array pitch is 3.0m, and length takes according to the specific requirement of support engineering Value, value range are 10m~15m.
The ratio between the upper wall 1 and lower 3 height of wall breast boards are 1:1.
When construction:
The first step, first according to geological mapping data, determine retaining wall structure applies position.Drilling is filled in sequence The position of note stake 6 carries out positioning and unwrapping wire, thereby determines that the exact position of later period borehole.It drills followed by impact drill, The effect of pore-forming is monitored in boring procedure in time, 4~5m of every drilling should verify once, before more bit change or at easy shrinkage cavity It should verify and make a record.Steel reinforcement cage should be hung in drilling on smooth place after the completion in advance, should be taken during hanging Reinforcement measure prevents steel reinforcement cage from deforming, the internal diameter of steel reinforcement cage 70mm smaller than casing inner diameter or so.With after-pouring pile foundation part Concrete, the speed that strict control pours, prevents rising of steel cage;To guarantee that the quality of concrete answers superfilled 300mm.
Second step, smooth ground, to superstructure assembling reinforcement, first to lower wall baffle assembling reinforcement, first by longitudinal direction Vertical bar is installed and is bound, and vertical muscle arranges 4, and every diameter is 20mm, is then bound according to the height of lower wall baffle Lateral tie, the diameter of stirrup are 12mm.The followed by steel bar arrangement of 2 part of relieving slab, (specific to introduce), upper wall 1 and off-load Plate 2 uses the reinforcing bar of identical type.
Third step applies bracket and template.Template uses three-ply board wooden form, and careful processing template joint part connects stubble Position uses steel bracket jam-packed, and spillage when preventing casting concrete and vibrating influences the integrality of retaining wall structure.
Last casting concrete.Concreting should be slowly and continuous, and reduction hydration heat of concrete as far as possible is to retaining wall The influence of structure, vibrates immediately after pouring.

Claims (6)

1. a kind of load retaining wall peg board barricade, it is characterised in that: the lower wall breast boards of upper wall and relieving slab, middle part including top and The fore shaft beam and cast-in-situ bored pile of lower wall rib column and lower part, the upper wall and relieving slab on top are using rigid connection, the lower wall at middle part Breast boards and the cast-in-situ bored pile of lower part are connected using armored concrete, and Shang Qiang connect branch by lower wall rib column with lower wall breast boards Support.
2. load retaining wall peg board barricade according to claim 1, it is characterised in that: the thickness of the relieving slab is according to specific work Journey amount is divided into 0.8m, 1.0m and 1.2m three types, and width is divided into 4.0m and two kinds of specifications of 5.0m, and longitudinal length is that retaining wall is long Degree.
3. load retaining wall peg board barricade according to claim 1, it is characterised in that: array pitch is 3.0m between the lower wall rib column, Vertical height is foundation pit and the difference in height for cheating the outer soil body, and section uses upper section for 0.8 × 1.0m, and lower section is 0.8 × 1.4m Variable cross-section.
4. load retaining wall peg board barricade according to claim 1, it is characterised in that: the fore shaft beam longitudinal length is retaining wall Length, width are 1.4~1.6m, are highly 1.0m.
5. load retaining wall peg board barricade according to claim 1, it is characterised in that: the diameter of the cast-in-situ bored pile is 1.4m, array pitch are 3.0m, and for length according to the specific requirement value of support engineering, value range is 10m~15m.
6. load retaining wall peg board barricade according to claim 1, it is characterised in that: the Shang Qiang and lower wall breast boards height it Than for 1:1.
CN201820770038.0U 2018-05-23 2018-05-23 A kind of load retaining wall peg board barricade Active CN208545767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820770038.0U CN208545767U (en) 2018-05-23 2018-05-23 A kind of load retaining wall peg board barricade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820770038.0U CN208545767U (en) 2018-05-23 2018-05-23 A kind of load retaining wall peg board barricade

Publications (1)

