CN208508389U - A kind of three-phase four-wire system cable cord holder - Google Patents

A kind of three-phase four-wire system cable cord holder Download PDF

Info

Publication number
CN208508389U
CN208508389U CN201820875310.1U CN201820875310U CN208508389U CN 208508389 U CN208508389 U CN 208508389U CN 201820875310 U CN201820875310 U CN 201820875310U CN 208508389 U CN208508389 U CN 208508389U
Authority
CN
China
Prior art keywords
movable pulley
pulley
fixed
cable
axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820875310.1U
Other languages
Chinese (zh)
Inventor
吴飞
吴一飞
钱德昌
俞建明
周峰
糜剑刚
钟飞
钟一飞
瞿金浩
沈浩昇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haining Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Haining Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haining Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Haining Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201820875310.1U priority Critical patent/CN208508389U/en
Application granted granted Critical
Publication of CN208508389U publication Critical patent/CN208508389U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a kind of three-phase four-wire system cable cord holders, including the first movable pulley, further include the second movable pulley, third movable pulley and fixed pulley;One end of drawstring is fixed on fixed point, and centre bypasses fixed pulley, and the other end is the free end that can be pulled;The axis of first movable pulley is parallel to the axis of fixed pulley, and the axis spacing of the axis of the first movable pulley and fixed pulley can not increase;One end of movable pulley balance rope is fixed on the second movable pulley, and centre bypasses the first movable pulley, and the other end is fixed on third movable pulley;One end of first traction rope connects the first cable, and centre bypasses the second movable pulley, and the other end connects the second cable;One end of second traction rope connects third cable, and centre bypasses third movable pulley, and the other end connects the 4th cable.The beneficial effects of the utility model are: the confined space operated on bar can be applied, stringing can be carried out to four cables simultaneously, realize perfect stringing effect.