Publication Number Publication Date
CN208545767U true CN208545767U (en) 2019-02-26

Family

ID=65421390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820770038.0U Active CN208545767U (en) 2018-05-23 2018-05-23 A kind of load retaining wall peg board barricade

Country Status (1)

Country Link
CN (1) CN208545767U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505537A (en) * 2018-05-23 2018-09-07 中国铁道科学研究院深圳研究设计院 A kind of load retaining wall peg board barricade
CN111395085A (en) * 2020-04-29 2020-07-10 中国铁路经济规划研究院有限公司 Roadbed transition structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505537A (en) * 2018-05-23 2018-09-07 中国铁道科学研究院深圳研究设计院 A kind of load retaining wall peg board barricade
CN111395085A (en) * 2020-04-29 2020-07-10 中国铁路经济规划研究院有限公司 Roadbed transition structure

Similar Documents

Publication Publication Date Title
CN102352632B (en) Anchor rod sheet pile combined structure and method for reinforcing high filling body on one side of slope
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN103225310A (en) Structural design method for load-bearing section of miniature anti-slip compound pile
CN110820763A (en) Truss type cast-in-situ bored pile supporting method for mucky soil deep foundation pit
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN107386285A (en) A kind of novel steel tube pile foundation rock borehole anchorage method
CN108005129A (en) A kind of safeguard structure system and method for controlling tunnel vertical deformation
CN208545767U (en) A kind of load retaining wall peg board barricade
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN108824471A (en) A kind of deep water drift net multi-column pier foundation and its construction method
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN207582471U (en) A kind of Retaining Structure with Double-row Piles equipped with deep layer prestress anchorage cable
CN106149745A (en) A kind of truss type steel tube grouting pile basis and construction method thereof
CN107605488B (en) Drilling shaft and suspension sinking filling reinforcement method thereof
CN201459749U (en) Stable structure for construction platform of deep water steel pipe pile
CN206448285U (en) Without bottom concrete combined type cofferdam under the conditions of formation geology
CN108505537A (en) A kind of load retaining wall peg board barricade
CN106120833A (en) A kind of underground truss-like pile foundation and construction method thereof
CN106245668A (en) A kind of truss-like pile foundation and construction method thereof
CN208996052U (en) The drilling tool of supporting construction and use that foundation pit anchor wall draws anchor supporting to be formed
CN203639929U (en) Split open caisson and pile composite anchor foundation
CN113158294B (en) Design method of slowly-inclined fold line sliding surface side slope deep-buried shear pile supporting structure
CN108035372A (en) A kind of method using drilling platform gooseneck suspension steel lifted trunk
CN210369069U (en) Joint anti structure of floating of karst area foundation ditch
CN209584855U (en) Bridge major diameter precast concrete tubular column basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 22nd Floor, Botai Engineering Exploration Building, No. 8 South Science and Technology Eighth Road, Nanshan High-tech Park, Shenzhen City, Guangdong Province

Patentee after: Academy of Iron Sciences (Shenzhen) Research and Design Institute Co., Ltd.

Address before: 518000 22nd Floor, Botai Engineering Exploration Building, No. 8 South Science and Technology Eighth Road, Nanshan High-tech Park, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN RESEARCH AND DESIGN INSTITUTE OF CARS

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190806

Address after: Great engineering prospecting No. 8 building, eight South Road 518000 South Science and technology in Guangdong province Shenzhen city Nanshan District high tech Park 22

Co-patentee after: China Railway Scientific Research Institute Group Co., Ltd.

Patentee after: Academy of Iron Sciences (Shenzhen) Research and Design Institute Co., Ltd.

Address before: Great engineering prospecting No. 8 building, eight South Road 518000 South Science and technology in Guangdong province Shenzhen city Nanshan District high tech Park 22

Patentee before: Academy of Iron Sciences (Shenzhen) Research and Design Institute Co., Ltd.

TR01 Transfer of patent right