Description

A kind of three-phase four-wire system cable cord holder
Technical field
The utility model belongs to power construction apparatus field, specifically a kind of three-phase four-wire system cable cord holder.
Background technique
In type low-voltage cable erection construction, a step is to carry out stringing to cable.General Low-voltage Transmission uses Three-phase four-wire system can synchronize in route simultaneously and lay 4 cables, therefore need to operate 4 cables one by one when stringing, tight respectively Line.Due to construction personnel's operation all on bar, the space of operation is limited, along with differing greatly for manual control stringing dynamics, Therefore stringing quality is difficult to ensure that the arc sag of four cables differs greatly.Chinese patent literature CN102709855A was in 2012 October 3 disclosed " tensioning method for side phase conductor in distribution line ", comprising the following steps: at tension pole cross arm both ends Leading block is set;An aluminium alloy wire tightener is then passed through after the free end of side phase conductor is bypassed leading block;In aluminium alloy One U-shaped latch closure is set on cord holder;Hauling block with traction rope is wound on to the middle part of balance rope;Finally by balance rope Two free ends are separately fixed in the U-shaped latch closure of two aluminium alloy wire tighteners, by drawing traction rope for two side phase conductors It tenses.The inventor of the program declares that the application of the invention can guarantee that both sides phase conductor is during stringing in distribution line Stress balance, tension pole cross arm will not be made to twist, and the working efficiency of stringing can also be improved.In view of three-phase four It is used in line system to 4 cables, therefore the technical solution is still difficult to meet the stringing needs of three-phase four-wire system.
Summary of the invention
Based on problem above, the utility model provides a kind of three-phase four-wire system cable cord holder, can apply and grasp on bar The confined space of work can carry out stringing to four cables simultaneously, realize perfect stringing effect.
In order to realize goal of the invention, the utility model adopts the following technical solution: a kind of three-phase four-wire system cable cord holder, It further include the second movable pulley, third movable pulley and fixed pulley including the first movable pulley;One end of drawstring is fixed on fixed point, Centre bypasses fixed pulley, and the other end is the free end that can be pulled;The axis of first movable pulley is parallel to the axis of fixed pulley, and The axis of one movable pulley and the axis spacing of fixed pulley can not increase;One end of movable pulley balance rope is fixed on the second movable pulley On, centre bypasses the first movable pulley, and the other end is fixed on third movable pulley;One end of first traction rope connects the first cable, Centre bypasses the second movable pulley, and the other end connects the second cable;One end of second traction rope connects third cable, and centre is around the Three movable pulleys, the other end connect the 4th cable.
The three-phase four-wire system cable cord holder of this programme design, includes 3 movable pulleys and a fixed pulley.Wherein, fixed Pulley is directly connected to drawstring, and one end of drawstring is fixed on fixed point, such as can be on cross-arm, and middle part is around fixed sliding Wheel, free end is held for operator, to carry out stringing operation.The axis of first movable pulley is parallel to the axis of fixed pulley, And first movable pulley axis and the axis spacing of fixed pulley can not increase, such design makes fixed pulley and the first movable pulley structure At a simple pulley blocks, when operator is when pulling drawstring, the first movable pulley can be with the mobile side of fixed pulley To synchronizing moving.On this basis, and a movable pulley balance rope is devised, the both ends of movable pulley balance rope are dynamic with second respectively The wheel axis connection of pulley, third movable pulley, it is intermediate then bypass the first movable pulley, the first movable pulley, the second movable pulley, third are moved Pulley is combined into another pulley blocks.In this pulley blocks, the second movable pulley, third movable pulley can be led respectively by one Messenger respectively connects 2 cables in pulley two sides, this 2 cables is made to realize that dynamic balance and length are flat on the movable pulley at place Weighing apparatus, and the second movable pulley and third movable pulley realize dynamic balance and length balance further through the first movable pulley.It is final to realize connection 4 cables on the second movable pulley, third movable pulley all realize dynamic balance and length balance, make to climb the operation on electric pole Personnel only need the free end for simply pulling drawstring, can be easily accomplished the stringing operation of 4 cables, and between each cable Perfect dynamic balance and length balance are kept, the arc sag difference of four cables is made to keep minimum.First cable, the second cable, Three cables, the 4th cable have no special definition, can be arbitrarily designated to actual 4 cables.
Preferably, being rigid connection between the axis of the first movable pulley and the axis of fixed pulley.The axis of first movable pulley and fixed It is preferred, can be eliminated with the randomness for connecting caused position of restricting with rigid connection between the axis of pulley, help operator high The completion stringing of effect operates.
Preferably, being rigid connection between the axis of the second movable pulley and the axis of third fixed pulley.This design can incite somebody to action The distance between second movable pulley and third movable pulley are fixed, eliminate the hidden danger that the cable of the two connection is wound mutually.
It, then can be with if it is necessary, 4 ends of the first traction rope and the second traction rope can be all connected with a movable pulley This cord holder is extended to the cord holder that can draw 8 cables simultaneously.
In conclusion the beneficial effects of the utility model are: the confined space operated on bar can be applied, it can be simultaneously Stringing is carried out to four cables, realizes perfect stringing effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Wherein: 1 first movable pulley, 2 second movable pulleys, 3 third movable pulleys, 4 fixed pulleys, 5 drawstrings, 6 movable pulleys balance rope, 7 first traction ropes, 8 second traction ropes, the first cable of A, the second cable of B, C third cable, the 4th cable of D.
Specific embodiment
The utility model is further described with specific embodiment with reference to the accompanying drawing.
Embodiment as shown in Figure 1 is a kind of three-phase four-wire system cable cord holder, is exclusively used in the construction of low voltage three-phase four-wire system Stringing.This cord holder includes the first movable pulley 1, the second movable pulley 2, third movable pulley 3 and fixed pulley 4.
One end of drawstring 5 is fixed on fixed point.In this example, one end of stretching is hook, can hook be scheduled on the work on cross-arm In skill hole, makes to stretch and be fixed with cross-arm.The centre of stretching bypasses fixed pulley, and the other end is the free end that can be pulled, for operation Personnel pull operation.The axis of first movable pulley is parallel to the axis of fixed pulley, and the axis of the axis of the first movable pulley and fixed pulley Between with connecting rod realize be rigidly connected.One end of movable pulley balance rope 6 is fixed on the second movable pulley, and centre is dynamic around first Pulley, the other end are fixed on third movable pulley;One end of first traction rope 7 connects the first cable A, and centre is around the second dynamic cunning Wheel, the other end connect the second cable B;One end of second traction rope 8 connects third cable C, and centre bypasses third movable pulley, another The 4th cable D of end connection.Wherein, it is realized and is rigidly connected with connecting rod between the axis of the second movable pulley and the axis of third fixed pulley.
In use, operator pulls the free end of drawstring, the first movable pulley is pulled by fixed pulley, the first movable pulley exists While with fixed pulley synchronizing moving, make to realize dynamic balance and length balance between the second movable pulley and third movable pulley.Second Movable pulley realizes the dynamic balance and length balance between the first cable and the second cable by the first traction rope, and third movable pulley is logical The dynamic balance and length balance between the second traction rope realization third cable and the 4th cable are crossed, it is final to realize that being connected to second moves 4 cables on pulley, third movable pulley all realize dynamic balance and length balance, and making to climb the operator on electric pole only needs The simple free end for pulling drawstring, can be easily accomplished the stringing operation of 4 cables, and keep between each cable perfect Dynamic balance and length balance, so that the arc sag difference of four cables is kept minimum.

Claims (3)

1. a kind of three-phase four-wire system cable cord holder, including the first movable pulley (1), characterized in that further include the second movable pulley (2), third movable pulley (3) and fixed pulley (4);One end of drawstring (5) is fixed on fixed point, and centre bypasses fixed pulley, another End is the free end that can be pulled;The axis of first movable pulley is parallel to the axis of fixed pulley, and the axis of the first movable pulley and fixed The axis spacing of pulley can not increase;One end of movable pulley balance rope (6) is fixed on the second movable pulley, and centre is dynamic around first Pulley, the other end are fixed on third movable pulley;One end of first traction rope (7) connects the first cable (A), and centre bypasses second Movable pulley, the other end connect the second cable (B);One end of second traction rope (8) connects third cable (C), and centre bypasses third Movable pulley, the other end connect the 4th cable (D).
2. a kind of three-phase four-wire system cable cord holder according to claim 1, characterized in that the axis of the first movable pulley and fixed It is rigid connection between the axis of pulley.
3. a kind of three-phase four-wire system cable cord holder according to claim 1 or 2, characterized in that the axis of the second movable pulley It is rigid connection between the axis of third fixed pulley.
CN201820875310.1U 2018-06-05 2018-06-05 A kind of three-phase four-wire system cable cord holder Active CN208508389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820875310.1U CN208508389U (en) 2018-06-05 2018-06-05 A kind of three-phase four-wire system cable cord holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820875310.1U CN208508389U (en) 2018-06-05 2018-06-05 A kind of three-phase four-wire system cable cord holder

Publications (1)

Publication Number Publication Date
CN208508389U true CN208508389U (en) 2019-02-15

Family

ID=65287936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820875310.1U Active CN208508389U (en) 2018-06-05 2018-06-05 A kind of three-phase four-wire system cable cord holder

Country Status (1)

Country Link
CN (1) CN208508389U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115411659A (en) * 2022-08-29 2022-11-29 国网江苏省电力有限公司泰州供电分公司 Wire tightener and cable tightening method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115411659A (en) * 2022-08-29 2022-11-29 国网江苏省电力有限公司泰州供电分公司 Wire tightener and cable tightening method
CN115411659B (en) * 2022-08-29 2023-09-08 国网江苏省电力有限公司泰州供电分公司 Cable tensioning method

Similar Documents

Publication Publication Date Title
CN100464474C (en) Live line replacing method high voltage transmission line strain insulator-string and device
CN102290742B (en) Tension stringing construction technology
CN205429581U (en) A locking lever structure for electron field
CN101582572B (en) Method of extra-high voltage tension stringing
JP5812325B2 (en) Electric wire tension reduction device and electric wire tension reduction method
CN102354926A (en) Large-section conductor tension stringing construction method
CN105914657B (en) Portable double plate circulation turnbuckle and its line tightening method of application
CN107240889B (en) Method for replacing long-distance multi-bundle conductor
CN208508389U (en) A kind of three-phase four-wire system cable cord holder
CN215772467U (en) Auxiliary support insulating fixture for bypass flexible cable lap joint overhead line
CN102403673A (en) Novel 2* one-drag-three tension stringing construction process
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN209282719U (en) A kind of console mode wire tensioning device for transmission line of electricity
CN202633831U (en) Manual multifunctional wire tensioning device
KR20080078104A (en) Method of construction a helicopter transmission of electricity line use rope ultra high molecular weight poly-ethylene
CN102709855A (en) Tension method of phase conductor used in distribution wire
CN202672034U (en) Cable threading plate of steel strand of stay cable
CN105024312A (en) Steel wire rope cable net sleeve
CN102709849A (en) Manual multifunctional wire tightening device and wire tightening method
CN216016275U (en) Wire tightening device
CN210326721U (en) Overhead line erecting tool
CN207098491U (en) Power circuit stringing fixing-line device
CN111478228B (en) Butt joint method of multi-split large-section lead and strain insulator string
CN204203526U (en) Double-edge type ADSS Strain clamp for optical cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant